CN114059564A - Precision control slope brushing method - Google Patents

Precision control slope brushing method Download PDF

Info

Publication number
CN114059564A
CN114059564A CN202111292909.5A CN202111292909A CN114059564A CN 114059564 A CN114059564 A CN 114059564A CN 202111292909 A CN202111292909 A CN 202111292909A CN 114059564 A CN114059564 A CN 114059564A
Authority
CN
China
Prior art keywords
brushing
slope
template
fine
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111292909.5A
Other languages
Chinese (zh)
Inventor
王裕彪
赵海峰
尹国海
王兴勇
张玉娟
刘花鹏
刘双龙
周英豪
路遥
吴光龙
刘建龙
李成录
郭晓
郭俊涛
孙帆
张树鹏
李松岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202111292909.5A priority Critical patent/CN114059564A/en
Publication of CN114059564A publication Critical patent/CN114059564A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A precise control slope brushing method relates to the technical field of earthwork construction, and comprises the following steps: firstly, capping and casting a catch basin; secondly, fixing a foundation surface by a stay wire; thirdly, brushing a slope finely; fourthly, measuring by a tape; fifthly, installing a template; sixthly, retesting; and seventhly, pouring and maintaining. The invention has the beneficial effects that: the invention has the beneficial effects that: the construction method is optimized, overbreak or underexcavation is avoided, errors are reduced, slope brushing is controlled accurately, measuring personnel on the construction site are reduced, the slope brushing construction progress is accelerated, the construction efficiency is improved, concrete overbooking is reduced, and the construction cost is saved.

Description

Precision control slope brushing method
Technical Field
The invention relates to the technical field of earthwork construction, in particular to a precise control slope brushing method.
Background
In the process of slope surface construction, the brushing of the slope is a difficult point and a key work; the smaller the body type error of the excavated slope is, the more cost is saved. After the excavation of the earthwork of a large area is finished, the process of fine carving is carried out, the thickness of the brush slope is controlled according to the design requirement, and the existing common slope brushing method is a combined process of measuring by a measurer, measuring by a GPS and brushing the slope mechanically: pouring the base and the capping concrete, finishing the pouring of the base and the capping concrete, performing fine brushing on an excavator, performing GPS following measurement (unqualified), performing fine brushing on the excavator, performing GPS following measurement (qualified), and entering the next procedure of slope protection concrete pouring; the construction method puts forward higher requirements and precision for measuring equipment and measuring personnel; on-site measuring personnel stare at the slope surface at any time and follow the excavator; the GPS is used for controlling the thickness of the slope elevation protection layer, the requirement on equipment operators is extremely high, the situation of over excavation or under excavation can occur, errors of +/-3 cm actually exist in the slope brushing site constructed according to the method, and the cost is increased for subsequent construction and concrete pouring.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a slope brushing method for fine control, which aims to solve the problems of slope brushing technology and precision.
The invention provides a method for precisely controlling slope brushing, which comprises the following steps:
step one, capping and casting a catch basin: after the earthwork excavation and replacement are finished, respectively pouring concrete on the top and the bottom to seal the top and cut off the ditch;
secondly, fixing the foundation surface by pulling wires: fixing points on the capping and the intercepting drain are determined by taking the base surface as a reference, and a steel wire rope is connected between the fixing points to determine a fine brushing surface;
step three, fine slope brushing: brushing a slope from the sealing top at the elevation position to the low water receiving ditch by adopting a slope brushing tool;
step four, measuring by a tape measure: after the slope brushing is finished, the measuring tape is adopted for checking and measuring, whether the fine brushing surface is in place is checked, if the fine brushing surface is not in place, the step three is continued, and if the fine brushing surface is in place, the next procedure is carried out;
fifthly, installing a template: installing a concrete pouring template in the corresponding fine brushing surface area;
sixth step, retest: after the template is installed, the template is checked and installed to be qualified, retest is carried out through a GPS measuring instrument, if the template is not qualified, the step five is continuously returned, and if the template is qualified, the next procedure is carried out;
seventhly, pouring and maintaining: and pouring concrete in the matched templates, press polishing to form a surface, demoulding after solidification, and watering for maintenance.
The steel wire rope is a steel wire rope with the diameter of more than 10 mm.
Paint with high identification degree is coated on the steel wire rope, and the steel wire rope is convenient for slope brushing workers to confirm.
The slope brushing tool is an excavator of the plate compactor.
And demolding within 12-18 hours after the concrete is poured.
The curing time is 14-28 days and is determined according to the weather temperature and the dryness.
The invention has the beneficial effects that: the construction method is optimized, overbreak or underexcavation is avoided, errors are reduced, slope brushing is controlled accurately, measuring personnel on the construction site are reduced, the slope brushing construction progress is accelerated, the construction efficiency is improved, concrete overbooking is reduced, and the construction cost is saved.
Drawings
FIG. 1 is a flow chart of the construction method of the present invention;
FIG. 2 is a cross-sectional view of a brush of the present invention;
in the figure: 1. capping, 2, intercepting ditch, 3, wire rope, 4, initial slope surface, 5 and foundation surface.
Detailed Description
Example 1
As shown in fig. 1-2, the present invention provides a method for precisely controlling slope brushing, which comprises the following steps:
firstly, pouring a water intercepting ditch 2 of a capping 1: after the earthwork excavation and replacement are finished, respectively pouring concrete on the top and the bottom to seal the top and cut off the ditch;
secondly, fixing the foundation surface by pulling wires: fixing points on the capping and the intercepting drain are determined by taking the base surface as a reference, and a steel wire rope is connected between the fixing points to determine a fine brushing surface;
step three, fine slope brushing: brushing a slope from the sealing top at the elevation position to the low water receiving ditch by adopting a slope brushing tool;
step four, measuring by a tape measure: after the slope brushing is finished, the measuring tape is adopted for checking and measuring, whether the fine brushing surface is in place is checked, if the fine brushing surface is not in place, the step three is continued, and if the fine brushing surface is in place, the next procedure is carried out;
fifthly, installing a template: installing a concrete pouring template in the corresponding fine brushing surface area;
sixth step, retest: after the template is installed, the template is checked and installed to be qualified, retest is carried out through a GPS measuring instrument, if the template is not qualified, the next procedure is continuously returned to the step-less step, and if the template is qualified;
seventhly, pouring and maintaining: and pouring concrete in the matched templates, press polishing to form a surface, demoulding after solidification, and watering for maintenance.
The steel wire rope is a steel wire rope with the diameter of more than 12 mm.
The steel wire rope is coated with yellow paint, so that the slope brushing worker can confirm the yellow paint conveniently.
The slope brushing tool is an excavator of the plate compactor.
And demolding after the concrete is poured for 14 hours.
The curing time is 20 days.
Example 2
As shown in fig. 1-2, the present invention provides a method for precisely controlling slope brushing, which comprises the following steps:
step one, capping and casting a catch basin: respectively pouring a roof sealing ditch and a water intercepting ditch at the top and the bottom after the earthwork excavation and replacement filling are finished;
secondly, fixing the foundation surface by pulling wires: fixing points on the capping and the intercepting drain are determined by taking the base surface as a reference, and a steel wire rope is connected between the fixing points to determine a fine brushing surface;
step three, fine slope brushing: brushing a slope from the sealing top at the elevation position to the low water receiving ditch by adopting a slope brushing tool;
step four, measuring by a tape measure: after the slope brushing is finished, the measuring tape is adopted for checking and measuring, whether the fine brushing surface is in place is checked, if the fine brushing surface is not in place, the step three is continued, and if the fine brushing surface is in place, the next procedure is carried out;
fifthly, installing a template: installing a concrete pouring template in the corresponding fine brushing surface area;
sixth step, retest: after the template is installed, the template is checked and installed to be qualified, retest is carried out through a GPS measuring instrument, if the template is not qualified, the step five is continuously returned, and if the template is qualified, the next procedure is carried out;
seventhly, pouring and maintaining: and pouring concrete in the matched templates, press polishing to form a surface, demoulding after solidification, and watering for maintenance.
The steel wire rope is a steel wire rope with the diameter of 16 mm.
The steel wire rope is coated with red paint, so that the slope brushing worker can confirm the red paint conveniently.
The slope brushing tool is an excavator of the plate compactor.
And demolding after the concrete is poured for 16 hours.
The curing time is 25 days.

Claims (4)

1. A method for precisely controlling slope brushing is characterized by comprising the following steps:
the method comprises the following steps of firstly, capping (1) and pouring of the intercepting ditch (2): after the earthwork excavation and replacement are finished, respectively pouring concrete on the top and the bottom to seal the roof (1) and the intercepting ditch (2);
secondly, the base surface (5) is fixed by stay wires: fixing points on the capping and the intercepting drain are determined by taking the foundation surface (5) as a reference, and a steel wire rope (3) is connected between the fixing points to determine a fine brushing surface;
step three, fine slope brushing: brushing a slope on the initial slope surface (4) from the sealing top at the elevation position to the direction of the low water receiving ditch by adopting a slope brushing tool;
step four, measuring by a tape measure: after the slope brushing is finished, the measuring tape is adopted for checking and measuring, whether the fine brushing surface is in place is checked, if the fine brushing surface is not in place, the step three is continued, and if the fine brushing surface is in place, the next procedure is carried out;
fifthly, installing a template: installing a concrete pouring template in the corresponding fine brushing surface area;
sixth step, retest: after the template is installed, the template is checked and installed to be qualified, retest is carried out through a GPS measuring instrument, if the template is not qualified, the step five is continuously returned, and if the template is qualified, the next procedure is carried out;
seventhly, pouring and maintaining: and pouring concrete in the matched templates, press polishing to form a surface, demoulding after solidification, and watering for maintenance.
2. The method for precisely controlling slope brushing according to claim 1, wherein: the steel wire rope (3) is a steel wire rope with the diameter of more than 10 mm.
3. The method for precisely controlling slope brushing according to claim 2, wherein: and paint with high identification degree is coated on the steel wire rope (3).
4. The method for precisely controlling slope brushing according to claim 1, wherein: the slope brushing tool adopts an excavator of a plate compactor.
CN202111292909.5A 2021-11-03 2021-11-03 Precision control slope brushing method Pending CN114059564A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111292909.5A CN114059564A (en) 2021-11-03 2021-11-03 Precision control slope brushing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111292909.5A CN114059564A (en) 2021-11-03 2021-11-03 Precision control slope brushing method

Publications (1)

Publication Number Publication Date
CN114059564A true CN114059564A (en) 2022-02-18

Family

ID=80273609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111292909.5A Pending CN114059564A (en) 2021-11-03 2021-11-03 Precision control slope brushing method

Country Status (1)

Country Link
CN (1) CN114059564A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898919A (en) * 2014-04-08 2014-07-02 山东金城建设有限公司 Side slope gradient control method in deep foundation pit excavation process
CN106012732A (en) * 2016-06-12 2016-10-12 中国十七冶集团有限公司 Construction method of drift-sand filler roadbed
CN107941199A (en) * 2017-11-10 2018-04-20 中国冶集团有限公司 A kind of slope measuring paying-off implement
JP2018091036A (en) * 2016-12-02 2018-06-14 フリー工業株式会社 Slope stabilization method
CN108385612A (en) * 2018-01-25 2018-08-10 浙江水利水电学院 A kind of construction method of the good concrete protecting face plate of stability
CN108611932A (en) * 2018-05-15 2018-10-02 中铁第六勘察设计院集团有限公司 It is a kind of pass through pool, fish pond location multiply road railway high-fill roadbed construction method
CN111893827A (en) * 2020-08-05 2020-11-06 中交上海航道局有限公司 Construction process of urban trunk road

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898919A (en) * 2014-04-08 2014-07-02 山东金城建设有限公司 Side slope gradient control method in deep foundation pit excavation process
CN106012732A (en) * 2016-06-12 2016-10-12 中国十七冶集团有限公司 Construction method of drift-sand filler roadbed
JP2018091036A (en) * 2016-12-02 2018-06-14 フリー工業株式会社 Slope stabilization method
CN107941199A (en) * 2017-11-10 2018-04-20 中国冶集团有限公司 A kind of slope measuring paying-off implement
CN108385612A (en) * 2018-01-25 2018-08-10 浙江水利水电学院 A kind of construction method of the good concrete protecting face plate of stability
CN108611932A (en) * 2018-05-15 2018-10-02 中铁第六勘察设计院集团有限公司 It is a kind of pass through pool, fish pond location multiply road railway high-fill roadbed construction method
CN111893827A (en) * 2020-08-05 2020-11-06 中交上海航道局有限公司 Construction process of urban trunk road

Similar Documents

Publication Publication Date Title
CN109680615B (en) Three-dimensional coordinate measuring construction method of short-line method section beam
JP6533842B2 (en) Joints used as final connections in submerged tunnels
CN102943565B (en) Construction method of large-sized arc-shaped wall
CN110130347B (en) Intelligent positioning guide device and method for pile foundation construction and engineering management method
CN106917409B (en) A kind of rock lid weight consolidation grouting construction method
CN107270814B (en) Prefabricated wind tunnel high-precision installation control method
CN108643217B (en) Construction method for high-speed railway roadbed contact net stand column foundation
CN102680942A (en) Blast furnace frame measuring positioning method based on total station
CN209025439U (en) A kind of height-adjustable Wedge device
CN113239429A (en) Method for manufacturing precast assembled bridge of concrete segments
CN112524335A (en) Non-excavation jacking external branch pipe construction method
CN108519782B (en) Automatic control system for prefabricated line shape of segmental bridge
CN108731598B (en) Matched beam section positioning method based on distance control
CN114059564A (en) Precision control slope brushing method
CN106289125B (en) A kind of ship closes up greatly the measurement method of step simulations carrying
CN210036720U (en) Box culvert jacking monitoring device
CN109506814B (en) Waterproof device and installation method of shield tunnel water and soil pressure monitoring equipment
CN107724419B (en) Equipment prefabricated foundation positioner and using method thereof
CN208173365U (en) Prefabricated assembled box-type transformer foundation
CN212612684U (en) Pile-column integrated prefabricated pipe pile position accurate positioning device
CN203034459U (en) Pile sinking positioning device
CN113649534A (en) Slab continuous casting sector section space positioning measurement method
CN109252620B (en) Shaped steel column and column cap shaping steel mould construction method
CN114278785B (en) Jacking construction method for thin-covered soil small-clear-distance multi-line parallel large-diameter mud-water balance pipeline
CN115726361A (en) Construction method for constructing pipe jacking horsewell firstly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220218

RJ01 Rejection of invention patent application after publication