CN114063500B - Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system - Google Patents

Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system Download PDF

Info

Publication number
CN114063500B
CN114063500B CN202111319712.6A CN202111319712A CN114063500B CN 114063500 B CN114063500 B CN 114063500B CN 202111319712 A CN202111319712 A CN 202111319712A CN 114063500 B CN114063500 B CN 114063500B
Authority
CN
China
Prior art keywords
sine wave
wave signal
data
control system
data acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111319712.6A
Other languages
Chinese (zh)
Other versions
CN114063500A (en
Inventor
刘建英
郭子祺
乔彦超
秦静欣
侯瑞东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aerospace Information Research Institute of CAS
Original Assignee
Aerospace Information Research Institute of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aerospace Information Research Institute of CAS filed Critical Aerospace Information Research Institute of CAS
Priority to CN202111319712.6A priority Critical patent/CN114063500B/en
Publication of CN114063500A publication Critical patent/CN114063500A/en
Application granted granted Critical
Publication of CN114063500B publication Critical patent/CN114063500B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25257Microcontroller

Abstract

The embodiment of the application provides a synchronous testing arrangement of data based on magnetic superconducting full tensor magnetic gradient system of observing and controling of avionics, includes: the signal generator is configured to generate sine wave signals with preset frequency and transmit the sine wave signals to the NI9215 module and the full tensor magnetic data analog acquisition module; the NI9215 module is configured to trigger acquisition of sine wave signals based on the PPS signals to obtain first sine wave signals; the full-tensor magnetic data analog acquisition module is configured to amplify the sine wave signal based on the PPS signal to obtain a second sine wave signal; and the data acquisition and control system is configured to resample the second sine wave signal based on the PPS signal and a preset resampling rule to obtain a resampled second sine wave signal, and determine a phase difference between the first sine wave signal and the resampled second sine wave signal to realize phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.

