CN114156920A CN202111436102.4A CN202111436102A CN114156920A CN 114156920 A CN114156920 A CN 114156920A CN 202111436102 A CN202111436102 A CN 202111436102A CN 114156920 A CN114156920 A CN 114156920A
Authority
CN
China
Prior art keywords
energy
capacity
heat
power
energy storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111436102.4A
Other languages
English (en)
Other versions
CN114156920B (zh
Inventor
蒙金有
项丽
李驰
杨文华
张金平
周宗川
黄越辉
葛鹏江
李湃
田星
郭琳润
申雅茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Research Institute Co Ltd CEPRI
State Grid Ningxia Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
State Grid Ningxia Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI, State Grid Ningxia Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN202111436102.4A priority Critical patent/CN114156920B/zh
Publication of CN114156920A publication Critical patent/CN114156920A/zh
Application granted granted Critical
Publication of CN114156920B publication Critical patent/CN114156920B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J15/00Systems for storing electric energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Power Engineering (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

本发明公开了一种多能互补综合能源系统中电‑热储能的容量配置方法,包括:搜集多能互补综合能源系统中,风电、光伏电站各自的历史归一化出力数据,以及光热电站集热器的理论输出热量序列和负荷历史数据;获取风电场、光伏电站、光热电站各自的装机容量;确定电、热储能的单位装机容量建设成本;建立多能互补综合能源系统中电‑热储能的容量优化模型,以出力数据、热量序列、负荷历史数据和装机容量作为约束条件;根据时序生产模拟计算,得出最优的储能电池配置、电加热设备容量、储热罐需增装容量。该方法综合考虑因素较多,输出的最优储能电池配置、电加热设备容量、储热罐需增装容量,进一步可提高综合能源系统的新能源利用率。

Description

一种多能互补综合能源系统中电-热储能的容量配置方法
技术领域
本发明属于多能互补综合能源系统领域,特别涉及一种多能互补综合能源系统中电-热储能的容量配置方法。
背景技术
构建多能互补、供需协调的智慧能源系统是我国未来的能源发展方向,也是提高新能源利用率的重要途径。随着储能成本的不断降低,大规模配置储能电站来进行电力系统调峰调频逐渐应用广泛。因此构建多能互补综合能源系统,考虑电、热储能的运行特性、建设成本等因素,通过合理优化配置两种储能类型的容量,最大化发挥电、热储能的灵活调节能力以及多种能源的时空互补特性,降低系统功率的随机波动,可以在尽可能经济的基础上,提高综合能源系统的新能源利用率。
在多能互补系统容量配置方面,目前的主要是针对风光储等几种电源开展了研究工作,已有的多能互补联合发电系统储能容量优化研究主要基于风/光的典型日场景进行优化。由于典型日出力曲线难以反映新能源大量的极端出力场景,因此,优化结果的合理性难以保证,更适合采用时序生产模拟方法来进行储能容量的优化配置。从目标函数方面,包括单目标优化方法和多目标优化方法,单目标优化方法在保证系统供电安全的前提下,以经济最优为优化目标,得到最优的各类能源的容量配置。多目标优化方法中,通常还会考虑系统的低碳环保,将系统等效二氧化碳排放量最小作为优化目标之一,从而得到最优的各类能源的容量配置。
但是,目前多能互补系统考虑的因素并不全面,在多能互补系统容量配置方面还存在改进的空间。
发明内容
本发明的主要目的在于提供一种多能互补综合能源系统中电-热储能的容量配置方法,可解决目前在多能互补系统容量配置方面存在效率较差的问题,可以为多能互补系统的规划提供技术参考和支持。
为实现上述目的,本发明采取的技术方案为:
一种多能互补综合能源系统中电-热储能的容量配置方法,包括:
搜集步骤:搜集多能互补综合能源系统中,风电、光伏电站各自的历史归一化出力数据,以及光热电站集热器的理论输出热量序列和负荷历史数据;
获取步骤:获取多能互补综合能源系统中风电场、光伏电站、光热电站各自的装机容量;
确定步骤:确定多能互补综合能源系统中电、热储能的单位装机容量建设成本;
构建步骤:基于单位装机容量建设成本,建立多能互补综合能源系统中电-热储能的容量优化模型,以所述出力数据、热量序列、负荷历史数据和装机容量作为约束条件;
输出配置步骤:根据时序生产模拟计算,通过优化求解所述多能互补综合能源系统中电-热储能的容量优化模型,得出最优的储能电池配置、电加热设备容量、储热罐需增装容量。
进一步地,所述搜集步骤中,出力数据包括:搜集时间长度为1年,时间分辨率为15min的风电、光伏电站的历史归一化处理数据。
进一步地,所述获取步骤中,还包括:
获取系统中的光热电站,年利用小时、所配置的储热罐容量、光热电站的电热转换效率;
获取系统中的电储能装置的电池充放电效率;
获取系统中的热储能装置电热转换效率。
进一步地,所述确定步骤中,电、热储能的单位装机容量建设成本,包括:电储能装置电池的单位容量成本、电加热设备的单位容量成本以及储热罐的单位容量成本。
进一步地,所述构建步骤中,多能互补综合能源系统中电-热储能的容量优化模型为:
min(KS·NPS+KH·ΔH+KPH·MPH) (1)
式中,NPS、ΔH和MPH分别为储能电池容量、储热罐增加容量以及电加热设备的额定容量;KS为电储能装置电池的单位容量成本;KPH为电加热设备的单位容量成本;KH为储热罐的单位容量成本。
进一步地,所述构建步骤中,所述约束条件包括:
1)风电功率约束:
Figure BDA0003381743510000031
式中,
Figure BDA0003381743510000032
为风电的归一化理论功率,t为时间;NW为风电场的装机容量;PW为风电的历史归一化出力数据;
2)光伏发电功率约束:
Figure BDA0003381743510000033
式中,
Figure BDA0003381743510000034
为光伏的归一化理论功率,t为时间;NPV为光伏电站的装机容量;PPV为光伏电站的历史归一化出力数据。
进一步地,所述约束条件还包括:
3)功率平衡约束:
整个多能互补能源系统里包含风电、光伏、光热、电储能、热储能还有负荷,系统与交流电网相联,输出功率应小于外送通道容量:
PW(t)+PPV(t)+PST(t)-PPS(t)-PPH(t)-PL(t)≤L (4)
式中,PST(t)为光热电站的功率、PPS(t)为电储能的功率,正值为充电,负值为放电,PPH(t)为电加热设备的输出功率,PL(t)为负荷历史数据,L为通道容量。
进一步地,所述约束条件还包括:
4)储能SOC约束,为能量型约束:
EPS(t)=EPS(t-1)(1-μPS)+ΔT·ηPS·PPS(t) (5)
Figure BDA0003381743510000041
Figure BDA0003381743510000042
Figure BDA0003381743510000043
式中,EPS(t)为电储能的电量,ΔT为时间长度,μPS为自放电率,ηPS为电储能的充放电效率,
Figure BDA0003381743510000044
Figure BDA0003381743510000045
为SOC状态变量的最小值和最大值;
5)储能电池充放电功率约束:
-MI≤PPS(t)≤MI (9)
式中,MI为电储能装置中逆变器的额定容量。
进一步地,所述约束条件还包括:
6)光热电站功率约束:
Figure BDA0003381743510000046
0≤PST(t)≤NST (11)
式中,PST(t)为光热电站的发电功率,
Figure BDA0003381743510000047
Figure BDA0003381743510000048
分别为光热电站的最小和最大出力;NST为热储能装置电热转换效率;XST(t)为0-1变量,表示光热电站是否处于发电状态;
7)电加热设备功率约束:
HPH(t)=ηPH·PPH(t) (12)
0≤PPH(t)≤MPH (13)
式中,HPH(t)为电加热设备的热功率,ηPH为电加热设备的电热转换效率;
8)储热系统储热量约束:
EST(t)=EST(t-1)+ΔT·HO(t)+ΔT·HPH(t)-ΔT·PST(t)·fST(PST(t)) (14)
Figure BDA0003381743510000051
式中,EST(t)为光热电站储热罐存储的热量,fST(PST(t))为储热罐输入的热量与光热电站输出功率间的电热转换效率,是光热电站功率的非线性函数;
Figure BDA0003381743510000052
Figure BDA0003381743510000053
分别为储热罐的最小和最大储热容量;HO为光热电站集热器的理论输出热量序列。
进一步地,所述约束条件还包括:
9)新能源弃电率约束:
Figure BDA0003381743510000054
式中,χ为新能源弃电率,hST为光热电站的年利用小时数。
与现有技术相比,本发明具有如下有益效果:
本发明提出了一种多能互补综合能源系统中电-热储能的容量配置方法,包括:搜集多能互补综合能源系统中,风电、光伏电站各自的历史归一化出力数据,以及光热电站集热器的理论输出热量序列和负荷历史数据;获取多能互补综合能源系统中风电场、光伏电站、光热电站各自的装机容量;确定多能互补综合能源系统中电、热储能的单位装机容量建设成本;基于单位装机容量建设成本,建立多能互补综合能源系统中电-热储能的容量优化模型,以所述出力数据、热量序列、负荷历史数据和装机容量作为约束条件;根据时序生产模拟计算,通过优化求解所述多能互补综合能源系统中电-热储能的容量优化模型,得出最优的储能电池配置、电加热设备容量、储热罐需增装容量;该方法综合考虑因素较多,构建以出力数据、热量序列、负荷历史数据和装机容量作为约束条件,将时序生产相关数据作为输入,优化求解模型可输出最优的储能电池配置、电加热设备容量、储热罐需增装容量;进一步可提高综合能源系统的新能源利用率。
附图说明
图1为本发明实施例提供的多能互补综合能源系统中电-热储能的容量配置方法流程图。
具体实施方式
为使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本发明。
在本发明的描述中,需要说明的是,术语“上”、“下”、“内”、“外”“前端”、“后端”、“两端”、“一端”、“另一端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。
本发明提供的一种多能互补综合能源系统中电-热储能的容量配置方法,参照图1所示,包括:
搜集步骤:搜集多能互补综合能源系统中,风电、光伏电站各自的历史归一化出力数据,以及光热电站集热器的理论输出热量序列和负荷历史数据;
获取步骤:获取多能互补综合能源系统中风电场、光伏电站、光热电站各自的装机容量;
确定步骤:确定多能互补综合能源系统中电、热储能的单位装机容量建设成本;
构建步骤:基于单位装机容量建设成本,建立多能互补综合能源系统中电-热储能的容量优化模型,以所述出力数据、热量序列、负荷历史数据和装机容量作为约束条件;
输出配置步骤:根据时序生产模拟计算,通过优化求解所述多能互补综合能源系统中电-热储能的容量优化模型,得出最优的储能电池配置、电加热设备容量、储热罐需增装容量。
具体实施如下:
1、搜集并整理多能互补综合能源系统中,时间长度为1年,时间分辨率为15min的风电、光伏电站的历史归一化出力数据PW和PPV,光热电站集热器的理论输出热量序列HO以及负荷的历史数据。
2、输入多能互补综合能源系统中风电场、光伏电站、光热电站的装机容量Nw,Npv和NST;对于系统中的光热电站,输入年利用小时、所配置的储热罐容量、光热电站的电热转换效率;对于系统中的电储能装置,输入储能装置的电池充放电效率;对于系统中的热储能装置,输入热储能设备的电热转换效率。
3.输入多能互补综合能源系统中电、热储能的单位装机容量建设成本,包括电储能装置电池的单位容量成本KS、电加热设备的单位容量成本KPH以及储热罐的单位容量成本KH
4.建立多能互补综合能源系统中电-热储能的容量优化模型,目标函数为经济性最优,如式(1)所示:
min(KS·NPS+KH·ΔH+KPH·MPH) (1)
式中,NPS、ΔH和MPH分别为储能电池容量、储热罐增加容量以及电加热设备的额定容量;KS为电储能装置电池的单位容量成本;KPH为电加热设备的单位容量成本;KH为储热罐的单位容量成本。
约束条件如式(2)至式(16)所示,包括以下约束,具体说明如下:
1)风电功率约束:
Figure BDA0003381743510000081
式中,
Figure BDA0003381743510000082
为风电的归一化理论功率,t为时间;NW为风电场的装机容量;PW为风电的历史归一化出力数据;
2)光伏发电功率约束:
Figure BDA0003381743510000083
式中,
Figure BDA0003381743510000091
为光伏的归一化理论功率,t为时间;NPV为光伏电站的装机容量;PPV为光伏电站的历史归一化出力数据。
3)功率平衡约束:
整个多能互补能源系统里包含风电、光伏、光热、电储能、热储能还有负荷,系统与交流电网相联,输出功率应小于外送通道容量:
PW(t)+PPV(t)+PST(t)-PPS(t)-PPH(t)-PL(t)≤L (4)
式中,PST(t)为光热电站的功率、PPS(t)为电储能的功率,正值为充电,负值为放电,PPH(t)为电加热设备的输出功率,PL(t)为负荷历史数据,L为通道容量。
4)储能SOC约束,为能量型约束:
EPS(t)=EPS(t-1)(1-μPS)+ΔT·ηPS·PPS(t) (5)
Figure BDA0003381743510000092
Figure BDA0003381743510000093
Figure BDA0003381743510000094
式中,EPS(t)为电储能的电量,ΔT为时间长度,μPS为自放电率,ηPS为电储能的充放电效率,
Figure BDA0003381743510000095
Figure BDA0003381743510000096
为SOC状态变量的最小值和最大值;
5)储能电池充放电功率约束:
-MI≤PPS(t)≤MI (9)
式中,MI为电储能装置中逆变器的额定容量。
6)光热电站功率约束:
Figure BDA0003381743510000097
0≤PST(t)≤NST (11)
式中,PST(t)为光热电站的发电功率,
Figure BDA0003381743510000101
Figure BDA0003381743510000102
分别为光热电站的最小和最大出力;NST为热储能装置电热转换效率;XST(t)为0-1变量,表示光热电站是否处于发电状态;
7)电加热设备功率约束:
HPH(t)=ηPH·PPH(t) (12)
0≤PPH(t)≤MPH (13)
式中,HPH(t)为电加热设备的热功率,ηPH为电加热设备的电热转换效率;
8)储热系统储热量约束:
EST(t)=EST(t-1)+ΔT·HO(t)+ΔT·HPH(t)-ΔT·PST(t)·fST(PST(t)) (14)
Figure BDA0003381743510000103
式中,EST(t)为光热电站储热罐存储的热量,fST(PST(t))为储热罐输入的热量与光热电站输出功率间的电热转换效率,是光热电站功率的非线性函数;
Figure BDA0003381743510000104
Figure BDA0003381743510000105
分别为储热罐的最小和最大储热容量;HO为光热电站集热器的理论输出热量序列。
9)新能源弃电率约束:
Figure BDA0003381743510000106
式中,χ为新能源弃电率,hST为光热电站的年利用小时数。
5.基于多能互补综合能源系统电储能/热储能容量联合优化模型,开展时序生产模拟计算,通过优化求解模型,得到同时配置电储能和热储能时,储能电池容量、电加热设备额定功率和储热罐增装容量的最优值,并输出结果。
比如:选取西北某省某多能互补集成优化示范工程开展测试,其中风电400MW,光伏200MW,光热50MW,储能50MW,示范项目光热电站储热罐的储热时长设计为12小时,总储热容量1456MWht,光热电站年利用小时数为3403,其中电池容量单价为218万元/MWh,逆变器单价为85万元/MW,电加热设备单价100万元/MW,储热罐单价为14.5万元/MWht。基于电储能/热储能容量联合优化模型,研究在储能系统的总投资成本(含电储能和热储能)最低情况下,该示范工程电储能和热储能的最优配置容量:储能电池配置60MWh,电加热设备容量42.5MW,储热罐需增装容量1610MWht。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (10)

1.一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于,包括:
搜集步骤:搜集多能互补综合能源系统中,风电、光伏电站各自的历史归一化出力数据,以及光热电站集热器的理论输出热量序列和负荷历史数据;
获取步骤:获取多能互补综合能源系统中风电场、光伏电站、光热电站各自的装机容量;
确定步骤:确定多能互补综合能源系统中电、热储能的单位装机容量建设成本;
构建步骤:基于单位装机容量建设成本,建立多能互补综合能源系统中电-热储能的容量优化模型,以所述出力数据、热量序列、负荷历史数据和装机容量作为约束条件;
输出配置步骤:根据时序生产模拟计算,通过优化求解所述多能互补综合能源系统中电-热储能的容量优化模型,得出最优的储能电池配置、电加热设备容量、储热罐需增装容量。
2.根据权利要求1所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述搜集步骤中,出力数据包括:搜集时间长度为1年,时间分辨率为15min的风电、光伏电站的历史归一化处理数据。
3.根据权利要求2所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述获取步骤中,还包括:
获取系统中的光热电站,年利用小时、所配置的储热罐容量、光热电站的电热转换效率;
获取系统中的电储能装置的电池充放电效率;
获取系统中的热储能装置电热转换效率。
4.根据权利要求2所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述确定步骤中,电、热储能的单位装机容量建设成本,包括:电储能装置电池的单位容量成本、电加热设备的单位容量成本以及储热罐的单位容量成本。
5.根据权利要求4所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述构建步骤中,多能互补综合能源系统中电-热储能的容量优化模型为:
min(KS·NPS+KH·ΔH+KPH·MPH) (1)
式中,NPS、ΔH和MPH分别为储能电池容量、储热罐增加容量以及电加热设备的额定容量;KS为电储能装置电池的单位容量成本;KPH为电加热设备的单位容量成本;KH为储热罐的单位容量成本。
6.根据权利要求5所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述构建步骤中,所述约束条件包括:
1)风电功率约束:
Figure FDA0003381743500000021
式中,
Figure FDA0003381743500000022
为风电的归一化理论功率,t为时间;NW为风电场的装机容量;PW为风电的历史归一化出力数据;
2)光伏发电功率约束:
Figure FDA0003381743500000023
式中,
Figure FDA0003381743500000024
为光伏的归一化理论功率,t为时间;NPV为光伏电站的装机容量;PPV为光伏电站的历史归一化出力数据。
7.根据权利要求6所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述约束条件还包括:
3)功率平衡约束:
整个多能互补能源系统里包含风电、光伏、光热、电储能、热储能还有负荷,系统与交流电网相联,输出功率应小于外送通道容量:
PW(t)+PPV(t)+PST(t)-PPS(t)-PPH(t)-PL(t)≤L (4)
式中,PST(t)为光热电站的功率、PPS(t)为电储能的功率,正值为充电,负值为放电,PPH(t)为电加热设备的输出功率,PL(t)为负荷历史数据,L为通道容量。
8.根据权利要求7所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述约束条件还包括:
4)储能SOC约束,为能量型约束:
EPS(t)=EPS(t-1)(1-μPS)+ΔT·ηPS·PPS(t) (5)
Figure FDA0003381743500000031
Figure FDA0003381743500000032
Figure FDA0003381743500000033
式中,EPS(t)为电储能的电量,ΔT为时间长度,μPS为自放电率,ηPS为电储能的充放电效率,
Figure FDA0003381743500000034
Figure FDA0003381743500000035
为SOC状态变量的最小值和最大值;
5)储能电池充放电功率约束:
-MI≤PPS(t)≤MI (9)
式中,MI为电储能装置中逆变器的额定容量。
9.根据权利要求8所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述约束条件还包括:
6)光热电站功率约束:
Figure FDA0003381743500000041
0≤PST(t)≤NST (11)
式中,PST(t)为光热电站的发电功率,
Figure FDA0003381743500000042
Figure FDA0003381743500000043
分别为光热电站的最小和最大出力;NST为热储能装置电热转换效率;XST(t)为0-1变量,表示光热电站是否处于发电状态;
7)电加热设备功率约束:
HPH(t)=ηPH·PPH(t) (12)
0≤PPH(t)≤MPH (13)
式中,HPH(t)为电加热设备的热功率,ηPH为电加热设备的电热转换效率;
8)储热系统储热量约束:
EST(t)=EST(t-1)+ΔT·HO(t)+ΔT·HPH(t)-ΔT·PST(t)·fST(PST(t)) (14)
Figure FDA0003381743500000044
式中,EST(t)为光热电站储热罐存储的热量,fST(PST(t))为储热罐输入的热量与光热电站输出功率间的电热转换效率,是光热电站功率的非线性函数;
Figure FDA0003381743500000045
Figure FDA0003381743500000046
分别为储热罐的最小和最大储热容量;HO为光热电站集热器的理论输出热量序列。
10.根据权利要求9所述的一种多能互补综合能源系统中电-热储能的容量配置方法,其特征在于:所述约束条件还包括:
9)新能源弃电率约束:
Figure FDA0003381743500000051
式中,χ为新能源弃电率,hST为光热电站的年利用小时数。
CN202111436102.4A 2021-11-29 2021-11-29 一种多能互补综合能源系统中电-热储能的容量配置方法 Active CN114156920B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111436102.4A CN114156920B (zh) 2021-11-29 2021-11-29 一种多能互补综合能源系统中电-热储能的容量配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111436102.4A CN114156920B (zh) 2021-11-29 2021-11-29 一种多能互补综合能源系统中电-热储能的容量配置方法

Publications (2)

Publication Number Publication Date
CN114156920A true CN114156920A (zh) 2022-03-08
CN114156920B CN114156920B (zh) 2023-12-29

Family

ID=80784164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111436102.4A Active CN114156920B (zh) 2021-11-29 2021-11-29 一种多能互补综合能源系统中电-热储能的容量配置方法

Country Status (1)

Country Link
CN (1) CN114156920B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114825381A (zh) * 2022-05-22 2022-07-29 国网甘肃省电力公司电力科学研究院 一种风光新能源基地光热电站容量配置方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020063144A1 (zh) * 2018-09-30 2020-04-02 中国电力科学研究院有限公司 一种柔性直流电网的能源外送能力评估方法及系统
CN112134271A (zh) * 2019-06-24 2020-12-25 中国电力科学研究院有限公司 一种多能互补系统装机容量优化方法及系统
CN112134307A (zh) * 2019-06-24 2020-12-25 中国电力科学研究院有限公司 多能互补系统的电储能/热储能容量联合优化方法及系统
CN112541609A (zh) * 2020-07-06 2021-03-23 河海大学 风光热和水蓄能联合可再生能源发电系统容量优化模型
CN114938008A (zh) * 2022-06-15 2022-08-23 国网河北省电力有限公司经济技术研究院 储能容量和储热容量配置方法、装置及终端设备
CN116345565A (zh) * 2023-02-24 2023-06-27 中国电力科学研究院有限公司 一种新能源与储能容量联合优化方法、系统、设备和介质

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020063144A1 (zh) * 2018-09-30 2020-04-02 中国电力科学研究院有限公司 一种柔性直流电网的能源外送能力评估方法及系统
CN112134271A (zh) * 2019-06-24 2020-12-25 中国电力科学研究院有限公司 一种多能互补系统装机容量优化方法及系统
CN112134307A (zh) * 2019-06-24 2020-12-25 中国电力科学研究院有限公司 多能互补系统的电储能/热储能容量联合优化方法及系统
CN112541609A (zh) * 2020-07-06 2021-03-23 河海大学 风光热和水蓄能联合可再生能源发电系统容量优化模型
CN114938008A (zh) * 2022-06-15 2022-08-23 国网河北省电力有限公司经济技术研究院 储能容量和储热容量配置方法、装置及终端设备
CN116345565A (zh) * 2023-02-24 2023-06-27 中国电力科学研究院有限公司 一种新能源与储能容量联合优化方法、系统、设备和介质

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
史昭娣;王伟胜;黄越辉;李湃;董凌;范越;: "多能互补发电系统储电和储热容量分层优化规划方法", 电网技术, no. 09 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114825381A (zh) * 2022-05-22 2022-07-29 国网甘肃省电力公司电力科学研究院 一种风光新能源基地光热电站容量配置方法

Also Published As

Publication number Publication date
CN114156920B (zh) 2023-12-29

Similar Documents

Publication Publication Date Title
CN102638195B (zh) 一种太阳能发电系统控制方法
CN111276960A (zh) 一种光-储直流微电网系统中储能模块预测控制方法
CN111181185A (zh) 一种应用燃料电池的直流微网系统及控制方法
CN113850474A (zh) 一种热电氢多能流综合能源系统及其优化调度方法
CN105356521A (zh) 一种基于时域滚动控制的交直流混合微电网运行优化方法
CN104616071B (zh) 一种风光储互补发电系统优化配置方法
CN109829228B (zh) 可再生能源系统中混合储能电源容量配置的优化方法
Sun et al. A Hybrid renewable DC microgrid voltage control
CN114156920A (zh) 一种多能互补综合能源系统中电-热储能的容量配置方法
CN112910009B (zh) 一种混合可再生能源耦合制氢方法及其系统
Lata-García et al. Techno-economic analysis of several energy storage options for off-grid renewable energy systems
Sulistiyowati et al. Fuel Cell Penetration Characteristics on Standalone Photovoltaic with Hybrid Energy Storage System
CN211790787U (zh) 一种应用燃料电池的直流微网系统
Xu et al. Multi-objective optimization configuration of wind-solar coupling hydrogen production system
CN116544982A (zh) 一种光伏消纳与峰谷套利的光储系统及其控制方法
Zhou et al. Research review on energy storage technology in power grid
CN205453155U (zh) 一种基于智能电网的分布式发电并网优化系统
Ghatak et al. Design framework for optimal deployment of photovoltaic hydrogen system with battery storage in unbalanced distribution system
Heo et al. Energy resource capacity optimization for zero-energy housing complex
CN107947208B (zh) 一种弃风与大规模电池储能协调运行方法
Yan et al. Life cycle improvement of serially connected batteries system by redundancy based on failure distribution analysis
Sharma et al. Optimized Electric vehicle Charging and discharging with sporadic Renewable energy source
CN114336764B (zh) 一种基于sofc与电转气技术的微电网系统及其容量配置方法
Lucas et al. Optimum battery capacity for a rooftop PV solar system
Sobamowo et al. Solar power applications and integration of lithium iron phosphate batteries in off-grid photovoltaic system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant