CN114205007B - 5G terminal rapid test system and method based on test sequence - Google Patents

5G terminal rapid test system and method based on test sequence Download PDF

Info

Publication number
CN114205007B
CN114205007B CN202111420033.8A CN202111420033A CN114205007B CN 114205007 B CN114205007 B CN 114205007B CN 202111420033 A CN202111420033 A CN 202111420033A CN 114205007 B CN114205007 B CN 114205007B
Authority
CN
China
Prior art keywords
test
terminal
radio frequency
sequence
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111420033.8A
Other languages
Chinese (zh)
Other versions
CN114205007A (en
Inventor
张郑洪
凌云志
张煜
孙昊
王先鹏
邵玉成
陈凤林
袁作涛
李恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Clp Kesiyi Technology Anhui Co ltd
Original Assignee
Clp Kesiyi Technology Anhui Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Clp Kesiyi Technology Anhui Co ltd filed Critical Clp Kesiyi Technology Anhui Co ltd
Priority to CN202111420033.8A priority Critical patent/CN114205007B/en
Publication of CN114205007A publication Critical patent/CN114205007A/en
Application granted granted Critical
Publication of CN114205007B publication Critical patent/CN114205007B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/10Monitoring; Testing of transmitters
    • H04B17/15Performance testing
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/20Monitoring; Testing of receivers
    • H04B17/29Performance testing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Monitoring And Testing Of Transmission In General (AREA)

Abstract

The invention discloses a 5G terminal rapid test system and a method based on a test sequence, which belong to the field of 5G mobile communication terminal test, wherein the test system comprises a terminal test equipment platform, a test terminal and a test instrument; the terminal test equipment platform is a control module in the whole system, performs service scheduling on the whole test flow, and controls the test terminal and the test instrument through the communication module to complete the test and data statistics of the terminal; the test terminal is placed in a terminal test equipment fixture; the test instrument completes the test of the test terminal. The test method adopts the system, a test sequence is preset during test, and then the switching of radio frequency and the acquisition of data are controlled through the cooperation of software and hardware, so that the instrument can conduct mass test in a short time, the test speed is increased, and the test time of the production line of the 5G terminal is greatly saved. The invention can measure signals in different frequency bands, different bandwidths, different powers and different modulation modes, and improves the test efficiency of the production line.