Description

Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system
Technical Field
The application relates to the field of superconducting application, in particular to a data synchronization testing device based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system.
Background
The core sensor of the aeromagnetic superconducting full tensor gradient measurement and control system is a superconducting quantum interferometer, and a superconducting magnetic sensor consisting of the superconducting quantum interferometer is a magnetic sensor with the highest sensitivity at present and can measure tiny magnetic signals. However, since the airborne platform is moving, magnetic compensation needs to be performed through high-precision attitude projection to eliminate the interference introduced by the motion of the airborne platform, and the interference is eliminated, so that not only the measurement precision of the position, attitude data and full tensor magnetic data is required to be as high as possible, but also the position, attitude data and full tensor magnetic data must keep high synchronism, but in the aeromagnetic superconducting full tensor gradient measurement and control system, the full tensor magnetic data and the position and attitude data are asynchronous due to different data sources of the full tensor magnetic data and the position and attitude data, and the synchronism precision when data synchronization is performed through the prior art is low.
Disclosure of Invention
The embodiment of the application provides a data synchronization testing device based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system, which can conveniently, quickly and effectively improve the synchronization precision of full tensor magnetic data and position and attitude data.
The technical scheme of the application is realized as follows:
the embodiment of the application provides a synchronous testing arrangement of data based on magnetic superconducting full tensor magnetic gradient system of observing and controling of avionics, the device includes: the system comprises a signal generator, an NI9215 module, a full tensor magnetic data simulation acquisition module and a data acquisition and control system, wherein the NI9215 module and the full tensor magnetic data simulation acquisition module are connected with the signal generator; wherein the content of the first and second substances,
the signal generator is configured to generate sine wave signals with preset frequency and transmit the sine wave signals to the NI9215 module and the full-tensor magnetic data analog acquisition module;
the NI9215 module is configured to trigger and acquire the sine wave signal based on a PPS (pulse per second) signal to obtain a first sine wave signal; transmitting the first sine wave signal to the data acquisition and control system; the NI9215 module is a non-delay data acquisition card;
the full-tensor magnetic data analog acquisition module is configured to amplify the sine wave signal based on the PPS signal to obtain a second sine wave signal; transmitting the second sine wave signal to the data acquisition and control system;
the data acquisition and control system is configured to resample the second sine wave signal based on the PPS signal and a preset resampling rule to obtain a resampled second sine wave signal, and determine a phase difference between the first sine wave signal and the resampled second sine wave signal to realize phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.
In the data synchronous testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the data acquisition and control system is connected with an inertial navigation system SPAN-CPT; wherein the content of the first and second substances,
the data acquisition and control system is further configured to acquire the PPS signal from the SPAN-CPT when a preset time is reached; and transmitting the PPS signal to the NI9215 module and the full-tensor magnetic data analog acquisition module.
In the data synchronization testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the NI9215 module is further configured to trigger based on the PPS signal and acquire the sine wave signal by using a first sampling frequency to obtain the first sine wave signal; and transmitting the first sine wave signal to the data acquisition and control system.
In the data synchronous testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the full tensor magnetic data analog acquisition module comprises a reading circuit and a first data acquisition board card; wherein the content of the first and second substances,
the reading circuit is configured to perform integral amplification on the sine wave signal to obtain an integral amplified sine wave signal, and transmit the integral amplified sine wave signal to the first data acquisition board card;
the first data acquisition board card is configured to acquire the sine wave signal subjected to integral amplification by using a second sampling frequency based on PPS signal triggering to obtain a second sine wave signal, and transmit the second sine wave signal to the data acquisition and control system.
In the above data synchronization test device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the output port of the signal generator is respectively connected with the input port of the NI9215 module and the input port of the readout circuit through a splitter, the output port of the readout circuit is connected with the input port of the first data acquisition board, and the output port of the first data acquisition board and the output port of the NI9215 module are connected with the input port of the data acquisition and control system.
In the above data synchronization test device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the data acquisition and control system is further configured to determine a first working parameter when a preset time arrives, and transmit the first working parameter to the readout circuit, so that the readout circuit performs integral amplification on the sine wave signal based on the first working parameter.
In the data synchronization testing apparatus based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the data acquisition and control system is further configured to extract a first phase of the first sine wave signal and a second phase of the resampled second sine wave signal, and determine a difference between the first phase and the second phase as the phase difference, so as to achieve phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.
In the data synchronous testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the first sampling frequency is 1000 hertz.
In the data synchronization testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the second sampling frequency is 1000 Hz.
In the data synchronization testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, the first data acquisition board card is NI 9234.
The embodiment of the application provides a synchronous testing arrangement of data based on magnetic superconducting full tensor magnetic gradient system of observing and controling of avionics, the device includes: the system comprises a signal generator, an NI9215 module, a full tensor magnetic data simulation acquisition module and a data acquisition and control system, wherein the NI9215 module and the full tensor magnetic data simulation acquisition module are connected with the signal generator; the signal generator is configured to generate sine wave signals with preset frequency and transmit the sine wave signals to the NI9215 module and the full-tensor magnetic data simulation acquisition module; the NI9215 module is configured to trigger acquisition of a sine wave signal based on a pulse per second PPS signal to obtain a first sine wave signal; transmitting the first sine wave signal to a data acquisition and control system; the NI9215 module is a non-delay data acquisition card; the full-tensor magnetic data analog acquisition module is configured to amplify the sine wave signal based on the PPS signal to obtain a second sine wave signal; transmitting the second sine wave signal to a data acquisition and control system; the data acquisition and control system is configured to resample the second sine wave signal based on the PPS signal and a preset resampling rule to obtain a resampled second sine wave signal, and determine a phase difference between the first sine wave signal and the resampled second sine wave signal to realize phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference; by adopting the implementation scheme, after the sine wave signal is generated, the sine wave signal is respectively input into the preset NI9215 module and the full-tensor magnetic data simulation acquisition module to simulate the process of acquiring position, attitude data and full-tensor magnetic data after resampling in actual conditions, then after the first sine wave signal and the second sine wave signal output by the NI9215 module and the full-tensor magnetic data simulation acquisition module are obtained, the phase difference between the two is calculated, then the second sine wave signal is compensated by utilizing the phase difference, namely, the data synchronization between the two is realized, furthermore, in actual conditions, the purpose of improving the data synchronization precision of the position, attitude data and full-tensor magnetic data after resampling can be achieved by utilizing the phase difference to compensate the full-tensor magnetic data after resampling, and the final data synchronization precision is enabled to be within 5 microseconds.
Drawings
Fig. 1 is a first schematic connection diagram of a data synchronization testing apparatus 1 based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system according to an embodiment of the present application;
fig. 2 is a schematic connection diagram of a data synchronization testing apparatus 1 based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system according to an embodiment of the present application;
fig. 3 is a schematic diagram of an exemplary signal acquisition result provided by an embodiment of the present application;
fig. 4 is a schematic diagram of an exemplary test result provided in an embodiment of the present application.
Detailed Description
The aviation superconducting full tensor magnetic gradient data acquisition and control system not only needs to acquire full tensor magnetic data, but also needs position and attitude data corresponding to the full tensor magnetic data in real time, and the higher the synchronism is, the better the synchronism is. The attitude data is used for effectively eliminating interference introduced by the full-tensor magnetic data in the motion state, and then the spatial distribution information of the measured area can be obtained only by corresponding the full-tensor magnetic data after the interference is eliminated with the position information. Therefore, the measurement accuracy of the position and attitude data and the synchronism with the full tensor magnetic data determine the data quality of the aviation superconducting full tensor magnetic gradient data acquisition and control system, but the full tensor magnetic data and the position and attitude data are asynchronous due to different data sources of the full tensor magnetic data and the position and attitude data.
The data synchronization of the position, attitude data and full tensor magnetic data may be obtained by resampling the full tensor magnetic data, because the position and attitude data are directly acquired from the SPAN-CPT after the inertial navigation system SPAN-CPT is directly connected with the data acquisition and control system, thus, at this point the delay in position and attitude data is negligible, but before resampling the full tensor magnetic data, since the full-tensor magnetic data needs to be integrated and amplified by the readout circuit and analog-to-digital converted, at this time, the full tensor magnetic data can generate delay, so that the re-sampled full tensor magnetic data can generate certain delay compared with the position and posture data, therefore, there is a certain time delay between the resampled full tensor magnetic data and the position and orientation data.
Based on the above problems, the application provides a data synchronization test device based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system, which is used for testing the time delay generated in the process of sampling full tensor magnetic data, position data and attitude data by using the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, and further adjusting the resampling parameter of the full tensor magnetic data through the time delay, so that the synchronization precision of the full tensor magnetic data and the position attitude data is improved.
It should be understood that the specific embodiments described herein are merely illustrative of the present application. And are not intended to limit the present application.
The embodiment of the present application provides a data synchronization testing arrangement 1 based on full tensor magnetic gradient measurement and control system of aeromagnetic superconduction, and fig. 1 is a schematic diagram of connection 1 of a data synchronization testing arrangement based on full tensor magnetic gradient measurement and control system of aeromagnetic superconduction that this application embodiment provided, as shown in fig. 1, data synchronization testing arrangement 1 based on full tensor magnetic gradient measurement and control system of aeromagnetic superconduction can include:
the system comprises a signal generator 10, an NI9215 module 11 and a full tensor magnetic data simulation acquisition module 12 which are connected with the signal generator, and a data acquisition and control system 13 which is connected with the NI9215 module and the full tensor magnetic data simulation acquisition module; wherein the content of the first and second substances,
the signal generator is configured to generate sine wave signals with preset frequency and transmit the sine wave signals to the NI9215 module and the full-tensor magnetic data analog acquisition module;
the NI9215 module is configured to trigger acquisition of a sine wave signal based on a pulse per second PPS signal to obtain a first sine wave signal; transmitting the first sine wave signal to a data acquisition and control system; the NI9215 module is a non-delay data acquisition card;
the full-tensor magnetic data analog acquisition module is configured to amplify the sine wave signal based on the PPS signal to obtain a second sine wave signal; transmitting the second sine wave signal to a data acquisition and control system;
and the data acquisition and control system is configured to resample the second sine wave signal based on the PPS signal and a preset resampling rule to obtain a resampled second sine wave signal, and determine a phase difference between the first sine wave signal and the resampled second sine wave signal to realize phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.
The data synchronization testing device based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system is suitable for testing the time delay between full tensor magnetic data and position and attitude data in the process of sampling the full tensor magnetic data and the position and attitude data by the aeromagnetic superconducting full tensor magnetic gradient measurement and control system, and further compensates the scene of the full tensor magnetic data after resampling through the delay time.
It should be noted that, in the embodiment of the present application, the preset frequency is 50 hz, and a specific preset frequency may be specified according to an actual situation, and the embodiment of the present application is not limited herein.
It should be noted that the sine wave signal generated by the signal generator may not necessarily have a zero phase, nor is it required to be triggered by the PPS signal.
It should be noted that the NI9215 module and the full tensor magnetic data simulation acquisition module are respectively used for simulating a process of acquiring position and attitude data in an actual situation and a process of acquiring resampled full tensor magnetic data.
In the embodiment of the application, a data synchronization testing device based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system is connected with an inertial navigation system SPAN-CPT through a data acquisition and control system; the data acquisition and control system is further configured to acquire a PPS signal from the SPAN-CPT when a preset time is reached; and transmitting the PPS signals to an NI9215 module and a full tensor magnetic data analog acquisition module.
Note that since the PPS signal is reliable after the SPAN-CPT convergence, it can be understood that the PPS signal is acquired from the SPAN-CPT after the SPAN-CPT convergence.
In this embodiment of the application, the NI9215 module is further configured to acquire a sine wave signal based on PPS signal triggering and by using a first sampling frequency, to obtain a first sine wave signal; and transmitting the first sine wave signal to a data acquisition and control system.
It should be noted that, because the data acquisition and control system is connected to the SPAN-CPT, in an actual situation, the data acquisition and control system can directly acquire pose data, that is, position and attitude data in the SPAN-CPT, and the delay can be ignored, so that the present application uses the NI9215 card to simulate the process of acquiring pose data in an actual situation, and because the NI9215 card is a non-delay Successive Approximation Register (SAR) type data acquisition card, the present application includes 4 synchronous sampling analog input channels, there is no sampling delay but microsecond-level conversion time, and the conversion time affects the sampling frequency and does not generate sampling delay, so that the present application can be used for simulating the process of acquiring pose data in an actual situation.
In the embodiment of the present application, the NI9215 acquires the sine wave signal by using the first sampling frequency of 1000 hz.
It should be noted that, in the embodiment of the present application, the sine wave signal is acquired by using the non-delay NI9215 card to simulate a process of acquiring the position and orientation data in the SPAN-CPT by the data acquisition and control system in an actual situation.
In the embodiment of the application, the full tensor magnetic data analog acquisition module comprises a reading circuit and a first data acquisition board card; the reading circuit is configured to perform integral amplification on the sine wave signal to obtain an integral amplified sine wave signal, and transmit the integral amplified sine wave signal to the first data acquisition board card; the first data acquisition board card is configured to acquire the sine wave signal subjected to integral amplification by using a second sampling frequency based on PPS signal triggering to obtain a second sine wave signal, and transmit the second sine wave signal to the data acquisition and control system.
It should be noted that, in an actual situation, resampling of the full-tensor magnetic data is realized through an upper computer program of the data acquisition and control system, so that, during simulation, a sine wave signal generated by the signal generator needs to pass through the reading circuit and the first data acquisition board card, and after obtaining a second sine wave signal, the second sine wave signal is sent to the data acquisition and control system, and the data acquisition and control system receives the second sine wave signal to perform resampling processing on the second sine wave signal, and performs phase comparison on the obtained second sine wave signal and the first sine wave.
It should be noted that the first data acquisition board card may be a data acquisition and control system acquisition board card, and may be a data acquisition card used in a process of resampling full-tensor magnetic data, in this embodiment of the present application, the first data acquisition board card is NI9234, and a specific first data acquisition board card may be determined according to an actual situation, which is not limited herein.
It should be noted that, in the embodiment of the present application, the second sampling frequency is 1000 hz.
In practical situations, when the resampling rule is used to resample the full-tensor magnetic data, the full-tensor magnetic data is time-stamped based on the PPS signal in the SPAN-CPT, so that, during simulation, the acquisition of the full-tensor magnetic data needs to be triggered based on the PPS signal in the SPAN-CPT, and the data is resampled after the acquisition.
In the embodiment of the application, an output port of the signal generator is respectively connected with an input port of the NI9215 module and an input port of the readout circuit through a splitter, an output port of the readout circuit is connected with an input port of the first data acquisition board card, and an output port of the first data acquisition board card and an output port of the NI9215 module are connected with an input port of the data acquisition and control system.
In this embodiment of the application, the data acquisition and control system is further configured to determine a first working parameter when the preset time is reached, and transmit the first working parameter to the amplifying circuit, so that the amplifying circuit amplifies the sine wave signal based on the first working parameter.
It should be noted that the determination process of the first operating parameter is a preparation operation before the test starts, and the reaching of the preset time may be understood as determining the first operating parameter of the readout circuit after the SPAN-CPT converges before the test starts, and transmitting the first operating parameter to the amplifying circuit, so that the readout circuit is in a normal operating state.
In an embodiment of the application, the data acquisition and control system is further configured to extract a first phase of the first sine wave signal and a second phase of the resampled second sine wave signal, and determine a difference between the first phase and the second phase as the phase difference to achieve phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.
It should be noted that, after the data acquisition and control system obtains the first sine wave signal and the resampled second sine wave signal, the first phase of the first sine wave signal is extracted, the second phase of the second sine wave signal is extracted, the phase difference between the first sine wave signal and the second sine wave signal is determined based on the first phase and the second phase, and then the resampled second sine wave signal is compensated by the phase difference to realize the phase synchronization between the first sine wave signal and the resampled second sine wave signal.
Exemplarily, the embodiment of the present application provides a second schematic connection diagram of a data synchronization testing apparatus 1 based on an aeromagnetic superconducting full tensor magnetic gradient measurement and control system, as shown in fig. 2, the data synchronization testing apparatus based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system includes: the system comprises a signal generator, an NI9215 circuit, a reading circuit, a first data acquisition board card and a data acquisition and control system, wherein the output end of the signal generator is respectively connected with the input ends of the NI9215 circuit and the reading circuit, the output end of the reading circuit is connected with the input end of the first data acquisition board card, meanwhile, the output ends of the NI9215 circuit and the first data acquisition board card are connected with the data acquisition and control system, and an inertial navigation system SPAN-CPT is also connected with the data acquisition and control system through the connection of the data acquisition and control system and further connected to a data synchronization test device based on a aeromagnetic superconducting full tensor magnetic gradient measurement and control system.
Based on the data synchronization testing apparatus based on the aeromagnetic superconducting full tensor magnetic gradient measurement and control system in fig. 2, and under the condition that the first data acquisition board selects NI9234, the acquired first sine wave signal and second sine wave signal are as shown in fig. 3, fig. 3 is a schematic diagram of an exemplary signal acquisition result given in the embodiment of the present application, the upper half of fig. 3 represents the second sine wave signal, and the lower half represents the first sine wave signal, and a phase difference between the first sine wave signal and the second sine wave signal can be obtained by extracting and subtracting phases of the two sine wave signals, as shown in fig. 4, an exemplary test result schematic diagram is given for the embodiment of the present application, fig. 4 is synchronization precision of compensated synchronization data, in fig. 4, the vertical axis is time after phase difference is obtained, a unit is nanosecond, the horizontal axis is data point number, and a test result shows, the average delay is-75.86 ns, the maximum delay is 1483ns, the minimum delay is-1853 ns, and the delay fluctuation is 3337ns, and as can be seen from fig. 4, the delay fluctuation is less than 5 microseconds, which shows that the device can test the synchronization accuracy of similar systems.
The embodiment of the application provides a data synchronization testing arrangement based on full tensor magnetic gradient measurement and control system of aeromagnetic superconduction, the device includes: the system comprises a signal generator, an NI9215 module, a full tensor magnetic data simulation acquisition module and a data acquisition and control system, wherein the NI9215 module and the full tensor magnetic data simulation acquisition module are connected with the signal generator; the signal generator is configured to generate sine wave signals with preset frequency and transmit the sine wave signals to the NI9215 module and the full-tensor magnetic data simulation acquisition module; the NI9215 module is configured to trigger acquisition of a sine wave signal based on a pulse per second PPS signal to obtain a first sine wave signal; transmitting the first sine wave signal to a data acquisition and control system; the NI9215 module is a non-delay data acquisition card; the full-tensor magnetic data analog acquisition module is configured to amplify the sine wave signal based on the PPS signal to obtain a second sine wave signal; transmitting the second sine wave signal to a data acquisition and control system; the data acquisition and control system is configured to resample the second sine wave signal based on the PPS signal and a preset resampling rule to obtain a resampled second sine wave signal, and determine a phase difference between the first sine wave signal and the resampled second sine wave signal to realize phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference; by adopting the implementation scheme, after the sine wave signal is generated, the sine wave signal is respectively input into the preset NI9215 module and the full-tensor magnetic data simulation acquisition module to simulate the process of acquiring position, attitude data and full-tensor magnetic data after resampling in actual conditions, then after the first sine wave signal and the second sine wave signal output by the NI9215 module and the full-tensor magnetic data simulation acquisition module are obtained, the phase difference between the two is calculated, then the second sine wave signal is compensated by utilizing the phase difference, namely, the data synchronization between the two is realized, furthermore, in actual conditions, the purpose of improving the data synchronization precision of the position, attitude data and full-tensor magnetic data after resampling can be achieved by utilizing the phase difference to compensate the full-tensor magnetic data after resampling, and the final data synchronization precision is enabled to be within 5 microseconds.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of a hardware embodiment, a software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (10)

1. The utility model provides a synchronous testing arrangement of data based on magnetic superconducting full tensor magnetic gradient system of observing and controling which characterized in that, the device includes: the system comprises a signal generator, an NI9215 module, a full tensor magnetic data simulation acquisition module and a data acquisition and control system, wherein the NI9215 module and the full tensor magnetic data simulation acquisition module are connected with the signal generator; wherein the content of the first and second substances,
the signal generator is configured to generate sine wave signals with preset frequency and transmit the sine wave signals to the NI9215 module and the full-tensor magnetic data analog acquisition module;
the NI9215 module is configured to trigger and collect the sine wave signal based on a pulse per second PPS signal to obtain a first sine wave signal; transmitting the first sine wave signal to the data acquisition and control system; the NI9215 module is a non-delay data acquisition card;
the full-tensor magnetic data analog acquisition module is configured to amplify the sine wave signal based on the PPS signal to obtain a second sine wave signal; transmitting the second sine wave signal to the data acquisition and control system;
the data acquisition and control system is configured to resample the second sine wave signal based on the PPS signal and a preset resampling rule to obtain a resampled second sine wave signal, and determine a phase difference between the first sine wave signal and the resampled second sine wave signal to realize phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.
2. The device of claim 1, wherein the data acquisition and control system is connected with an inertial navigation system SPAN-CPT; wherein, the first and the second end of the pipe are connected with each other,
the data acquisition and control system is further configured to acquire the PPS signal from the SPAN-CPT when a preset time is reached; and transmitting the PPS signal to the NI9215 module and the full-tensor magnetic data analog acquisition module.
3. The apparatus of claim 1, wherein the NI9215 module is further configured to acquire the sine wave signal with a first sampling frequency based on the PPS signal trigger, resulting in the first sine wave signal; and transmitting the first sine wave signal to the data acquisition and control system.
4. The device of claim 3, wherein the full tensor magnetic data analog acquisition module comprises a readout circuit and a first data acquisition board card; wherein the content of the first and second substances,
the reading circuit is configured to perform integral amplification on the sine wave signal to obtain an integral amplified sine wave signal, and transmit the integral amplified sine wave signal to the first data acquisition board card;
the first data acquisition board card is configured to acquire the sine wave signal subjected to integral amplification by using a second sampling frequency based on the PPS signal trigger to obtain a second sine wave signal, and transmit the second sine wave signal to the data acquisition and control system.
5. The device of claim 4, wherein an output port of the signal generator is connected to an input port of the NI9215 module and an input port of the readout circuit through a splitter, an output port of the readout circuit is connected to an input port of the first data acquisition board, and an output port of the first data acquisition board and an output port of the NI9215 module are connected to an input port of the data acquisition and control system.
6. The apparatus of claim 4,
the data acquisition and control system is further configured to determine a first working parameter when a preset time is reached, and transmit the first working parameter to the readout circuit, so that the readout circuit performs integral amplification on the sine wave signal based on the first working parameter.
7. The apparatus of claim 1,
the data acquisition and control system is further configured to extract a first phase of the first sine wave signal and a second phase of the resampled second sine wave signal and determine a difference between the first phase and the second phase as the phase difference to achieve phase synchronization between the first sine wave signal and the second sine wave signal based on the phase difference.
8. The apparatus of claim 3, wherein the first sampling frequency is 1000 hertz.
9. The apparatus of claim 4, wherein the second sampling frequency is 1000 hertz.
10. The apparatus of claim 4, wherein the first data acquisition board is NI 9234.
CN202111319712.6A 2021-11-09 2021-11-09 Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system Active CN114063500B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111319712.6A CN114063500B (en) 2021-11-09 2021-11-09 Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111319712.6A CN114063500B (en) 2021-11-09 2021-11-09 Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system

Publications (2)

Publication Number Publication Date
CN114063500A CN114063500A (en) 2022-02-18
CN114063500B true CN114063500B (en) 2022-07-19

Family

ID=80274347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111319712.6A Active CN114063500B (en) 2021-11-09 2021-11-09 Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system

Country Status (1)

Country Link
CN (1) CN114063500B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116125540A (en) * 2023-04-12 2023-05-16 中国科学院空天信息创新研究院 Low-temperature super-navigation magnetic full tensor gradient measurement system and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102253284A (en) * 2011-04-18 2011-11-23 中国航空工业集团公司北京长城计量测试技术研究所 Phase difference synchronous measuring device and method for multi-way sine wave signals
CN104457793B (en) * 2014-12-08 2017-06-16 中国科学院上海微系统与信息技术研究所 The parallel calibration method of the synchronization accuracy of the full tensor magnetic gradient measure and control device of superconduction
CN113377054B (en) * 2021-06-22 2022-08-02 中国科学院空天信息创新研究院 Data synchronization method and device

Also Published As

Publication number Publication date
CN114063500A (en) 2022-02-18

Similar Documents

Publication Publication Date Title
CN106525226B (en) Evaluation method and system based on-site vibration load recognition
CN103323693B (en) For testing test device, test system and the method for power engineering test object
JPH03233327A (en) Load cell type weight measuring instrument
NO335926B1 (en) Method for checking the condition of a multi-sensitivity seismic accelerometer
US4931962A (en) Fixture and nonrepeatable error compensation system
US20190041365A1 (en) Modal vibration analysis system
CN114063500B (en) Data synchronization testing device based on aeromagnetic superconducting full tensor magnetic gradient measurement and control system
CN105785402B (en) A kind of system and method for GNSS signal simulator time-delay calibration
US6784819B2 (en) Measuring skew between digitizer channels using fourier transform
CN109613302A (en) Capacitor MEMS acceleration meter mechanical beams stiffness measurement methods, devices and systems
CN113377054B (en) Data synchronization method and device
CN103487051B (en) The method that satellite control system obtains star sensor data generation time
JPH0552907A (en) Device for testing electronic parts or the like
CN109581062A (en) High-precision impedance measurement system for oscilloscope calibrator probe
TWI426287B (en) Method and apparatus for complex time measurements
CN207571261U (en) A kind of system for signal acquisition in integrated circuit testing
EP0335981A1 (en) Magnetic resonance imaging system
CN114001892B (en) Time synchronization method between free jet test measurement systems
CN112325808A (en) Flatness real-time calibration compensation measurement method based on multiple PSDs
US6381340B1 (en) Method for calculating relative phases between signal channels in a multi-sensor tracking device
CN113014206A (en) Scale factor temperature drift compensation device and method for current/frequency conversion circuit
CN109506675A (en) A kind of temperature drift automatic compensating method for photoelectric nacelle
CN104034399B (en) Eliminate method and weighing apparatus that dynamic weighing synchrodata is affected by transmission delay
RU2204117C2 (en) Facility measuring static moment of blades
CN201421339Y (en) Electrical property inspecting and analyzing system of micro-mechanic sensing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant