Prior art keywords
ball number
temporary
equipment
stored ball
instruction signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111407945.1A
Other languages
Chinese (zh)
Other versions
CN114118336A (en
Inventor
王琛
于洋
李�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Shandong Shidaobay Nuclear Power Co Ltd
Huaneng Nuclear Energy Technology Research Institute Co Ltd
Original Assignee
Huaneng Shandong Shidaobay Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Shandong Shidaobay Nuclear Power Co Ltd filed Critical Huaneng Shandong Shidaobay Nuclear Power Co Ltd
Priority to CN202111407945.1A priority Critical patent/CN114118336B/en
Publication of CN114118336A publication Critical patent/CN114118336A/en
Application granted granted Critical
Publication of CN114118336B publication Critical patent/CN114118336B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06MCOUNTING MECHANISMS; COUNTING OF OBJECTS NOT OTHERWISE PROVIDED FOR
    • G06M1/00Design features of general application
    • G06M1/08Design features of general application for actuating the drive
    • G06M1/10Design features of general application for actuating the drive by electric or magnetic means
    • G06M1/108Design features of general application for actuating the drive by electric or magnetic means by electronic means
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/18Apparatus for bringing fuel elements to the reactor charge area, e.g. from a storage place
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/32Apparatus for removing radioactive objects or materials from the reactor discharge area, e.g. to a storage place; Apparatus for handling radioactive objects or materials within a storage place or removing them therefrom
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Databases & Information Systems (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The invention provides a high-temperature gas cooled reactor temporary storage ball number configuration method and a system, wherein the method comprises the following steps: acquiring the operating condition of the spherical fuel element; selecting a logic configuration matched with the operation condition from a preset logic configuration library according to the operation condition, and executing the logic configuration, wherein the preset logic configuration library comprises a temporary ball number logic configuration of the ball storage tank and a temporary ball number logic configuration before equipment. And selecting a matched logic configuration according to the operating condition of the spherical fuel element, and accurately calculating the temporary storage ball number in a certain device according to the selected logic configuration, thereby realizing ordered and single fuel element delivery.