Description

5G terminal rapid test system and method based on test sequence
Technical Field
The invention belongs to the field of 5G mobile communication terminal testing, and particularly relates to a 5G terminal rapid testing system and method based on a testing sequence.
Background
The 5G technology is mature, and with the rapid development of industry, the 5G terminals are oriented to the market, and accordingly, the testing problem in the production process is caused. The large capacity and large bandwidth of 5G brings about improvement of data volume, and the conventional test method cannot meet the rapid test requirement of the production line, so that a test method capable of improving the test efficiency of the production line and reducing the time cost is needed.
Disclosure of Invention
In order to ensure the product quality and also consider the time cost, the invention provides a 5G terminal rapid test system and a 5G terminal rapid test method based on a test sequence, which are improved on the basis of the traditional test method, the test sequence is added, and the switching of radio frequency and the acquisition of data are controlled through the cooperation of software and hardware, so that the instrument performs a large amount of test in a short time, the test speed is increased, and the test time of a 5G terminal production line is greatly saved.
The technical scheme of the invention is as follows:
A5G terminal rapid test system based on a test sequence comprises a terminal test equipment platform, a test terminal and a test instrument;
the test terminal is placed in a terminal test equipment fixture;
The test instrument is used for testing the test terminal;
The terminal test equipment platform is responsible for carrying out service scheduling on the formulated whole test flow, and controls the test terminal and the test instrument through the communication module to complete the test and data statistics of the terminal.
Further, the test flow is determined by a manually pre-configured test sequence, and the test sequence includes time of the test flow, frequency point of the test, power and related parameters of the test signal.
Further, the test sequence contains control information for the test terminal and the test meter, which control the test meter and the test terminal to perform signal generation and reception through the same rhythm, and send and receive fixed signals at fixed time points.
Further, the test instrument comprises a radio frequency hardware module and a baseband processing module, and information exchange is carried out between the radio frequency hardware module and the baseband processing module through an SPI interface of the FPGA.
Further, radio frequency connection is established between the test terminal and the radio frequency hardware module, the FPGA controls the radio frequency hardware to switch frequency points and power through SPI, and collection of information data of the test terminal is completed.
The 5G terminal rapid test method based on the test sequence adopts the 5G terminal rapid test system based on the test sequence to test, and specifically comprises the following steps:
S1, manually pre-configuring a test sequence, wherein the sequence comprises the time of each test flow, and the frequency point, the power and the related parameters of a test signal tested in each test flow;
s2, the terminal test equipment platform simultaneously sends the test sequence to the test terminal and the test instrument;
s3, after the software in the test instrument receives the test sequence, calculating a configuration value of a corresponding radio frequency register according to configuration of radio frequency points, power and the like in the test sequence, and generating a corresponding time axis according to the time length of each measurement period;
S4, after the starting time of the test terminal and the test instrument is synchronous, timing is started, the FPGA sends the value of the radio frequency control register to the radio frequency hardware through the SPI interface at a corresponding time point, so that accurate radio frequency control is achieved, and data acquisition of the test terminal is completed.
Further, the 5G terminal is rapidly tested by combining software and hardware; on a hardware side, the radio frequency of the test instrument is that the FPGA controls a transmitting frequency point, transmitting power, a receiving frequency point and receiving power through an SPI interface; and generating radio frequency control parameters of the instrument at a software side according to the issued manually preconfigured test sequence.
Further, the RF control parameter form of the instrument is an array, wherein the array comprises two types of information, one type is special information comprising time information, and the other type is common information only comprising the address and the value of a control RF register; one piece of special information corresponds to one group of common information; according to the time planning in each testing sub-flow in the testing sequence, calculating the time point of radio frequency switching, writing the information into an array firstly, then writing the radio frequency control information corresponding to the time point backwards in sequence until the information of the array is written, calculating the next time point to generate and write the next information, and finally writing the generated complete control sequence into the DDR; the sequence contains the configuration of the radio frequency controlled registers and the point in time at which the configuration needs to be validated.
The invention has the beneficial technical effects that:
The test sequence is added, and the switching of radio frequency and the acquisition of data are controlled through the cooperation of software and hardware, so that the instrument performs a large number of tests in a short time, the test speed is accelerated, the test time of a 5G terminal production line is greatly saved, and the time cost is reduced; the requirement of a terminal production line on 5G terminal comprehensive test instrument equipment is met; by adopting the method of test sequence control, signal measurement with different frequency bands, different bandwidths, different powers and different modulation modes can be performed, and the test efficiency of the production line is improved.
Drawings
FIG. 1 is a block diagram of a 5G terminal rapid test system architecture based on test sequences of the present invention;
fig. 2 is a schematic design block diagram of a 5G terminal rapid test method based on a test sequence.
Detailed Description
The invention is described in further detail below with reference to the attached drawings and detailed description:
The invention provides a 5G terminal rapid test system and a 5G terminal rapid test method based on a test sequence, which mainly aim at the rapid test requirement on a 5G terminal production line, realize the requirement of performing a large number of tests in a very short time through the control of the test sequence, and greatly improve the test efficiency.
The test sequence mainly refers to that in order to complete a test target, the characteristic of a tested terminal is combined, a test flow is planned, and a test sequence is artificially set, wherein the test sequence defines the time of each test flow in the test, and the frequency point, the power and the related parameters of a test signal, such as bandwidth, a modulation mode, a channel type, an RB number and the like, which are tested in each test flow. The sequence contains control information for the test instrument and the test terminal, and mainly aims to enable the test instrument and the test terminal to generate and receive signals through the same rhythm, and send and receive fixed signals at fixed time points, so that the purpose of rapid measurement is achieved.
The test system and the test method are mainly realized by combining software and hardware. On the hardware side, the radio frequency of the test instrument mainly comprises an FPGA (field programmable gate array) for controlling a transmitting frequency point, transmitting power, a receiving frequency point and receiving power through an SPI (serial peripheral interface). Because the minimum test time requirement reaches microsecond level, the traditional method for controlling the radio frequency in real time cannot meet the requirement of rapid test, and the method needs to be matched with a software side at the moment to realize rapid control of the radio frequency.
