CN1140974A - Method of structure for processing junction cable - Google Patents

Method of structure for processing junction cable Download PDF

Info

Publication number
CN1140974A
CN1140974A CN96106033A CN96106033A CN1140974A CN 1140974 A CN1140974 A CN 1140974A CN 96106033 A CN96106033 A CN 96106033A CN 96106033 A CN96106033 A CN 96106033A CN 1140974 A CN1140974 A CN 1140974A
Authority
CN
China
Prior art keywords
unit
cable
main tank
stube cable
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN96106033A
Other languages
Chinese (zh)
Other versions
CN1066906C (en
Inventor
角田昌弘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Publication of CN1140974A publication Critical patent/CN1140974A/en
Application granted granted Critical
Publication of CN1066906C publication Critical patent/CN1066906C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/16Mechanical energy storage, e.g. flywheels or pressurised fluids

Abstract

An electrical setting main body whereon a printed circuit board unit is mounted and can be loaded and unloaded. Terminals fixed on the interior surface of rear part of the main body can be connected to the printed circuit board by junction cable comprising a plurality of wiring members. The wiring members have excess length which lies on the lengths the unit moves in and out of the main body. The wiring members covered with a flexible unwoven fabric are arranged horizontally parallel to the direction in which the unit moves out of the main body. The junction cable is held by terminals in rear part of unit and main body with an excess part sagging down.

Description

In order to handle the structure and the method for stube cable
The present invention relates to a kind of structure and method in order to processing overlength stube cable, this cable can be used for connecting in the structure of main tank and unit, and main tank be introduced and be drawn in its unit can, for example, and a kind of syndeton that connects the unit in link daughter board and the communicator.
Disclose in order to main tank that connects communicator and the known structure that can introduce and draw the unit of main tank, disclose 62-15897 and 63-62300 number as Japan Patent.
Fig. 1 in the accompanying drawing shows at Japan Patent and discloses the cable handling structure perspective view that is disclosed in 62-15897 number.As shown in Figure 1, movable base 102 can be supported on the guide rail 102 mutually movably, and its guide rail is fixedly mounted in the main tank (not shown).Movable base 102 support fixation thereon and have an electric device unit 101 of the many cables 105 that stretched out by its rear side, a pair of supporting bracket 104 is vertically mounted on the rear end of movable base 102, and swing plate 106 is angled to be arranged between the supporting bracket 104 and by its support movably, cable 105 is provided with in parallel to each other, and be fixed on the swing plate 106 by fixture, parallel cable 105 also can be fixed on the fixed head 107, this plate can be installed in the main tank behind the movable base 102, and cable 105 can be fixed on the intermediate plate 108 between swing plate 106 and the fixed head 107.
When electric device unit 101 was pushed main tank, cable 105 sagged into U-shaped because of the weight of intermediate plate 108, and cable 105 keeps being parallel to each other simultaneously, and can adjust between electric device unit 101 and main tank.
Yet because cable 105 is by each fixture fix in position seriatim, so packaging efficiency is relatively poor, and it is consuming time that cable 1,050 minutes is installed; Cable 105 has each restrictive coating, and it is very hard so that they are not flexible, and makes electric device unit 101 be difficult for inserting in the main tank thus.For electric device unit 101 is inserted in the main tank easily, when pushing electric device unit 101 in the main tank, the bending radius that increases cable 105 is very necessary, yet this needing can cause big space behind electric device unit 101.
Accompanying drawing 2 shows at Japan Patent and discloses disclosed cable handling structural section figure in 63-62300 number.As shown in Figure 2, printed circuit board (PCB) 202 detachably is installed in the device case 201, it has the cable 205 that the rear side by printed circuit board (PCB) 202 stretches out, a plurality of this device casees 201 are with the form stack of vertical rack (not shown), each printed circuit board (PCB) 202 in device case 201 can interconnect by cable 208 between device, and this cable can be connected to the front side of printed circuit board (PCB) 202.
In each device case 201, definite space is all arranged in order to adjust terminal 204 on printed circuit board (PCB) 202, the cable 205 from printed circuit board (PCB) 202 can be connected with it.Terminal 204 is slidably mounted on the bogie side frame 203 that is fixed in device case 201 sidewalls, and terminal 204 can slide front and back on direction shown in the arrow B, and therefore, cable 205 has certain extra long distance, and it depends on the distance that terminal 204 moves.Can be connected on the front of terminal 204 in order to the connector 206 that connects the external cable (not shown), when external cable being connected on the connector 206, external cable can be connected with printed circuit board (PCB) 202 by terminal 204, and external cable is introduced in the device case 201 by the cable aperture on device case 201 sidewalls.
After being installed in printed circuit board (PCB) 202 in the device case 201, terminal 204 can being pulled to the front side of device case 201, and external cable can be connected with connector 206; Then, terminal 204 is pushed, and cable 208 is connected on the printed circuit board (PCB) 202 between will installing.
Only used structure shown in Figure 2 in application, wherein cable 208 is to be connected on the front side of device case 201 between external cable and device, because the connection of cable 205, makes printed circuit board (PCB) 202 can not optionally put into device case 201 and by its taking-up.
Therefore, purpose of the present invention just provides a kind of in order to handle the structure and the method for stube cable, it makes unit that printed circuit board (PCB) is installed be placed in the main tank at an easy rate and by wherein taking out, wherein can connect stube cable, and also can make in the confined space of cable between unit and main tank in place easily.
In order to achieve the above object, according to the invention provides a kind of method of handling stube cable, wherein cable is made up of multiple conducting wires, be arranged on the terminal on the unit main tank rear side inner surface that electric device and printed circuit board (PCB) are installed in order to connection, there is moving to move into and to shift out main tank of certain distance its unit, stube cable has the extra length of respective distances, its method comprises the following steps: that lead is parallel to the direction that shifts out main tank in the unit to be horizontally disposed with, and cover with soft layer, stube cable is installed on the terminal in unit rear side and the main tank, makes the overlength part of stube cable sagging simultaneously.
According to the present invention, also provide a kind of in order to handle the structure of stube cable, wherein stube cable is made up of multiple conducting wires, be arranged on the terminal on the unit main tank rear side inner surface that electric device and printed circuit board (PCB) are installed in order to connection, there is moving to move into and to shift out main tank of certain distance its unit, its structure of extra length that stube cable has respective distances is characterised in that, lead is parallel to the direction that shifts out main tank in the unit and is horizontally disposed with, and cover with soft layer, stube cable is kept by the terminal in unit rear side and the main tank, make the overlength part of stube cable sagging simultaneously.
Adopt said structure, make stube cable assign to support, and the unit can move into and shift out main tank along with the stube cable that is connected with terminal with the unit with its sagging surplus length portion.Stube cable is to be twisted into by the soft layer that is coated with lead, and it can be positioned between unit and the terminal at an easy rate.Be horizontally disposed with owing to lead is parallel to the direction that shifts out main tank in the unit, and be coated with soft layer, make to move in the unit and prevent the stube cable twisting and keep its succinct shape when shifting out main tank.Because lead is coated with soft layer, can make stube cable crooked at an easy rate, make the unit move into and shift out main tank at an easy rate, and need be between the rear side of unit and the terminal in the main tank big parking space.
Stube cable is covered by gum sleeve in the zone that rear side kept by unit in the main tank and terminal; therefore; stube cable can be by casing protection to prevent damage; make the lead of stube cable be subjected to excessive compression so that fracture when thus, having prevented on external force is applied to by the stube cable that rear side kept of unit in the main tank and terminal.Stube cable also can be covered by another gum sleeve on by the zone line between the zone that rear side kept of unit in the main tank and terminal, thus, it is sagging that the zone line of stube cable is easy under the weight of sleeve pipe, and prevent its twisting or other confusions reliably.
Stube cable is by the cable support member supports, its support component is angled to be installed in respectively on the rear side of unit in the main tank and terminal movably, because the cable support element shifts out the distance of main tank according to the unit can mobile angledly certain angle, thereby having prevented from also can not be subjected to undue bending when even stube cable from pulling out the main tank certain distance fully in the unit, its distance is corresponding to the extra length of stube cable.
Above-mentioned and other purposes of the present invention, feature and advantage will by with reference to accompanying drawing to the following description of the embodiment of the invention and clearer.
Fig. 1 is the common structure fragmentary, perspective view in order to the cable of handling the electric device unit that can move into and shift out main tank;
Fig. 2 is the vertical cross-section diagram in order to another common structure of the cable of handling the electric device unit that can move into and shift out main tank;
Fig. 3 is in order to handle the structure perspective view of stube cable according to first embodiment of the invention;
Fig. 4 is the casing profile figure of structure shown in Figure 3;
Fig. 5 is the side partial cross-sectional that stube cable is fixed to the zone on the unit according to second embodiment of the invention in order to the structure of handling stube cable; With
Fig. 6 is the side partial cross-sectional that stube cable is fixed to the zone on the link daughter board in according to the structure of second embodiment of the invention.
First embodiment;
Describe according to first embodiment of the invention in order to handle the structure of stube cable with reference to Fig. 3 and 4 below.According to first embodiment, in communicator, comprised principle of the present invention.
As shown in Figure 3, unit 1 is installed in the main tank of communicator movably, in order to move back and forth by the direction shown in the arrow C, particularly, unit 1 is supported on the guide rail (not shown) that is installed in the main tank movably or is fixed on the mobile foundation (not shown) that is supported on movably on the guide rail (not shown) that is installed in the main tank.Unit 1 has the unit frame 2 of supporting printing board 3, unit frame 2 is supported on the upper end at its rear portion, whole cable support rod 6 stretches out perpendicular to the surface level of the unit frame 2 of supporting printing board 3, and printed circuit board (PCB) 3 has connector 3a, stube cable 5 can be connected on it.
Link daughter board 4 can be fixed on the inner surface of main tank rear side, in order to printed circuit board (PCB) 3 is connected on another unit or the external device (ED) (not shown), link daughter board 4 has Wiring connector 4a, it is placed in the upper end, be used for connecting stube cable 5, connector 3a and Wiring connector 4a can be connected to each other by stube cable 5, and printed circuit board (PCB) 3 is connected on another unit or external device (ED) of main tank rear side.
Stube cable 5 comprises multiple conducting wires, it is parallel to the direction horizontal-extending that unit 1 shifts out main tank, the nonwoven fibre layers 10 that lead is made up of the plastic optical fibre of softness coats, stube cable 5 has extra length, its length shifts out the distance of main tank corresponding to unit 1, because the end that connects by cable 5 hangs on the cable support rod 6, institute is so that the extra length of stube cable sags into U-shaped between cable support excellent 6 and link daughter board 4.
Be supported between unit 1 and the link daughter board 4 at stube cable 5 on the zone of zone under the Wiring connector 4a and cable support rod 6, particularly, on the zone of cable support rod 6, the part of stube cable 5 is clipped between cable support rod 6 and the pressure strip 8a, and with screw 9a it is tightened up; On the zone under the Wiring connector 4a, the part of stube cable 5 is clipped between link daughter board 4 and the pressure strip 8b, and with screw 9b it is tightened up.
Stube cable 5 is coated with gum sleeve 11 on interval location, it is separately positioned on the zone between cable support rod 6 and the crimping plate 8a, on the zone between link daughter board 4 and the crimping plate 8b, and on the zone line between the above-mentioned zone.
With reference to Fig. 4 each sleeve pipe 11 is described below.Sleeve pipe 11 comprises the flat element (see figure 3) around stube cable 5, and sleeve pipe 11 has definite succeeding vat 11a within it, and its form fit is in the cross section of the stube cable of being made up of parallel wire 5.Stube cable 5 is being connected in before connector 3a and the Wiring connector 4a, stube cable 5 can be inserted and have in the sleeve pipe 11 that is installed in the lead among each groove 11a, each sleeve pipe 11 also has cross through hole 11b, in order to screw 9a, 9b inserts in it, thereby stube cable 5 is fixed on cable support rod 6 and the link daughter board 4.
Because groove 11a is in the cross section that is matched with the stube cable of being made up of parallel wire 5 in shape, stube cable 5 can keep by making its lead keep the sleeve pipe 11 that is parallel to each other.
Sleeve pipe 11 on cable support rod 6 and link daughter board 4 zones is being inserted into crimping plate 8a, and 8b following time can prevent effectively that stube cable 5 is subjected to excess compression and fracture.
In order by means of stube cable 5 connector 3a and Wiring connector 4a to be interconnected, lead can be provided with in parallel to each other, then, coats with non-woven fibre soft layer 10, making stube cable 5, and stube cable 5 is covered with sleeve pipe 11 with interval location.
Then, the end of stube cable 5 is connected with Wiring connector 4a with connector 3a, and control hangs over stube cable 5 on the cable support rod 6.One of sleeve pipe 11 of close unit 3 is sandwiched between cable support rod 6 and the crimping plate 8a, and fixes by screw 9a, and is sandwiched between link daughter board 4 and the crimping plate 8b near another sleeve pipe 11 of link daughter board 4, and fixes by screw 9b.Existing stube cable 5 remains between unit 1 and the link daughter board 4 with the U-shaped structure.
Form and coat because stube cable 5 is stranded by non-woven fibre soft layer 10, so stube cable 5 can curve required form at an easy rate, therefore, main tank can be put into and at an easy rate from wherein taking out in the unit 1 that is connected with stube cable 5, and makes that institute's spacing reaches minimum between unit 1 and link daughter board 4.In the middle of between coating unit 1 and the link daughter board 4 sleeve pipe 11 of stube cable 5 will keep since gravity and between unit 1 and link daughter board 4 the sagging stube cable 5 of one-tenth U-shaped.Have, the stube cable 5 between unit 1 and the link daughter board 4 will keep smoothed version again, and can be in the unit 1 not move into and twisting or other confusions take place when shifting out main tank.Second embodiment:
Describe according to second embodiment of the invention in order to handle the structure of stube cable with reference to Fig. 5 and 6 below.According to the structure of second embodiment be that according to different of first example structure stube cable is installed to regional different on unit and the link daughter board,, therefore will at length do not described below with identical according to the other guide of the structure of second embodiment according to the structure of first embodiment.
As shown in Figure 5, unit 21 has unit frame 22, and first cable support rod 26 is angled to be installed on the surface of unit frame 22 movably, in order to the fixed printed circuit board (not shown), the first cable support rod 26 moves around the axle 26a that is vertically connected on the unit frame 22 with direction shown in the arrow D angledly, stube cable 25 is made of lead, it is coated with the non-woven fibre soft layer and is with a plurality of sleeve pipes 31 on interval location, a part that has the stube cable 25 of one of sleeve pipe 31 is sandwiched between first cable support rod 26 and the crimping plate 28a, and by screw.
As shown in Figure 6, link daughter board 24 has bogie side frame, and second cable support rod 27 is angled to be installed on the bogie side frame of link daughter board 24 movably, the second cable support rod 27 moves around being vertically connected on the bogie side frame and being parallel to a 27a of 26a (see figure 5) extension with direction shown in the arrow E angledly, part with stube cable 25 of another sleeve pipe 31 is sandwiched between second cable support rod 27 and the crimping plate 28b, and is fixed with screw.
The stube cable 25 angled first and second cable support rods 26 that are fixed to movably, on 27, therefore, when the main tank certain distance is pulled out in unit 21, its distance is corresponding to the extra length of stube cable 25, be fixed with the first and second cable support rods 26 of stube cable 25,27 surface is with angledly around each 26a, 27a is moved into the plane of basic horizontal, therefore, even when main tank is pulled out fully in unit 21, its distance is corresponding to the extra length of stube cable 25, stube cable 25 will be not can overbending, nor can overstress stretch, thus, main tank can be pulled out in unit 1 on big relatively stroke, and when pulling it main tank, can operate at an easy rate by the operator.
The preferred embodiments of the present invention adopt particular term to be described, and this description obviously can carry out various variations and remodeling, but it all can not break away from the spirit and scope of following claim just for illustrative purposes.

Claims (5)

1. method of handling stube cable, its cable is made up of multiple conducting wires, be arranged on the terminal on the electric device main tank rear side inner surface and be installed in printed circuit board (PCB) in the unit in order to connection, its unit can move into and shift out the main tank certain distance, described stube cable has the extra length corresponding to this distance, and described stube cable method comprises the following steps:
Lead is parallel to the direction that shifts out main tank in the unit is horizontally disposed with, and cover lead with soft layer; With
On the rear side and the terminal in the main tank with the stube cable unit, the extra length of stube cable is sagging simultaneously.
2. structure of handling stube cable, its cable is made up of multiple conducting wires, be arranged on the terminal on the electric device main tank rear side inner surface and be installed in printed circuit board (PCB) in the unit in order to connection, its unit can move into and shift out the main tank certain distance, and the described stube cable that has corresponding to the extra length of this distance comprises:
The lead that is parallel to that the direction that shifts out main tank in the unit is horizontally disposed with and covers with soft layer; With
The stube cable that rear side and the terminal in the main tank by the unit keeps, the extra length of stube cable is sagging simultaneously.
3. according to the structure of claim 2, wherein stube cable is coated by gum sleeve in its zone that terminal kept in by unit rear side and main tank.
4. according to the structure of claim 2, wherein coat by gum sleeve in the zone line of stube cable between its zone that terminal kept in by unit rear side and main tank.
5. according to the structure of claim 2, it further comprises the cable support element that is installed in respectively on unit rear side and the main tank terminal, in order to move around each that is parallel to the direction of settling lead angledly, described stube cable is to have by described cable support member supports.
CN96106033A 1995-03-03 1996-03-02 Method of structure for processing junction cable Expired - Fee Related CN1066906C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP044467/1995 1995-03-03
JP7044467A JP2748883B2 (en) 1995-03-03 1995-03-03 Processing method and processing structure of relay cable
JP044467/95 1995-03-03

Publications (2)

Publication Number Publication Date
CN1140974A true CN1140974A (en) 1997-01-22
CN1066906C CN1066906C (en) 2001-06-06

Family

ID=12692315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN96106033A Expired - Fee Related CN1066906C (en) 1995-03-03 1996-03-02 Method of structure for processing junction cable

Country Status (4)

Country Link
JP (1) JP2748883B2 (en)
CN (1) CN1066906C (en)
AR (1) AR001132A1 (en)
BR (1) BR9600650A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0823407D0 (en) * 2008-12-23 2009-01-28 Nexan Technologies Ltd Apparatus for storing data
GB2467622B (en) * 2008-12-23 2011-12-14 Nexsan Technologies Ltd Data storage apparatus
JP6306986B2 (en) * 2014-08-29 2018-04-04 シャープ株式会社 Wiring structure and information processing terminal device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6215897A (en) * 1985-07-15 1987-01-24 株式会社日立製作所 Cable wiring mechanism
JPS6362300A (en) * 1986-09-03 1988-03-18 富士通株式会社 Terminal board for front access of communication equipment
FR2632990B1 (en) * 1988-06-15 1990-10-12 Campenon Bernard Btp METHOD FOR STABILIZING A BRIDGE APRON AGAINST WIND ACTION
JPH01321810A (en) * 1988-06-23 1989-12-27 Toshiba Corp Wiring guide
US5096163A (en) * 1991-02-07 1992-03-17 Swearingen Gary V Wire guide apparatus
US5535557A (en) * 1994-12-02 1996-07-16 Precision Pine, Inc. Non-laminated, self-configuring, variable pitch spiral stairset and method of fabricating spiral stairway

Also Published As

Publication number Publication date
JPH08242085A (en) 1996-09-17
AR001132A1 (en) 1997-09-24
BR9600650A (en) 1997-12-30
CN1066906C (en) 2001-06-06
JP2748883B2 (en) 1998-05-13

Similar Documents

Publication Publication Date Title
CN1291183C (en) Guiding and holding clamp of drag cable
CN100501878C (en) Multiconductor cable and method of producing the cable
US6236795B1 (en) High-density fiber optic cable distribution frame
CN103281596B (en) There is the adapter panel of lateral sliding adapter arrays
EP1912301A1 (en) Structured cabling system and method
CN1713310A (en) Optical fiber composite power cable having loose-tube-type optical fiber impregnated therein
CN1066906C (en) Method of structure for processing junction cable
CN1199323C (en) Bundling bifilar helix of flat flexible cable
CN100458485C (en) Fiber optic assemblies, cable, and manufacturing methods therefor
CN100337368C (en) Crimp contact which can easily be reduced in size
CN219476386U (en) Cable processing mount
CN113629618A (en) Cabin wiring harness wiring device based on transportation equipment
CN2919470Y (en) Processing device for spring wire
CN1284029C (en) Liquid crystal display device
US7540552B2 (en) Apparatus for arranging cables in a vehicle
CN1233098A (en) Combined vertical electrical cable layer and its laying method
CN219779685U (en) Fixing device is used in arrangement of robot pencil
CN100341076C (en) Coaxial cable
CN216390325U (en) Electronic wire harness fixing mechanism
CN220273167U (en) Network wiring auxiliary device convenient to adjust
CN220019851U (en) Antiwind mechanism and check-up cable thereof
CN116190006B (en) Stranded wire device for twisting twist by multiple wire harnesses
CN214205541U (en) Optical fiber transceiver mounting rack
CN214292752U (en) Positioning fixture for cable test
CN220731980U (en) Wire harness processing is with patching machine

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee