CN114091919A - Resource scheduling method and system for offshore wind power operation and maintenance base - Google Patents

Resource scheduling method and system for offshore wind power operation and maintenance base Download PDF

Info

Publication number
CN114091919A
CN114091919A CN202111402614.9A CN202111402614A CN114091919A CN 114091919 A CN114091919 A CN 114091919A CN 202111402614 A CN202111402614 A CN 202111402614A CN 114091919 A CN114091919 A CN 114091919A
Authority
CN
China
Prior art keywords
task
requirements
route
maintenance
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111402614.9A
Other languages
Chinese (zh)
Inventor
孙财新
张波
吕晓静
郭小江
刘鑫
周昳铭
闫姝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Clean Energy Research Institute
Original Assignee
Huaneng Clean Energy Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Clean Energy Research Institute filed Critical Huaneng Clean Energy Research Institute
Priority to CN202111402614.9A priority Critical patent/CN114091919A/en
Publication of CN114091919A publication Critical patent/CN114091919A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The application discloses a resource scheduling method and a resource scheduling system for an offshore wind power operation and maintenance base, and particularly aims to obtain an operation and maintenance task to be planned and scheduling requirements thereof, wherein the scheduling requirements comprise resource requirements, window period requirements and route requirements; carrying out resource allocation on the operation and maintenance task according to resource requirements; and under the condition that the current meteorological hydrological information meets the requirements, performing route planning on the task ship to obtain at least one task route meeting the requirements, and pushing the task route to a dispatcher. The scheme does not depend on the operation experience of the scheduling personnel, but depends on various objective data, so that the method has stronger objectivity, and the efficiency of operation and maintenance operation can be improved.

Description

Resource scheduling method and system for offshore wind power operation and maintenance base
Technical Field
The application relates to the technical field of offshore wind power, in particular to a resource scheduling method and system for an offshore wind power operation and maintenance base.
Background
In recent years, with the large-scale development of offshore wind power projects, more and more offshore wind power operation and maintenance bases are built and used for providing operation and maintenance services such as construction, maintenance and material guarantee for corresponding offshore wind power projects. The offshore wind power operation and maintenance base needs to provide services such as multiple resource scheduling, remote resource coordination, resource allocation and the like, but the problems of unclear resource allocation, short working time, high operation and maintenance cost and the like exist at present, so that the operation and maintenance operation efficiency is low. For historical reasons, manual resource allocation can only be performed based on operation experience at present, and the requirement for improving operation and maintenance operation efficiency cannot be met.
Disclosure of Invention
In view of this, the application provides a resource scheduling method and system for an offshore wind power operation and maintenance base, which are used for improving operation and maintenance operation efficiency.
In order to achieve the above object, the following solutions are proposed:
a resource scheduling method of an offshore wind power operation and maintenance base comprises the following steps:
acquiring an operation and maintenance task to be planned and scheduling requirements of the operation and maintenance task, wherein the scheduling requirements comprise resource requirements, window period requirements and air route requirements;
performing resource allocation on the operation and maintenance task according to the resource requirement;
and under the condition that the current meteorological hydrological information meets the requirements, performing route planning on the task ship to obtain at least one task route meeting the requirements.
Optionally, the resource allocation for the operation and maintenance task according to the resource requirement includes:
and allocating personnel, materials, equipment and task ships to the operation and maintenance work task according to the resource requirements.
Optionally, the performing route planning for the task ship under the condition that the current meteorological hydrological information meets the requirement to obtain at least one task route meeting the requirement includes:
judging whether the current meteorological hydrological information meets the window period requirement of the operation and maintenance task;
and if the window period requirement is met, performing route planning on the task ship according to the route requirement to obtain the task route.
Optionally, when there are multiple mission routes, the method further includes the following steps:
carrying out economic analysis on the plurality of task air routes to obtain an economic index of each task air route;
and taking the optimal task route as the optimal task route according to the economic indexes, and pushing the optimal task route to dispatching personnel.
A resource scheduling system of an offshore wind power operation and maintenance base, comprising:
the task obtaining module is configured to obtain an operation and maintenance task to be planned and scheduling requirements of the operation and maintenance task, wherein the scheduling requirements comprise resource requirements, window period requirements and air route requirements;
the resource allocation module is configured to allocate resources to the operation and maintenance task according to the resource requirements;
and the route planning module is configured to plan routes for the task ship under the condition that the current meteorological hydrological information meets the requirements to obtain at least one task route meeting the requirements.
Optionally, the resource allocation module is configured to allocate personnel, materials, equipment and task ships to the operation and maintenance work task according to the resource demand.
Optionally, the route planning module includes:
the window judging unit is configured to judge whether the current meteorological hydrological information meets the window period requirement of the operation and maintenance task;
and the planning execution unit is configured to plan a flight line for the task ship according to the flight line requirement to obtain the task flight line if the window period requirement is met.
Optionally, when the number of the mission air routes is multiple, the method further includes:
the economic analysis module is configured to perform economic analysis on the plurality of task air routes when the plurality of task air routes are available to obtain economic indexes of each task air route;
and the optimal selection module is configured to take the task route with the optimal economy as the optimal task route according to the economic indexes, and push the optimal task route to dispatching personnel.
According to the technical scheme, the resource scheduling method and system of the offshore wind power operation and maintenance base are disclosed, and specifically, the operation and maintenance task to be planned and the scheduling requirements of the operation and maintenance task are obtained, wherein the scheduling requirements comprise resource requirements, window period requirements and air route requirements; carrying out resource allocation on the operation and maintenance task according to resource requirements; and under the condition that the current meteorological hydrological information meets the requirements, performing route planning on the task ship to obtain at least one task route meeting the requirements, and pushing the task route to a dispatcher. The scheme does not depend on the operation experience of the scheduling personnel, but depends on various objective data, so that the method has stronger objectivity, and the efficiency of operation and maintenance operation can be improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present application, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a flowchart of a resource scheduling method for a maritime operation and maintenance base according to an embodiment of the present application;
fig. 2 is a flowchart of another resource scheduling method for a maritime operation and maintenance base according to an embodiment of the present application;
fig. 3 is a block diagram of a resource scheduling system of a maritime operation and maintenance base according to an embodiment of the present application;
fig. 4 is a block diagram of another resource scheduling system of a maritime operation and maintenance base according to an embodiment of the present application.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Example one
Fig. 1 is a flowchart of a resource scheduling method for a maritime operation and maintenance base according to an embodiment of the present application.
As shown in fig. 1, the resource scheduling method provided in this embodiment is used for providing a scheduling scheme for a scheduler, and includes the following specific steps:
and S1, acquiring the operation and maintenance job tasks to be planned and the scheduling requirements thereof.
Different types of different offshore wind power plants have corresponding operation and maintenance tasks. The types of operation and maintenance tasks comprise faults, defects, regular inspection, routing inspection, technical improvement, special work and the like. Each operation and maintenance task has corresponding resource requirements, window period requirements and air route requirements.
The resource requirements comprise personnel requirements, material requirements, equipment requirements, ship requirements and the like. Window period requirements include requirements for wind, wave, visibility, precipitation, humidity, temperature conditions. The route requirements include requirements for width, water depth, curvature, shoal, reef, navigation markers, and the like.
The operation and maintenance task to be planned in the application can be multiple, that is, the operation and maintenance task is not limited to be planned for one operation and maintenance task. And in the planning process, planning all operation and maintenance tasks in sequence according to the smoothness of the embodiment.
And S2, distributing the resources to the operation and maintenance task according to the resource requirements.
Namely, the operation and maintenance task is allocated with personnel, materials, equipment, task ships and the like according to the resource requirements. Namely, the resource allocation is carried out on a plurality of operation and maintenance job tasks in sequence. All operation and maintenance work tasks are distributed to corresponding personnel, materials, equipment and task ships.
And S3, performing route planning for the mission ship.
After the operation and maintenance operation task is subjected to resource allocation, the route planning is carried out on the task ships allocated to the operation and maintenance operation task, and at least one task route is planned for each task ship. The specific process is as follows:
firstly, judging whether the current meteorological hydrological information meets the window period requirement of an operation and maintenance task. The meteorological hydrological information includes wind, wave, visibility, precipitation, humidity, temperature, etc. And judging whether the meteorological water temperature information meets the window period requirement of the operation and maintenance task or not according to the meteorological hydrological information and the granularity thereof. And if the operation is not met, judging the next operation and maintenance task, and if the operation is met, operating downwards.
And then, carrying out route planning on the operation and maintenance task meeting the window period requirement, firstly selecting a plurality of routes during route planning, and then judging whether the width, the water depth, the curvature, the shoal, the submerged reef, the navigation mark and the like of each route meet the requirement, and whether military requirements, maritime requirements, farms and other limiting conditions meet the requirement. And selecting at least one route meeting the limiting conditions from the routes through judgment as a task route. And pushing the mission route to the dispatcher.
According to the technical scheme, the resource scheduling method of the offshore wind power operation and maintenance base is provided, and specifically, the operation and maintenance task to be planned and the scheduling requirement of the operation and maintenance task are obtained, wherein the scheduling requirement comprises a resource requirement, a window period requirement and a route requirement; carrying out resource allocation on the operation and maintenance task according to resource requirements; and under the condition that the current meteorological hydrological information meets the requirements, performing route planning on the task ship to obtain at least one task route meeting the requirements, and pushing the task route to a dispatcher. The scheme does not depend on the operation experience of the scheduling personnel, but depends on various objective data, so that the method has stronger objectivity, and the efficiency of operation and maintenance operation can be improved.
In addition, in an embodiment of the present application, the method further includes the following steps, as shown in fig. 2:
and S4, carrying out economic analysis on the plurality of mission routes.
And when the number of the finally obtained task routes is multiple, analyzing the economy of each task route, namely calculating economic indexes such as cost, task time and efficiency and the like required by each task route.
And S5, determining the optimal mission route according to the economic index.
After the economic index of each task route is calculated, finding out the economically optimal task route as the optimal task route, and pushing the optimal task route to the dispatcher. The optimization is not limited to the lowest cost, and factors such as task time and efficiency need to be considered. Therefore, not only can the resource scheduling be realized, but also the economic index of the operation and maintenance task can be improved through subsequent operation.
Example two
Fig. 3 is a block diagram of a resource scheduling system of a maritime operation and maintenance base according to an embodiment of the present application.
As shown in fig. 3, the resource scheduling system provided in this embodiment is used for providing a scheduling scheme for a scheduler, and specifically includes a task obtaining module 10, a resource allocating module 20, and an airline planning module 30.
The task obtaining module is used for obtaining the operation and maintenance task to be planned and the scheduling requirement thereof.
Different types of different offshore wind power plants have corresponding operation and maintenance tasks. The types of operation and maintenance tasks comprise faults, defects, regular inspection, routing inspection, technical improvement, special work and the like. Each operation and maintenance task has corresponding resource requirements, window period requirements and air route requirements.
The resource requirements include personnel requirements, material requirements, equipment requirements, ship requirements and the like. Window period requirements include requirements for wind, wave, visibility, precipitation, humidity, temperature conditions. The route requirements include requirements for width, water depth, curvature, shoal, reef, navigation markers, and the like.
The operation and maintenance task to be planned in the application can be multiple, that is, the operation and maintenance task is not limited to be planned for one operation and maintenance task. And in the planning process, planning all operation and maintenance tasks in sequence according to the smoothness of the embodiment.
And the resource allocation module is used for allocating resources to the operation and maintenance task according to the resource requirements.
Namely, the operation and maintenance task is allocated with personnel, materials, equipment, task ships and the like according to the resource requirements. Namely, the resource allocation is carried out on a plurality of operation and maintenance job tasks in sequence. All operation and maintenance work tasks are distributed to corresponding personnel, materials, equipment and task ships.
And the route planning module is used for planning routes for the task ship.
After the operation and maintenance operation task is subjected to resource allocation, the route planning is carried out on the task ships allocated to the operation and maintenance operation task, and at least one task route is planned for each task ship. The module comprises a window judging unit and a planning execution unit.
The window judging unit is used for judging whether the current meteorological hydrological information meets the window period requirement of an operation and maintenance task. The meteorological hydrological information includes wind, wave, visibility, precipitation, humidity, temperature, etc. And judging whether the meteorological water temperature information meets the window period requirement of the operation and maintenance task or not according to the meteorological hydrological information and the granularity thereof. And if the operation is not met, judging the next operation and maintenance task, and if the operation is met, operating downwards.
The planning execution unit is used for planning air routes aiming at operation and maintenance tasks meeting the requirements in the window period, firstly, a plurality of air routes are selected during air route planning, and then whether the width, the water depth, the curvature, the shoal, the submerged reef, the navigation mark and the like of each air route meet the requirements, and whether military requirements, maritime requirements, farms, other limiting conditions and the like meet the requirements are judged. And selecting at least one route meeting the limiting condition from the judgment routes as a task route. And pushing the mission route to the dispatcher.
According to the technical scheme, the resource scheduling system of the offshore wind power operation and maintenance base is provided, and specifically, the operation and maintenance task to be planned and the scheduling requirements of the operation and maintenance task are obtained, wherein the scheduling requirements comprise resource requirements, window period requirements and route requirements; carrying out resource allocation on the operation and maintenance task according to resource requirements; and under the condition that the current meteorological hydrological information meets the requirements, performing route planning on the task ship to obtain at least one task route meeting the requirements, and pushing the task route to a dispatcher. The scheme does not depend on the operation experience of the scheduling personnel, but depends on various objective data, so that the method has stronger objectivity, and the efficiency of operation and maintenance operation can be improved.
In addition, in one embodiment of the present application, the economic analysis module 40 and the optimal selection module 50 are further included, as shown in fig. 4:
and the economy analysis module is used for carrying out economy analysis on a plurality of mission air routes.
And when the number of the finally obtained task routes is multiple, analyzing the economy of each task route, namely calculating economic indexes such as cost, task time and efficiency and the like required by each task route.
And the optimal selection module is used for determining an optimal mission route according to the economic indexes.
After the economic index of each task route is calculated, finding out the economically optimal task route as the optimal task route, and pushing the optimal task route to the dispatcher. The optimization is not limited to the lowest cost, and factors such as task time and efficiency need to be considered. Therefore, not only can the resource scheduling be realized, but also the economic indicators of the operation and maintenance task can be improved through the subsequent operation.
The embodiments in the present specification are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, apparatus, or computer program product. Accordingly, embodiments of the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, embodiments of the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
Embodiments of the present invention are described with reference to flowchart illustrations and/or block diagrams of methods, terminal devices (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing terminal to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing terminal, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing terminal to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing terminal to cause a series of operational steps to be performed on the computer or other programmable terminal to produce a computer implemented process such that the instructions which execute on the computer or other programmable terminal provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While preferred embodiments of the present invention have been described, additional variations and modifications of these embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including preferred embodiments and all such alterations and modifications as fall within the scope of the embodiments of the invention.
Finally, it should also be noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or terminal that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or terminal. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in the process, method, article, or terminal equipment comprising the element.
The technical solutions provided by the present invention are described in detail above, and the principle and the implementation of the present invention are explained in this document by applying specific examples, and the descriptions of the above examples are only used to help understanding the method and the core idea of the present invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, the specific embodiments and the application range may be changed, and in summary, the content of the present specification should not be construed as a limitation to the present invention.

Claims (8)

1. A resource scheduling method of an offshore wind power operation and maintenance base is characterized by comprising the following steps:
the method comprises the steps of obtaining an operation and maintenance task to be planned and scheduling requirements of the operation and maintenance task, wherein the scheduling requirements comprise resource requirements, window period requirements and air route requirements;
performing resource allocation on the operation and maintenance task according to the resource requirement;
and under the condition that the current meteorological hydrological information meets the requirements, performing route planning on the task ship to obtain at least one task route meeting the requirements.
2. The resource scheduling method according to claim 1, wherein the allocating the resources to the operation and maintenance job task according to the resource requirement comprises:
and allocating personnel, materials, equipment and task ships to the operation and maintenance work task according to the resource requirements.
3. The resource scheduling method of claim 1, wherein the planning of routes for the mission vessel to obtain at least one mission route satisfying the requirements under the condition that the current weather hydrologic information satisfies the requirements comprises the steps of:
judging whether the current meteorological hydrological information meets the window period requirement of the operation and maintenance task;
and if the window period requirement is met, performing route planning on the task ship according to the route requirement to obtain the task route.
4. The resource scheduling method according to any one of claims 1 to 3, wherein when the task route is multiple, the method further comprises the following steps:
carrying out economic analysis on a plurality of task routes to obtain an economic index of each task route;
and taking the optimal task route as the optimal task route according to the economic indexes, and pushing the optimal task route to dispatching personnel.
5. A resource scheduling system of an offshore wind power operation and maintenance base is characterized by comprising:
the task obtaining module is configured to obtain an operation and maintenance task to be planned and scheduling requirements of the operation and maintenance task, wherein the scheduling requirements comprise resource requirements, window period requirements and air route requirements;
the resource allocation module is configured to allocate resources to the operation and maintenance task according to the resource requirements;
and the route planning module is configured to plan routes for the task ship under the condition that the current meteorological hydrological information meets the requirements to obtain at least one task route meeting the requirements.
6. The resource scheduling system of claim 5 wherein the resource allocation module is configured to allocate personnel, supplies, equipment and task vessels to the operation and maintenance job task according to the resource requirements.
7. The resource scheduling system of claim 5 wherein the route planning module comprises:
the window judging unit is configured to judge whether the current meteorological hydrological information meets the window period requirement of the operation and maintenance task;
and the planning execution unit is configured to plan a flight line for the task ship according to the flight line requirement to obtain the task flight line if the window period requirement is met.
8. The resource scheduling system of any one of claims 5 to 7, further comprising, when the mission route is a plurality of routes:
the economic analysis module is configured to perform economic analysis on the plurality of task air routes to obtain economic indexes of each task air route when the number of the task air routes is multiple;
and the optimal selection module is configured to take the task route with the optimal economy as the optimal task route according to the economic indexes, and push the optimal task route to dispatching personnel.
CN202111402614.9A 2021-11-19 2021-11-19 Resource scheduling method and system for offshore wind power operation and maintenance base Pending CN114091919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111402614.9A CN114091919A (en) 2021-11-19 2021-11-19 Resource scheduling method and system for offshore wind power operation and maintenance base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111402614.9A CN114091919A (en) 2021-11-19 2021-11-19 Resource scheduling method and system for offshore wind power operation and maintenance base

Publications (1)

Publication Number Publication Date
CN114091919A true CN114091919A (en) 2022-02-25

Family

ID=80303853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111402614.9A Pending CN114091919A (en) 2021-11-19 2021-11-19 Resource scheduling method and system for offshore wind power operation and maintenance base

Country Status (1)

Country Link
CN (1) CN114091919A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117634851A (en) * 2024-01-23 2024-03-01 广州市勤思网络科技有限公司 Ship-personnel scheduling method and device applied to sand production of ship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117634851A (en) * 2024-01-23 2024-03-01 广州市勤思网络科技有限公司 Ship-personnel scheduling method and device applied to sand production of ship
CN117634851B (en) * 2024-01-23 2024-07-16 广州市勤思网络科技有限公司 Ship-personnel scheduling method and device applied to sand production of ship

Similar Documents

Publication Publication Date Title
CN107067163A (en) A kind of breakdown maintenance work dispatching method and device
US9109895B2 (en) Estimating probabilities of arrival times for voyages
Dekker et al. On the impact of optimisation models in maintenance decision making: the state of the art
CN114936332B (en) Method, device and storage medium for analyzing ship traffic flow in water area of wind farm
JP5953219B2 (en) Flight simulation device
CN106485429B (en) Unmanned aerial vehicle operation scheduling method and device
CN114091919A (en) Resource scheduling method and system for offshore wind power operation and maintenance base
CN104376375B (en) Marine ships oil spill accident emergency resources concocting method based on multi objective fuzzy planning
CN112036674A (en) Intelligent scheduling method for offshore wind power ship
CN111105050B (en) Fan maintenance plan generation method, device, equipment and storage medium
CN116226706A (en) Fishing net position indication identification method based on group motion characteristics
CN116625376A (en) Unmanned aerial vehicle maritime search and rescue path planning method based on tabu bee colony algorithm
KR20190057827A (en) Method and apparatus for searching arctic optimal route using multi overlap lattice technique
Benedicto et al. A decision support tool for port planning based on monte carlo simulation
CN112101897B (en) Intelligent management method, device and system for offshore wind power
CN114049034A (en) Task planning method and device for offshore wind power construction operation
Dawid et al. Development of an O&M tool for short term decision making applied to offshore wind farms
CN112580870A (en) Disaster-affected pole tower determination method and device
CN116501083A (en) Marine flight path planning system based on A algorithm
KR101982470B1 (en) Marine activity risk forecasting system
Henesey et al. Using simulation in evaluating berth allocation at a container terminal
CN114997645A (en) Method, system, computer device and medium for optimizing operation and maintenance scheduling of offshore wind farm
CN112561394A (en) Method and system for realizing multi-wind electric field area multi-wind-machine operation and maintenance scheduling by single operation and maintenance ship
Xiao et al. A solution method for the maritime pilot scheduling problem with working hour regulations