On the software side, in order to meet the test requirement, according to the issued manually preconfigured test sequence, the radio frequency control parameters of the instrument are generated. The parameter is in the form of an array, which contains two types of information, one type is special information containing time information, and the other type is common information only containing the address and the value of the control radio frequency register. One piece of special information corresponds to a set of general information. According to the time planning in each test sub-flow in the test sequence, calculating the time point of radio frequency switching, writing the information into an array, then writing the radio frequency control information corresponding to the time point backwards in sequence until the information of the group is written, calculating the next time point to generate and write the next information, and finally writing the generated complete control sequence into the DDR, wherein the sequence comprises the register configuration of radio frequency control and the time point of the configuration needing to be effective. The whole test sequence takes time as a base point, and corresponding operations are carried out at specific time points, including control of radio frequency and data acquisition and measurement. By combining software and hardware, the rapid measurement of the 5G terminal in the extremely short time specified by the test sequence is realized. In the scheme, the radio frequency control based on the test sequence has extremely high requirement on time precision, and the time required by the radio frequency control to take effect is added, so that the software side needs to fully consider the two points when generating the radio frequency control sequence, and then combines the test requirement to achieve accurate radio frequency control and test.
The test method is mainly applied to 5G terminal production line test, and the whole test system is mainly divided into 3 parts as shown in figure 1: terminal test equipment platform, test terminal, test instrument. The terminal test equipment platform is a control module in the whole system, and is mainly used for carrying out service scheduling on the whole test flow, so as to realize test and data statistics of the test terminal, and the terminal test equipment platform is mainly used for controlling the other two parts through a communication module: one is a test terminal which is placed in a terminal test equipment fixture; the other is a test instrument, and the test of the test terminal is mainly realized by the test instrument.
The test instrument comprises a radio frequency hardware module and a baseband processing module, and information exchange is carried out between the radio frequency hardware module and the baseband processing module through an SPI interface of the FPGA. The test terminal and the radio frequency hardware module are connected by radio frequency, the FPGA controls the radio frequency hardware to switch frequency points and power through SPI, and the acquisition of information data of the test terminal is completed.
The 5G terminal rapid test method based on the test sequence is the core of the test instrument, and completes the rapid switching control of the radio frequency and the terminal measurement, and the schematic block diagram is shown in figure 2. The FPGA controls the radio frequency hardware to switch frequency points and power through SPI, and for accurate control, a control sequence is required to be generated through calculation, and the corresponding control register value is sent at the corresponding time point, so that the signal transmission of the test terminal and the signal reception of the test instrument are in a completely aligned state, and equipment automation test is performed.
The implementation of the whole test method mainly comprises the cooperation of a software algorithm and FPGA logic, and the control of radio frequency hardware is realized through an SPI interface of the FPGA, so that corresponding measurement is carried out. The equipment platform sends the test sequence to the test terminal and the test instrument simultaneously, and the test terminal and the test instrument start timing at the same time point in a time synchronization mode. After receiving the test sequence, the instrument software calculates the configuration value of the corresponding radio frequency register according to the configuration of the radio frequency point, the power and the like in the test sequence, and generates a corresponding time axis according to the time length of each measurement period. After the test terminal and the test instrument start time are synchronized, timing starts, and the FPGA can send the value of the radio frequency control register to the radio frequency hardware through the SPI interface at the corresponding time point, so that the aim of accurate radio frequency control is achieved.
Summarizing, a 5G terminal rapid test method based on a test sequence comprises the following steps:
step 1, manually pre-configuring a test sequence, wherein the sequence comprises the time of each test flow, and the frequency point, the power and the related parameters of a test signal tested in each test flow;
Step 2, the terminal test equipment platform simultaneously transmits the test sequence to the test terminal and the test instrument;
Step 3, after the software in the test instrument receives the test sequence, calculating a configuration value of a corresponding radio frequency register according to the configuration of radio frequency points, power and the like in the test sequence, and generating a corresponding time axis according to the time length of each measurement period;
and 4, after the starting time of the test terminal and the test instrument is synchronized, starting timing, and sending the value of the radio frequency control register to the radio frequency hardware through the SPI interface at a corresponding time point by the FPGA so as to achieve accurate radio frequency control and complete the acquisition of the data of the test terminal.
The test method is suitable for the scenes of terminal transmitter test, terminal receiver test and simultaneous test of the terminal transmitter and the terminal receiver. For these three typical test scenarios, different measurement controls are performed separately.
Terminal transmitter test: the method mainly tests a transmitter of a terminal and carries out comprehensive analysis and test on a time domain, a frequency domain and a demodulation domain of a 5G terminal signal. The terminal and the test instrument are respectively controlled by the equipment issuing control instructions, and the transmitter indexes under different frequency points, different bandwidths and different powers are rapidly tested through the test sequences.
Terminal receiver measurement: the method mainly tests the receiver of the terminal, and performs maximum input level test, reference sensitivity test, RSSI detection and the like of the 5G terminal.
The terminal transmitter and receiver simultaneously measure: and (3) the signal transmission of the instrument, the signal reception of the terminal, the signal generation of the terminal and the signal reception of the instrument are correspondingly carried out, the synchronization of the instrument signals is respectively completed at the same time, and the two test sequences are carried out simultaneously to complete the test.
Compared with the independent test of the two, the requirements of the transmitter and the receiver on the radio frequency control are more strict, and the test sequences of the transmitter and the receiver are required to be aligned strictly so as to meet the test requirements, realize the comprehensive test of the 5G terminal production line, improve the test efficiency and ensure the product quality.
It should be understood that the above description is not intended to limit the invention to the particular embodiments disclosed, but to limit the invention to the particular embodiments disclosed, and that the invention is not limited to the particular embodiments disclosed, but is intended to cover modifications, adaptations, additions and alternatives falling within the spirit and scope of the invention.

Claims (4)

1. A5G terminal rapid test method based on a test sequence is characterized in that a 5G terminal rapid test system based on the test sequence is adopted, and the 5G terminal rapid test system comprises a terminal test equipment platform, a test terminal and a test instrument;
the test terminal is placed in a terminal test equipment fixture;
The test instrument is used for testing the test terminal;
the terminal test equipment platform is responsible for carrying out service scheduling on the formulated whole test flow, and controls the test terminal and the test instrument through the communication module to complete the test and data statistics of the terminal;
The test sequence comprises control information for the test terminal and the test instrument, the test instrument and the test terminal are controlled to send and receive signals through the same rhythm, and fixed signals are sent and received at fixed time points;
The quick test method of the 5G terminal specifically comprises the following steps:
S1, manually pre-configuring a test sequence, wherein the sequence comprises the time of each test flow, and the frequency point, the power and the related parameters of a test signal tested in each test flow;
s2, the terminal test equipment platform simultaneously sends the test sequence to the test terminal and the test instrument;
S3, after the software in the test instrument receives the test sequence, calculating the value of a corresponding radio frequency control register according to the configuration of radio frequency points and power in the test sequence, and generating a corresponding time axis according to the time length of each measurement period;
S4, after the starting time of the test terminal and the test instrument is synchronized, starting timing, the FPGA sends the value of the radio frequency control register to the radio frequency hardware through the SPI interface at a corresponding time point, so that accurate radio frequency control is achieved, and the acquisition of test terminal data is completed;
The 5G terminal is rapidly tested by combining software and hardware; on a hardware side, the radio frequency of the test instrument mainly comprises an FPGA (field programmable gate array) for controlling a transmitting frequency point, transmitting power, a receiving frequency point and receiving power through an SPI (serial peripheral interface); on a software side, according to a manually preconfigured test sequence issued, generating radio frequency control parameters of the instrument;
The radio frequency control parameter form of the instrument is an array, wherein the array comprises two types of information, one type is special information comprising time information, and the other type is common information only comprising the address and the value of a control radio frequency register; one piece of special information corresponds to one group of common information; according to the time planning in each test sub-flow in the test sequence, calculating the time point of radio frequency switching, writing the information into an array, then writing the radio frequency control information corresponding to the time point backwards in sequence until the information of the group is written, calculating the next time point to generate and write the next information, and finally writing the generated complete control sequence into the DDR, wherein the sequence comprises the register configuration of radio frequency control and the time point of the configuration needing to be effective.
2. The method for testing the 5G terminal according to claim 1, wherein the test procedure is determined by a manually preconfigured test sequence, and the test sequence includes a time of the test procedure, a frequency point of the test, power, and a test signal related parameter.
3. The method for rapidly testing the 5G terminal based on the test sequence according to claim 1, wherein the test instrument comprises a radio frequency hardware module and a baseband processing module, and information exchange is performed between the radio frequency hardware module and the baseband processing module through an SPI interface of an FPGA.
4. The method for rapidly testing the 5G terminal based on the test sequence according to claim 3, wherein the test terminal and the radio frequency hardware module are connected by radio frequency, the FPGA controls the radio frequency hardware to switch frequency points and power through SPI, and the acquisition of information data of the test terminal is completed.
CN202111420033.8A 2021-11-26 2021-11-26 5G terminal rapid test system and method based on test sequence Active CN114205007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111420033.8A CN114205007B (en) 2021-11-26 2021-11-26 5G terminal rapid test system and method based on test sequence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111420033.8A CN114205007B (en) 2021-11-26 2021-11-26 5G terminal rapid test system and method based on test sequence

Publications (2)

Publication Number Publication Date
CN114205007A CN114205007A (en) 2022-03-18
CN114205007B true CN114205007B (en) 2024-04-19

Family

ID=80649120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111420033.8A Active CN114205007B (en) 2021-11-26 2021-11-26 5G terminal rapid test system and method based on test sequence

Country Status (1)

Country Link
CN (1) CN114205007B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117615407B (en) * 2023-12-08 2024-09-27 广州通则康威科技股份有限公司 Automatic test method and device for WiFi performance and terminal equipment

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0708546A2 (en) * 1994-10-21 1996-04-24 Deutsche Telekom AG QAM communication method
US6993069B1 (en) * 1997-12-19 2006-01-31 Siemens Information And Communication Networks, S.P.A. Simulation process of radiofrequency scenario in radio mobile environment and testing system employing said process
CN1805313A (en) * 2005-11-21 2006-07-19 海信集团有限公司 Quick parallel radio frequency test system and test method for mobile terminals
CN102820936A (en) * 2012-02-23 2012-12-12 沈阳理工大学 Distributed type differential frequency hopping communication test system
CN103209038A (en) * 2013-03-21 2013-07-17 大唐联仪科技有限公司 Method, device and system for testing radio-frequency performance of terminals
CN107390109A (en) * 2017-06-09 2017-11-24 苏州迅芯微电子有限公司 The automatically testing platform and its Software Architecture Design method of high-speed ADC chip
WO2018040355A1 (en) * 2016-08-31 2018-03-08 中兴通讯股份有限公司 Radio frequency detection method and system
CN108040345A (en) * 2018-01-18 2018-05-15 深圳信息通信研究院 A kind of 4G mobile terminals LTE conducted emission power automated detection systems
CN108377171A (en) * 2018-03-21 2018-08-07 北京东方计量测试研究所 A kind of ad hoc network equipment radio frequency integrated test system for performance
CN112751968A (en) * 2020-12-30 2021-05-04 中电科仪器仪表(安徽)有限公司 5G terminal testing device and testing method based on cloud testing platform

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5723396B2 (en) * 2013-02-18 2015-05-27 アンリツ株式会社 Signal generation apparatus, mobile communication terminal test apparatus including the same, signal generation method, and mobile communication terminal test method
JP6450344B2 (en) * 2016-06-17 2019-01-09 アンリツ株式会社 Mobile terminal test apparatus and transmitting antenna test method
US20210157696A1 (en) * 2019-11-22 2021-05-27 Rohde & Schwarz Gmbh & Co. Kg Radio frequency test and measurement device, system and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0708546A2 (en) * 1994-10-21 1996-04-24 Deutsche Telekom AG QAM communication method
US6993069B1 (en) * 1997-12-19 2006-01-31 Siemens Information And Communication Networks, S.P.A. Simulation process of radiofrequency scenario in radio mobile environment and testing system employing said process
CN1805313A (en) * 2005-11-21 2006-07-19 海信集团有限公司 Quick parallel radio frequency test system and test method for mobile terminals
CN102820936A (en) * 2012-02-23 2012-12-12 沈阳理工大学 Distributed type differential frequency hopping communication test system
CN103209038A (en) * 2013-03-21 2013-07-17 大唐联仪科技有限公司 Method, device and system for testing radio-frequency performance of terminals
WO2018040355A1 (en) * 2016-08-31 2018-03-08 中兴通讯股份有限公司 Radio frequency detection method and system
CN107390109A (en) * 2017-06-09 2017-11-24 苏州迅芯微电子有限公司 The automatically testing platform and its Software Architecture Design method of high-speed ADC chip
CN108040345A (en) * 2018-01-18 2018-05-15 深圳信息通信研究院 A kind of 4G mobile terminals LTE conducted emission power automated detection systems
CN108377171A (en) * 2018-03-21 2018-08-07 北京东方计量测试研究所 A kind of ad hoc network equipment radio frequency integrated test system for performance
CN112751968A (en) * 2020-12-30 2021-05-04 中电科仪器仪表(安徽)有限公司 5G terminal testing device and testing method based on cloud testing platform

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
Design and Application of Portable Distribution Automation Terminal Detector;Chong Ruan等;《2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)》;20190627;全文 *
LTE FDD射频终端自动测试解决方案;丁宝军;耿爱成;;沈阳工程学院学报(自然科学版);20160415(02);全文 *
卫星通信地面终端射频一致性测试及仿真分析;王硕;王兵;李昌华;邹光南;;航天器工程;20131015(05);全文 *
基于FPGA和LabVIEW的虚拟频率特性测试仪设计;郭睿楠;李冶;王义涛;;实验室研究与探索;20160515(05);全文 *
基于VXI总线的电子装备自动测试系统研究;梁四洋, 崔少辉;兵工自动化;20030215(01);全文 *
基于软件无线电的电台综合测试系统研究;杨文举;黄天波;;电子测试;20120805(08);全文 *
适用于海上卫星通信终端的快速测试系统;饶浩;梁显锋;张津舟;田野;谌德军;安军社;;电讯技术;20200128(01);全文 *

Also Published As

Publication number Publication date
CN114205007A (en) 2022-03-18

Similar Documents

Publication Publication Date Title
CN101137178B (en) GSM base station voice service automatic testing equipment and method
CN105610522A (en) Detection system and method for universal Beidou radio frequency module
CN114205007B (en) 5G terminal rapid test system and method based on test sequence
KR100268231B1 (en) An apparatus and method for air interface simulation
CN103592637B (en) Method and device for testing digital array module transmitting channel phase congruency
WO2011160415A1 (en) Multi-channel test means and method for radio remote unit
CN101977393A (en) Received signal quality indicator (RSQI) testing method and device
CN110572223A (en) Calibration method of radio frequency baseband integrated terminal automatic test system
WO2013000302A1 (en) Method and device for generating test signal of remote radio unit
US20220276329A1 (en) Intelligent instrument verification system and method
CN112882069B (en) Single-flow multi-index test evaluation method and system for satellite navigation terminal
CN113365286A (en) Wireless network performance test method, system and computer storage medium
CN111431647A (en) Passive antenna array beam forming test system and test method
CN106559276B (en) Throughput testing method and device for multiple terminals
CN1677907B (en) Method for calibrating a transmitter and a receiver path of a communication device and test system therefor
CN108040345B (en) Automatic detection system for LTE conduction transmitting power of 4G mobile terminal
CN112988489A (en) Method, device, equipment and storage medium for testing radio frequency chip
CN211656395U (en) 5G multichannel wireless base station radio frequency unit parallel test system
CN212259350U (en) Wireless network performance test system
CN108200545B (en) WLAN signaling test system and test method
CN104618930A (en) Multi-antenna testing system calibration method and device
CN204886982U (en) Ultrashort wave radio station terminal test appearance
CN101400077A (en) Signal simulating device and method used in time preact test
CN101572907B (en) Time switch template test method for TD-SCDMA terminal
CN102395151A (en) Test method, system and device of mobile terminal switching

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant