CN114091360A - 一种多模型融合的电压互感器误差状态评估方法 - Google Patents
一种多模型融合的电压互感器误差状态评估方法 Download PDFInfo
- Publication number
- CN114091360A CN114091360A CN202210073100.1A CN202210073100A CN114091360A CN 114091360 A CN114091360 A CN 114091360A CN 202210073100 A CN202210073100 A CN 202210073100A CN 114091360 A CN114091360 A CN 114091360A
- Authority
- CN
- China
- Prior art keywords
- model
- cvt
- state
- data set
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 43
- 238000012549 training Methods 0.000 claims abstract description 39
- 238000000034 method Methods 0.000 claims abstract description 37
- 238000003066 decision tree Methods 0.000 claims abstract description 29
- 230000002159 abnormal effect Effects 0.000 claims abstract description 17
- 238000002790 cross-validation Methods 0.000 claims abstract description 10
- 230000008569 process Effects 0.000 claims description 14
- 238000012795 verification Methods 0.000 claims description 11
- 238000012360 testing method Methods 0.000 claims description 9
- 230000036541 health Effects 0.000 claims description 6
- 238000013145 classification model Methods 0.000 claims description 3
- 230000010354 integration Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 12
- 230000004927 fusion Effects 0.000 description 8
- 238000004590 computer program Methods 0.000 description 7
- 238000001514 detection method Methods 0.000 description 7
- 238000012545 processing Methods 0.000 description 6
- 238000012986 modification Methods 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 230000006870 function Effects 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 238000005259 measurement Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000007781 pre-processing Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000004422 calculation algorithm Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000013210 evaluation model Methods 0.000 description 2
- 238000012854 evaluation process Methods 0.000 description 2
- 238000004806 packaging method and process Methods 0.000 description 2
- 238000010200 validation analysis Methods 0.000 description 2
- 241000820057 Ithone Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007635 classification algorithm Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/08—Probabilistic or stochastic CAD
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- Theoretical Computer Science (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Artificial Intelligence (AREA)
- Computer Hardware Design (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210073100.1A CN114091360B (zh) | 2022-01-21 | 2022-01-21 | 一种多模型融合的电压互感器误差状态评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210073100.1A CN114091360B (zh) | 2022-01-21 | 2022-01-21 | 一种多模型融合的电压互感器误差状态评估方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114091360A true CN114091360A (zh) | 2022-02-25 |
CN114091360B CN114091360B (zh) | 2022-04-22 |
Family
ID=80309072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210073100.1A Active CN114091360B (zh) | 2022-01-21 | 2022-01-21 | 一种多模型融合的电压互感器误差状态评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114091360B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116416884A (zh) * | 2023-06-12 | 2023-07-11 | 深圳市彤兴电子有限公司 | 一种显示器模组的测试装置及其测试方法 |
CN117648670A (zh) * | 2024-01-24 | 2024-03-05 | 润泰救援装备科技河北有限公司 | 救援数据融合方法、电子设备、存储介质及救援消防车 |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040111453A1 (en) * | 2002-12-06 | 2004-06-10 | Harris Christopher K. | Effective multi-class support vector machine classification |
WO2011062866A1 (en) * | 2009-11-19 | 2011-05-26 | Illinois Tool Works Inc. | Cluster analysis system and method to improve sorting performance |
CN108109162A (zh) * | 2018-01-08 | 2018-06-01 | 中国石油大学(华东) | 一种利用自适应特征融合的多尺度目标跟踪方法 |
US20180196899A1 (en) * | 2015-10-28 | 2018-07-12 | Fractal Industries, Inc. | System and methods for multi-language abstract model creation for digital environment simulations |
CN109919370A (zh) * | 2019-02-26 | 2019-06-21 | 国网冀北电力有限公司运营监测(控)中心 | 一种电力负荷预测方法及预测装置 |
US20200111194A1 (en) * | 2018-10-08 | 2020-04-09 | Rensselaer Polytechnic Institute | Ct super-resolution gan constrained by the identical, residual and cycle learning ensemble (gan-circle) |
CN111242175A (zh) * | 2019-12-31 | 2020-06-05 | 国网北京市电力公司 | 基于机器学习的计量点电压异常检测方法及系统 |
KR102157613B1 (ko) * | 2020-06-05 | 2020-09-18 | 현대엔지니어링(주) | 기계학습을 이용한 자동화 철골구조물 설계 시스템 및 방법 |
US20200333767A1 (en) * | 2018-02-17 | 2020-10-22 | Electro Industries/Gauge Tech | Devices, systems and methods for predicting future consumption values of load(s) in power distribution systems |
US20200356839A1 (en) * | 2019-05-09 | 2020-11-12 | ClimateAI, Inc. | Systems and methods for selecting global climate simulation models for training neural network climate forecasting models |
WO2021086502A1 (en) * | 2019-10-31 | 2021-05-06 | Landmark Graphics Corporation | A flow simulator for generating reservoir management workflows and forecasts based on analysis of high-dimensional parameter data space |
CN113452018A (zh) * | 2021-06-29 | 2021-09-28 | 湖南大学 | 一种电力系统备用不足风险场景辨识方法 |
US20210342997A1 (en) * | 2019-12-16 | 2021-11-04 | Insurance Services Office, Inc. | Computer Vision Systems and Methods for Vehicle Damage Detection with Reinforcement Learning |
US20220004875A1 (en) * | 2020-07-02 | 2022-01-06 | Mitsubishi Electric Research Laboratories, Inc. | Automated Construction of Neural Network Architecture with Bayesian Graph Exploration |
CN113935440A (zh) * | 2021-12-15 | 2022-01-14 | 武汉格蓝若智能技术有限公司 | 一种电压互感器误差状态迭代评估方法及系统 |
-
2022
- 2022-01-21 CN CN202210073100.1A patent/CN114091360B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040111453A1 (en) * | 2002-12-06 | 2004-06-10 | Harris Christopher K. | Effective multi-class support vector machine classification |
WO2011062866A1 (en) * | 2009-11-19 | 2011-05-26 | Illinois Tool Works Inc. | Cluster analysis system and method to improve sorting performance |
US20180196899A1 (en) * | 2015-10-28 | 2018-07-12 | Fractal Industries, Inc. | System and methods for multi-language abstract model creation for digital environment simulations |
CN108109162A (zh) * | 2018-01-08 | 2018-06-01 | 中国石油大学(华东) | 一种利用自适应特征融合的多尺度目标跟踪方法 |
US20200333767A1 (en) * | 2018-02-17 | 2020-10-22 | Electro Industries/Gauge Tech | Devices, systems and methods for predicting future consumption values of load(s) in power distribution systems |
US20200111194A1 (en) * | 2018-10-08 | 2020-04-09 | Rensselaer Polytechnic Institute | Ct super-resolution gan constrained by the identical, residual and cycle learning ensemble (gan-circle) |
CN109919370A (zh) * | 2019-02-26 | 2019-06-21 | 国网冀北电力有限公司运营监测(控)中心 | 一种电力负荷预测方法及预测装置 |
US20200356839A1 (en) * | 2019-05-09 | 2020-11-12 | ClimateAI, Inc. | Systems and methods for selecting global climate simulation models for training neural network climate forecasting models |
WO2021086502A1 (en) * | 2019-10-31 | 2021-05-06 | Landmark Graphics Corporation | A flow simulator for generating reservoir management workflows and forecasts based on analysis of high-dimensional parameter data space |
US20210342997A1 (en) * | 2019-12-16 | 2021-11-04 | Insurance Services Office, Inc. | Computer Vision Systems and Methods for Vehicle Damage Detection with Reinforcement Learning |
CN111242175A (zh) * | 2019-12-31 | 2020-06-05 | 国网北京市电力公司 | 基于机器学习的计量点电压异常检测方法及系统 |
KR102157613B1 (ko) * | 2020-06-05 | 2020-09-18 | 현대엔지니어링(주) | 기계학습을 이용한 자동화 철골구조물 설계 시스템 및 방법 |
US20220004875A1 (en) * | 2020-07-02 | 2022-01-06 | Mitsubishi Electric Research Laboratories, Inc. | Automated Construction of Neural Network Architecture with Bayesian Graph Exploration |
CN113452018A (zh) * | 2021-06-29 | 2021-09-28 | 湖南大学 | 一种电力系统备用不足风险场景辨识方法 |
CN113935440A (zh) * | 2021-12-15 | 2022-01-14 | 武汉格蓝若智能技术有限公司 | 一种电压互感器误差状态迭代评估方法及系统 |
Non-Patent Citations (7)
Title |
---|
FAN XIN-QIAO等: "Faulty phase selection based on high-order multi-resolution singular entropy for high-voltage transmission", 《ELECTRIC POWER AUTOMATION EQUIPMENT》 * |
余萍 等: "《人工智能导论试验》", 31 May 2020, 北京:中国铁道出版社 * |
卡西克•拉玛苏布兰马尼安: "《深入理解XGBoost 高效机器学习算法与进阶》", 31 January 2020, 北京:机械工业出版社 * |
唐文虎等: "数据驱动的人工智能技术在电力设备状态分析中的研究与应用", 《高电压技术》 * |
张乐平 等: "基于模型融合的多维条件下现场校验仪计量误差建模研究", 《仪表技术与传感器》 * |
杜平等: "基于故障起点检测的电力系统故障数据匹配方法", 《电力科学与技术学报》 * |
林强: "《机器学习、深度学习与强化学习》", 31 May 2019, 北京:知识产权出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116416884A (zh) * | 2023-06-12 | 2023-07-11 | 深圳市彤兴电子有限公司 | 一种显示器模组的测试装置及其测试方法 |
CN116416884B (zh) * | 2023-06-12 | 2023-08-18 | 深圳市彤兴电子有限公司 | 一种显示器模组的测试装置及其测试方法 |
CN117648670A (zh) * | 2024-01-24 | 2024-03-05 | 润泰救援装备科技河北有限公司 | 救援数据融合方法、电子设备、存储介质及救援消防车 |
CN117648670B (zh) * | 2024-01-24 | 2024-04-12 | 润泰救援装备科技河北有限公司 | 救援数据融合方法、电子设备、存储介质及救援消防车 |
Also Published As
Publication number | Publication date |
---|---|
CN114091360B (zh) | 2022-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114091360B (zh) | 一种多模型融合的电压互感器误差状态评估方法 | |
CN113935440A (zh) | 一种电压互感器误差状态迭代评估方法及系统 | |
CN107958292B (zh) | 基于代价敏感学习的变压器模糊谨慎推理故障诊断方法 | |
CN107730084A (zh) | 基于灰色预测和风险评估的变压器检修决策方法 | |
CN111401785A (zh) | 一种基于模糊关联规则的电力系统设备故障预警方法 | |
CN114004008B (zh) | 一种基于神经网络和遗传算法的飞机装配线资源配置优化方法 | |
CN114298579B (zh) | 一种基于数据挖掘的有源配电网故障风险预警方法及系统 | |
CN112348318B (zh) | 一种供应链风险预测模型的训练和应用方法及装置 | |
CN116579768B (zh) | 一种发电厂在线仪表运维管理方法及系统 | |
CN112257914B (zh) | 一种基于随机森林的航空安全因果预测方法 | |
CN113139570A (zh) | 一种基于最优混合估值的大坝安全监测数据补全方法 | |
CN112215254A (zh) | 一种基于改进案例推理的变电站故障诊断方法以及诊断装置 | |
CN112699229A (zh) | 基于深度学习模型的自适应推题方法 | |
CN109359742A (zh) | 一种地铁子系统预防维修周期的生成方法 | |
Tian et al. | Structure feature extraction for hierarchical alarm flood classification and alarm prediction | |
Zheng et al. | Data-driven optimization based on random forest surrogate | |
CN114565051B (zh) | 基于神经元影响程度的产品分类模型的测试方法 | |
Lacombe et al. | A meta-learning approach for automated hyperparameter tuning in evolving data streams | |
CN115544886A (zh) | 高速电梯的失效时间节点预测方法、系统、设备和介质 | |
CN115496340A (zh) | 健康状态评估的方法、装置和设备 | |
CN115470854A (zh) | 信息系统故障分类方法及分类系统 | |
Ji et al. | Risk index early-warning of smart grid based on neural network | |
CN111026661B (zh) | 一种软件易用性全面测试方法及系统 | |
Jackson et al. | Machine learning for classification of economic recessions | |
CN117891959B (zh) | 一种基于贝叶斯网络的文献元数据储存方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 1803-1805, building 2-07, guanggu.core center, 303 Guanggu Avenue, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000 Patentee after: Wuhan Gelanruo Intelligent Technology Co.,Ltd. Address before: Room 1803-1805, building 2-07, guanggu.core center, 303 Guanggu Avenue, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000 Patentee before: WUHAN GLORY ROAD INTELLIGENT TECHNOLOGY Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Multi-model Fusion Method for Voltage Transformer Error State Evaluation Effective date of registration: 20221230 Granted publication date: 20220422 Pledgee: Bank of China Limited Wuhan Donghu New Technology Development Zone Branch Pledgor: Wuhan Gelanruo Intelligent Technology Co.,Ltd. Registration number: Y2022420000404 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20220422 Pledgee: Bank of China Limited Wuhan Donghu New Technology Development Zone Branch Pledgor: Wuhan Gelanruo Intelligent Technology Co.,Ltd. Registration number: Y2022420000404 |