Description

High-temperature gas cooled reactor temporary storage ball number configuration method and system
Technical Field
The invention relates to the field of nuclear fuel loading and unloading, in particular to a configuration method and a configuration system for temporary storage ball number of a high-temperature gas cooled reactor.
Background
In a high temperature gas cooled reactor nuclear power plant, the core consists of spherical fuel elements with a diameter of 60 mm. During the operation of the high-temperature gas cooled reactor, the continuous unloading and loading functions of the spherical fuel elements are performed by the fuel loading and unloading system. About 6000 fuel elements are discharged from the core through the fuel handling system every day, the fuel elements are subjected to ball breaking separation and burnup measurement, and the fuel elements which do not reach the burnup depth are conveyed back to the core again.
The fuel handling system conveys spherical fuel elements to various devices such as a ball crushing separation device, a fuel consumption measurement device, a storage tank and the like through pipelines, and in the conveying process, a single device is required to execute single conveying work according to the temporary storage quantity of the upstream fuel elements. However, due to the lack of logic configuration for temporarily storing the amount of upstream fuel elements, the fuel handling system cannot singulate and sequentially transport the fuel elements, which affects the normal operation of the high temperature gas cooled reactor nuclear power plant.
Disclosure of Invention
Therefore, the technical problem to be solved by the present invention is to overcome the defect of the prior art that the logical configuration for implementing the temporary storage amount of the upstream fuel elements is not available, so as to provide a temporary storage ball number configuration method and system for a high temperature gas cooled reactor.
In order to achieve the purpose, the invention provides the following technical scheme:
in a first aspect, an embodiment of the present invention provides a configuration method for temporary storage of a sphere number of a high temperature gas cooled reactor, including: acquiring the operating condition of the spherical fuel element; and selecting a logic configuration matched with the operating condition from a preset logic configuration library according to the operating condition, and executing the logic configuration, wherein the preset logic configuration library comprises a temporary storage ball number logic configuration of a ball storage tank and a temporary storage ball number logic configuration before equipment.
Optionally, the logic configuration of the device pre-staged ball count includes: acquiring a measured value of an upstream counter of the equipment and a measured value of a downstream counter of the equipment; when the measured value of the upstream counter of the equipment is added with 1, generating a command signal for temporarily storing the number of balls and adding 1; when the measured value of the downstream counter of the equipment is added with 1, generating an instruction signal for subtracting 1 from the number of the temporary stored balls; and calculating to obtain the number of the temporary stored balls before the current equipment according to the instruction signal of adding 1 to the number of the temporary stored balls and the instruction signal of subtracting 1 from the number of the temporary stored balls.
Optionally, the obtaining the previous temporary stored ball number by calculation according to the instruction signal of adding 1 to the temporary stored ball number and the instruction signal of subtracting 1 from the temporary stored ball number includes: when the instruction signal of adding 1 to the temporary stored ball number and the instruction signal of subtracting 1 from the temporary stored ball number after non-selection exist at the same time, the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment is executed, and the current temporary stored ball number before the equipment is obtained; when the instruction signal of subtracting 1 from the temporary stored ball number and the instruction signal of adding 1 from the temporary stored ball number after non-selection exist at the same time, the operation of subtracting 1 from the temporary stored ball number before the equipment at the previous moment is executed, and the current temporary stored ball number before the equipment is obtained; when the instruction signal of adding 1 to the temporary stored ball number does not exist, the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment is not executed, and the temporary stored ball number before the equipment at the previous moment is updated to the temporary stored ball number before the current equipment; when the instruction signal for subtracting 1 from the temporary stored ball number does not exist, the operation of subtracting 1 from the temporary stored ball number before the previous moment is not executed, and the temporary stored ball number before the previous moment is updated to the temporary stored ball number before the current moment.
Optionally, the configuration method for temporary storage sphere number of the high temperature gas cooled reactor further includes: and generating a command signal for adding 1 to the temporary stored ball number or generating a command signal for subtracting 1 from the temporary stored ball number according to the manual input signal.
Optionally, the logic configuration of the number of balls temporarily stored in the ball storage tank includes: acquiring a measured value of an upstream counter of the equipment and a measured value of a downstream counter of the equipment; performing difference on the measured value of the device upstream counter and the measured value of the device downstream counter; and correcting the difference value to obtain the number of the temporary storage balls in front of the current equipment.
In a second aspect, an embodiment of the invention provides a high temperature gas cooled reactor temporary storage sphere number configuration system, including: the acquisition module is used for acquiring the operating condition of the spherical fuel element; and the matching module is used for selecting the logic configuration matched with the operating condition from a preset logic configuration library according to the operating condition and executing the logic configuration, wherein the preset logic configuration library comprises the logic configuration of the temporary storage ball number of the ball storage tank and the logic configuration of the temporary storage ball number before equipment.
In a third aspect, an embodiment of the present invention provides a computer-readable storage medium, where computer instructions are stored, and the computer instructions are configured to cause the computer to execute the method for configuring temporary storage sphere number of a high temperature gas cooled reactor according to the first aspect of the embodiment of the present invention.
In a fourth aspect, an embodiment of the present invention provides a computer device, including: the storage and the processor are in communication connection with each other, the storage stores computer instructions, and the processor executes the computer instructions to execute the temporary storage sphere number configuration method for the high temperature gas cooled reactor according to the first aspect of the embodiments of the present invention.
The technical scheme of the invention has the following advantages:
the invention provides a configuration method for temporary storage ball number of a high-temperature gas cooled reactor, which comprises the following steps: acquiring the operating condition of the spherical fuel element; selecting a logic configuration matched with the operation condition from a preset logic configuration library according to the operation condition, and executing the logic configuration, wherein the preset logic configuration library comprises a temporary ball number logic configuration of the ball storage tank and a temporary ball number logic configuration before equipment. And selecting a matched logic configuration according to the operating condition of the spherical fuel element, and accurately calculating the temporary storage ball number in a certain device according to the selected logic configuration, thereby realizing ordered and single fuel element delivery.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a flow chart illustrating an exemplary method for configuring temporary storage count of high temperature gas cooled reactor in accordance with an embodiment of the present invention;
FIG. 2 is a logic configuration of a pre-device temporary ball count in accordance with an embodiment of the present invention;
FIG. 3 is a logic configuration of the temporary stored ball count of the ball storage tank according to the embodiment of the present invention;
FIG. 4 is a schematic block diagram illustrating an exemplary high temperature gas cooled reactor temporary storage sphere configuration system according to an embodiment of the present invention;
fig. 5 is a block diagram of a specific example of a computer device according to an embodiment of the present invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; the two elements may be directly connected or indirectly connected through an intermediate medium, or may be communicated with each other inside the two elements, or may be wirelessly connected or wired connected. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In addition, the technical features involved in the different embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
The embodiment of the invention provides a configuration method for temporary storage ball number of a high-temperature gas cooled reactor, as shown in figure 1, comprising the following steps:
step S1: and acquiring the operating condition of the spherical fuel element.
In one embodiment, the spherical fuel element is operated under two operating conditions: 1) when loading/unloading the components, a plurality of components continuously pass through the working conditions of the counter on the upstream and downstream of the ball storage tank. 2) The fuel handling system delivers spherical fuel elements normally and there is no condition where multiple elements are continuously passing through the device upstream and downstream counters.
Step S2: selecting a logic configuration matched with the operation condition from a preset logic configuration library according to the operation condition, and executing the logic configuration, wherein the preset logic configuration library comprises a temporary ball number logic configuration of the ball storage tank and a temporary ball number logic configuration before equipment.
In an embodiment, when the operation condition is a condition that a plurality of elements continuously pass through the upstream counter and the downstream counter of the spherical tank, the interval time between two elements continuously passing through the counter is less than 500ms of the scanning time of the DCS logic configuration, the time for scanning the reading of the counter is only 50ms, and is less than the interval time between the elements continuously passing through the counter, and the reading of the counter by the DCS cannot be missed. Therefore, the logical configuration of the ball storage tank temporary ball number is executed, and the ball storage tank temporary ball number is calculated through the current value of the counter.
Further, when the operating condition does not have a condition that a plurality of elements continuously pass through the upstream and downstream counters of the device, the interval time of two elements continuously passing through the counter is far longer than the scanning time of the DCS logic configuration by 500ms, the DCS logic can be used to process the counter value, that is, the logic configuration of the ball number temporarily stored before the device is executed.
The invention provides a configuration method for temporary storage ball number of a high-temperature gas cooled reactor, which comprises the following steps: acquiring the operating condition of the spherical fuel element; selecting a logic configuration matched with the operation condition from a preset logic configuration library according to the operation condition, and executing the logic configuration, wherein the preset logic configuration library comprises a temporary ball number logic configuration of the ball storage tank and a temporary ball number logic configuration before equipment. And selecting a matched logic configuration according to the operating condition of the spherical fuel element, and accurately calculating the temporary storage ball number in a certain device according to the selected logic configuration, thereby realizing ordered and single fuel element delivery.
In one embodiment, the method for pre-device temporary storage of ball count logic configuration includes the following steps:
step 210: a device upstream counter measurement and a device downstream counter measurement are obtained.
In a specific embodiment, as shown in fig. 2, jsq1.av is a measurement point corresponding to an upstream counter of the device, and is used to obtain a measurement value of the upstream counter of the device, when the counter is incremented by 1, the jsq1.av is incremented by 1, and the number of balls temporarily stored before the device is incremented by 1; and the JSQ2.AV is a measuring point corresponding to the equipment downstream counter and is used for obtaining the measuring value of the equipment downstream counter, when the counter is increased by 1, the JSQ2.AV is increased by 1, and the number of balls temporarily stored in the equipment before is decreased by 1.
Step 211: when the measured value of the counter on the upstream of the device is added with 1, a command signal for adding 1 to the temporary stored ball number is generated.
In an embodiment, due to the condition that the upstream counter is missed, in such a condition, an interface for manually modifying the offset of the temporary ball count of the ball storage tank by an operator needs to be added, that is, a command signal for adding 1 to the temporary ball count is generated according to a manual input signal.
In the embodiment of the present invention, as shown in fig. 2, CXPD301 converts the plus 1 of jsq1.av into a pulse signal of the number of temporary storage balls of 1 scan cycle width plus 1; onp is an instruction signal for the operator to manually add 1 to the temporary ball count, and since the instruction width is 2 seconds, it needs to be converted into a pulse signal for adding 1 to the temporary ball count of 1 scan cycle width by using R _ TRIG 01. And taking OR logic of the two signals to obtain a command DM01 for adding 1 to the temporary stored ball number.
Step 212: when the measured value of the counter at the downstream of the device is added with 1, an instruction signal for subtracting 1 from the number of the temporary stored balls is generated.
In an embodiment, also when generating the command signal for subtracting 1 from the temporary ball count, due to the condition that the downstream counter is missing, in such a condition, it is necessary to add an interface for the operator to manually modify the offset of the temporary ball count of the ball storage tank, that is, the command signal for subtracting 1 from the temporary ball count is generated according to the manual input signal.
In the embodiment of the present invention, as shown in fig. 2, CXPD302 converts the plus 1 of jsq2.av into a pulse signal of the number of temporary storage balls minus 1 of 1 scan cycle width; ofp is an instruction signal for manually subtracting 1 from the temporary ball count by an operator, and since the instruction width is 2 seconds, it needs to be converted into a pulse signal for subtracting 1 from the temporary ball count of 1 scan cycle width by using R _ TRIG 02. The two signals are OR-ed to obtain the instruction DM02 for subtracting 1 from the number of temporary stored balls.
Step 213: and calculating to obtain the number of the temporary stored balls before the current equipment according to the instruction signal of adding 1 to the number of the temporary stored balls and the instruction signal of subtracting 1 from the number of the temporary stored balls.
In an embodiment, the method for calculating the number of balls temporarily stored before the device according to the instruction signal of adding 1 to the number of balls temporarily stored and the instruction signal of subtracting 1 from the number of balls temporarily stored includes the following steps:
step 2131: and when the instruction signal of adding 1 to the temporary stored ball number and the instruction signal of subtracting 1 from the temporary stored ball number after non-selection exist at the same time, executing the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment to obtain the current temporary stored ball number before the equipment.
Step 2132: and when the instruction signal of subtracting 1 from the temporary stored ball number and the instruction signal of adding 1 to the temporary stored ball number after the non-selection exist at the same time, subtracting 1 from the temporary stored ball number before the equipment at the previous moment to obtain the current temporary stored ball number before the equipment.
Step 2133: when the instruction signal of adding 1 to the temporarily stored ball number does not exist, the operation of adding 1 to the temporarily stored ball number before the equipment at the previous moment is not executed, and the temporarily stored ball number before the equipment at the previous moment is updated to the temporarily stored ball number before the current equipment.
Step 2134: when the instruction signal for subtracting 1 from the temporary stored ball number does not exist, the operation of subtracting 1 from the temporary stored ball number before the previous moment is not executed, and the temporary stored ball number before the previous moment is updated to the temporary stored ball number before the current moment.
In a specific embodiment, to avoid the simultaneous triggering of DM01 and DM02, only the triggering of DM01 is caused to be active (since the DM01 trigger preceded the logic of increasing zc.ai by 1 in the data stream). For the logic of adding 1 to the temporary stored ball number ZC.AI, using the 'NOT' trigger of DM01 and DM 02; for the logic of temporary stored ball count zc.ai minus 1, the "not" trigger of DM02 and DM01 is used. Therefore, when DM01 and DM02 are equal to 1 at the same time, the logics of zc.ai plus 1 and minus 1 are not triggered, and the temporary stored ball number is not added or subtracted and still remains as the original value.
Since the processing logic of the temporary ball number plus 1 and minus 1 is similar, only the logic of the temporary ball number plus 1 is analyzed below.
When DM01 is 1, the output of SEL (11) is ADD (10), i.e., zc.ai is zc.av +1, and when DM01 is 0, the output of SEL (11) is zc.ai, i.e., zc.ai is zc.ai. There are two points to note:
the ai is zc.av +1 logic, that is, a variable is added with 1/subtracted with 1 to assign to its own logic, and the number of times of calculation is the number of times of the DCS scanning cycle, that is, if the DM01 is too long for 1, it will cause zc.ai to be zc.av +1 for many operations, and a large number of wrong accumulations occur to the temporary stored ball number. Therefore, it is necessary to ensure that the time of DM01 equals 1 is 1 DCS scanning period.
When DM01 is 0, zc.ai is used, which if used results in zc.ai adding 1 when DM01 is 1 and zc.ai changing back to the value before adding 1 when DM01 is 0. This is because the transfer from zc.ai to zc.av requires 1 scan cycle and DM01 holds only 1 scan cycle, when DM01 changes from 1 to 0, at which time zc.ai has been incremented by 1 and zc.av has not been incremented by 1, the use of zc.ai to zc.av results in zc.ai changing back to the value before addition by 1.
In one embodiment, the logic configuration of the number of balls temporarily stored in the ball storage tank includes the following steps:
step 221: a device upstream counter measurement and a device downstream counter measurement are obtained.
Step 222: and carrying out difference on the measured value of the counter at the upstream of the equipment and the measured value of the counter at the downstream of the equipment.
Step 223: and correcting the difference value to obtain the number of the temporary storage balls in front of the current equipment.
In a specific embodiment, as shown in fig. 3, jsq1.av is a measurement point corresponding to an upstream counter of the device, and is used to obtain a measurement value of the upstream counter of the device, when the counter is incremented by 1, the jsq1.av is incremented by 1, and the number of balls temporarily stored before the device is incremented by 1; and the JSQ2.AV is a measuring point corresponding to the equipment downstream counter and is used for obtaining the measuring value of the equipment downstream counter, when the counter is increased by 1, the JSQ2.AV is increased by 1, and the number of balls temporarily stored in the equipment before is decreased by 1. The temporary stored ball number AM07.AI is JSQ1.AV-JSQ2.AV before the current device, so that the temporary stored ball number can not be missed even 2 elements continuously pass through the counter under the condition that the counter is not missed.
If the working condition that the element is directly loaded into the ball storage tank without passing through the counter occurs, an operator is required to manually correct the number of balls in the ball storage tank. Am03.av is a correction value input by an operator, and kg01.onp is a correction command. When the operator clicks the correction instruction, the output of the SEL (14) is AM03.AV, the number of the temporary balls AM07.AI is JSQ1.AV-JSQ2.AV + AM03.AV, the pulse width of the correction instruction KG01.ONP is 2 seconds, KG01.ONP is 0 after 2 seconds, and the output of the SEL (14) is connected to the selection value when KG01.ONP is 0, namely the output of the SEL (14) is kept at the value of a period on AM03.AV, so that the number of the temporary balls can still have the correction effect when the correction instruction disappears.
An embodiment of the present invention further provides a high temperature gas cooled reactor temporary storage ball number configuration system, as shown in fig. 4, including:
the acquisition module 1 is used for acquiring the operating condition of the spherical fuel element. For details, refer to the related description of step S1 in the above embodiment, and are not described herein again.
And the matching module 2 is used for selecting a logic configuration matched with the operation condition from a preset logic configuration library according to the operation condition and executing the logic configuration, wherein the preset logic configuration library comprises a temporary storage ball number logic configuration of the ball storage tank and a temporary storage ball number logic configuration before equipment. For details, refer to the related description of step S2 in the above embodiment, and are not described herein again.
An embodiment of the present invention further provides a computer device, as shown in fig. 5, the device may include a processor 61 and a memory 62, where the processor 61 and the memory 62 may be connected by a bus or in another manner, and fig. 5 takes the connection by the bus as an example.
The processor 61 may be a Central Processing Unit (CPU). The Processor 61 may also be other general purpose processors, Digital Signal Processors (DSPs), Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components, or combinations thereof.
The memory 62, which is a non-transitory computer readable storage medium, may be used to store non-transitory software programs, non-transitory computer executable programs, and modules, such as the corresponding program instructions/modules in embodiments of the present invention. The processor 61 executes various functional applications and data processing of the processor by running the non-transitory software programs, instructions and modules stored in the memory 62, so as to implement the temporary storage sphere number configuration method of the high temperature gas cooled reactor in the above method embodiment.
The memory 62 may include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created by the processor 61, and the like. Further, the memory 62 may include high speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid state storage device. In some embodiments, the memory 62 may optionally include memory located remotely from the processor 61, and these remote memories may be connected to the processor 61 via a network. Examples of such networks include, but are not limited to, the internet, intranets, mobile communication networks, and combinations thereof.
One or more modules are stored in the memory 62, and when executed by the processor 61, perform the temporary storage sphere configuration method for the high temperature gas cooled reactor provided by the embodiments of the present invention.
The details of the computer device can be understood by referring to the corresponding descriptions and effects in the embodiments shown in fig. 1 to fig. 3, and are not described herein again.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above may be implemented by a computer program that instructs the relevant hardware to perform the processes, and the computer program may be stored in a computer readable storage medium, and when executed, may include the processes of the embodiments of the methods described above. The storage medium may be a magnetic Disk, an optical Disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a Flash Memory (Flash Memory), a Hard Disk Drive (Hard Disk Drive, abbreviated as HDD), or a Solid State Drive (SSD); the storage medium may also comprise a combination of memories of the kind described above.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications of the invention may be made without departing from the spirit or scope of the invention.

Claims (6)

1.A configuration method for temporary storage ball number of a high-temperature gas cooled reactor is characterized by comprising the following steps:
acquiring the operating condition of the spherical fuel element;
selecting a logic configuration matched with the operation condition from a preset logic configuration library according to the operation condition, and executing the logic configuration, wherein the preset logic configuration library comprises a logic configuration of the temporary storage ball number of the ball storage tank and a logic configuration of the temporary storage ball number before equipment;
the logical configuration of the pre-register ball count of the device comprises:
acquiring a measured value of an upstream counter of the equipment and a measured value of a downstream counter of the equipment;
when the measured value of the upstream counter of the equipment is added with 1, generating a command signal for temporarily storing the number of balls and adding 1;
when the measured value of the downstream counter of the equipment is added with 1, generating an instruction signal for subtracting 1 from the number of the temporary storage balls;
calculating to obtain the number of temporary storage balls before the current equipment according to the instruction signal of adding 1 to the number of temporary storage balls and the instruction signal of subtracting 1 from the number of temporary storage balls;
the method for calculating the number of the temporary storage balls before the equipment according to the instruction signal of adding 1 to the number of the temporary storage balls and the instruction signal of subtracting 1 from the number of the temporary storage balls comprises the following steps:
when the instruction signal of adding 1 to the temporary stored ball number and the instruction signal of subtracting 1 from the temporary stored ball number after non-selection exist at the same time, the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment is executed, and the current temporary stored ball number before the equipment is obtained;
when the instruction signal of subtracting 1 from the temporary stored ball number and the instruction signal of adding 1 from the temporary stored ball number after non-selection exist at the same time, the operation of subtracting 1 from the temporary stored ball number before the equipment at the previous moment is executed, and the current temporary stored ball number before the equipment is obtained;
when the instruction signal of adding 1 to the temporary stored ball number does not exist, the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment is not executed, and the temporary stored ball number before the equipment at the previous moment is updated to the temporary stored ball number before the current equipment;
when the instruction signal of subtracting 1 from the temporarily stored ball number does not exist, the operation of subtracting 1 from the temporarily stored ball number of the device at the previous moment is not executed, and the temporarily stored ball number of the device at the previous moment is updated to the currently temporarily stored ball number of the device.
2. The method of claim 1, further comprising: and generating a command signal for adding 1 to the temporary stored ball number or generating a command signal for subtracting 1 from the temporary stored ball number according to the manual input signal.
3. The method of claim 1, wherein the logical configuration of the temporary storage ball count of the ball storage tank comprises:
acquiring a measured value of an upstream counter of the equipment and a measured value of a downstream counter of the equipment;
performing difference on the measured value of the device upstream counter and the measured value of the device downstream counter;
and correcting the difference value to obtain the number of the temporary storage balls in front of the current equipment.
4. A temporary storage ball number configuration system for a high temperature gas cooled reactor according to any one of claims 1-3, comprising:
the acquisition module is used for acquiring the operating condition of the spherical fuel element;
the matching module is used for selecting a logic configuration matched with the operating condition from a preset logic configuration library according to the operating condition and executing the logic configuration, wherein the preset logic configuration library comprises a temporary storage ball number logic configuration of a ball storage tank and a temporary storage ball number logic configuration before equipment;
the logical configuration of the pre-register ball count of the device comprises:
acquiring a measured value of an upstream counter of the equipment and a measured value of a downstream counter of the equipment;
when the measured value of the upstream counter of the equipment is added with 1, generating an instruction signal for adding 1 to the number of the temporary stored balls;
when the measured value of the downstream counter of the equipment is added with 1, generating an instruction signal for subtracting 1 from the number of the temporary storage balls;
calculating to obtain the number of temporary storage balls before the current equipment according to the instruction signal of adding 1 to the number of temporary storage balls and the instruction signal of subtracting 1 from the number of temporary storage balls;
the method for calculating the number of the temporary storage balls before the equipment according to the instruction signal of adding 1 to the number of the temporary storage balls and the instruction signal of subtracting 1 from the number of the temporary storage balls comprises the following steps:
when the instruction signal of adding 1 to the temporary stored ball number and the instruction signal of subtracting 1 from the temporary stored ball number after non-selection exist at the same time, the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment is executed, and the current temporary stored ball number before the equipment is obtained;
when the instruction signal of subtracting 1 from the temporary stored ball number and the instruction signal of adding 1 from the temporary stored ball number after non-selection exist at the same time, the operation of subtracting 1 from the temporary stored ball number before the equipment at the previous moment is executed, and the current temporary stored ball number before the equipment is obtained;
when the instruction signal of adding 1 to the temporary stored ball number does not exist, the operation of adding 1 to the temporary stored ball number before the equipment at the previous moment is not executed, and the temporary stored ball number before the equipment at the previous moment is updated to the temporary stored ball number before the current equipment;
when the instruction signal for subtracting 1 from the temporary stored ball number does not exist, the operation of subtracting 1 from the temporary stored ball number before the previous moment is not executed, and the temporary stored ball number before the previous moment is updated to the temporary stored ball number before the current moment.
5. A computer readable storage medium storing computer instructions for causing a computer to perform the method according to any one of claims 1 to 3.
6. A computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to perform the temporary storage sphere number configuration method of the high temperature gas cooled reactor according to any one of claims 1 to 3.
CN202111407945.1A 2021-11-19 2021-11-19 High-temperature gas cooled reactor temporary storage ball number configuration method and system Active CN114118336B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111407945.1A CN114118336B (en) 2021-11-19 2021-11-19 High-temperature gas cooled reactor temporary storage ball number configuration method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111407945.1A CN114118336B (en) 2021-11-19 2021-11-19 High-temperature gas cooled reactor temporary storage ball number configuration method and system

Publications (2)

Publication Number Publication Date
CN114118336A CN114118336A (en) 2022-03-01
CN114118336B true CN114118336B (en) 2022-08-16

Family

ID=80372406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111407945.1A Active CN114118336B (en) 2021-11-19 2021-11-19 High-temperature gas cooled reactor temporary storage ball number configuration method and system

Country Status (1)

Country Link
CN (1) CN114118336B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115081578B (en) * 2022-06-08 2023-11-03 华能核能技术研究院有限公司 Fuel ball counter signal processing system, method and device and electronic equipment
CN115083637B (en) * 2022-06-27 2023-10-13 华能核能技术研究院有限公司 Logical judgment method and device for fuel element counter of pebble-bed high-temperature gas cooled reactor
CN116384435B (en) * 2023-03-30 2024-03-22 华能山东石岛湾核电有限公司 System and method for judging neglected recording of high-temperature gas cooled reactor counter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253327A (en) * 1996-03-19 1997-09-30 Pfu Ltd Pachinko ball counter
CN101202126A (en) * 2007-12-10 2008-06-18 清华大学 Bidirectional ball-passing count and display device for ball bed high temperature gas-cooling stack ball-passing loading/unloading system
CN102855951A (en) * 2012-09-27 2013-01-02 清华大学 Loading and temporary storage device for new fuel of pebble-bed high-temperature reactor
CN111695246A (en) * 2020-05-26 2020-09-22 国家核安保技术中心 Nuclear material balance method, device and equipment and computer storage medium
CN113505871A (en) * 2021-04-19 2021-10-15 华能山东石岛湾核电有限公司 Counting method, device and storage medium
CN113643834A (en) * 2021-08-11 2021-11-12 华能山东石岛湾核电有限公司 Configuration realization system and realization method for fuel ball lifting time of high-temperature gas cooled reactor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253327A (en) * 1996-03-19 1997-09-30 Pfu Ltd Pachinko ball counter
CN101202126A (en) * 2007-12-10 2008-06-18 清华大学 Bidirectional ball-passing count and display device for ball bed high temperature gas-cooling stack ball-passing loading/unloading system
CN102855951A (en) * 2012-09-27 2013-01-02 清华大学 Loading and temporary storage device for new fuel of pebble-bed high-temperature reactor
CN111695246A (en) * 2020-05-26 2020-09-22 国家核安保技术中心 Nuclear material balance method, device and equipment and computer storage medium
CN113505871A (en) * 2021-04-19 2021-10-15 华能山东石岛湾核电有限公司 Counting method, device and storage medium
CN113643834A (en) * 2021-08-11 2021-11-12 华能山东石岛湾核电有限公司 Configuration realization system and realization method for fuel ball lifting time of high-temperature gas cooled reactor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高温气冷堆核材料衡算方法研究;张敏,张亮,洪哲,杨晓伟,何玮,阙骥;《原子能科学技术》;20200331;全文 *

Also Published As

Publication number Publication date
CN114118336A (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN114118336B (en) High-temperature gas cooled reactor temporary storage ball number configuration method and system
CN114005561B (en) High-temperature gas cooled reactor fuel element conveying control method and system
US20200252317A1 (en) Mitigating failure in request handling
CN116225749A (en) Real-time error correction method, system and storage medium for radar external guide data
CN110554956A (en) BDMS automatic testing method
CN108622756B (en) A kind of detection method and system of lifting device
US20120096467A1 (en) Microprocessor operation monitoring system
CN114185798A (en) Interface test case detection method and device, computer equipment and storage medium
CN112419698A (en) Electric energy meter data transmission method, system and device based on distribution line message specification
CN111752786A (en) Data storage method, data summarization method, equipment and medium in pressure test process
CN109188331A (en) The method of calibration of test framework calculates equipment and check system
CN115563015B (en) Code heat statistics method, device, equipment and storage medium
CN104486092B (en) Data monitoring method and device
CN117596449A (en) Image transmission method and device
CN113489708B (en) Detection method and device, electronic equipment and computer readable storage medium
CN117648317A (en) Data comparison method, device, equipment and storage medium of heterogeneous data source
CN110929102B (en) Data processing method and device and electronic equipment
CN113744909A (en) Digital procedure pushing method and device for nuclear power plant and computer equipment
CN109885402B (en) Method for testing function output data overflow, terminal equipment and storage medium
EP3331200A1 (en) Device and method for buffering reports
CN115527284A (en) Inspection method, equipment and storage medium of monitoring system
CN117514506A (en) Injection control method, system, medium and electronic equipment of injection valve
CN117270508A (en) Vehicle fault prediction method, device, equipment and storage medium
CN118196925A (en) Vehicle state signal processing method, device, equipment and storage medium
CN111695814A (en) Evaluation parameter acquisition method and apparatus, storage medium, and electronic apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221008

Address after: No.9 Shihe Road, Rongcheng City, Weihai City, Shandong Province

Patentee after: HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER Co.,Ltd.

Patentee after: Huaneng Nuclear Energy Technology Research Institute Co.,Ltd.

Address before: No.9 Shihe Road, Rongcheng City, Weihai City, Shandong Province