CN114024331A - Planning operation measure optimization method for improving direct current bearing capacity - Google Patents

Planning operation measure optimization method for improving direct current bearing capacity Download PDF

Info

Publication number
CN114024331A
CN114024331A CN202110988496.8A CN202110988496A CN114024331A CN 114024331 A CN114024331 A CN 114024331A CN 202110988496 A CN202110988496 A CN 202110988496A CN 114024331 A CN114024331 A CN 114024331A
Authority
CN
China
Prior art keywords
direct current
power
measures
planning
direct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110988496.8A
Other languages
Chinese (zh)
Other versions
CN114024331B (en
Inventor
魏明奎
蔡绍荣
周泓
江栗
路亮
陶宇轩
沈力
王庆
梁文举
文一宇
张鹏
杨宇霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Branch of State Grid Corp
Original Assignee
Southwest Branch of State Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Branch of State Grid Corp filed Critical Southwest Branch of State Grid Corp
Priority to CN202110988496.8A priority Critical patent/CN114024331B/en
Publication of CN114024331A publication Critical patent/CN114024331A/en
Application granted granted Critical
Publication of CN114024331B publication Critical patent/CN114024331B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/36Arrangements for transfer of electric power between ac networks via a high-tension dc link
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

The invention discloses a planning operation measure optimization method for improving direct current bearing capacity, and belongs to the technical field of power grid planning. The invention comprises the following steps of 1: acquiring a power supply and a load plan of a power grid of a sending end, and evaluating the maximum direct current transmission capacity of a given grid frame according to the power supply and the load plan of the power grid of the sending end; step 2: if the maximum direct current transmission capacity is smaller than the rated transmission power, making corresponding operation optimization measures; and step 3: if the direct current carrying capacity is still smaller than the rated transmission power after various operation optimization measures are taken, various costs caused by the fact that direct current cannot be sent out at full power are monetized in a unified mode, and risk costs of an operation layer are formed; and 4, step 4: planning measures are made, and investment priority ranking is carried out on different planning measures until the maximum direct current transmission capacity reaches the rated transmission power. The invention preferentially adopts operation measures and planning measures, screens out the optimal measure combination with the best effect and the lowest cost, avoids resource waste and reduces the cost.

Description

Planning operation measure optimization method for improving direct current bearing capacity
Technical Field
The invention belongs to the technical field of power grid planning, and particularly relates to a planning operation measure optimization method for improving direct current bearing capacity.
Background
At present, research on direct current bearing capacity is still in an exploration stage, and without a clear definition, the direct current bearing capacity should include two aspects of "direct current" and "bearing capacity", where direct current is an important power transmission method for power transmission, and the bearing capacity includes its own attribute, that is, the capacity of direct current transmission cannot exceed a "threshold" that can be carried by a power system. For a transmission-side power grid, from the perspective of planning, the direct-current carrying capacity is derived from energy planning and power planning, the direct-current planning serves a renewable energy development plan of a regional power grid, and when a large amount of surplus power exists in the regional power grid, direct current becomes an external transmission means of the surplus power. In essence, the direct current bearing capacity depends on the degree of energy development, and a matching alternating current network frame follows an upgrading and transforming plan of a power supply and a direct current load planning, and the main power for driving the direct current bearing capacity to be gradually improved is the development and construction of renewable energy. Theoretically, if the new power supply and the main framework structure and other supporting projects are built in advance or synchronously, the direct current output is not limited, conversely, the power supply and the power grid can not be disconnected, the direct current planning can not be improved, or the direct current transmission capacity can not be improved, and the source, the power grid and the direct current load are planned cooperatively.
From the operation perspective, because the safety problem is checked according to N-1 mainly by considering the abundance and economy such as power and electric quantity balance, peak regulation standby and the like when planning the direct current construction, and the construction of the direct current engineering is far ahead of the construction of a main alternating current network, the direct current bearing capacity in the actual operation is generally smaller than the rated power of the direct current planning, and the direct current construction is particularly obvious in the transition period of direct current operation. Therefore, optimization can be carried out from the aspects of operation measures and planning measures so as to improve the direct current carrying capacity.
However, in the prior art, if the optimization is performed only from the aspect of operation measures, the optimization effect is limited, and if the optimization is performed only from the aspect of planning measures, the cost is high, and resource waste is easily caused.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a planning operation measure optimization method for improving the direct current bearing capacity, which aims to: and on the premise of improving the direct current bearing capacity, screening out operation optimization measures and planning measures with the best optimization effect and the lowest cost.
The technical scheme adopted by the invention is as follows:
a planning operation measure optimization method for improving direct current bearing capacity comprises the following steps:
step 1: acquiring a power supply and a load plan of a power grid of a sending end, and evaluating the maximum direct current transmission capacity of a given grid frame according to the power supply and the load plan of the power grid of the sending end;
step 2: if the maximum direct current transmission capacity is smaller than the rated transmission power, making corresponding operation optimization measures;
and step 3: if the direct current carrying capacity is still smaller than the rated transmission power after various operation optimization measures are taken, unified monetization is carried out on electricity abandonment loss caused by that direct current cannot be sent out at full power, emergency control cost and 599 punishment cost caused by load shedding, and risk cost of an operation level is formed;
and 4, step 4: planning measures are made, and investment priority ranking is carried out on different planning measures until the maximum direct current transmission capacity reaches the rated transmission power.
Preferably, the planning measures in step 4 include: a dynamic reactive power compensation device STATCOM is arranged in the vicinity of the direct current converter station; strengthening the near-region alternating current net rack to improve the short circuit capacity of the near-region alternating current system; for new energy existing in the direct-current matching power supply, the electrical distance between the new energy and the converter station is increased, and the new energy offline risk is reduced; in order to avoid the high frequency of a sending end caused by the failure of the simultaneous sending and receiving of the direct current commutation, the direct current inversion station adopts a VSC commutation station during planning and construction.
Preferably, the operation optimization measures in step 2 include a first operation optimization measure, a second operation optimization measure and a third operation optimization measure.
Preferably, the one-pass operation optimization measure specifically includes: when a dynamic stability problem exists after the N-1 fault or the N-2 fault of the direct current near-zone alternating current section exists, the damping ratio after the large disturbance fault is increased by optimizing the excitation and PSS parameters of the hydroelectric generating set, and the power flow organization capacity of the direct current near-zone alternating current section is improved; the starting mode of the direct-current near-zone unit is optimized, the unit with strong dynamic reactive voltage supporting capability is increased, the transient state or steady state voltage rise after the direct-current fault is reduced, and the direct-current transmission capability is improved; and for the simultaneous-transmitting and receiving direct currents, the starting values of all direct-current commutation failure prediction links are cooperatively optimized according to the interaction of multiple direct currents, the multiple direct currents are coordinated to restore the sequence, and the risk of simultaneous commutation failure is reduced.
Preferably, the two-run optimization measures include: for the condition that the direct current transmission capacity is limited by the steady-state overvoltage after direct current locking, the sequence of the generator tripping objects and the measure quantity are finely arranged; the output of the water generator set is quickly adjusted by directly supplying a water generator set output quick adjustment instruction under the water generator set speed adjusting system through the stability control system, partial discrete cutting amount is replaced, and the system frequency characteristic after direct current large disturbance impact is optimized.
Preferably, the three operation optimization measures include: and for the condition that the frequency of the direct current transmission capacity is stable under the impact of direct current high power, the strategy of the high-frequency generator tripping of the power grid is optimized, the fixed value of the high-frequency generator tripping is finely arranged, and the low-frequency load shedding is matched.
Preferably, in step 4, the investment priority ranking of the different planning measures is determined by the maximum value of the difference between the risk variation and the investment cost before and after the investment of the planning measures, and the calculation formula is as follows:
max(ΔCrisk-Cinvest)
Figure BDA0003231630820000021
in the formula: cdiscard、Cec、CpeRespectively representing electricity abandon cost, emergency control cost and 599 punishment cost caused by the fact that direct current cannot be sent out at full power; crisk 0、Crisk' operation risks before and after planning measures are input respectively; cinvestCost for planning measures; i. lambda [ alpha ]i、ωtThe typical working condition number, the working condition probability and the fault probability are respectively; j is the working condition that the power arranged by direct current is larger than the maximum transmissible power; pj、PDC maxThe direct current power arranged under the working condition j and the direct current maximum bearing capacity subjected to multiple constraints are respectively arranged, k is the unit cost of electricity abandonment, and P isDC max=min(PDC ESCR,PDC AC,PDC voltage,PDC frequency)。PDC ESCRFor maximum DC transmission power, P, subject to short-circuit ratioDC ACFor maximum transmission power of DC, P, constrained by the electrical organization of the AC channelsDC voltageFor maximum power transmission of direct current, P, subject to voltage stability constraintsDC frequencyFor frequency-constrained DC maximumsThe transmission power.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. the invention preferentially performs operation optimization under the condition that the direct current bearing capacity is smaller than the rated transmission power, and adopts planning measures for the working condition that the direct current bearing capacity is still smaller than the rated transmission power after the operation optimization so as to reduce planning investment as much as possible, avoid resource waste and reduce cost.
2. Before planning measures are taken, unified monetization is carried out on electricity abandon loss caused by that direct current cannot be sent out with full power, emergency control cost, 599 penalty cost caused by load shedding and the like, risk cost of an operation layer is formed, economic evaluation is carried out on investment effects of various planning measures, and investment priority ranking is carried out on different planning measures until the maximum transmission capacity of the direct current reaches the rated transmission power of the direct current. Therefore, the optimal combination of planning measures and operation measures is obtained, and the planning personnel of the power system is guided to perfect all the planning measures.
Drawings
The invention will now be described, by way of example, with reference to the accompanying drawings, in which:
FIG. 1 is a DC transmission structure diagram of a southwest power grid in an embodiment;
FIG. 2 is a converter station AC bus voltage after DC blocking according to an embodiment;
FIG. 3 shows the frequency deviation after failing to commutate the same-transmission and receiving DC phases in the embodiment.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all the embodiments. The components of the embodiments of the present application, generally described and illustrated in the figures herein, can be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present application, presented in the accompanying drawings, is not intended to limit the scope of the claimed application, but is merely representative of selected embodiments of the application. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present application without making any creative effort, shall fall within the protection scope of the present application.
The present invention will be described in detail with reference to fig. 1.
Taking the southwest of China as an example, extra-high voltage direct current of three loops of Yahu-Nanchang, white Crane beach-Jiangsu and white Crane beach-Zhejiang are sequentially connected to a power grid in the climbing of Sichuan before 2023 years, a regional power grid forms a trans-regional power transmission pattern of 'two longitudinal directions and eight transverse directions', the water-electricity ratio is over 70%, the trans-regional rated external transmission capacity is increased to 5420 ten thousand kilowatts, and the conventional direct current capacity of simultaneous transmission and reception of the southwest and the east of China is 3360 ten thousand kilowatts.
Table 12023 southwest electric network dc scale
Figure BDA0003231630820000041
(1) Single DC carrying capacity and planning measure optimization
Taking Yahu direct current as an example, only 4 sets of matched caravan trench power plants with the capacity of 150 ten thousand kilowatts are put into production before 2023 years ago, a new energy source set with the capacity of 80 thousand kilowatts is accessed in a near area, and the rest of electric power is collected from a main network. Different from the modes of Binjin, repavone and Jinsu extra-high voltage direct current 'big hydropower and big direct current', the elegant lake direct current nearby district hydropower is numerous, the power organization and voltage supporting capability are insufficient, and the single direct current is limited by the direct current bearing capability with multiple constraints of safety, and mainly comprises the following steps:
(a) overload restraint is carried out after alternating current N-2 faults of the collected sections;
(b) restraining transient overvoltage and steady overvoltage of the converter station after the direct current blocking fault;
(c) after direct current commutation fails, the new energy in the near area passes through at low voltage, the direct current near area voltage characteristic is deteriorated, and the new energy is disconnected.
After the multiple constraint conditions are considered, the DC carrying capacity of the Yahu lake is only 400 ten thousand kilowatts and is far lower than the rated power of 800 ten thousand kilowatts. Optimization is therefore preferably carried out by means of operational measures, including: 1. starting the direct current near area; 2. and optimizing the generator tripping control strategy after the direct current locking, wherein the direct current carrying capacity is improved to 510 ten thousand kilowatts from 400 ten thousand kilowatts after the two steps of operation optimization measures are taken.
From the main limited factor of the DC bearing capacity of the Yahu lake, the DC bearing capacity is essentially caused by the lag production of a matched power supply, the uncoordinated development of source-DC loads and the insufficient power collecting capacity of an AC network frame, so that when planning measures are optimized, a dynamic reactive power compensation device is added and the DC near-region power transmission network is strengthened. Because the direct current near-zone lunar station faces the risk of exceeding the standard of the short circuit current, the direct current near-zone lunar station is not suitable for installing a phase modulator, and a static synchronous compensator (STATCOM) with a good dynamic reactive power support effect is preferentially selected. And determining the priority sequencing and the installation place of the dynamic reactive power compensation device and the power transmission line by comparing the risk benefits of different planning measures. Wherein the compensation capacity of the STATCOM is 600Mvar, the time constant of the filter is 0.02s, the response delay is 0.02s, and the comprehensive manufacturing cost is about 200 yuan/kVar. The kilometer cost of each unit capacity of a 500kV line is about 3012 yuan, and the capacity of the newly added line is about 3803 MW. The unit of the power supply can be referred to for the price of the power on the internet, for example, the unit cost of the power abandonment of the hydropower is 227.7 yuan/MWh. The fault probability of a 500kV line is 1.14 times per 100km. years, the fault probability of a main transformer is 1.29 times per 100 years, the fault probability of a direct current single pole is 1.6 times per year, and the fault probability of a double pole is 0.1 times per year. The load amount of the post-fault load is not up to 599 punishment conditions, CpeIs 0. The calculated risk gains after respectively investing different planning measures are shown in table 2.
TABLE 2 Risk and cost under different planning measures
Figure BDA0003231630820000051
As can be seen from fig. 2 and table 2, the measures of installing the STATCOM in the converter station are adopted to maximize the risk benefit, improve the dc carrying capacity with the best effect, and reduce the overvoltage risk after the dc blocking fault. And because the investment cost of the newly-built line is too high, the risk income of the year cannot offset the line investment cost. Therefore, a recommended measure for improving the dc capability is to add a STATCOM device to the converter station.
(2) Load-bearing capacity and operation optimization of simultaneous-transmission and simultaneous-reception direct-current group
In 2023, the conventional direct current capacity of the southwest and the east China which are simultaneously transmitted and received is 3360 ten thousand kilowatts, the total inertial load of the southwest power grid in the small-abundance mode is 372027MW & lt/EN & gt, according to theoretical estimation, the newly-added direct current outgoing power is considered to be provided by a matched power supply with the same parameters as that of the white crane beach unit, namely the maximum output of a single unit is 1000MW, and the kinetic energy is 4675.6MW & lt/EN & gt. As can be known from the Huadong alternating current fault simulation, the risk that 5 times of extra-high voltage direct current simultaneously causes 2 times of continuous phase commutation failure exists, namely delta t is 0.4 s. The maximum bearing capacity of the direct current with the maximum frequency not exceeding 50.8Hz after the direct current commutation failure of the same transmission and reception is estimated to be 2720 ten thousand kilowatts by the formula, and is smaller than the total 3360 thousand kilowatts of five extra-high voltage conventional direct currents of the current same transmission and reception. And (3) adopting operation optimization measures, carrying out cooperative optimization on the starting values of all direct current commutation failure prediction links, coordinating a multi-direct current recovery sequence, reducing the risk of simultaneous continuous commutation failure of five loops of direct current to one time, namely, the delta t is 0.2s, the maximum direct current bearing capacity with the maximum frequency not exceeding 50.8Hz is 13740 ten thousand kilowatts, and increasing the power of the same-transmission and same-receiving direct current, wherein the frequency deviation curve of the generator after commutation failure is shown in figure 3 and is lower than 50.8 Hz.
In summary, the direct current carrying capacity of simultaneous transmission and reception of the southwest power grid and the east China power grid is greatly improved after the optimization of operation measures is considered.
The above-mentioned embodiments only express the specific embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present application. It should be noted that, for those skilled in the art, without departing from the technical idea of the present application, several changes and modifications can be made, which are all within the protection scope of the present application.

Claims (7)

1. A planning operation measure optimization method for improving direct current bearing capacity is characterized by comprising the following steps:
step 1: acquiring a power supply and a load plan of a power grid of a sending end, and evaluating the maximum direct current transmission capacity of a given grid frame according to the power supply and the load plan of the power grid of the sending end;
step 2: if the maximum direct current transmission capacity is smaller than the rated transmission power, making corresponding operation optimization measures;
and step 3: if the direct current carrying capacity is still smaller than the rated transmission power after various operation optimization measures are taken, unified monetization is carried out on electricity abandonment loss caused by that direct current cannot be sent out at full power, emergency control cost and 599 punishment cost caused by load shedding, and risk cost of an operation layer is formed;
and 4, step 4: planning measures are made, and investment priority ranking is carried out on different planning measures until the maximum direct current transmission capacity reaches the rated transmission power.
2. The method for optimizing planning operation measures for improving direct current carrying capacity according to claim 1, wherein the planning measures in the step 4 include: a dynamic reactive power compensation device STATCOM is arranged in the vicinity of the direct current converter station; strengthening the near-region alternating current net rack to improve the short circuit capacity of the near-region alternating current system; for new energy existing in the direct-current matching power supply, the electrical distance between the new energy and the converter station is increased, and the new energy offline risk is reduced; in order to avoid the high frequency of a transmitting end caused by the failure of the simultaneous transmission and receiving of the direct current commutation, the direct current inversion station adopts a VSC commutation station during planning construction.
3. The method as claimed in claim 1, wherein the operation optimization measures in step 2 include a first operation optimization measure, a second operation optimization measure, and a third operation optimization measure.
4. The method according to claim 3, wherein the first operation optimization measure specifically includes: when the dynamic stability problem exists after the N-1 fault or the N-2 fault of the direct current near-zone alternating current section exists, the damping ratio after the large disturbance fault is increased by optimizing the excitation and PSS parameters of the hydroelectric generating set, and the power flow organization capacity of the direct current near-zone alternating current section is improved; the starting mode of the direct-current near-zone unit is optimized, the unit with strong dynamic reactive voltage supporting capability is increased, the transient state or steady state voltage rise after the direct-current fault is reduced, and the direct-current transmission capability is improved; and for the simultaneous-transmitting and receiving direct currents, performing cooperative optimization on the starting values of all direct-current commutation failure prediction links according to the multi-direct-current interaction, coordinating the multi-direct-current recovery sequence, and reducing the risk of simultaneous commutation failure.
5. The method according to claim 3, wherein the two-operation optimization measures include: for the condition that the direct current transmission capacity is limited by the steady-state overvoltage after direct current locking, the sequence of the generator tripping objects and the measure quantity are finely arranged; the output of the hydroelectric generating set is quickly adjusted by directly supplying a hydroelectric generating set output quick adjustment instruction to a hydroelectric generating set speed adjusting system through a stability control system, partial discrete machine cutting amount is replaced, and the system frequency characteristic after direct-current large-disturbance impact is optimized.
6. The method according to claim 3, wherein the three operation optimization measures include: and for the condition that the frequency of the direct current transmission capacity is stable under the impact of direct current high power, the strategy of the high-frequency generator tripping of the power grid is optimized, the fixed value of the high-frequency generator tripping is finely arranged, and the low-frequency load shedding is matched.
7. The method for optimizing planning operation measures for improving dc carrying capacity according to claim 1, wherein in step 4, the investment priority ranking of different planning measures is determined by the maximum value of the difference between the operation risk variation and the investment cost before and after the investment of the planning measures, and the calculation formula is as follows:
max(ΔCrisk-Cinvest)
Figure FDA0003231630810000021
in the formula: cdiscard、Cec、CpeRespectively representing electricity abandon cost, emergency control cost and 599 punishment cost caused by the fact that direct current cannot be sent out at full power; crisk 0、Crisk' operation risks before and after planning measures are input respectively; cinvestCost for planning measures; i. lambda [ alpha ]i、ωtThe typical working condition number, the working condition probability and the fault probability are respectively; j is the working condition that the power arranged by direct current is larger than the maximum transmissible power; pj、PDC maxRespectively arranging the direct current power under the working condition j and the direct current maximum bearing capacity under multiple constraints; k is the unit cost of power curtailment.
CN202110988496.8A 2021-08-26 2021-08-26 Planning operation measure optimization method for improving direct current bearing capacity Active CN114024331B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110988496.8A CN114024331B (en) 2021-08-26 2021-08-26 Planning operation measure optimization method for improving direct current bearing capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110988496.8A CN114024331B (en) 2021-08-26 2021-08-26 Planning operation measure optimization method for improving direct current bearing capacity

Publications (2)

Publication Number Publication Date
CN114024331A true CN114024331A (en) 2022-02-08
CN114024331B CN114024331B (en) 2022-10-21

Family

ID=80054364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110988496.8A Active CN114024331B (en) 2021-08-26 2021-08-26 Planning operation measure optimization method for improving direct current bearing capacity

Country Status (1)

Country Link
CN (1) CN114024331B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114779017A (en) * 2022-05-16 2022-07-22 电子科技大学 Simultaneous commutation failure prediction method for simultaneous transmission and reception system
CN115441513A (en) * 2022-08-05 2022-12-06 国网冀北电力有限公司电力科学研究院 Phase modulator determining method and device suitable for new energy station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742888A (en) * 2017-09-29 2018-02-27 国电南瑞科技股份有限公司 It is a kind of to consider short circuit current and the receiving end power network phase modifier dispatching method of system frequency voltage risk
CN112766634A (en) * 2020-12-23 2021-05-07 国电南瑞科技股份有限公司 Coordination optimization method and system for meeting all-time clean power supply of regional power grid
CN112952887A (en) * 2021-02-05 2021-06-11 国网四川省电力公司经济技术研究院 Method and system for evaluating direct current bearing capacity of sending-end power grid
US20210249896A1 (en) * 2020-02-10 2021-08-12 Vertiv Corporation Power supply management system and method for use with one or multiple different utility proxies
CN113300396A (en) * 2021-05-20 2021-08-24 南瑞集团有限公司 Method and system for optimizing direct current transmission limit in planning period

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742888A (en) * 2017-09-29 2018-02-27 国电南瑞科技股份有限公司 It is a kind of to consider short circuit current and the receiving end power network phase modifier dispatching method of system frequency voltage risk
US20210249896A1 (en) * 2020-02-10 2021-08-12 Vertiv Corporation Power supply management system and method for use with one or multiple different utility proxies
CN112766634A (en) * 2020-12-23 2021-05-07 国电南瑞科技股份有限公司 Coordination optimization method and system for meeting all-time clean power supply of regional power grid
CN112952887A (en) * 2021-02-05 2021-06-11 国网四川省电力公司经济技术研究院 Method and system for evaluating direct current bearing capacity of sending-end power grid
CN113300396A (en) * 2021-05-20 2021-08-24 南瑞集团有限公司 Method and system for optimizing direct current transmission limit in planning period

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114779017A (en) * 2022-05-16 2022-07-22 电子科技大学 Simultaneous commutation failure prediction method for simultaneous transmission and reception system
CN114779017B (en) * 2022-05-16 2023-04-18 电子科技大学 Simultaneous commutation failure prediction method for simultaneous transmission and reception system
CN115441513A (en) * 2022-08-05 2022-12-06 国网冀北电力有限公司电力科学研究院 Phase modulator determining method and device suitable for new energy station

Also Published As

Publication number Publication date
CN114024331B (en) 2022-10-21

Similar Documents

Publication Publication Date Title
Ratnam et al. Future low-inertia power systems: Requirements, issues, and solutions-A review
Marvik et al. Electrification of offshore petroleum installations with offshore wind integration
CN104836254B (en) A kind of power grid"black-start" system and the method for photovoltaic plant participation power grid"black-start"
CN109378830B (en) Synchronous phase modulator site selection method based on long-distance power transmission
CN114024331B (en) Planning operation measure optimization method for improving direct current bearing capacity
CN108767876A (en) A kind of active frequency response model forecast Control Algorithm towards bulk power grid
CN106026122A (en) Integrated asynchronous excitation phase modifier and reactive compensation and active balance method thereof
CN110912242A (en) Large-disturbance transient stability coordination control method for DC micro-grid containing hybrid energy storage
CN111900710A (en) Grid-connected direct-current micro-grid coordination control method
Barragan et al. Operational benefits of multiterminal DC-links in active distribution networks
CN110970905B (en) Multi-power-supply reactive power coordination method and system for optimizing voltage control capability of wind power plant
Fang et al. An optimal control strategy for reactive power in wind farms consisting of VSCF DFIG wind turbine generator systems
CN105896550A (en) Monitoring method of intelligent reactive power compensation system
Abbey et al. Energy management strategies for optimization of energy storage in wind power hybrid system
Divshali et al. Improving PV hosting capacity of distribution grids considering dynamic voltage characteristic
Karystianos et al. Operation of the electrical system of Crete in interconnection with the mainland grid: A stability study
Zare et al. Intelligent topology-oriented load shedding scheme in power systems
Gandhar et al. Application of SSSC for compensation assessment of interconnected power system
CN109412192A (en) From the back-to-back soft straight device operation method of energy storage multiterminal
CN113178879B (en) Frequency recovery control method suitable for multiple virtual synchronous machines
CN112600260A (en) Transient voltage sensitivity sequencing-based unit difference adjustment coefficient optimization method and device
Osman et al. Application of FVSI, Lmn and CPF techniques for proper positioning of FACTS devices and SCIG wind turbine integrated to a distributed network for voltage stability enhancement
CN112865071A (en) Frequency offset prediction method under distributed photovoltaic high permeability of direct current receiving end power grid
Li et al. A coordinated control strategy for hybrid black start with an LCC HVDC system and an auxiliary synchronous generator
Peng et al. Transient Stability Analysis of Hu-Liao HVDC and AC Parallel Transmission System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant