CN114178323A - 热轧双相钢层流冷却喷射集管的冷却水流量获取方法 - Google Patents

热轧双相钢层流冷却喷射集管的冷却水流量获取方法 Download PDF

Info

Publication number
CN114178323A
CN114178323A CN202111269299.7A CN202111269299A CN114178323A CN 114178323 A CN114178323 A CN 114178323A CN 202111269299 A CN202111269299 A CN 202111269299A CN 114178323 A CN114178323 A CN 114178323A
Authority
CN
China
Prior art keywords
cooling
temperature
section
header
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111269299.7A
Other languages
English (en)
Other versions
CN114178323B (zh
Inventor
陈全忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN202111269299.7A priority Critical patent/CN114178323B/zh
Publication of CN114178323A publication Critical patent/CN114178323A/zh
Application granted granted Critical
Publication of CN114178323B publication Critical patent/CN114178323B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • B21B37/76Cooling control on the run-out table
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B45/0218Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B45/0233Spray nozzles, Nozzle headers; Spray systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2261/00Product parameters
    • B21B2261/20Temperature
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)
  • Heat Treatment Of Strip Materials And Filament Materials (AREA)
  • Control Of Heat Treatment Processes (AREA)

Abstract

本发明涉及一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法,该方法采用多段冷却方式,通过理论分析建立了层流冷却过程中二维轧件温度场计算模型,基于设定的层流冷却工艺布置、多段冷却策略,根据建立的水冷换热系数与水冷流量密度的关系,采用温度计算模型计算轧件截面温度分布,根据各冷却段终止计算位置处的轧件表面温度与目标冷却温度的差值,采用优化算法修正各冷却段的喷射集管的冷却水流量。本发明适用于热轧双相钢层流冷却过程中各喷射集管冷却水流量的在线预设定计算,使轧件温度快速精准地冷却到目标冷却温度,提高热轧双相钢层流冷却温度的控制精度,以获得体积分数满足工艺要求的铁素体与马氏体的混合组织。

Description

热轧双相钢层流冷却喷射集管的冷却水流量获取方法
技术领域
本发明属于热轧技术领域,具体涉及一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法。
背景技术
层流冷却装置是控制热轧带钢冷却温度,以实现微观组织精准控制的关键设备,其布置形式主要由一定数量的喷射集管及控制阀组成,通过控制喷射集管的开闭及冷却水流量,实现轧件温度控制。
热轧双相钢成品的微观组织为铁素体与马氏体,其中铁素体占比约80%,马氏体占比约20%,其轧后低温卷取工艺的层流冷却过程主要包括三个阶段:首先快速冷却到铁素体相变区的“鼻温”附近,然后在铁素体相变区缓冷以获得体积分数约80%的铁素体,最后快速冷却到马氏体相变区获得体积分数约20%的马氏体。而对于不同厚度或速度的热轧双相钢带钢,要实现该冷却过程,采用的各喷射集管冷却水流量的预设定值是不同的。现场生产情况表明,由于喷射集管冷却水流量的预设定值误差较大,导致轧件温度前馈控制精度较低,使得层流冷却控制系统需要较长的调节时间才能使轧件冷却温度与目标冷却温度相吻合,这期间会产生较多的废品,降低了成品收得率。
综上所述,需要进一步开发适用于热轧双相钢层流冷却喷射集管的冷却水流量获取方法。
发明内容
本发明的目的在于克服现有技术之缺陷,提供了一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法,用于解决热轧双相钢层流冷却过程中的喷射集管冷却水流量预设定误差较大,导致轧件温度前馈控制精度较低的问题。
本发明的技术方案是这样实现的:本发明公开了一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法,包括如下步骤:
S1、构造层流冷却系统的工艺布置,并获取工艺参数;
S2、建立水冷换热系数与水冷流量密度的关系;
S3、划分轧件宽向-厚向截面网格节点,并建立各节点的坐标系参数及温度计算模型;
S4、将层流冷却系统分成多个冷却段,设定各冷却段的起始计算位置、终止计算位置、目标冷却温度及冷却温度控制精度;设定各冷却段首次计算时全部喷射集管均为关闭状态;
S5、从首个冷却段开始,依次计算各冷却段的各喷射集管冷却水流量的预设定值,根据指定冷却段设定的各喷射集管的冷却水流量,从该冷却段的起始计算位置到终止计算位置,计算该冷却段的轧件截面温度分布;判断该冷却段的终止计算位置处的轧件表面温度与目标冷却温度之差是否满足冷却温度控制精度;
S51、若满足,则该冷却段计算结束,转入步骤S6;
S52、若不满足,则从该冷却段的首个喷射集管开始,每开启一个喷射集管后,若该喷射集管的现有冷却水流量未达到最大流量,则修正该喷射集管的冷却水流量,计算该冷却段的轧件截面温度分布,直至该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度,不再开启该冷却段的后续喷射集管,该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;若该喷射集管的冷却水流量已达到最大流量,则开启该冷却段的下一个喷射集管;
S6、判断该冷却段是否为最后一个冷却段,若该冷却段是最后一个冷却段,则表明最后一个冷却段计算完成,计算结束,若该冷却段不是最后一个冷却段,则转入步骤S5继续计算下一个冷却段。
进一步地,将层流冷却系统沿轧件长度方向分成第一冷却段、第二冷却段及第三冷却段,其中,第一冷却段与第三冷却段为快冷段,第二冷却段为缓冷段。
进一步地,步骤S1中获取的工艺参数包括喷射集管数量以及各喷射集管的中心位置、喷射宽度、喷射区域长度及最大冷却水流量以及轧件的厚度、宽度、速度、初始温度和热物性参数。
进一步地,步骤S2中建立水冷换热系数与水冷流量密度的关系由水冷试验获得,根据试验结果数据由线性插值法计算相应水冷流量密度条件下对应的水冷换热系数。
进一步地,步骤S3中划分轧件宽向-厚向截面网格节点,并建立各节点的坐标系参数及温度计算模型,具体为:建立y-z直角坐标系,其中y轴位于轧件中间厚度位置处,z轴位于轧件中间宽度位置处,将轧件二分之一的宽向-厚向横截面离散成N×M个网格,其中轧件半宽等分为N段,i=1、2、3...N,网格宽度为
Figure BDA0003328107210000031
轧件半厚等分为M段,j=1、2、3...M,网格厚度为
Figure BDA0003328107210000032
Δzi,j=Δzi,j-1=Δzi,j+1=Δz,其中Δzi,j为轧件节点(i,j)对应单元的厚向长度,Δzi,j-1为轧件节点(i,j-1)对应单元的厚向长度,Δzi,j+1为轧件节点(i,j+1)对应单元的厚向长度;
根据节点所处的位置,分为内部节点、表面节点、端部节点、芯部节点及角部节点;
(1)对于内部节点,其序号可以表示为(i,j),i=2、3、4...N-1,j=2、3、4...M-1,节点(i,j)横坐标为:
Figure BDA0003328107210000033
纵坐标为:
Figure BDA0003328107210000041
其温度计算模型表达式为:
Figure BDA0003328107210000042
(2)对于表面节点,其序号可表示为(i,M),i=2、3、4...N-1,节点(i,M)横坐标为
Figure BDA0003328107210000043
纵坐标为
Figure BDA0003328107210000044
若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则其温度计算模型表达式为:
Figure BDA0003328107210000045
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则其温度计算模型表达式为:
Figure BDA0003328107210000046
(3)对于端部节点,其序号可表示为(N,j),j=2、3、4...M-1,节点(N,j)横坐标为
Figure BDA0003328107210000047
纵坐标为
Figure BDA0003328107210000048
其温度计算模型表达式为:
Figure BDA0003328107210000049
(4)对于芯部节点,其中厚度芯部端面节点的序号可表示为(i,1),i=2、3、4...N-1,横坐标为
Figure BDA00033281072100000410
纵坐标为
Figure BDA00033281072100000411
宽度芯部端面节点的序号可表示为(1,j),j=2、3、4...M-1,横坐标为
Figure BDA00033281072100000412
纵坐标为
Figure BDA0003328107210000051
对于厚向芯部节点,则其温度计算模型表达式为:
Figure BDA0003328107210000052
对于宽向芯部节点,则其温度计算模型表达式为:
Figure BDA0003328107210000053
(5)对于角部节点,其中左上角部节点序号为(1,M),横坐标为
Figure BDA0003328107210000054
纵坐标为
Figure BDA0003328107210000055
右上角部节点序号为(N,M),横坐标为
Figure BDA0003328107210000056
纵坐标为
Figure BDA0003328107210000057
左下角部节点序号为(1,1),横坐标为
Figure BDA0003328107210000058
纵坐标为
Figure BDA0003328107210000059
右下角部节点序号为(N,1),横坐标为
Figure BDA00033281072100000510
纵坐标为
Figure BDA00033281072100000511
对于左上角部节点,若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则其温度计算模型表达式为:
Figure BDA00033281072100000512
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则其温度计算模型表达式为:
Figure BDA00033281072100000513
对于右上角部节点,若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则其温度计算模型表达式为:
Figure BDA0003328107210000061
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则其温度计算模型表达式为:
Figure BDA0003328107210000062
对于左下角部节点,则其温度计算模型表达式为:
Figure BDA0003328107210000063
对于右下角部节点,则其温度计算模型表达式为:
Figure BDA0003328107210000064
式中,hw为水冷换热系数,单位W/(mm2×℃);ha为空冷换热系数,单位W/(mm2×℃);Tw为冷却水温度,单位℃;Ta为环境温度,单位℃;εr为轧件热辐射率;σ0为绝对黑体的辐射系数,σ0=5.67×10-6W/(mm2×K4);c为轧件比热容,单位J/(kg×℃);ρ为轧件材质密度,单位kg/mm3;λ为轧件导热系数(热导率),单位W/(mm×℃);B为轧件宽度,单位mm;h为轧件厚度,单位mm;Δt为计算时间增量,单位S;
Figure BDA0003328107210000065
为当前时刻节点(i,j)的温度,单位℃;
Figure BDA0003328107210000066
为上一时刻节点(i,j)的温度,单位℃;
Figure BDA0003328107210000067
为上一时刻节点(i-1,j)的温度,单位℃;
Figure BDA0003328107210000068
为上一时刻节点(i+1,j)的温度,单位℃;
Figure BDA0003328107210000069
为上一时刻节点(i,j-1)的温度,单位℃;
Figure BDA0003328107210000071
为上一时刻节点(i,j+1)的温度,单位℃。
进一步地,所述空冷换热系数ha为10~100W/(mm2×℃),所述轧件热辐射率εr为0.4~0.9,所述环境温度Ta为20~40℃。
进一步地,步骤S5中根据指定冷却段设定的各喷射集管的冷却水流量,计算该冷却段的轧件截面温度分布,具体包括:根据指定冷却段设定的各喷射集管的冷却水流量计算水冷换热系数,然后采用温度计算模型计算该冷却段层流冷却过程中的轧件截面温度分布。
进一步地,从各冷却段的首个喷射集管开始,依次连续开启喷射集管,使得各冷却段终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度时后续的喷射集管不再开启。
进一步地,每开启一个喷射集管后,判断该喷射集管的现有冷却水流量是否达到最大流量,若该喷射集管的现有冷却水流量未达到最大流量,则开始修正该喷射集管的冷却水流量,每修正一次,转入步骤S5重新计算、判断,当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度时,则该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度且该喷射集管的现有冷却水流量未达到最大流量时,继续修正该喷射集管的冷却水流量,转入步骤S5重新计算该冷却段;当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度但该喷射集管的现有冷却水流量已达到最大流量,则开启该冷却段的下一个喷射集管,转入步骤S5重新计算该冷却段。
进一步地,喷射集管每次修正后的冷却水流量的计算方法如下:
假设某喷射集管的冷却水流量第1次设定时其冷却水流量为q(1),第1次设定计算后该喷射集管的冷却水增量即修正量为Δq(1),则:
当r=1时,q(2)=q(1)+Δq(1)
当r≥2时,
Figure BDA0003328107210000081
式中,r为某喷射集管的冷却水流量的修正次数;T为终止计算位置处的目标冷却温度;T(r)为某喷射集管的冷却水流量第r次修正后计算出的终止计算位置处的轧件表面温度;T(r-1)为某喷射集管的冷却水流量第r-1次修正后计算出的终止计算位置处的轧件表面温度;Δq(r-1)为某喷射集管的冷却水流量第r-1次修正后计算得到的该喷射集管的冷却水流量增量即修正量;Δq(r)为某喷射集管的冷却水流量第r次修正后计算得到的该喷射集管的冷却水流量增量即修正量;
则某喷射集管第r次修正后的冷却水流量为:
q(r+1)=q(r)+Δq(r)
本发明至少具有如下有益效果:本发明方法通过理论分析建立了层流冷却过程中二维轧件温度场计算模型,基于设定的层流冷却工艺布置、多段冷却策略及终止计算位置处的目标冷却温度,根据建立的水冷换热系数与水冷流量密度的关系,采用温度计算模型计算轧件截面温度分布,根据各冷却段终止计算位置处的轧件中间宽度处表面温度与目标冷却温度的差值,采用优化算法依次修正各冷却段的喷射集管的冷却水流量,以确保计算出的轧件温度与目标温度相吻合。
本发明所述方法原理清晰明确,假设和简化条件少,其计算精度比解析法更高,计算速度比有限元法更快,适用于热轧双相钢层流冷却过程中各喷射集管冷却水流量的在线预设定计算,使轧件温度快速精准地冷却到目标冷却温度,提高热轧双相钢层流冷却温度的控制精度,以获得体积分数满足工艺要求的铁素体与马氏体的混合组织。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。
图1为本实施例一提供的一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法的流程图;
图2为本实施例一采用的用于喷射集管冷却水流量修正的割线法示意图;
图3为本实施例二的层流冷却系统示意图;
图4为本实施例二的轧件速度与位置变化的曲线图;
图5为本实施例二的由水冷实验建立的水冷换热系数与水冷流量密度的关系曲线图;
图6为本实施例二的轧件网格划分示意图;
图7为采用本实施例二方法获得的各喷射集管冷却水流量时计算出的轧件温度分布变化。
附图中,1为1#喷射集管(开启状态);2为34#喷射集管(关闭状态);3为轧件;4为水冷区;5为空冷区。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。
实施例一
参见图1,本发明实施例提供了一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法,采用多段冷却方式,包括以下步骤:
S1、构造层流冷却系统的工艺布置,并获取工艺参数,包括喷射集管数量以及各喷射集管的中心位置、喷射宽度、喷射区域长度及最大冷却水流量以及轧件的厚度、宽度、速度、初始温度和热物性参数;
S2、建立水冷换热系数与水冷流量密度的关系;所述建立水冷换热系数与水冷流量密度的关系由水冷试验获得,根据试验结果数据由线性插值法计算相应水冷流量密度条件下对应的水冷换热系数;
S3、划分轧件宽向-厚向截面网格节点,并建立各节点的坐标系参数及温度计算模型;
S4、将层流冷却系统分成多个冷却段,设定各冷却段的起始计算位置、终止计算位置、目标冷却温度及冷却温度控制精度;设定各冷却段首次计算时全部喷射集管均为关闭状态;
S5、从首个冷却段开始,依次计算各冷却段的各喷射集管冷却水流量的预设定值,根据指定冷却段设定的各喷射集管的冷却水流量,从该冷却段的起始计算位置到终止计算位置,计算该冷却段的轧件截面温度分布;判断该冷却段的终止计算位置处的轧件表面温度与目标冷却温度之差是否满足冷却温度控制精度;
S51、若满足,则该冷却段计算结束,转入步骤S6;
S52、若不满足,则从该冷却段的首个喷射集管开始,每开启一个喷射集管后,若该喷射集管的现有冷却水流量未达到最大流量,则修正该喷射集管的冷却水流量,计算该冷却段的轧件截面温度分布,直至该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度,不再开启该冷却段的后续喷射集管,该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;若该喷射集管的冷却水流量已达到最大流量,则开启该冷却段的下一个喷射集管;
S6、判断该冷却段是否为最后一个冷却段,若该冷却段是最后一个冷却段,则表明最后一个冷却段计算完成(即表明全部冷却段的终止位置的轧件中间宽度处表面温度与目标冷却温度之差均满足冷却温度控制精度),计算结束,若该冷却段不是最后一个冷却段,则转入步骤S5继续计算下一个冷却段。
按上述方案,所述计算过程从首个冷却段开始计算,依次计算各冷却段,直到最后一个冷却段计算完成。
进一步地,步骤S5中从各冷却段的首个喷射集管开始,依次连续开启喷射集管,使得各冷却段终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度时后续的喷射集管不再开启。
进一步地,每开启一个喷射集管后,判断该喷射集管的现有冷却水流量是否达到最大流量,若该喷射集管的现有冷却水流量未达到最大流量,则开始修正该喷射集管的冷却水流量,每修正一次,改变一次冷却水流量(视计算情况而定,可以是增加也可以是减小),计算该冷却段的轧件截面温度分布,当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度时,则修正结束,不再开启该冷却段的后续喷射集管,该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度且该喷射集管的现有冷却水流量未达到最大流量时,继续修正该喷射集管的冷却水流量;当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度但该喷射集管的现有冷却水流量已达到最大流量,则开启该冷却段的下一个喷射集管。
进一步地,采用多段冷却方式,具体包括:将层流冷却系统分成三个区段,从层流冷却入口到出口依次为第一冷却段(即前冷却段)、第二冷却段(即中冷却段)及第三冷却段(即后冷却段),其中第一冷却段与第三冷却段为快冷段,第二冷却段为缓冷段。第一冷却段(即前冷却段)用于使轧件快速冷却到铁素体相变区的“鼻温”附近,然后第二冷却段(即中冷却段)用于使轧件在铁素体相变区缓冷以获得体积分数约80%的铁素体,最后第三冷却段(即后冷却段)用于使轧件快速冷却到马氏体相变区获得体积分数约20%的马氏体。
进一步地,划分轧件宽向-厚向截面网格节点,并建立各节点的坐标系参数及温度计算模型,具体为:
建立y-z直角坐标系,其中y轴位于轧件中间厚度位置处,z轴位于轧件中间宽度位置处。将轧件二分之一的宽向-厚向横截面离散成N×M个网格,其中轧件半宽等分为N段,i=1、2、3...N,网格宽度为
Figure BDA0003328107210000121
轧件半厚等分为M段,j=1、2、3...M,网格厚度为
Figure BDA0003328107210000122
Δzi,j=Δzi,j-1=Δzi,j+1=Δz,其中Δzi,j-轧件节点(i,j)对应单元的厚向长度,Δzi,j-1-轧件节点(i,j-1)对应单元的厚向长度,Δzi,j+1-轧件节点(i,j+1)对应单元的厚向长度;
根据节点所处的位置,分为内部节点、表面节点、端部节点、芯部节点及角部节点;
(1)对于内部节点,其序号可以表示为(i,j),i=2、3、4...N-1,j=2、3、4...M-1,节点(i,j)横坐标为:
Figure BDA0003328107210000123
纵坐标为:
Figure BDA0003328107210000124
其温度计算模型表达式为:
Figure BDA0003328107210000125
(2)对于表面节点,其序号可表示为(i,M),i=2、3、4...N-1,节点(i,M)横坐标为
Figure BDA0003328107210000131
纵坐标为
Figure BDA0003328107210000132
其温度计算模型表达式为:
若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则
Figure BDA0003328107210000133
若轧件截面在水冷区4,即在喷射集管喷射区内且喷射集管开启,则
Figure BDA0003328107210000134
(3)对于端部节点,其序号可表示为(N,j),j=2、3、4...M-1,节点(N,j)横坐标为
Figure BDA0003328107210000135
纵坐标为
Figure BDA0003328107210000136
其温度计算模型表达式为:
Figure BDA0003328107210000137
(4)对于芯部节点,其中厚度芯部端面节点的序号可表示为(i,1),i=2、3、4...N-1,横坐标为
Figure BDA0003328107210000138
纵坐标为
Figure BDA0003328107210000139
宽度芯部端面节点的序号可表示为(1,j),j=2、3、4...M-1,横坐标为
Figure BDA00033281072100001310
纵坐标为
Figure BDA00033281072100001311
其温度计算模型表达式为:
对于厚向芯部节点,则
Figure BDA00033281072100001312
对于宽向芯部节点,则
Figure BDA0003328107210000141
(5)对于角部节点,其中左上角部节点序号为(1,M),横坐标为
Figure BDA0003328107210000142
纵坐标为
Figure BDA0003328107210000143
右上角部节点序号为(N,M),横坐标为
Figure BDA0003328107210000144
纵坐标为
Figure BDA0003328107210000145
左下角部节点序号为(1,1),横坐标为
Figure BDA0003328107210000146
纵坐标为
Figure BDA0003328107210000147
右下角部节点序号为(N,1),横坐标为
Figure BDA0003328107210000148
纵坐标为
Figure BDA0003328107210000149
其温度计算模型表达式为:
对于左上角部节点,若轧件截面在空冷区5,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则
Figure BDA00033281072100001410
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则
Figure BDA00033281072100001411
对于右上角部节点,若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则
Figure BDA00033281072100001412
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则
Figure BDA0003328107210000151
对于左下角部节点,则
Figure BDA0003328107210000152
对于右下角部节点,则
Figure BDA0003328107210000153
式中,hw-水冷换热系数,单位W/(mm2×℃);
ha-空冷换热系数,单位W/(mm2×℃),取值为10~100W/(mm2×℃);
Tw-冷却水温度,单位℃;
Ta-环境温度,单位℃,取值为20~40℃;
εr-轧件热辐射率,取值为0.4~0.9;
σ0-绝对黑体的辐射系数,σ0=5.67×10-6W/(mm2×K4);
c-轧件比热容,单位J/(kg×℃);
ρ-轧件材质密度,单位kg/mm3
λ-轧件导热系数(热导率),单位W/(mm×℃);
B-轧件宽度,单位mm;
h-轧件厚度,单位mm;
Δt-计算时间增量,单位S;
Figure BDA0003328107210000154
-当前时刻节点(i,j)的温度,单位℃;
Figure BDA0003328107210000155
-上一时刻节点(i,j)的温度,单位℃;
Figure BDA0003328107210000161
-上一时刻节点(i-1,j)的温度,单位℃;
Figure BDA0003328107210000162
-上一时刻节点(i+1,j)的温度,单位℃;
Figure BDA0003328107210000163
-上一时刻节点(i,j-1)的温度,单位℃;
Figure BDA0003328107210000164
-上一时刻节点(i,j+1)的温度,单位℃。
进一步地,所述空冷换热系数ha为10~100W/(mm2×℃),所述轧件热辐射率εr为0.4~0.9,所述环境温度Ta为20~40℃。
进一步地,步骤S5中根据指定冷却段设定的各喷射集管的冷却水流量,计算该冷却段的轧件截面温度分布,具体包括:根据指定冷却段设定的各喷射集管的冷却水流量计算水冷换热系数,然后采用温度计算模型计算该冷却段层流冷却过程中的轧件截面温度分布。
进一步地,修正该喷射集管的冷却水流量,具体为采用割线法修正该喷射集管的冷却水流量。
如图2所示,割线法的具体原理如下:
假设指定冷却段的某喷射集管的冷却水流量第1次设定时其冷却水流量为q(1),第1次设定计算后该喷射集管的冷却水增量(修正量)为Δq(1),则:
当r=1时,q(2)=q(1)+Δq(1)
当r≥2时,
Figure BDA0003328107210000165
式中,r-指定冷却段的某喷射集管的冷却水流量的修正次数;
T-指定冷却段的终止计算位置处的目标冷却温度;
T(r)-指定冷却段的某喷射集管的冷却水流量第r次修正后计算出的该冷却段的终止计算位置处的轧件表面温度;
T(r-1)-指定冷却段的某喷射集管的冷却水流量第r-1次修正后计算出的该冷却段的终止计算位置处的轧件表面温度;
Δq(r-1)-指定冷却段的某喷射集管的冷却水流量第r-1次修正后计算得到的该喷射集管的冷却水流量增量(修正量);
Δq(r)-指定冷却段的某喷射集管的冷却水流量第r次修正后计算得到的该喷射集管的冷却水流量增量(修正量);
则修正后的该喷射集管的冷却水流量为:
q=q(r+1)=q(r)+Δq(r)
优选地,单个喷射集管的冷却水流量第1次设定时其冷却水流量为q(1)=0。当然,q(1)的值还可根据实际需求进行调整。
当q(1)不为0时,优选地,依次按照设定规则(如可以是连续开启规则)开启指定冷却段的喷射集管的过程中,从该冷却段的首个喷射集管开始,每开启一个喷射集管后,先转入步骤S5重新计算、判断,当该冷却段的终止计算位置处的轧件表面温度与目标冷却温度之差满足冷却温度控制精度时,则该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;当该冷却段的终止计算位置处的轧件表面温度与目标冷却温度之差不满足冷却温度控制精度时,采用修正该喷射集管的冷却水流量,每修正一次,改变一次冷却水流量,转入步骤S5重新计算、判断;当终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度且该喷射集管的现有冷却水流量未达到最大流量时,继续修正该喷射集管的冷却水流量;当终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度但该喷射集管的现有冷却水流量已达到最大流量,则控制该冷却段的下一个喷射集管开启。
实施例二
本实施例以热轧低双相钢DP600为例,在实施例一所述方法的基础上,计算其在层流冷却过程中各喷射集管的冷却水流量预设定值,并与现场实测温度值进行比较,以进一步说明本发明方法的通用性及精确性。层流冷却系统的工艺布置如图3所示,其中喷射集管数量为34个,从层流冷却入口到出口依次为1#~34#,各喷射集管的序号、中心位置、喷射宽度、喷射区域长度及最大冷却水流量如表1第1列~第5列所示,轧件的厚度为2mm、宽度为1600mm、初始温度为880℃,轧件热导率为30W/(m×℃),轧件比热容为670J/(kg×℃),轧件密度为7800kg/m3
表1
Figure BDA0003328107210000181
Figure BDA0003328107210000191
轧件的起始计算位置为-1m(即位于层流冷却1#喷射集管1中心位置的入口侧1m处),轧件3的终止计算位置为39m(即位于层流冷却34#喷射集管2中心位置的出口侧1.38m处),轧件速度随轧件位置的变化如图4所示,其中在轧件的起始计算位置处轧件速度为240m/min,在轧件的终止计算位置处轧件速度为300m/min,从轧件的起始计算位置到轧件的终止计算位置之间轧件以匀加速速度运行。
冷却水温度为30℃,环境温度为30℃,空冷换热系数为30W/(mm2×℃),轧件热辐射率为0.7,计算时间步长为0.5ms。由水冷实验建立的水冷换热系数与水冷流量密度的关系如图5所示。
如图6所示,将轧件二分之一的宽向-厚向横截面离散成20×5个网格,其中轧件半宽等分为20段,i=1、2、3...20,网格宽度为
Figure BDA0003328107210000192
轧件半厚等分为5段,j=1、2、3、4、5,网格厚度为
Figure BDA0003328107210000193
Δzi,j=Δzi,j-1=Δzi,j+1=Δz。
节点(i,j)横坐标为:
Figure BDA0003328107210000194
纵坐标为:
Figure BDA0003328107210000195
各冷却段的起始计算位置、终止计算位置及终止计算位置处的目标冷却温度如表2所示。冷却温度控制精度为5℃。单个喷射集管的冷却水流量第1次设定时其冷却水流量为q(1)=0(即第1次设定为关闭状态),第1次设定计算后该喷射集管的冷却水增量(修正量)为Δq(1)=1L/min。
表2
Figure BDA0003328107210000201
采用本实施例方法计算出的各喷射集管的冷却水流量及开闭状态分别如表1第6列及第7列所示,可以看出,本实施例采用多段冷却方式时,在第1冷却段(起始计算位置为-1m,终止计算位置为5m),当1#~4#喷射集管均完全开启(即各自均达到其最大冷却水流量2950L/min),5#喷射集管开启至其冷却水流量达到608L/min时,能够保证在第1冷却段的终止计算位置(5m)处的轧件中间宽度处表面温度计算值(698℃)与目标冷却温度(700℃)之差小于冷却温度控制精度(5℃);在第2冷却段(起始计算位置为5m,终止计算位置为18.9m),当6#喷射集管开启至其冷却水流量达到2026L/min,且该冷却段范围内的其他喷射集管为关闭状态时,能够保证在第2冷却段的终止计算位置(18.9m)处的轧件中间宽度处表面温度计算值(649℃)与目标冷却温度(650℃)之差小于冷却温度控制精度(5℃);在第3冷却段(起始计算位置为18.9m,终止计算位置为39m),当18#~30#喷射集管均完全开启(即各自均达到其最大冷却水流量2950L/min),31#喷射集管开启至其冷却水流量达到750L/min,且该冷却段范围内的其他喷射集管为关闭状态时,能够保证在第3冷却段的终止计算位置(39m)处的轧件中间宽度处表面温度计算值(294℃)与目标冷却温度(290℃)之差小于冷却温度控制精度(5℃)。
相应的层流冷却过程中轧件中间宽度处的表面、芯部及厚向平均温度变化如图7所示,另外也给出了生产现场采用上述喷射集管冷却水流量后在各冷却段的终止计算位置处的轧件中间宽度处的表面温度实测值(见图7中黑色圆点所示,依次为709℃、642℃及283℃),因此从轧件温度理论计算与现场实测温度两个方面均表明,采用本发明实施例方法获得的喷射集管冷却水流量预设定值,能够保证轧件表面温度与目标冷却温度之差满足冷却温度控制精度要求。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (9)

1.一种热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于,包括如下步骤:
S1、构造层流冷却系统的工艺布置,并获取工艺参数;
S2、建立水冷换热系数与水冷流量密度的关系;
S3、划分轧件宽向-厚向截面网格节点,并建立各节点的坐标系参数及温度计算模型;
S4、将层流冷却系统分成多个冷却段,设定各冷却段的起始计算位置、终止计算位置、目标冷却温度及冷却温度控制精度;设定各冷却段首次计算时全部喷射集管均为关闭状态;
S5、从首个冷却段开始,依次计算各冷却段的各喷射集管冷却水流量的预设定值,根据指定冷却段设定的各喷射集管的冷却水流量,从该冷却段的起始计算位置到终止计算位置,计算该冷却段的轧件截面温度分布;判断该冷却段的终止计算位置处的轧件表面温度与目标冷却温度之差是否满足冷却温度控制精度;
S51、若满足,则该冷却段计算结束,转入步骤S6;
S52、若不满足,则从该冷却段的首个喷射集管开始,每开启一个喷射集管后,若该喷射集管的现有冷却水流量未达到最大流量,则修正该喷射集管的冷却水流量,计算该冷却段的轧件截面温度分布,直至该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度,不再开启该冷却段的后续喷射集管,该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;若该喷射集管的冷却水流量已达到最大流量,则开启该冷却段的下一个喷射集管;
S6、判断该冷却段是否为最后一个冷却段,若该冷却段是最后一个冷却段,则表明最后一个冷却段计算完成,计算结束,若该冷却段不是最后一个冷却段,则转入步骤S5继续计算下一个冷却段。
2.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:将层流冷却系统沿轧件长度方向分成第一冷却段、第二冷却段及第三冷却段,其中,第一冷却段与第三冷却段为快冷段,第二冷却段为缓冷段。
3.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:步骤S1中获取的工艺参数包括喷射集管数量以及各喷射集管的中心位置、喷射宽度、喷射区域长度及最大冷却水流量以及轧件的厚度、宽度、速度、初始温度和热物性参数。
4.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:步骤S2中建立水冷换热系数与水冷流量密度的关系由水冷试验获得,根据试验结果数据由线性插值法计算相应水冷流量密度条件下对应的水冷换热系数。
5.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:步骤S3中划分轧件宽向-厚向截面网格节点,并建立各节点的坐标系参数及温度计算模型,具体为:建立y-z直角坐标系,其中y轴位于轧件中间厚度位置处,z轴位于轧件中间宽度位置处,将轧件二分之一的宽向-厚向横截面离散成N×M个网格,其中轧件半宽等分为N段,i=1、2、3...N,网格宽度为
Figure FDA0003328107200000021
轧件半厚等分为M段,j=1、2、3...M,网格厚度为
Figure FDA0003328107200000022
Δzi,j=Δzi,j-1=Δzi,j+1=Δz,其中Δzi,j为轧件节点(i,j)对应单元的厚向长度,Δzi,j-1为轧件节点(i,j-1)对应单元的厚向长度,Δzi,j+1为轧件节点(i,j+1)对应单元的厚向长度;
根据节点所处的位置,分为内部节点、表面节点、端部节点、芯部节点及角部节点;
(1)对于内部节点,其序号可以表示为(i,j),i=2、3、4...N-1,j=2、3、4...M-1,节点(i,j)横坐标为:
Figure FDA0003328107200000031
纵坐标为:
Figure FDA0003328107200000032
其温度计算模型表达式为:
Figure FDA0003328107200000033
(2)对于表面节点,其序号可表示为(i,M),i=2、3、4...N-1,节点(i,M)横坐标为
Figure FDA0003328107200000034
纵坐标为
Figure FDA0003328107200000035
若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则其温度计算模型表达式为:
Figure FDA0003328107200000036
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则其温度计算模型表达式为:
Figure FDA0003328107200000037
(3)对于端部节点,其序号可表示为(N,j),j=2、3、4...M-1,节点(N,j)横坐标为
Figure FDA0003328107200000038
纵坐标为
Figure FDA0003328107200000039
其温度计算模型表达式为:
Figure FDA0003328107200000041
(4)对于芯部节点,其中厚度芯部端面节点的序号可表示为(i,1),i=2、3、4...N-1,横坐标为
Figure FDA0003328107200000042
纵坐标为
Figure FDA0003328107200000043
宽度芯部端面节点的序号可表示为(1,j),j=2、3、4...M-1,横坐标为
Figure FDA0003328107200000044
纵坐标为
Figure FDA0003328107200000045
对于厚向芯部节点,则其温度计算模型表达式为:
Figure FDA0003328107200000046
对于宽向芯部节点,则其温度计算模型表达式为:
Figure FDA0003328107200000047
(5)对于角部节点,其中左上角部节点序号为(1,M),横坐标为
Figure FDA0003328107200000048
纵坐标为
Figure FDA0003328107200000049
右上角部节点序号为(N,M),横坐标为
Figure FDA00033281072000000410
纵坐标为
Figure FDA00033281072000000411
左下角部节点序号为(1,1),横坐标为
Figure FDA00033281072000000412
纵坐标为
Figure FDA00033281072000000413
右下角部节点序号为(N,1),横坐标为
Figure FDA00033281072000000414
纵坐标为
Figure FDA00033281072000000415
对于左上角部节点,若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则其温度计算模型表达式为:
Figure FDA0003328107200000051
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则其温度计算模型表达式为:
Figure FDA0003328107200000052
对于右上角部节点,若轧件截面在空冷区,即在喷射集管喷射区之间或者在喷射集管喷射区内但是喷射集管关闭,则其温度计算模型表达式为:
Figure FDA0003328107200000053
若轧件截面在水冷区,即在喷射集管喷射区内且喷射集管开启,则其温度计算模型表达式为:
Figure FDA0003328107200000054
对于左下角部节点,则其温度计算模型表达式为:
Figure FDA0003328107200000055
对于右下角部节点,则其温度计算模型表达式为:
Figure FDA0003328107200000056
式中,hw为水冷换热系数;ha为空冷换热系数;Tw为冷却水温度;Ta为环境温度;εr为轧件热辐射率;σ0为绝对黑体的辐射系数;c为轧件比热容;ρ为轧件材质密度;λ为轧件导热系数;B为轧件宽度;h为轧件厚度;Δt为计算时间增量;
Figure FDA0003328107200000061
为当前时刻节点(i,j)的温度;
Figure FDA0003328107200000062
为上一时刻节点(i,j)的温度;
Figure FDA0003328107200000063
为上一时刻节点(i-1,j)的温度;
Figure FDA0003328107200000064
为上一时刻节点(i+1,j)的温度;
Figure FDA0003328107200000065
为上一时刻节点(i,j-1)的温度;
Figure FDA0003328107200000066
为上一时刻节点(i,j+1)的温度。
6.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:步骤S5中根据指定冷却段设定的各喷射集管的冷却水流量,计算该冷却段的轧件截面温度分布,具体包括:根据指定冷却段设定的各喷射集管的冷却水流量计算水冷换热系数,然后采用温度计算模型计算该冷却段层流冷却过程中的轧件截面温度分布。
7.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:从各冷却段的首个喷射集管开始,依次连续开启喷射集管,使得各冷却段终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度时后续的喷射集管不再开启。
8.如权利要求1所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:每开启一个喷射集管后,判断该喷射集管的现有冷却水流量是否达到最大流量,若该喷射集管的现有冷却水流量未达到最大流量,则开始修正该喷射集管的冷却水流量,每修正一次,转入步骤S5重新计算、判断,当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差满足冷却温度控制精度时,则该冷却段计算结束,得到该冷却段的各喷射集管的冷却水流量预设定值,转入步骤S6;当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度且该喷射集管的现有冷却水流量未达到最大流量时,继续修正该喷射集管的冷却水流量;当该冷却段的终止计算位置处轧件表面温度与目标冷却温度之差不满足冷却温度控制精度但该喷射集管的现有冷却水流量已达到最大流量,则开启该冷却段的下一个喷射集管。
9.如权利要求8所述的热轧双相钢层流冷却喷射集管的冷却水流量获取方法,其特征在于:喷射集管每次修正后的冷却水流量的计算方法如下:
假设某喷射集管的冷却水流量第1次设定时其冷却水流量为q(1),第1次设定计算后该喷射集管的冷却水增量即修正量为Δq(1),则:
当r=1时,q(2)=q(1)+Δq(1)
当r≥2时,
Figure FDA0003328107200000071
式中,r为某喷射集管的冷却水流量的修正次数;T为终止计算位置处的目标冷却温度;T(r)为某喷射集管的冷却水流量第r次修正后计算出的终止计算位置处的轧件表面温度;T(r-1)为某喷射集管的冷却水流量第r-1次修正后计算出的终止计算位置处的轧件表面温度;Δq(r-1)为某喷射集管的冷却水流量第r-1次修正后计算得到的该喷射集管的冷却水流量增量即修正量;Δq(r)为某喷射集管的冷却水流量第r次修正后计算得到的该喷射集管的冷却水流量增量即修正量;
则某喷射集管第r次修正后的冷却水流量为:
q(r+1)=q(r)+Δq(r)
CN202111269299.7A 2021-10-29 2021-10-29 热轧双相钢层流冷却喷射集管的冷却水流量获取方法 Active CN114178323B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111269299.7A CN114178323B (zh) 2021-10-29 2021-10-29 热轧双相钢层流冷却喷射集管的冷却水流量获取方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111269299.7A CN114178323B (zh) 2021-10-29 2021-10-29 热轧双相钢层流冷却喷射集管的冷却水流量获取方法

Publications (2)

Publication Number Publication Date
CN114178323A true CN114178323A (zh) 2022-03-15
CN114178323B CN114178323B (zh) 2023-06-23

Family

ID=80601669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111269299.7A Active CN114178323B (zh) 2021-10-29 2021-10-29 热轧双相钢层流冷却喷射集管的冷却水流量获取方法

Country Status (1)

Country Link
CN (1) CN114178323B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101381806A (zh) * 2007-09-06 2009-03-11 中冶赛迪工程技术股份有限公司 一种带钢的冷却装置及其冷却控制方法
JP2011167754A (ja) * 2010-02-22 2011-09-01 Sumitomo Metal Ind Ltd 厚鋼板の冷却制御方法、冷却制御装置および厚鋼板の製造方法
JP2019013967A (ja) * 2017-07-07 2019-01-31 新日鐵住金株式会社 熱延鋼板の冷却装置、および熱延鋼板の冷却方法
CN111079275A (zh) * 2019-12-05 2020-04-28 中冶南方工程技术有限公司 一种板带热轧生产线轧件温度获取方法及装置
CN112122360A (zh) * 2019-06-24 2020-12-25 上海梅山钢铁股份有限公司 一种薄规格热连轧带钢的层流冷却控制方法
CN112872059A (zh) * 2019-11-30 2021-06-01 上海梅山钢铁股份有限公司 一种厚规格热轧带钢层流两段式冷却的控制方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101381806A (zh) * 2007-09-06 2009-03-11 中冶赛迪工程技术股份有限公司 一种带钢的冷却装置及其冷却控制方法
JP2011167754A (ja) * 2010-02-22 2011-09-01 Sumitomo Metal Ind Ltd 厚鋼板の冷却制御方法、冷却制御装置および厚鋼板の製造方法
JP2019013967A (ja) * 2017-07-07 2019-01-31 新日鐵住金株式会社 熱延鋼板の冷却装置、および熱延鋼板の冷却方法
CN112122360A (zh) * 2019-06-24 2020-12-25 上海梅山钢铁股份有限公司 一种薄规格热连轧带钢的层流冷却控制方法
CN112872059A (zh) * 2019-11-30 2021-06-01 上海梅山钢铁股份有限公司 一种厚规格热轧带钢层流两段式冷却的控制方法
CN111079275A (zh) * 2019-12-05 2020-04-28 中冶南方工程技术有限公司 一种板带热轧生产线轧件温度获取方法及装置

Also Published As

Publication number Publication date
CN114178323B (zh) 2023-06-23

Similar Documents

Publication Publication Date Title
CN101780478B (zh) 一种热轧带钢及钢板板形和精度控制的方法和设备
CN105327949B (zh) 一种热轧带钢卷取温度的流量控制方法
CN106119520B (zh) 一种冷轧热镀锌退火炉板温协调控制系统及方法
CN105817489B (zh) 一种热轧带钢层流冷却工艺
CN103225017B (zh) 一种棒线材方坯加热炉模型控制方法及装置
CN104073623B (zh) 一种辊底式退火炉温度控制方法
CN111079275B (zh) 一种板带热轧生产线轧件温度获取方法及装置
CN1974041A (zh) 一种带钢卷取温度控制方法及其装置
JP7285320B2 (ja) 角部を増肉した、熱冷複合成形された正方形/長方形鋼管及びその製造方法
KR20130067953A (ko) 연속 소둔라인 급냉대의 스트립 온도제어 방법 및 장치
CN103559334B (zh) 一种层流冷却温度场的建模方法及系统
JP4598586B2 (ja) 冷却制御方法、装置、及びコンピュータプログラム
CN105344720A (zh) 一种精轧带钢终轧温度的在线控制方法
CN107626751A (zh) 热连轧线超快速冷却的控制方法
CN110834032A (zh) 连铸连轧温度场跟踪铸坯温度的方法及装置
Xie et al. Optimization and model of laminar cooling control system for hot strip mills
CN105734235B (zh) 一种热连轧带钢密集冷却控制方法
CN114178323A (zh) 热轧双相钢层流冷却喷射集管的冷却水流量获取方法
CN105855297A (zh) 一种提高热轧首块无取向硅钢头部厚度精度的控制方法
CN113441556B (zh) 一种低温卷取型热轧双相钢的层流冷却工艺控制方法
CN201033333Y (zh) 一种带钢卷取温度控制装置
CN114178325B (zh) 热轧碳钢层流冷却喷射集管的冷却水流量获取方法及温度计算方法
CN116449790A (zh) 宽厚板的生产控制方法
CN114178324A (zh) 热轧合金钢层流冷却喷射集管的冷却水流量获取方法及修正方法
CN105772518B (zh) 一种热轧高强钢应力减量化的两段稀疏层流冷却方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant