Production and processing method and device for indoor design material Download PDFInfo
- Publication number
- CN114167827A CN114167827A CN202111468214.8A CN202111468214A CN114167827A CN 114167827 A CN114167827 A CN 114167827A CN 202111468214 A CN202111468214 A CN 202111468214A CN 114167827 A CN114167827 A CN 114167827A
- Authority
- CN
- China
- Prior art keywords
- production
- model
- design
- blanking
- generating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 165
- 239000000463 material Substances 0.000 title claims abstract description 150
- 238000013461 design Methods 0.000 title claims abstract description 111
- 238000003672 processing method Methods 0.000 title claims abstract description 25
- 238000000034 method Methods 0.000 claims abstract description 49
- 238000012545 processing Methods 0.000 claims abstract description 25
- 230000008569 process Effects 0.000 claims abstract description 19
- 239000000047 product Substances 0.000 claims description 49
- 238000005034 decoration Methods 0.000 claims description 12
- 230000006870 function Effects 0.000 claims description 8
- 239000002994 raw material Substances 0.000 claims description 8
- 239000011265 semifinished product Substances 0.000 claims description 8
- 238000004590 computer program Methods 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 claims description 4
- 238000007639 printing Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 8
- 239000011248 coating agent Substances 0.000 description 5
- 238000000576 coating method Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 5
- 238000011960 computer-aided design Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000000007 visual effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012163 sequencing technique Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000000547 structure data Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32252—Scheduling production, machining, job shop
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
The embodiment of the application provides a production and processing method of an indoor design material, which comprises the steps of obtaining a production line and working hours corresponding to each product in a blanking list; determining a production process of a product according to a preset configuration, and determining production time and delivery time according to the process; the production task is generated according to the production time and the delivery time and is sent to the production line for production, the production task can be automatically generated, the production and processing errors are eliminated, and therefore the production efficiency is improved.
Description
Technical Field
The embodiment of the application relates to the technical field of computer aided design, in particular to an indoor design material production and processing method, device, electronic equipment and storage medium.
Background
Home decoration design is a very time consuming and laborious task, and a qualified design usually takes a designer hours or even days to design. With the continuous progress of computer and network technologies, computer-side design tools are optimized, but the efficiency of human design is still low. Particularly when a plurality of similar repeated design works are carried out, the demand of people for automatic design of home decoration is more and more strong.
After the indoor design model is constructed, because the indoor design model has intuition, the interpretation time is reduced, the communication effect is strengthened, the communication links are reduced, and the design quality is improved. However, during the production and processing of manufacturers, the material model, size, quantity and the like are not consistent with the actual site during installation, so that the cost of manpower, material resources, construction period and the like of the project is increased virtually, and the production efficiency is reduced.
Disclosure of Invention
The embodiment of the application provides an indoor design material production and processing method, device, electronic equipment and storage medium, which can automatically generate production tasks and improve production efficiency.
In a first aspect, embodiments of the present application provide a production processing method for an indoor design material, the production processing method including:
acquiring a production line and working hours corresponding to each product in a blanking list;
determining a production process of a product according to a preset configuration, and determining production time and delivery time according to the process;
and generating a production task according to the production time and the delivery time, and sending the production task to a production line for production.
As one possible implementation of the present application, the production processing method further comprises,
acquiring semi-finished products and raw materials corresponding to products, grading the blanking lists, and respectively generating the blanking lists for the finished products, the semi-finished products and the raw materials;
respectively generating production tasks aiming at each level of blanking lists; and the number of the first and second groups,
generating an assembled production task according to the corresponding relation of the upper and lower blanking lists; and the number of the first and second groups,
and generating a process relation among the production tasks.
As one possible implementation manner of the present application, the production processing method further includes printing mark information on the produced finished product, where the mark information includes indoor design model identification information and a model of the product; wherein the indoor design model is pre-established.
As one possible implementation of the present application, the generating of the blanking list includes:
traversing the indoor design model, and counting the types and the number of material units in the design model; the indoor design model is pre-established, and the type of the material unit comprises the minimum unit of decoration and design of the material unit;
generating a blanking list according to the statistical result; the blanking list comprises product types and quantity, and the product types and the quantity correspond to the types and the quantity of the material units;
sending the blanking list to a production line end for production;
for the material units corresponding to the filling areas, calculating the number of the material units according to the size of the filling areas, and rounding up the calculation result in units of lines; and counting the material units in the indoor design model for the material units corresponding to the filling areas.
As an embodiment of one possible implementation of the present application, the building of the indoor design model includes:
acquiring a plurality of 2D design drawings;
inputting the 2D design drawing into a pre-established learning model, wherein the 2D design drawing comprises marks and size information of the house frame structure;
obtaining an indoor structure model through identification and learning of the marks and the size information;
displaying the indoor structure model and the material units in different areas on an operation interface;
and adding a certain material unit into an indoor structure model to obtain an indoor design model.
As a possible implementation manner of the application, before displaying the material units, a designer is prompted to select a scene type, a function type and a style type, and after receiving a type selection instruction, the corresponding material units are displayed according to the selected type; or the selection is carried out according to the package type, and the package type comprises material units of fixed models and material units of successful cases which are designed once.
As one possible implementation of the present application, the selecting according to the package type includes selecting n package types with close proportions and structures according to the house structure and size;
and adapting the material unit types in the selected package type according to the size proportion of the structure model.
In a second aspect, embodiments of the present application provide a processing apparatus for a production processing method of an indoor design material, the apparatus including:
the acquisition module is used for acquiring the production line and the working hour corresponding to each product in the blanking list;
the working procedure determining module is used for determining the working procedure of product production according to preset configuration and determining the production time and delivery time according to the working procedure;
and the task generating module is used for generating a production task according to the production time and the delivery time and sending the production task to the production line for production.
In a third aspect, an embodiment of the present application provides an electronic device, including a memory and a processor, where the memory stores a computer program thereon, and the processor implements the method according to any one of the first aspect when executing the program.
In a fourth aspect, embodiments of the present application provide a computer-readable storage medium on which a computer program is stored, which, when executed by a processor, implements the method according to any one of the first aspect.
The embodiment of the application provides a production and processing method and device for an indoor design material, electronic equipment and a storage medium, wherein the production and processing method comprises the steps of obtaining a production line and working hours corresponding to each product in a blanking list; determining a production process of a product according to a preset configuration, and determining production time and delivery time according to the process; the production task is generated according to the production time and the delivery time and is sent to the production line for production, the production task can be automatically generated, the production and processing errors are eliminated, and therefore the production efficiency is improved.
It should be understood that what is described in this summary section is not intended to limit key or critical features of the embodiments of the application, nor is it intended to limit the scope of the application. Other features of the present application will become apparent from the following description.
Drawings
In order to more clearly illustrate one or more embodiments or prior art solutions of the present specification, the drawings that are needed in the description of the embodiments or prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments described in the present specification, and that other drawings can be obtained by those skilled in the art without inventive exercise.
Fig. 1 shows a flow chart of a method of producing and processing a design material in a chamber according to an embodiment of the present application;
fig. 2 shows a flow chart of a method of producing and processing a design material in a chamber according to another embodiment of the present application;
FIG. 3 shows a flow chart of a method of generating a blanking list of an embodiment of the present application;
FIG. 4 is a flow chart illustrating a method of pre-modeling an indoor design model according to an embodiment of the present application;
FIG. 5 shows a schematic view of an indoor design material production processing apparatus of an embodiment of the present application;
FIG. 6 shows a schematic view of an indoor design material production processing installation of another embodiment of the present application;
fig. 7 shows a block diagram of an electronic device according to an embodiment of the present application.
Detailed Description
In order to make those skilled in the art better understand the technical solutions in one or more embodiments of the present disclosure, the technical solutions in one or more embodiments of the present disclosure will be clearly and completely described below with reference to the drawings in one or more embodiments of the present disclosure, and it is obvious that the described embodiments are only a part of the embodiments of the present disclosure, and not all embodiments. All other embodiments that can be derived by a person skilled in the art from one or more of the embodiments described herein without making any inventive step shall fall within the scope of protection of this document.
Computer Aided Design (CAD) refers to using a Computer and its graphic equipment to help a designer perform a Design work. In design, a computer is usually used for carrying out a large amount of calculation, analysis and comparison on different schemes so as to determine the optimal scheme; various design information, whether numerical, textual or graphical, can be stored in the computer's memory or external memory and retrieved quickly.
The existing online design tool is complex to operate, a designer needs to consume more time to be familiar with operation steps and then designs a picture, therefore, the material unit is provided in the embodiment of the application, the material unit not only comprises materials required by indoor design, but also comprises materials required by decoration, and a designer provides a simple dragging mode to finish the indoor design and generate a model. However, since the material model, size, quantity and the like are not matched with the actual site during installation, the cost of manpower, material resources, construction period and the like of the project is increased virtually, the production efficiency is reduced, how to provide an effective production and processing method for the indoor design material is to improve the production efficiency of the indoor design material, and the method has great economic benefit and value.
It should be noted that the description in the embodiments of the present application is only for clearly illustrating the technical solutions in the embodiments of the present application, and does not limit the technical solutions provided in the embodiments of the present application.
Fig. 1 shows a flowchart of a method for producing and processing a design material in a chamber according to an embodiment of the present application.
Referring to fig. 1, the production processing method comprises the following steps:
s20, acquiring production lines and working hours corresponding to each product in the blanking list;
specifically, the blanking list comprises product models and the number of the product models, and the product models and the number of the product models correspond to the models and the number of the material units;
the material unit may be, for example, a floor, wallpaper, a table, a switch, a waterproof coating, or the like. The material unit is the minimum unit for decoration and design, such as a floor, a switch and the like; the material unit includes a unique identifier (e.g., XX model floor); type (e.g., floor, table, switch, etc.); a style model (e.g., style picture, visual presentation); the size parameter is adjustable or fixed and unadjustable according to the type; and the color parameters are adjustable or fixed and not adjustable according to types.
S40, determining a production process of the product according to the preset configuration, and determining the production time and delivery time according to the process;
for example, statistics related to sequencing, positioning and size of tables, wallpapers, floors and the like, and the production time and delivery time are determined according to the procedures, so that the efficiency and accuracy of production statistics are improved, and errors of manual sequencing production and material loss and waste are avoided.
And S60, generating a production task according to the production time and the delivery time, and sending the production task to the production line for production.
The embodiment of the application provides a production and processing method of an indoor design material, which comprises the steps of obtaining a production line and working hours corresponding to each product in a blanking list; determining a production process of a product according to a preset configuration, and determining production time and delivery time according to the process; the production task is generated according to the production time and the delivery time and is sent to the production line for production, the production task can be automatically generated, the production and processing errors are eliminated, and therefore the production efficiency is improved.
Fig. 2 shows a flow chart of a method of producing and processing a design material in a chamber according to an embodiment of the present application; as shown in fig. 2, the manufacturing method further includes,
s20', obtaining semi-finished products and raw materials corresponding to the products, grading the blanking lists, and respectively generating the blanking lists for the finished products, the semi-finished products and the raw materials;
respectively generating production tasks aiming at each level of blanking lists; and the number of the first and second groups,
generating an assembled production task according to the corresponding relation of the upper and lower blanking lists; and the number of the first and second groups,
and generating a process relation among the production tasks.
In some embodiments, the production processing method further comprises printing mark information on the produced finished product, wherein the mark information comprises indoor design model identification information and the model number of the product; wherein the indoor design model is pre-established. The produced finished product can be marked (such as pasting a two-dimensional code), and the mark comprises a design model identification (which can correspond to a user searching for entrusted design and decoration), the model of the product and the like.
Fig. 3 is a flowchart illustrating a method for generating a blanking list according to an embodiment of the present application, where as shown in fig. 3, the method for generating a blanking list includes:
s201, traversing an indoor design model, and counting the types and the number of material units in the design model; the indoor design model is pre-established, and the type of the material unit comprises the minimum unit of decoration and design of the material unit;
there are various implementations for material units (e.g., floors and tiles, etc.) that correspond to the fill area. In the first mode, the number of material units is calculated according to the size of the filling area, and the calculation result is rounded up in a row unit. And the material cells at the edges only display parts, but the material cells are complete. Therefore, material units in the design model can be counted. The traversal order may be partitioned, hierarchical traversal, such as top to bottom, left to right.
S202, generating a blanking list according to the statistical result; the blanking list comprises product types and quantity, and the product types and the quantity correspond to the types and the quantity of the material units;
the material unit may be, for example, a floor, wallpaper, a table, a switch, a waterproof coating, or the like. The material unit is the minimum unit for decoration and design, such as a floor, a switch and the like; the material unit includes a unique identifier (e.g., XX model floor); type (e.g., floor, table, switch, etc.); a style model (e.g., style picture, visual presentation); the size parameter is adjustable or fixed and unadjustable according to the type; and the color parameters are adjustable or fixed and not adjustable according to types. The material unit can be further edited according to the editing instruction, for example, the material unit comprises a shape editing characteristic and a color setting characteristic, the shape editing characteristic means that the material can be zoomed, moved, stretched and the like, and the color setting characteristic means that the color of the material can be set.
And S203, sending the blanking list to a production line end for production.
According to the production and processing method for the indoor design material, the model number and the number of material units in the design model are counted by traversing the indoor design model; generating a blanking list according to the statistical result; and sending the blanking list to a production line end for production, and automatically generating a blanking task, thereby improving the production efficiency.
Specifically, one material unit directly corresponds to one product, and the indoor design model building process can fill up the relevant area according to the type of the material unit; and when the related area is filled, the edge part is partially displayed, and a cropping size parameter is added to the material unit of the edge part. For example, the structural model is displayed in a main area in the editing interface, and material elements are displayed in a toolbar on one side. The material unit can be further edited according to the editing instruction, for example, the material unit comprises a shape editing characteristic and a color setting characteristic, the shape editing characteristic means that the material can be zoomed, moved, stretched and the like, and the color setting characteristic means that the color of the material can be set. An indoor design model building process, for example, dragging a certain material unit into a structural model, and only adding one material unit every time of dragging; or, filling the related area according to the type of the material unit; or after the material unit is added, whether the addition is continued or not is confirmed at the adjacent position of the material unit. The embodiment provides multiple implementation modes, namely, a mode I that only one material unit is added at a time in a dragging mode, and a mode II that related areas are automatically filled according to the type of the material unit, for example, a floor can fill the whole ground. And in the third mode, the addition is confirmed after the dragging once, and whether the addition is continued or not is automatically prompted at the adjacent position. The method can provide a large number of material units for designers, facilitates the combination of the materials for the designers, saves the time for the designers to search the materials, and improves the design efficiency.
Fig. 4 is a flowchart illustrating a method of previously building an indoor design model according to an embodiment of the present application, and as shown in fig. 4, the method of building an indoor design model includes,
s2011, obtaining a plurality of 2D design drawings;
s2012, inputting the 2D design drawing into a pre-established learning model, wherein the 2D design drawing comprises marks and size information of the house frame structure;
s2013, identifying and learning the marks and the size information to obtain an indoor structure model;
s2014, displaying the indoor structure model and the material unit in different areas on an operation interface;
s2015, adding the material units into an indoor structure model to obtain an indoor design model.
The indoor structure comprises an indoor structure model and a material unit, wherein the material unit is the minimum unit for decoration and design; it should be noted that the indoor structure model may also be, for example, a 3D model of a house structure, such as a bim model; the material unit may be, for example, a floor, wallpaper, a table, a switch, a waterproof coating, or the like. The material unit is the minimum unit for decoration and design, such as a floor, a switch and the like; the material unit includes a unique identifier (e.g., XX model floor); type (e.g., floor, table, switch, etc.); a style model (e.g., style picture, visual presentation); the size parameter is adjustable or fixed and unadjustable according to the type; and the color parameters are adjustable or fixed and not adjustable according to types. The material unit can be further edited according to the editing instruction, for example, the material unit comprises a shape editing characteristic and a color setting characteristic, the shape editing characteristic means that the material can be zoomed, moved, stretched and the like, and the color setting characteristic means that the color of the material can be set. An indoor design model building process, for example, dragging a certain material unit into a structural model, and only adding one material unit every time of dragging; or, filling the related area according to the type of the material unit; or after the material unit is added, whether the addition is continued or not is confirmed at the adjacent position of the material unit. The embodiment provides multiple implementation modes, namely, a mode I that only one material unit is added at a time in a dragging mode, and a mode II that related areas are automatically filled according to the type of the material unit, for example, a floor can fill the whole ground. And in the third mode, the addition is confirmed after the dragging once, and whether the addition is continued or not is automatically prompted at the adjacent position. The method can provide a large number of material units for designers, facilitates the combination of the materials for the designers, saves the time for the designers to search the materials, and improves the design efficiency.
Specifically, the method for establishing the indoor design model may further include a step of correcting the indoor design model, specifically including obtaining accurate data in a laser scanning manner to generate a laser scanning model; correcting the indoor design model according to the data in the laser scanning model, and modifying the house frame structure data; for example, reading data of the same position from the laser scanning model and the design model respectively, like the height of the same position of a wall; and comparing the two data, and if the two data are different, modifying the data of the design model by using the data of the laser scanning model. And aiming at the design model after the data is modified, adjusting material units in the design model. For example, the position, size, etc. of the material unit is modified. Such as floor and wall refilling. The position of the furniture relative to the wall is adjusted. For example, the material units are added or subtracted. If the plane of the floor is taken as the horizontal plane, after the data is modified, the ground is found to be uneven, an idle space exists between the floor of the house frame and the floor, and the leveling piece is automatically filled in the idle space. And calculating the number and height of the leveling pieces according to the area and height of the free space, and filling the corresponding leveling pieces according to the number and height of the leveling pieces. For another example, the plane of the wall surface coating is a vertical plane, and when the data is modified and the wall is found to be not vertical, the space between the surface of the wall and the coating plane is automatically filled with the material units of the cement.
Specifically, before the material units are displayed, a designer is prompted to select a scene type, a function type and a style type, and after a type selection instruction is received, the corresponding material units are displayed according to the selected type; or the selection is carried out according to the package type, and the package type comprises material units of fixed models and material units of successful cases which are designed once.
Specifically, the selection according to the package type includes,
selecting n package types with approximate proportion and structure according to the house structure and size;
and adapting the material unit types in the selected package type according to the size proportion of the structure model.
For example, scaling, aligning according to a preset reference point, scaling, etc. The designer may also make manual adjustments. When the whole area is filled, the edge part can be partially displayed, a cropping size parameter is added to the material unit of the edge part, specifically, a parameter modification instruction such as modifying size, color and the like is received for the material unit, and the corresponding area is refilled with the modified material unit.
In some embodiments, the material units include unique identification, type, style model, size parameters, and color parameters;
an indoor design model building process, for example, related areas can be filled according to the types of the material units; and when the related area is filled, the edge part is partially displayed, and a cropping size parameter is added to the material unit of the edge part. For example, the structural model is displayed in a main area in the editing interface, and material elements are displayed in a toolbar on one side. The material unit can be further edited according to the editing instruction, for example, the material unit comprises a shape editing characteristic and a color setting characteristic, the shape editing characteristic means that the material can be zoomed, moved, stretched and the like, and the color setting characteristic means that the color of the material can be set.
Based on the same inventive concept, the embodiment of the present application further provides an indoor design material production processing apparatus, which can be used for implementing the method described in the above embodiment, as described in the following embodiment. Because the principle of solving the problems of the indoor design material production and processing device is similar to that of the indoor design material production and processing method, the implementation of the indoor design material production and processing device can refer to the implementation of the indoor design material production and processing method, and repeated parts are not described again. As used hereinafter, the term "unit" or "module" may be a combination of software and/or hardware that implements a predetermined function. While the system described in the embodiments below is preferably implemented in software, implementations in hardware, or a combination of software and hardware are also possible and contemplated.
Fig. 5 is a block diagram showing a structure of a chamber design material production processing apparatus according to an embodiment of the present application. As shown in fig. 5, the indoor design material production processing apparatus includes:
the acquisition module 20 is used for acquiring production lines and working hours corresponding to each product in the blanking list;
a process determining module 40 for determining the process of product production according to a preset configuration and determining the production time and delivery time according to the process;
and the task generating module 60 is used for generating a production task according to the production time and the delivery time, and sending the production task to the production line for production.
The embodiment of the application provides a production and processing method of an indoor design material, wherein the production and processing method obtains a production line and working hours corresponding to each product in a blanking list through a statistical module 20; the procedure determining module 40 determines a procedure of product production according to a preset configuration, and determines production time and delivery time according to the procedure; the task generating module 60 generates a production task according to the production time and the delivery time, and sends the production task to the production line for production, so that the production task can be automatically generated, the production and processing errors are eliminated, and the production efficiency is improved.
Fig. 6 is a block diagram showing a structure of a room design material production processing apparatus according to another embodiment of the present application; as shown in fig. 2, the production processing apparatus further includes,
the grading module 401 is configured to obtain semi-finished products and raw materials corresponding to products, grade the blanking lists, and generate the blanking lists for the finished products, the semi-finished products, and the raw materials respectively;
respectively generating production tasks aiming at each level of blanking lists; and the number of the first and second groups,
generating an assembled production task according to the corresponding relation of the upper and lower blanking lists; and the number of the first and second groups,
and generating a process relation among the production tasks.
In some embodiments, marking information may be printed on the produced finished product, the marking information including in-house design model identification information, a model number of the product; wherein the indoor design model is pre-established. The produced finished product can be marked (such as pasting a two-dimensional code), and the mark comprises a design model identification (which can correspond to a user searching for entrusted design and decoration), the model of the product and the like.
Fig. 7 is a schematic structural diagram of an electronic device to which the embodiment of the present application can be applied, and as shown in fig. 7, the electronic device of the present application includes a Central Processing Unit (CPU)701 that can perform various appropriate actions and processes according to a program stored in a Read Only Memory (ROM)702 or a program loaded from a storage section 708 into a Random Access Memory (RAM) 703. In the RAM 703, various programs and data necessary for system operation are also stored. The CPU 701, the ROM 702, and the RAM 703 are connected to each other via a bus 704. An input/output (I/O) interface 705 is also connected to bus 704.
The following components are connected to the I/O interface 705: an input portion 706 including a keyboard, a mouse, and the like; an output section 707 including a display such as a Cathode Ray Tube (CRT), a Liquid Crystal Display (LCD), and the like, and a speaker; a storage section 708 including a hard disk and the like; and a communication section 709 including a network interface card such as a LAN card, a modem, or the like. The communication section 709 performs communication processing via a network such as the internet. A drive 710 is also connected to the I/O interface 705 as needed. A removable medium 711 such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, or the like is mounted on the drive 710 as necessary, so that a computer program read out therefrom is mounted into the storage section 708 as necessary.
The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to various embodiments of the present invention. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
The units or modules described in the embodiments of the present application may be implemented by software or hardware. The described units or modules may also be provided in a processor, and may be described as: a processor includes an acquisition module, a generation module, and a process determination module, wherein the names of these modules do not constitute a limitation on the module itself in some cases, for example, the task generation module can also be described as "a task generation module for generating a production task from a production time and a delivery time and sending the production task to a production line for production".
As another aspect, the present application also provides a computer-readable storage medium, which may be a computer-readable storage medium included in the indoor design material production processing apparatus in the above-described embodiment; or it may be a computer-readable storage medium that exists separately and is not built into the electronic device. The computer readable storage medium stores one or more programs for use by one or more processors in performing the method for manufacturing and processing interior design materials described herein.
The above description is only a preferred embodiment of the application and is illustrative of the principles of the technology employed. It will be appreciated by a person skilled in the art that the scope of the invention as referred to in the present application is not limited to the embodiments with a specific combination of the above-mentioned features, but also covers other embodiments with any combination of the above-mentioned features or their equivalents without departing from the inventive concept. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.
Claims (10)
1. A production and processing method of an indoor design material is characterized by comprising the following steps:
acquiring a production line and working hours corresponding to each product in a blanking list;
determining a production process of a product according to a preset configuration, and determining production time and delivery time according to the process;
and generating a production task according to the production time and the delivery time, and sending the production task to a production line for production.
2. The production process of claim 1, further comprising,
acquiring semi-finished products and raw materials corresponding to products, grading the blanking lists, and respectively generating the blanking lists for the finished products, the semi-finished products and the raw materials;
respectively generating production tasks aiming at each level of blanking lists; and the number of the first and second groups,
generating an assembled production task according to the corresponding relation of the upper and lower blanking lists; and the number of the first and second groups,
and generating a process relation among the production tasks.
3. The production method according to claim 1, further comprising printing a mark information including an interior design model identification information, a model number of the product on the produced finished product; wherein the indoor design model is pre-established.
4. The production and processing method according to claim 1, wherein the generating of the blanking list comprises:
traversing the indoor design model, and counting the types and the number of material units in the design model; the indoor design model is pre-established, and the type of the material unit comprises the minimum unit of decoration and design of the material unit;
generating a blanking list according to the statistical result; the blanking list comprises product types and quantity, and the product types and the quantity correspond to the types and the quantity of the material units;
sending the blanking list to a production line end for production;
for the material units corresponding to the filling areas, calculating the number of the material units according to the size of the filling areas, and rounding up the calculation result in units of lines; and counting the material units in the indoor design model for the material units corresponding to the filling areas.
5. The production and processing method according to claim 3, wherein the building of the chamber design model comprises:
acquiring a plurality of 2D design drawings;
inputting the 2D design drawing into a pre-established learning model, wherein the 2D design drawing comprises marks and size information of the house frame structure;
obtaining an indoor structure model through identification and learning of the marks and the size information;
displaying the indoor structure model and the material units in different areas on an operation interface;
and adding a certain material unit into an indoor structure model to obtain an indoor design model.
6. The production and processing method according to claim 5, wherein before displaying the material units, a designer is prompted to select a scene type, a function type and a style type, and after receiving a type selection instruction, the corresponding material units are displayed according to the selected type; or the selection is carried out according to the package type, and the package type comprises material units of fixed models and material units of successful cases which are designed once.
7. The manufacturing process of claim 6, wherein selecting based on the type of package comprises,
selecting n package types with approximate proportion and structure according to the house structure and size;
and adapting the material unit types in the selected package type according to the size proportion of the structure model.
8. A processing device for producing and processing an indoor design material is characterized by comprising:
the acquisition module is used for acquiring the production line and the working hour corresponding to each product in the blanking list;
the working procedure determining module is used for determining the working procedure of product production according to preset configuration and determining the production time and delivery time according to the working procedure;
and the task generating module is used for generating a production task according to the production time and the delivery time and sending the production task to the production line for production.
9. An electronic device comprising a memory and a processor, the memory having stored thereon a computer program, wherein the processor, when executing the computer program, implements the method of any of claims 1 to 7.
10. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the method according to any one of claims 1 to 7.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111327694 | 2021-11-10 | ||
CN2021113276946 | 2021-11-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114167827A true CN114167827A (en) | 2022-03-11 |
CN114167827B CN114167827B (en) | 2024-02-09 |
Family
ID=80482845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111468214.8A Active CN114167827B (en) | 2021-11-10 | 2021-12-03 | Method and device for producing and processing indoor design material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114167827B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114997516A (en) * | 2022-06-29 | 2022-09-02 | 北京建工集团有限责任公司 | Plate processing method and device, electronic equipment and storage medium |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010100379A (en) * | 2000-05-01 | 2001-11-14 | 이영환 | Method for operation of the trend-up program to order custom-made design of building interior by step |
CN1601538A (en) * | 2003-09-26 | 2005-03-30 | 日东电工株式会社 | Prodn plan management method and prodn, plan mangement programme |
KR20060124093A (en) * | 2005-05-31 | 2006-12-05 | 백홍재 | A method for finishing outer wall of builing |
CN102687130A (en) * | 2009-11-12 | 2012-09-19 | 系统科技国际公司 | System and method for the management and design of complex production processes |
CN105427021A (en) * | 2015-10-30 | 2016-03-23 | 江苏云道信息技术有限公司 | Intelligent clothes production scheduling method |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
CN109300187A (en) * | 2018-09-27 | 2019-02-01 | 安捷睿(厦门)机器人有限公司 | A kind of finishing management system, method and server |
CN110648033A (en) * | 2018-06-27 | 2020-01-03 | 西安海平方网络科技有限公司 | Method and device for acquiring engineering list, computer equipment and storage medium |
CN111798130A (en) * | 2020-07-03 | 2020-10-20 | 东土科技(宜昌)有限公司 | Scheduling method, scheduling equipment and computer readable storage medium |
CN113159979A (en) * | 2021-03-17 | 2021-07-23 | 清华大学 | Scheduling decision method and system |
CN113570175A (en) * | 2021-09-27 | 2021-10-29 | 深圳市玄羽科技有限公司 | Method for establishing industrial refined working hour and quantity management platform |
CN113610420A (en) * | 2021-08-17 | 2021-11-05 | 浪潮商用机器有限公司 | Server product working hour statistical system and working hour statistical method |
-
2021
- 2021-12-03 CN CN202111468214.8A patent/CN114167827B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010100379A (en) * | 2000-05-01 | 2001-11-14 | 이영환 | Method for operation of the trend-up program to order custom-made design of building interior by step |
CN1601538A (en) * | 2003-09-26 | 2005-03-30 | 日东电工株式会社 | Prodn plan management method and prodn, plan mangement programme |
KR20060124093A (en) * | 2005-05-31 | 2006-12-05 | 백홍재 | A method for finishing outer wall of builing |
CN102687130A (en) * | 2009-11-12 | 2012-09-19 | 系统科技国际公司 | System and method for the management and design of complex production processes |
CN105427021A (en) * | 2015-10-30 | 2016-03-23 | 江苏云道信息技术有限公司 | Intelligent clothes production scheduling method |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
CN110648033A (en) * | 2018-06-27 | 2020-01-03 | 西安海平方网络科技有限公司 | Method and device for acquiring engineering list, computer equipment and storage medium |
CN109300187A (en) * | 2018-09-27 | 2019-02-01 | 安捷睿(厦门)机器人有限公司 | A kind of finishing management system, method and server |
CN111798130A (en) * | 2020-07-03 | 2020-10-20 | 东土科技(宜昌)有限公司 | Scheduling method, scheduling equipment and computer readable storage medium |
CN113159979A (en) * | 2021-03-17 | 2021-07-23 | 清华大学 | Scheduling decision method and system |
CN113610420A (en) * | 2021-08-17 | 2021-11-05 | 浪潮商用机器有限公司 | Server product working hour statistical system and working hour statistical method |
CN113570175A (en) * | 2021-09-27 | 2021-10-29 | 深圳市玄羽科技有限公司 | Method for establishing industrial refined working hour and quantity management platform |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114997516A (en) * | 2022-06-29 | 2022-09-02 | 北京建工集团有限责任公司 | Plate processing method and device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN114167827B (en) | 2024-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dore et al. | Semi-automatic generation of as-built BIM façade geometry from laser and image data | |
CN102105908B (en) | Method and device for production of master pattern tool | |
CN114140690A (en) | Decoration progress monitoring method and device, electronic equipment and storage medium | |
US5892691A (en) | Method, apparatus, and software product for generating weighted deformations for geometric models | |
CN111177831A (en) | BIM technology-based steel bar three-dimensional modeling and automatic calculation method | |
US8065123B2 (en) | Systems and methods for performing quantity takeoff computations from computer aided design drawings | |
CN112132970B (en) | Natural texture synthesis system and method for 3D printing | |
WO2006034541A1 (en) | Method and system for estimating project costs | |
US20130150994A1 (en) | Method of carving three-dimensional artwork | |
CN111859511A (en) | Method and device for generating vertical face construction drawing by building model | |
CN114167827B (en) | Method and device for producing and processing indoor design material | |
CN112182718B (en) | Component design method and device based on BIM and 3D technology and storage medium | |
CN109033558A (en) | External scaffolding model modelling approach based on Revit platform | |
CN103310042A (en) | Three-dimensional angle rib distribution method | |
CN100561483C (en) | A kind of method for making of shoe-like sample plate and system | |
GB2370737A (en) | 3D-model image generation | |
CN114140438A (en) | Plate production and processing method and device, electronic equipment and storage medium | |
CN109992865B (en) | Method for processing elevation in AutoCAD engineering drawing | |
CN111985038B (en) | Engineering amount calculating method and device for space to be repaired | |
CN113420353A (en) | Steel bar arrangement method and device and electronic equipment | |
CN111784801B (en) | Automatic drawing method and system for parking space plan of completion monomer building | |
CN113536617A (en) | Rapid generation method of fine finite element model with complex structure | |
CN114139236A (en) | Production control method and device for indoor design material | |
CN114139238A (en) | Indoor design model correction method and device, electronic equipment and storage medium | |
CN114139235A (en) | Decoration construction method, decoration construction device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |