CN1141489C - Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile - Google Patents

Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile Download PDF

Info

Publication number
CN1141489C
CN1141489C CNB011246790A CN01124679A CN1141489C CN 1141489 C CN1141489 C CN 1141489C CN B011246790 A CNB011246790 A CN B011246790A CN 01124679 A CN01124679 A CN 01124679A CN 1141489 C CN1141489 C CN 1141489C
Authority
CN
China
Prior art keywords
pump
mud
hole
conduit
slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB011246790A
Other languages
Chinese (zh)
Other versions
CN1332309A (en
Inventor
宁晋生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB011246790A priority Critical patent/CN1141489C/en
Publication of CN1332309A publication Critical patent/CN1332309A/en
Application granted granted Critical
Publication of CN1141489C publication Critical patent/CN1141489C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a method and a device for cleaning a directly sucking and reversely circulating hole bottom before concrete is filled into a drilling filling pile. The device is characterized in that the device is composed of a guide tube 1, a mud pump 2, a support frame 3, a frame lifting ring 5, a hydrocyclone 6, a water outlet pipe 4, a slurry return pipe 7, etc. Mud with large loam content is pumped from the bottom of a pile hole via the guide pipe by the mud pump or a sewage pump to be delivered to the hydrocyclone. The mud is divided into sand and slurry by the vortex of the hydrocyclone. The sand is discharged from a sand discharge port, and the slurry is returned to the pile hole by the slurry return pipe. In the process of cleaning, deposit at a hole bottom is churned up by moving the mud pump and the guide pipe, and is pumped out. The method and the device have the advantages of simplicity, easy operation, high cleaning speed, cleanness, high efficiency and low cost, and can be used for treating a drill rod burying accident in drilling.

Description

Direct absorbing type reversing port bottom slag-removing method and device before the bored pile concrete pouring
One, technical field
The invention belongs to construction process for bored pile and equipment, particularly hole bottom slag-removing method and the device before the bored pile concrete pouring.
Two, background technology
In using rotary drilling rig, percussive drill pore-creating filling pile work progress, sediment problem at the bottom of the preceding hole of bored pile filling stake does not all obtain fine solution all the time.As Chinese patent 98113538 disclosed a kind of drilled pile hole forming method and equipment, its drilled pile hole forming method, employing is revolved to grab and is drilled to the hole, get earlier core or comprehensively the broken churn drill of going up of revolution cutting advance, then, portal deslagging or mud circulation deslagging of grab bucket, or grab bucket portals and the compound deslagging of mud circulation, repeat to creep into, tapping process, until pore-forming.Behind pore-forming, the sediment that exists at the bottom of the hole does not have solution.And at present, bored pile irritated the processing of sediment mainly contains following several method at the bottom of the preceding hole:
(1) the anti-pore-forming that circulates uses the inverse circulation pump scarfing cinder, and this is a clinker removal method preferably at present, the problem and the shortcoming of its existence are: need wait for scarfing cinder to the preceding rig of this hole perfusion after the Completion of Drilling Hole, promptly adopt scarfing cinder behind the pore-forming of background technology, boring work stops, and the rig utilization rate is lower.And used anti-circulation sandstone pump configuration is complicated and heavy, and fault is more, and operation technique is had relatively high expectations, and its price is also higher.
(2) direct circulation pore-forming, processing to sediment at the bottom of the hole only is to use slush pump, send into the lower mud punching of sand content by conduit, sediment at the bottom of the hole dashed and the tape loop outer precipitation of portalling gradually, this method length consuming time and scarfing cinder are not thorough, the mud sand content is higher in the hole, stops after the punching that silt particle can very fast precipitation produce sediment in the mud.
(3) to no circulation pore-forming, as the rotary drilling rig pore-forming, percussive drill pore-forming etc., then can't cleaning hole after being lowered to conduit at the bottom of sediment.The objective of the invention is to overcome in the above existing drilling pouring stake construction, the deficiency of sediment method for cleaning before the concrete pouring, it is improved, and provide a kind of use equipment simple, operating procedure is simple, scarfing cinder speed is fast, cleans out thoroughly preceding direct absorbing type reversing port bottom slag-removing method of the concrete pouring that use cost is cheap and device.
Three, summary of the invention
The invention provides before the bored pile concrete pouring slag cleaning device at the bottom of the direct absorbing type reversing port, it comprises that the concrete that gos deep at the bottom of the hole irritates the outlet pipe that is connected on the framework of the foul water pump of conduit, following connecting duct or slush pump, the supporting pump housing and conduit, the pump housing, and also is provided with drop handle on framework.
Slag cleaning device at the bottom of the direct absorbing type reversing port before above-described a kind of bored pile concrete pouring is characterized in: also comprise the hydrocyclone that an outlet pipe connects, and be connected the return pipe of hydrocyclone top to the stake hole.
Direct absorbing type reversing port bottom slag-removing method before the bored pile concrete pouring of the present invention, be characterized in: adopt the sludge pump or the slush pump that are connecting conduit, conduit is goed deep into bottom, stake hole, carrying conduit, pump and framework by drop handle goes here and there up and down, stir at the bottom of the hole behind the sediment, transfer framework and make mud flood pump head, start pump and will extract the stake hole out, and drain in the mud pit through outlet pipe with the mud of slag.Simultaneously, replenish clear water or mud in the stake hole, continuous drawing is cleaned out until sediment.
Direct absorbing type reversing port bottom slag-removing method before the above bored pile concrete pouring, be characterized in: the band slag mud of extracting out in the described method is sent into hydrocyclone through outlet pipe, behind its parting sand and the slurry, sand is got rid of to walk clearly, slurry is back to a hole again by return pipe, the straight suction instead circulated, and cleans out until sediment.
Direct absorbing type reversing port bottom slag-removing method is applicable to that all underwater drilling castinplace piles irritate scarfing cinder work at the bottom of the preceding hole, and it is simple, easy to operate to have technology, and scarfing cinder speed is fast, thoroughly clean, and the duration is short, low cost and other advantages.Equipment therefor is simple in structure, floor space is little, easy to install.This method underground drilling accident that also can be used for holing is handled.
Four, description of drawings
Fig. 1 is a slag cleaning device at the bottom of the direct absorbing type reversing port.
Five, the specific embodiment
Below in conjunction with description of drawings exemplary embodiments of the present invention.
Slag cleaning device at the bottom of the direct absorbing type reversing port before Fig. 1, a kind of bored pile concrete pouring.By the conduit 1 that concrete at the bottom of deep stake 8 holes, hole is irritated, bottom connecting the foul water pump of conduit or slush pump 2, the supporting pump housing and conduit framework 3,, outlet pipe 4, spiral-flow type desander 6 and return pipe 7 are formed.Described pump is contained on the framework, setting up the connection of upper and lower flange or other form under the framework makes conduit be communicated with pump housing water inlet, its delivery port connects outlet pipe, and to hydrocyclone, revolve desander sand removing hole is arranged, the overfall mouth, the silt particle that sand removing hole is discharged is in time walked clearly, and the overfall mouth connects return pipe also to a stake aperture.Also has a drop handle 5 at the top of described framework.Described hydrocyclone is a kind of cyclonic separator, and it separates sand with slurry.
Use one of method of slag cleaning device of the present invention; Concrete steps:
1, connects foul water pump (perhaps slush pump) and irritate conduit, connect foul water pump upper water-out pipe and hydrocyclone, connect the outlet pipe on the desander and put into an aperture with concrete.
2, carry stress frame and go here and there up and down,, transfer framework and make mud flood pump head with sediment at the bottom of the stirring hole.
3, start foul water pump (or slush pump) and inhale hole bottom slurry, simultaneously, start the hydrocyclone desanding.Foul water pump is with the hole bottom slurry inspiration and send into hydrocyclone, and behind its parting sand and the mud, sand is discharged by sand removing hole, and mud is in the return pipe return aperture.
4, transfer conduit gradually according to the situation of shaking out, at the bottom of the hole, after the desander sand production rate reduces, the hole is described at the bottom of sediment remove substantially.
5, switch off the pump, sediment at the bottom of the desander, measured hole.As still there being sediment at the bottom of the measured hole, repeat above process, continue scarfing cinder, clean out until reaching sediment.
Two of the method for use slag cleaning device of the present invention; Concrete steps:
1, connects foul water pump or slush pump and irritate conduit, connect pump upper water-out pipe mud pit to the hole with concrete.
2, carry stress frame and go here and there up and down,, transfer framework and make mud flood foul water pump or mud pump head with sediment at the bottom of the stirring hole.
3, start slurry at the bottom of foul water pump (or slush pump) is inhaled the hole, simultaneously, moisturizing or mend slurry guarantees the water level in the hole.
4, till sediment is cleaned out at the bottom of the hole.
Points for attention in using operation scarfing cinder process:
1, should be constantly in the scarfing cinder process in the hole, injects clear water or mud, keep certain height of water level, prevent out that the quantity of slag it's the end causes in the hole to past too greatly water level.
2, perfusion frame mouth should be big, so that the pump housing and framework pass through.
3, advance to starch hose length and the pulp hose length should suitably be adjusted according to field condition, to satisfy the demand.

Claims (4)

1, slag cleaning device at the bottom of the preceding direct absorbing type reversing port of a kind of bored pile concrete pouring, it comprises that the concrete that gos deep at the bottom of the hole irritates conduit (1), it is characterized in that: concrete is irritated the outlet pipe (4) that is connected on the framework (3), the pump housing of the foul water pump of the following connecting duct of conduit or slush pump (2), the supporting pump housing and conduit, and also is provided with drop handle (5) on framework.
2, slag cleaning device at the bottom of the preceding direct absorbing type reversing port of a kind of bored pile concrete pouring according to claim 1, it is characterized in that: it also comprises the hydrocyclone (6) that an outlet pipe connects, and is connected the return pipe (7) of hydrocyclone top to stake hole (8).
3, direct absorbing type reversing port bottom slag-removing method before a kind of bored pile concrete pouring, it is characterized in that: adopt the sludge pump or the slush pump (2) that are connecting conduit (1), with the deep bottom, stake hole (8) of conduit, put forward catheter pump and framework is gone here and there up and down by drop handle (5), at the bottom of the stirring hole behind the sediment, transferring framework makes mud flood pump head, starting pump will extract the stake hole out with the mud of slag, drain in the mud pit, simultaneously, replenish clear water or mud in the stake hole, continuous drawing is cleaned out until sediment.
4, direct absorbing type reversing port bottom slag-removing method before a kind of bored pile concrete pouring, employing is connecting the sludge pump or the slush pump (2) of conduit (1), conduit is goed deep into bottom, stake hole (8), put forward catheter pump and framework is gone here and there up and down by drop handle (5), stir at the bottom of the hole behind the sediment, transferring framework makes mud flood pump head, start pump and will extract the stake hole out with the mud of slag, it is characterized in that: the band slag mud of extraction is sent into hydrocyclone (6) through outlet pipe (4), behind its parting sand and the slurry, sand is got rid of to walk clearly, and slurry is back to a hole again by return pipe (7), the straight suction instead circulated, and cleans out until sediment.
CNB011246790A 2001-08-03 2001-08-03 Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile Expired - Fee Related CN1141489C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB011246790A CN1141489C (en) 2001-08-03 2001-08-03 Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB011246790A CN1141489C (en) 2001-08-03 2001-08-03 Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile

Publications (2)

Publication Number Publication Date
CN1332309A CN1332309A (en) 2002-01-23
CN1141489C true CN1141489C (en) 2004-03-10

Family

ID=4665773

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB011246790A Expired - Fee Related CN1141489C (en) 2001-08-03 2001-08-03 Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile

Country Status (1)

Country Link
CN (1) CN1141489C (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787815B (en) * 2011-05-18 2015-08-05 上海市基础工程集团有限公司 The positive and negative circulation of extra-deep hole drilling castinplace pile combines construction technology
CN103061263A (en) * 2011-10-18 2013-04-24 周承利 Spraying-type deslagging method
CN102373703A (en) * 2011-11-24 2012-03-14 中铁二十一局集团有限公司 Centrifugal sand remover for bridge pile foundation construction and application method thereof
CN102535444B (en) * 2011-12-06 2016-01-13 中铁十八局集团第五工程有限公司 Shallow subsurface excavated metro station at water-rich sandy stratum stake mechanical execution method
CN103967446B (en) * 2013-02-04 2016-06-29 四川省地质工程勘察院 Eddy flow sediment outflow well washing system
CN103216202A (en) * 2013-04-07 2013-07-24 李�杰 Pile bottom cleaning device
CN107386999B (en) * 2017-09-14 2023-12-29 广州君豪岩土工程有限公司 Reverse circulation hole cleaning device for rotary drilling
CN109183797B (en) * 2018-10-20 2020-08-21 四川志德公路工程有限责任公司 Pile foundation hole cleaning device and process
CN109339708B (en) * 2018-10-29 2020-05-15 武大巨成结构股份有限公司 Hole forming process of anchoring hole bottom reaming device
CN111443698A (en) * 2018-12-28 2020-07-24 上海太昂科技有限公司 Posture self-adjusting mobile balancing device and method, electronic terminal and storage medium
CN110043205B (en) * 2019-05-16 2021-09-21 深圳市工勘岩土集团有限公司 Secondary hole cleaning method for cast-in-place pile
CN113294102B (en) * 2021-04-12 2023-01-10 深圳市工勘岩土集团有限公司 Bored concrete pile reverse circulation clear hole device based on sediment stuff pump

Also Published As

Publication number Publication date
CN1332309A (en) 2002-01-23

Similar Documents

Publication Publication Date Title
CN1141489C (en) Directly sucking and reversely circular bottom slag-removing method and equipment before filling concrete for drilling cast-in-situ pile
CN112096323B (en) Construction system and method for slurry-free clear water pore-forming of cast-in-situ bored pile
CN110409422B (en) Diaphragm wall construction method and diaphragm wall construction system
CN108868678A (en) For clearing up the hole cleaning device and method of Punching Borehole Cast-in-place Concrete Pile bottom hole sediment
CN208564475U (en) Stake holes cleaning equipment
CN109629561A (en) A kind of high trestle operation platform reacting cycle pile system of clean and environmental protection
CN207538100U (en) A kind of Novel water conservancy project Accrete clearing device
CN108277802B (en) Suction type slag remover
CN212003125U (en) Device for cleaning sludge in pile core of PHC prefabricated pipe pile
CN212428665U (en) Bridge hole pile sand-rich sediment pump drainage device
CN218030114U (en) Device for removing pile hole sediment of cast-in-place pile
CN103527078A (en) Hole forming technology and device for bored pile construction through down-the-hole hammer
CN114737900B (en) Static rotational flow well washing device and method for cleaning in-situ immersed drilling holes
CN110344462A (en) A kind of anticlogging dredge pump
CN206438508U (en) Split type quick hole cleaning device
CN213709494U (en) Tubular pile internal water jet gas lift reverse circulation advanced leading hole pile sinking construction device
CN212337234U (en) Well washing device for subway deep foundation pit dewatering well
CN209483247U (en) Boring mud Sediment filter box for high trestle operation platform reacting cycle pile system
CN209483248U (en) Boring mud deposit box for high trestle operation platform reacting cycle pile system
CN210564473U (en) Monitoring well bottom dredging device
CN209687462U (en) Drilling is with spouting plugging device soon
CN208330239U (en) A kind of reacting cycle hole cleaning device
CN1295420C (en) Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment
CN220248038U (en) Drilling cleaning device for concrete reinforcement
CN220599716U (en) Rectangular slide-resistant pile drilling machine with armpit horizontal cantilever and step-by-step type size variable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040310

Termination date: 20100803