Prior art keywords
rod
cloth
cement
sliding
shielding cloth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111344714.0A
Other languages
Chinese (zh)
Other versions
CN114046056B (en
Inventor
李栋梁
王权
刘志强
贾继访
陈凌潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202111344714.0A priority Critical patent/CN114046056B/en
Publication of CN114046056A publication Critical patent/CN114046056A/en
Application granted granted Critical
Publication of CN114046056B publication Critical patent/CN114046056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/28Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/34Supporting means, e.g. frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Seats For Vehicles (AREA)

Abstract

The invention relates to the field of construction auxiliary equipment, in particular to cement shielding equipment for constructional engineering. The invention uses the insertion of the main support bar into the green cement or sand to seat the cloth barrier above the pile of cement. Adjusting the positions of the mounting seats on the sliding rails and the sliding frames to enable the sliding rails and the sliding frames to form a closed polygon; the cement pile is positioned inside the closed polygon. The whole device has simple structure, convenient use and long service life; the structure design of no electricity, the fabrication cost is low and the wide popularization is easy; through setting up multiunit slide rail and carriage, the messenger shelters from the scope adjustable, is convenient for to not co-altitude, and the cement of different volumes is to carrying out the corresponding sheltering from of utensil, effectively reduces to shelter from spacious environment between cloth and the cement to improve this stability of sheltering from the device.

Description

Cement shelters from equipment for building engineering
Technical Field
The invention relates to the field of construction auxiliary equipment, in particular to cement shielding equipment for constructional engineering.
Background
In the building engineering, cement is used, and the cement is generally placed outdoors, is easily wetted by rainwater, influences the use and is easy to harden.
The invention with the authorization notice number of CN108590210B discloses cement shielding equipment for constructional engineering, which comprises a bottom plate, an arc-shaped plate, a connecting block, a fixed block, shielding cloth and the like; the installation of bottom plate top front and back bilateral symmetry formula has the arc, and the fixed block is installed in arc lateral surface left side, and open at the arc middle part has the arc, is equipped with the slider in the arc, slider and arc sliding fit. The cement anti-wetting device can block cement by the effect of the shielding cloth, so that rainwater is prevented from wetting the cement, the shielding cloth can be shaken by the shaking device, the rainwater is prevented from falling onto the cement when the shielding cloth is opened, and the effects that the cement can be shielded, the cement cannot be wetted, and the cement anti-wetting device is not easy to harden and does not affect use are achieved.
However, the above prior art has the following drawbacks:
1. the valve is provided with more electric driving devices, so that the manufacturing cost of the shielding device is higher, the shielding device is not beneficial to being widely applied in small construction sites, and the practicability of the device is lower;
2. the volume of the cement piles is different, the device cannot shield the cement piles with different sizes, the shielding range is narrow, and the practicability is poor;
3. the shaking device is high in manufacturing cost, poor in practicability and low in economic benefit when used for shaking rainwater;
4. the whole equipment of the invention has low portability and can not be effectively stored when not used.
Disclosure of Invention
The invention provides cement shielding equipment for constructional engineering, aiming at the technical problems in the background technology.
The technical scheme of the invention is as follows: the utility model provides a cement shelters from equipment for building engineering, includes mount pad, slide rail, carriage, positioning seat one, adsorbs a piece one, positioning seat two, adsorbs a piece three, vice bracing piece, keeps off cloth seat, main tributary bracing piece, main shelters from cloth and shelters from cloth adsorption element.
The mounting seat is arranged on the sliding rail in a sliding manner; the sliding frame is arranged on the mounting seat in a sliding manner; the first positioning seat is arranged on the slide rail; the first adsorption piece is arranged on the first positioning seat; the second positioning seat is arranged on the sliding frame; the second adsorption piece is arranged on the second positioning seat; the adsorption piece III is arranged on the mounting seat; the auxiliary support rod is arranged on the mounting seat; the cloth blocking seat is arranged on the main support rod; the main support rod is arranged on the cement pile and is positioned in a closed area formed by the multiple groups of sliding rails and the multiple groups of sliding frames; the main shielding cloth is arranged on the cloth blocking seat; the shielding cloth adsorption piece is arranged on the main shielding cloth and is respectively connected with the adsorption piece I, the adsorption piece II and the adsorption piece III in an adsorption manner.
Preferably, the auxiliary support rod is an elastic rod; one end of the elastic rod is arranged on the mounting seat, and the other end of the elastic rod is arranged on the main shielding cloth; the elastic rod is provided with an elastic control assembly.
Preferably, the elastic control assembly comprises a control ring, a control rod and a handle; the control ring is arranged at one end of the elastic rod far away from the mounting seat; the control rod is arranged on the control ring; the handle is arranged at one end of the control rod far away from the control ring.
Preferably, the elastic rod comprises a sliding rod, a guide sleeve rod and a spring; the sliding rod is sleeved on the guide sleeve rod in a sliding manner; the spring slides and sets up on the direction loop bar, and the one end setting of spring is on the slide bar, and the other end setting of spring is on the direction loop bar.
Preferably, the sliding rod is provided with a clamping block; a clamping groove is formed in the guide sleeve rod; the clamping block is arranged on the clamping groove in a sliding mode.
Preferably, the sliding rail is provided with a sliding chute; the first positioning seat is arranged on the sliding chute in a sliding manner; the second positioning seat is arranged on the sliding frame in a sliding mode.
Preferably, a limiting plate is arranged on the sliding frame.
Preferably, the periphery of the main shielding cloth is provided with an auxiliary shielding cloth I and an auxiliary shielding cloth II; the auxiliary shielding cloth I is provided with a shielding cloth adsorption part corresponding to the adsorption part II; and the secondary shielding cloth II is provided with a shielding cloth adsorption part corresponding to the adsorption part I.
Preferably, a supporting bent rod mounting seat is arranged on the first positioning seat; the supporting bent rod mounting seat is detachably provided with a supporting bent rod; the other end of the supporting bent rod is detachably arranged on the cloth blocking seat.
A cement shelters from equipment for building engineering, this shelters from equipment's application method as follows:
s1, inserting the main supporting rod into the cement or sandy soil to make the blocking cloth seat above the cement pile.
S2, adjusting the positions of the mounting seats on the sliding rails and the sliding frames to enable the multiple groups of sliding rails and the sliding frames to form a closed polygon; the cement pile is positioned inside the closed polygon.
S3, arranging one end of the support bent rod on the support bent rod mounting seat, and arranging the other end of the support bent rod on the cloth blocking seat; unfolding the main shielding cloth on the cloth blocking seat and laying the main shielding cloth on the support bent rod; the edge of the main shielding cloth is placed on the auxiliary supporting rod; the cement pile is positioned inside the main shielding cloth.
And S4, sequentially adsorbing the shielding cloth adsorption piece on the main shielding cloth on the adsorption piece I, the adsorption piece II and the adsorption piece III.
S5, when impurities remain on the main shielding cloth, the handle is used, the control ring is driven to move through the control rod, so that the height of the elastic rod is driven to change, the main shielding cloth shakes, and the impurities on the main shielding cloth are removed conveniently.
Compared with the prior art, the technical scheme of the invention has the following beneficial technical effects: the whole device has simple structure, convenient use and long service life; the structure design of no electricity, the fabrication cost is low and the wide popularization is easy; by arranging the plurality of groups of sliding rails and the sliding frame, the shielding range of the main shielding cloth can be adjusted, targeted shielding can be conveniently performed on cement pairs with different heights and different volumes, and the open environment between the shielding cloth and the cement is effectively reduced, so that the stability of the shielding device is improved; and the invention is convenient to store when not in use, and can not affect the construction site.
Drawings
Fig. 1 is a first structural diagram of an embodiment of the present invention.
Fig. 2 is a schematic structural diagram of a second embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a second embodiment of the present invention.
FIG. 4 is a perspective view of one embodiment of the present invention.
FIG. 5 is a cross-sectional view of one embodiment of the present invention.
Fig. 6 is a partially enlarged structural view of a portion a in fig. 5.
Reference numerals: 1. a mounting seat; 2. a slide rail; 3. a carriage; 4. a first positioning seat; 5. a first adsorption part; 6. a second positioning seat; 7. a second adsorption part; 8. an adsorption part III; 9. an auxiliary support rod; 10. an elastic rod; 11. a control loop; 12. a control lever; 13. a handle; 14. a slide bar; 15. a guide loop bar; 16. a spring; 17. a clamping block; 18. a card slot; 19. a limiting plate; 20. a chute; 21. a support bent rod mounting seat; 22. supporting the bent rod; 23. a cloth blocking seat; 24. a main support bar; 25. a main shielding cloth; 26. a shielding cloth adsorbing member; 28. a first auxiliary shielding cloth; 29. and a secondary shielding cloth II.
Detailed Description
Example one
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
In this embodiment, the apparatus is used by inserting the main support rods 24 into the green cement or sand so that the cloth holder 23 is above the pile of cement. Adjusting the positions of the mounting seat 1 on the sliding rails 2 and the sliding frame 3 to enable a plurality of groups of sliding rails 2 and sliding frames 3 to form a closed polygon; the cement pile is positioned inside the closed polygon. The main shielding cloth 25 on the cloth blocking seat 23 is unfolded and laid on the supporting bent rod 22; the edge of the main shielding cloth 25 is placed on the auxiliary support bar 9; the cement pile is located inside the primary shielding cloth 25. The barrier cloth adsorbing member 26 on the main barrier cloth 25 is sequentially adsorbed and arranged on the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8. And finishing the shielding operation of the cement. The whole device has simple structure, convenient use and long service life; the structure design of no electricity, the fabrication cost is low and the wide popularization is easy; by arranging the plurality of groups of sliding rails 2 and the sliding frame 3, the shielding range of the main shielding cloth 25 can be adjusted, targeted shielding can be conveniently carried out on cement pairs with different heights and different volumes, and the open environment between the shielding cloth and the cement is effectively reduced, so that the stability of the shielding device is improved; and the invention is convenient to store when not in use, and can not affect the construction site.
Example two
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
As shown in fig. 5, further, the auxiliary support bar 9 is provided as an elastic bar 10; one end of the elastic rod 10 is arranged on the mounting base 1, and the other end of the elastic rod 10 is arranged on the main shielding cloth 25; the elastic rod 10 is provided with an elastic control assembly.
In this embodiment, the elastic rod 10 is provided, and the elastic member inside the elastic rod 10 is shaken, so that the total length of the elastic rod 10 is changed, the main shielding cloth 25 is driven to shake conveniently, and impurities or rainwater on the main shielding cloth 25 can be shaken off.
EXAMPLE III
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
As shown in fig. 5, further, the auxiliary support bar 9 is provided as an elastic bar 10; one end of the elastic rod 10 is arranged on the mounting base 1, and the other end of the elastic rod 10 is arranged on the main shielding cloth 25; the elastic rod 10 is provided with an elastic control assembly.
Further, the elastic control assembly comprises a control ring 11, a control rod 12 and a handle 13; the control ring 11 is arranged at one end of the elastic rod 10 far away from the mounting seat 1; the control rod 12 is arranged on the control ring 11; a handle 13 is provided at the end of the control rod 12 remote from the control ring 11.
In this embodiment, when the impurities remain on the main shielding cloth 25, the handle 13 is used to drive the control ring 11 to move through the control rod 12, so as to drive the height of the elastic rod 10 to change, so that the main shielding cloth 25 shakes, the impurities on the main shielding cloth 25 are conveniently removed, the arrangement of the electric equipment is reduced, the practicability of the invention is improved, and the manufacturing cost of the invention is reduced.
Example four
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
As shown in fig. 5, further, the auxiliary support bar 9 is provided as an elastic bar 10; one end of the elastic rod 10 is arranged on the mounting base 1, and the other end of the elastic rod 10 is arranged on the main shielding cloth 25; the elastic rod 10 is provided with an elastic control assembly.
As shown in fig. 6, further, the elastic rod 10 includes a sliding rod 14, a guide sleeve rod 15, and a spring 16; the sliding rod 14 is sleeved on the guide sleeve rod 15 in a sliding manner; the spring 16 is slidably disposed on the guide sleeve rod 15, one end of the spring 16 is disposed on the slide rod 14, and the other end of the spring 16 is disposed on the guide sleeve rod 15.
In this embodiment, the sliding rod 14 and the guide sleeve rod 15 are provided to limit the elastic expansion of the spring 16, thereby improving the wind resistance and stability of the shielding device.
EXAMPLE five
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
As shown in fig. 5, further, the auxiliary support bar 9 is provided as an elastic bar 10; one end of the elastic rod 10 is arranged on the mounting base 1, and the other end of the elastic rod 10 is arranged on the main shielding cloth 25; the elastic rod 10 is provided with an elastic control assembly.
As shown in fig. 6, further, the elastic rod 10 includes a sliding rod 14, a guide sleeve rod 15, and a spring 16; the sliding rod 14 is sleeved on the guide sleeve rod 15 in a sliding manner; the spring 16 is slidably disposed on the guide sleeve rod 15, one end of the spring 16 is disposed on the slide rod 14, and the other end of the spring 16 is disposed on the guide sleeve rod 15.
As shown in fig. 6, further, a latch 17 is provided on the slide rod 14; a clamping groove 18 is arranged on the guide sleeve rod 15; the latch 17 is slidably disposed on the latch slot 18.
In the present embodiment, a latch 17 is provided to prevent the slide rod 14 from falling off the guide sleeve rod 15; and a clamping groove 18 is arranged to limit the sliding of the clamping block 17 on the guide sleeve rod 15.
EXAMPLE six
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
Further, a sliding groove 20 is arranged on the sliding rail 2; the first positioning seat 4 is arranged on the sliding groove 20 in a sliding manner; the second positioning seat 6 is slidably arranged on the sliding frame 3.
In this embodiment, the sliding groove 20 is provided to limit the sliding of the second positioning seat 6 on the sliding rail 2, so as to improve the stability of the sliding of the second positioning seat 6 on the sliding rail 2.
EXAMPLE seven
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
Further, a limiting plate 19 is arranged on the sliding frame 3.
In the present embodiment, the stopper plate 19 is provided to prevent the mount 1 from falling off the carriage 3, thereby improving the sliding stability of the mount 1 on the carriage 3.
Example eight
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
Further, a first auxiliary shielding cloth 28 and a second auxiliary shielding cloth 29 are arranged on the periphery of the main shielding cloth 25; the first auxiliary shielding cloth 28 is provided with a shielding cloth adsorption piece 26 corresponding to the second adsorption piece 7; the second auxiliary shielding cloth 29 is provided with a shielding cloth adsorbing member 26 corresponding to the adsorbing member one 5.
In this embodiment, the first auxiliary shielding cloth 28 and the second auxiliary shielding cloth 29 are provided to improve the connection tightness between the main shielding cloth 25 and the slide rail 2 and the slide frame 3, thereby improving the wind resistance of the whole shielding device.
Example nine
The cement shielding equipment for the building engineering comprises a mounting seat 1, a slide rail 2, a sliding frame 3, a first positioning seat 4, a first adsorption part 5, a second positioning seat 6, a second adsorption part 7, a third adsorption part 8, an auxiliary supporting rod 9, a cloth blocking seat 23, a main supporting rod 24, main shielding cloth 25 and a shielding cloth adsorption part 26.
As shown in fig. 1-4, the mounting seat 1 is slidably disposed on the slide rail 2; the sliding frame 3 is arranged on the mounting seat 1 in a sliding manner; the first positioning seat 4 is arranged on the slide rail 2; the first adsorption piece 5 is arranged on the first positioning seat 4; the second positioning seat 6 is arranged on the sliding frame 3; the second adsorption piece 7 is arranged on the second positioning seat 6; the third adsorption piece 8 is arranged on the mounting base 1; the auxiliary support rod 9 is arranged on the mounting seat 1; the cloth blocking seat 23 is arranged on the main support rod 24; the main support rods 24 are arranged on the cement pile, and the main support rods 24 are positioned in an enclosed area formed by the multiple groups of sliding rails 2 and the multiple groups of sliding frames 3; the main shielding cloth 25 is arranged on the cloth blocking seat 23; the shielding cloth adsorbing member 26 is disposed on the main shielding cloth 25, and the shielding cloth adsorbing member 26 is respectively connected to the adsorbing member one 5, the adsorbing member two 7, and the adsorbing member three 8.
Further, a supporting bent rod mounting seat 21 is arranged on the first positioning seat 4; the supporting bent rod 22 is detachably arranged on the supporting bent rod mounting seat 21; the other end of the support bent rod 22 is detachably arranged on the cloth baffle seat 23.
In this embodiment, the support bent rod 22 and the support bent rod mounting seat 21 are provided, and the main shielding cloth 25 is further erected above the cement pile to prevent the shielding cloth from being adhered to the cement pile.
A cement shelters from equipment for building engineering, this shelters from equipment's application method as follows:
s1, the main supporting rod 24 is inserted into the cement or sand, so that the cloth stopper 23 is located above the cement pile.
S2, adjusting the positions of the mounting seat 1 on the sliding rails 2 and the sliding frame 3 to enable the sliding rails 2 and the sliding frame 3 to form a closed polygon; the cement pile is positioned inside the closed polygon.
S3, arranging one end of the support bent rod 22 on the support bent rod installation seat 21, and arranging the other end of the support bent rod 22 on the cloth blocking seat 23; the main shielding cloth 25 on the cloth blocking seat 23 is unfolded and laid on the supporting bent rod 22; the edge of the main shielding cloth 25 is placed on the auxiliary support bar 9; the cement pile is located inside the primary shielding cloth 25.
And S4, sequentially adsorbing and arranging the shielding cloth adsorbing piece 26 on the main shielding cloth 25 on the adsorbing piece I5, the adsorbing piece II 7 and the adsorbing piece III 8.
S5, when impurities remain on the main shielding cloth 25, the handle 13 is used, the control rod 12 drives the control ring 11 to move, so that the height of the elastic rod 10 is changed, the main shielding cloth 25 shakes, and the impurities on the main shielding cloth 25 are removed conveniently.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (10)

1. The cement shielding equipment for the constructional engineering is characterized by comprising a mounting seat (1), a slide rail (2), a sliding frame (3), a first positioning seat (4), a first adsorption part (5), a second positioning seat (6), a second adsorption part (7), a third adsorption part (8), an auxiliary support rod (9), a cloth blocking seat (23), a main support rod (24), main shielding cloth (25) and a shielding cloth adsorption part (26);
the mounting seat (1) is arranged on the sliding rail (2) in a sliding manner; the sliding frame (3) is arranged on the mounting seat (1) in a sliding manner; the first positioning seat (4) is arranged on the sliding rail (2); the first adsorption piece (5) is arranged on the first positioning seat (4); the second positioning seat (6) is arranged on the sliding frame (3); the second adsorption piece (7) is arranged on the second positioning seat (6); the adsorption piece III (8) is arranged on the mounting seat (1); the auxiliary supporting rod (9) is arranged on the mounting seat (1); the cloth blocking seat (23) is arranged on the main support rod (24); the main support rod (24) is arranged on the cement pile, and the main support rod (24) is positioned in an enclosed area formed by the multiple groups of sliding rails (2) and the multiple groups of sliding frames (3); the main shielding cloth (25) is arranged on the cloth shielding seat (23); the shielding cloth adsorption piece (26) is arranged on the main shielding cloth (25), and the shielding cloth adsorption piece (26) is respectively connected with the adsorption piece I (5), the adsorption piece II (7) and the adsorption piece III (8) in an adsorption mode.
2. Cement screening arrangement according to claim 1, characterized in that the secondary support bar (9) is arranged as a flexible bar (10); one end of the elastic rod (10) is arranged on the mounting seat (1), and the other end of the elastic rod (10) is arranged on the main shielding cloth (25); an elastic control component is arranged on the elastic rod (10).
3. A cement screening arrangement for building engineering according to claim 2, characterized in that the elastic control assembly comprises a control ring (11), a control rod (12) and a handle (13); the control ring (11) is arranged at one end of the elastic rod (10) far away from the mounting seat (1); the control rod (12) is arranged on the control ring (11); the handle (13) is arranged at one end of the control rod (12) far away from the control ring (11).
4. Cement screening arrangement according to claim 2, characterized in that the resilient rod (10) comprises a sliding rod (14), a guide sleeve rod (15) and a spring (16); the sliding rod (14) is sleeved on the guide sleeve rod (15) in a sliding manner; the spring (16) is arranged on the guide sleeve rod (15) in a sliding mode, one end of the spring (16) is arranged on the sliding rod (14), and the other end of the spring (16) is arranged on the guide sleeve rod (15).
5. A cement sheltering device for building engineering according to claim 4, characterized in that the sliding rod (14) is provided with a block (17); a clamping groove (18) is arranged on the guide sleeve rod (15); the clamping block (17) is arranged on the clamping groove (18) in a sliding mode.
6. The cement sheltering device for building engineering according to claim 1, characterized in that the sliding rail (2) is provided with a chute (20); the first positioning seat (4) is arranged on the sliding groove (20) in a sliding manner; the second positioning seat (6) is arranged on the sliding frame (3) in a sliding mode.
7. Cement sheltering device for building engineering according to claim 1, characterised in that it provides a limit plate (19) on the carriage (3).
8. Cement screening apparatus for construction engineering according to claim 1, wherein a first secondary screening cloth (28) and a second secondary screening cloth (29) are provided at the periphery of the primary screening cloth (25); the first auxiliary shielding cloth (28) is provided with a shielding cloth adsorption part (26) corresponding to the second adsorption part (7); the second auxiliary shielding cloth (29) is provided with a shielding cloth adsorption piece (26) corresponding to the adsorption piece (5).
9. The cement sheltering device for building engineering according to claim 1, characterized in that the first positioning seat (4) is provided with a support bent rod mounting seat (21); the supporting bent rod (22) is detachably arranged on the supporting bent rod mounting seat (21); the other end of the supporting bent rod (22) is detachably arranged on the cloth blocking seat (23).
10. A cement sheltering device for construction engineering according to any of claims 1-9, characterized by the following method of use of the device:
s1, inserting the main support rod (24) into the undried cement or sandy soil to enable the cloth blocking seat (23) to be positioned above the cement pile;
s2, adjusting the positions of the mounting seat (1) on the sliding rail (2) and the sliding frame (3) to enable the sliding rail (2) and the sliding frame (3) to form a closed polygon; the cement pile is positioned inside the closed polygon;
s3, arranging one end of the support bent rod (22) on the support bent rod mounting seat (21), and arranging the other end of the support bent rod (22) on the cloth blocking seat (23); the main shielding cloth (25) on the cloth shielding seat (23) is unfolded and laid on the supporting bent rod (22); the edge of the main shielding cloth (25) is placed on the auxiliary supporting rod (9); the cement pile is positioned inside the main shielding cloth (25);
s4, sequentially adsorbing and arranging the shielding cloth adsorption piece (26) on the main shielding cloth (25) on the adsorption piece I (5), the adsorption piece II (7) and the adsorption piece III (8);
s5, when impurities are left on the main shielding cloth (25), the handle (13) is used to drive the control ring (11) to move through the control rod (12), so that the height of the elastic rod (10) is changed, the main shielding cloth (25) shakes, and the impurities on the main shielding cloth (25) are removed conveniently.
CN202111344714.0A 2021-11-15 2021-11-15 Cement shielding equipment for constructional engineering Active CN114046056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111344714.0A CN114046056B (en) 2021-11-15 2021-11-15 Cement shielding equipment for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111344714.0A CN114046056B (en) 2021-11-15 2021-11-15 Cement shielding equipment for constructional engineering

Publications (2)

Publication Number Publication Date
CN114046056A true CN114046056A (en) 2022-02-15
CN114046056B CN114046056B (en) 2023-06-23

Family

ID=80208907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111344714.0A Active CN114046056B (en) 2021-11-15 2021-11-15 Cement shielding equipment for constructional engineering

Country Status (1)

Country Link
CN (1) CN114046056B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080016786A1 (en) * 2006-07-24 2008-01-24 Vasileios Bougioukos Shading systems
KR100886343B1 (en) * 2008-08-11 2009-03-03 주식회사 동아스트 The ascent and descent where the assembly dissolution is possible just the infrastructure
CN207847240U (en) * 2017-12-17 2018-09-11 湖南拓曼节能科技有限公司 A kind of mounting support structure of two-orbit canopy
CN108590210A (en) * 2018-04-23 2018-09-28 刘桂兰 A kind of constructional engineering mud blocks equipment
CN208310391U (en) * 2018-04-19 2019-01-01 长沙金雪莱电子科技有限公司 A kind of intelligence solar protection devices
CN210217321U (en) * 2019-04-03 2020-03-31 深圳市雅上篷房技术有限公司 Good and strong wind-resistant covering or awning on a car, boat, etc. room of stability
DE202020105104U1 (en) * 2020-09-04 2020-10-08 China Railway Liuyuan Group Co., Ltd. Protective bracket with a mesh profile structure for underground tunnel construction
CN211923619U (en) * 2020-03-27 2020-11-13 中国建筑第二工程局有限公司 Security protection device for construction
CN112343361A (en) * 2019-12-19 2021-02-09 福州集丫科技有限公司 Cement shelters from device for construction
CN214220829U (en) * 2021-01-06 2021-09-17 李树臣 Protection canopy for building engineering
US20210293048A1 (en) * 2020-03-18 2021-09-23 Nanjing Kekang Outdoor Products Co., Ltd. Outdoor Leisure Rain Shield Tent

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080016786A1 (en) * 2006-07-24 2008-01-24 Vasileios Bougioukos Shading systems
KR100886343B1 (en) * 2008-08-11 2009-03-03 주식회사 동아스트 The ascent and descent where the assembly dissolution is possible just the infrastructure
CN207847240U (en) * 2017-12-17 2018-09-11 湖南拓曼节能科技有限公司 A kind of mounting support structure of two-orbit canopy
CN208310391U (en) * 2018-04-19 2019-01-01 长沙金雪莱电子科技有限公司 A kind of intelligence solar protection devices
CN108590210A (en) * 2018-04-23 2018-09-28 刘桂兰 A kind of constructional engineering mud blocks equipment
CN210217321U (en) * 2019-04-03 2020-03-31 深圳市雅上篷房技术有限公司 Good and strong wind-resistant covering or awning on a car, boat, etc. room of stability
CN112343361A (en) * 2019-12-19 2021-02-09 福州集丫科技有限公司 Cement shelters from device for construction
US20210293048A1 (en) * 2020-03-18 2021-09-23 Nanjing Kekang Outdoor Products Co., Ltd. Outdoor Leisure Rain Shield Tent
CN211923619U (en) * 2020-03-27 2020-11-13 中国建筑第二工程局有限公司 Security protection device for construction
DE202020105104U1 (en) * 2020-09-04 2020-10-08 China Railway Liuyuan Group Co., Ltd. Protective bracket with a mesh profile structure for underground tunnel construction
CN214220829U (en) * 2021-01-06 2021-09-17 李树臣 Protection canopy for building engineering

Also Published As

Publication number Publication date
CN114046056B (en) 2023-06-23

Similar Documents

Publication Publication Date Title
CN114046056A (en) Cement shelters from equipment for building engineering
CN113013741A (en) Switch cabinet and installation process thereof
CN214220829U (en) Protection canopy for building engineering
CN216288916U (en) Tunnel LTE directional aerial convenient to maintain
CN213106436U (en) Large-area glass coating clamp
CN213091786U (en) Cable fault detector
CN215106074U (en) Building structure design antidetonation connection structure
CN215814792U (en) Building model antidetonation detects demonstration platform with diversified display function
CN211936052U (en) Construction dust keeper
CN210342906U (en) Cable distribution box peripheral fence with rain-proof shed
CN206236175U (en) Student classroom is turned out for work the fixing device of the equipment of checking card
CN113653010B (en) Flexible ecological bank protection
CN201750518U (en) General test platform
CN210375142U (en) Building construction measuring device
CN217953490U (en) Good topography survey device of dirt resistance
CN214101814U (en) Portable wireless AP device
CN220058027U (en) Side slope anchoring device for building municipal engineering
CN210669987U (en) Resistance box device for photovoltaic module
CN218072023U (en) Mine mining machine electric protection device
CN215866780U (en) Transformer life cycle detection device based on big data architecture
CN210291301U (en) Anti-shock and anti-falling movable LED display screen
CN215098985U (en) Earthquake-resistant storage device for geographic mapping instrument
CN214899777U (en) Intelligent box-type substation
CN213282073U (en) Civil engineering cost management device
CN218099918U (en) Movable water curtain generator for water lamplight display

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant