CN114086562A - 高寒区运营地铁隧道正上方超前加固的基坑施工方法 - Google Patents
高寒区运营地铁隧道正上方超前加固的基坑施工方法 Download PDFInfo
- Publication number
- CN114086562A CN114086562A CN202111425455.4A CN202111425455A CN114086562A CN 114086562 A CN114086562 A CN 114086562A CN 202111425455 A CN202111425455 A CN 202111425455A CN 114086562 A CN114086562 A CN 114086562A
- Authority
- CN
- China
- Prior art keywords
- subway tunnel
- underground continuous
- foundation pit
- right above
- lattice beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
Abstract
一种高寒区运营地铁隧道正上方超前加固的基坑施工方法,属于基坑开挖加固技术领域。所述方法包括如下步骤:在既有运营地铁隧道的两侧分别施做一扇地下连续墙;开挖两扇地下连续墙外侧的土体;在两扇地下连续墙之间施做十字格构梁;在十字格构梁的每个相交节点处均施做抗拔桩;对既有运营地铁隧道正上方的土体分层分块重复上述步骤。本发明用于既有运营地铁隧道上方的基坑开挖工程,通过地下连续墙、十字格构梁以及抗拔桩的相互作用,能够在基坑工程施工时有效地保护既有运营地铁隧道的安全。
Description
技术领域
本发明涉及一种高寒区运营地铁隧道正上方超前加固的基坑施工方法,属于基坑开挖加固技术领域。
背景技术
城市轨道交通的高速发展,使得地铁覆盖了主要商业圈和经济圈等城市密集地区。随着地面可利用土地的减少,以地铁为中心的地下空间综合体将成为未来发展的重要方向。城市地下轨道交通的发展能够有效带动周边经济协同发展,促进城市新经济带形成。
因此,在既有运营地铁隧道周边进行的各项工程活动将变得日益频繁,伴随而来的运营地铁临隧道上方基坑工程不可避免。运营地铁隧道上方的基坑开挖将引起既有隧道上方应力释放,造成既有隧道的上浮,衬砌的大变形,继而增大了既有隧道衬砌产生裂隙的风险,从而影响既有隧道的正常运营。隧道作为现代城市的重要交通,其安全性极为重要,为了确保地铁隧道的安全,有必要针对这样的问题提出一种运营地铁隧道上方开挖施工的加固工法。
发明内容
为解决背景技术中存在的问题,本发明提供一种高寒区运营地铁隧道正上方超前加固的基坑施工方法。
实现上述目的,本发明采取下述技术方案:一种高寒区运营地铁隧道正上方超前加固的基坑施工方法,所述方法包括如下步骤:
S1:在既有运营地铁隧道的两侧分别施做一扇地下连续墙;
S2:开挖两扇地下连续墙外侧的土体;
S3:在两扇地下连续墙之间施做十字格构梁;
S4:在十字格构梁的每个相交节点处均施做抗拔桩;
S5:对既有运营地铁隧道正上方的土体分层分块重复S1-S4。
与现有技术相比,本发明的有益效果是:
本发明用于既有运营地铁隧道上方的基坑开挖工程,通过地下连续墙、十字格构梁、抗拔桩的相互作用,能够在基坑工程正式大面积土体开挖卸荷施工时,超前对隧道正上方区域内进行加固,与传统基坑开挖的防控手段不同之处在于,传统加固手段都是在土体开挖卸荷完场之后再进行防控手段的施作,而彼时埋于土下的隧道结构已经在一定程度上产生了不可挽回的形变,往往不能很好的起到保护地铁的作用。本发明工法是在隧道正上方区域内土体未大面积开挖前就进行格构梁超前预加固,这样再进行后续的大面积土体卸荷时,隧道结构可得到有效保护,且格构梁后期可作为结构底板的梁结构部件,同时施工成本低廉,有效地保护了既有运营地铁隧道的安全。
附图说明
图1是S2完成后的结构示意图;
图2是S301完成后的结构示意图;
图3是S302完成后的结构示意图;
图4是S304完成后的结构示意图;
图5是S4完成后的结构示意图;
图6是地下连续墙、横向格构梁、纵向格构梁以及抗拔桩的连接关系示意图;
图7是既有运营地铁隧道、横向格构梁、纵向格构梁以及抗拔桩的连接关系示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是发明的一部分实施例,而不是全部的实施例,基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
一种高寒区运营地铁隧道正上方超前加固的基坑施工方法,所述方法包括如下步骤:
S1:在既有运营地铁隧道1的两侧分别施做一扇地下连续墙2;
地下连续墙2的尺寸以及地下连续墙2外侧距隧道边缘的距离可由实际工程确定。
S2:开挖两扇地下连续墙2外侧的土体;
S3:在两扇地下连续墙2之间施做十字格构梁;
S301:在两扇地下连续墙2之间用专用冲槽或挖槽设备开挖多条横向沟槽4,横向沟槽4的尺寸以及间距可由实际工程确定;
S302:在每条横向沟槽4内均施做横向格构梁6,每个所述横向格构梁6的两端分别与对应的地下连续墙2连接,横向格构梁6的尺寸以及间距可由实际工程确定;
S303:在两扇地下连续墙2之间用专用冲槽或挖槽设备开挖多条纵向沟槽5,纵向沟槽5的尺寸以及间距可由实际工程确定;
S304:在每条纵向沟槽5内均施做纵向格构梁7,所述纵向格构梁7的尺寸以及间距可由实际工程确定;每个纵向格构梁7与对应的横向格构梁6构成十字格构梁。
S4:在十字格构梁的每个相交节点处均施做抗拔桩3,所述抗拔桩3的桩径、桩长以及排数可由实际确定;
S5:对既有运营地铁隧道1正上方的土体分层分块重复S1-S4。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同条件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。
Claims (2)
1.一种高寒区运营地铁隧道正上方超前加固的基坑施工方法,其特征在于:所述方法包括如下步骤:
S1:在既有运营地铁隧道(1)的两侧分别施做一扇地下连续墙(2);
S2:开挖两扇地下连续墙(2)外侧的土体;
S3:在两扇地下连续墙(2)之间施做十字格构梁;
S4:在十字格构梁的每个相交节点处均施做抗拔桩(3);
S5:对既有运营地铁隧道(1)正上方的土体分层分块重复S1-S4。
2.根据权利要求1所述的一种高寒区运营地铁隧道正上方超前加固的基坑施工方法,其特征在于:所述S3包括如下步骤:
S301:在两扇地下连续墙(2)之间开挖多条横向沟槽(4);
S302:在每条横向沟槽(4)内均施做横向格构梁(6),每个所述横向格构梁(6)的两端分别与对应的地下连续墙(2)连接;
S303:在两扇地下连续墙(2)之间开挖多条纵向沟槽(5);
S304:在每条纵向沟槽(5)内均施做纵向格构梁(7),每个纵向格构梁(7)与对应的横向格构梁(6)构成十字格构梁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111425455.4A CN114086562A (zh) | 2021-11-27 | 2021-11-27 | 高寒区运营地铁隧道正上方超前加固的基坑施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111425455.4A CN114086562A (zh) | 2021-11-27 | 2021-11-27 | 高寒区运营地铁隧道正上方超前加固的基坑施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114086562A true CN114086562A (zh) | 2022-02-25 |
Family
ID=80305082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111425455.4A Pending CN114086562A (zh) | 2021-11-27 | 2021-11-27 | 高寒区运营地铁隧道正上方超前加固的基坑施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114086562A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104532849A (zh) * | 2014-12-25 | 2015-04-22 | 重庆大学 | 一种运营地铁隧道上方基坑开挖方法 |
CN207161093U (zh) * | 2017-10-15 | 2018-03-30 | 郑爱元 | 一种适用于城市地铁近接工程施工的保护结构 |
CN209924997U (zh) * | 2018-10-19 | 2020-01-10 | 上海城建市政工程(集团)有限公司 | 一种城市隧道上跨既有地铁隧道的抗上浮施工结构 |
CN113565525A (zh) * | 2021-08-28 | 2021-10-29 | 中铁上海工程局集团有限公司 | 一种新建盾构隧道超临近超浅埋上跨既有隧道的施工防护体系及施工方法 |
CN113653105A (zh) * | 2021-08-20 | 2021-11-16 | 济南市市政工程设计研究院(集团)有限责任公司 | 一种既有地铁结构抗浮体系及其施工方法 |
-
2021
- 2021-11-27 CN CN202111425455.4A patent/CN114086562A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104532849A (zh) * | 2014-12-25 | 2015-04-22 | 重庆大学 | 一种运营地铁隧道上方基坑开挖方法 |
CN207161093U (zh) * | 2017-10-15 | 2018-03-30 | 郑爱元 | 一种适用于城市地铁近接工程施工的保护结构 |
CN209924997U (zh) * | 2018-10-19 | 2020-01-10 | 上海城建市政工程(集团)有限公司 | 一种城市隧道上跨既有地铁隧道的抗上浮施工结构 |
CN113653105A (zh) * | 2021-08-20 | 2021-11-16 | 济南市市政工程设计研究院(集团)有限责任公司 | 一种既有地铁结构抗浮体系及其施工方法 |
CN113565525A (zh) * | 2021-08-28 | 2021-10-29 | 中铁上海工程局集团有限公司 | 一种新建盾构隧道超临近超浅埋上跨既有隧道的施工防护体系及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110159298B (zh) | 一种地铁暗挖车站初支扣拱施工方法 | |
CN110735656B (zh) | 软质岩地区基于拱盖法的超大断面暗挖车站洞内逆作法 | |
CN105064397A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法 | |
CN210598987U (zh) | 基于单层四导洞和中导洞内桩基础的地铁车站 | |
CN109056810B (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法 | |
CN113062354A (zh) | 明挖桩撑体系预制装配式地铁车站拼装方法 | |
CN102410031B (zh) | 桩墙法建造地下空间结构 | |
CN104131565A (zh) | 一种逆作土方正作开挖的施工方法 | |
CN111139837A (zh) | 一种软土地区十字交叉地铁处多基坑同时开挖方法 | |
CN202865850U (zh) | 近端头井盾构隧道上基坑开挖支护结构 | |
CN110985042A (zh) | 城市综合管廊与地下浅埋暗挖隧道联合支护体系及工艺 | |
CN110005440B (zh) | 横向管棚支护下双侧壁导洞式施工方法 | |
CN114086562A (zh) | 高寒区运营地铁隧道正上方超前加固的基坑施工方法 | |
CN108756932B (zh) | 一种包含支护结构的隧道施工方法 | |
CN115522963A (zh) | 一种地下两层四跨暗挖车站结构的施工方法 | |
CN112664206B (zh) | 软弱覆层浅埋大断面隧道铣挖开挖方法 | |
CN111794286B (zh) | 一种软土地层中地铁下穿地下空间保护结构及施工方法 | |
CN213476893U (zh) | 跨越大型地下管线基坑支护结构 | |
CN211598699U (zh) | 一种增加地基承载力的暗挖车站结构 | |
CN210195752U (zh) | 一种拱盖暗挖逆筑地下结构 | |
CN113006085A (zh) | 一种先撑后挖的斜向预制钢桩基坑支护体系及其施工方法 | |
CN219772980U (zh) | 深基坑邻近建筑物的地下联合支护结构 | |
CN211500660U (zh) | 城市综合管廊与地下浅埋暗挖隧道联合支护体系 | |
CN213417846U (zh) | 一种邻近高铁的基坑支护结构 | |
CN113605918B (zh) | 一种基于暗挖导洞与跳挖竖井的既有隧道跨越体系及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |