CN114016455B - Maintenance device based on gardens cement road surface construction - Google Patents

Maintenance device based on gardens cement road surface construction Download PDF

Info

Publication number
CN114016455B
CN114016455B CN202111541736.6A CN202111541736A CN114016455B CN 114016455 B CN114016455 B CN 114016455B CN 202111541736 A CN202111541736 A CN 202111541736A CN 114016455 B CN114016455 B CN 114016455B
Authority
CN
China
Prior art keywords
reel
hole
winding
pillar
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111541736.6A
Other languages
Chinese (zh)
Other versions
CN114016455A (en
Inventor
石吉宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengxian Luban Construction Machinery Co ltd
Original Assignee
Fengxian Luban Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fengxian Luban Construction Machinery Co ltd filed Critical Fengxian Luban Construction Machinery Co ltd
Priority to CN202111541736.6A priority Critical patent/CN114016455B/en
Publication of CN114016455A publication Critical patent/CN114016455A/en
Application granted granted Critical
Publication of CN114016455B publication Critical patent/CN114016455B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F13/00Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions
    • E01F13/02Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions free-standing; portable, e.g. for guarding open manholes ; Portable signs or signals specially adapted for fitting to portable barriers
    • E01F13/028Flexible barrier members, e.g. cords; Means for rendering same conspicuous; Adapted supports, e.g. with storage reel
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a maintenance device based on garden cement pavement construction, and relates to the technical field of cement pavement construction. The invention comprises a first pillar and a second pillar; a first winding wheel and a second winding wheel are rotatably mounted at the top of the first strut, a first winding rope and a second winding rope are respectively wound on the first winding wheel and the second winding wheel, and the end parts of the first winding rope and the second winding rope are fixed at the end part of the second strut; at least one third support is connected to the first winding rope and/or the second winding rope between the first support and the second support. According to the invention, the protection of the construction position of the cement road surface is realized through the arrangement of the first support, the second support, the third support and the winding ropes, and two groups of winding ropes are respectively wound through the two winding wheels, so that the integral enclosure protection operation is facilitated, and meanwhile, the winding ropes are convenient to wind and unwind.

Description

Maintenance device based on gardens cement road surface construction
Technical Field
The invention belongs to the technical field of cement pavement construction, and particularly relates to a maintenance device based on garden cement pavement construction.
Background
At present, the known cement pavement is easy to deform, bulge or dent due to poor foundation relation along with long-term use; particularly for gardens, in order to provide good playing environments for tourists, maintenance of damaged pavements is required; in the conventional pavement maintenance, the raised or sunken part is usually cut, and then a new concrete material is filled until the concrete material is solidified; consequently in whole cement road surface work progress, protect the construction position, vital when avoiding the visitor to step on carelessly, current protection generally adopts several isolation piles to protect, can connect the connection rope between isolation pile simultaneously, and this kind of mode has the trouble-operated problem such as receive and release and fix the trouble to connecting the rope in the use.
Disclosure of Invention
The invention aims to provide a maintenance device based on garden cement pavement construction, which solves the problem of troublesome operations such as the conventional connecting rope winding and unwinding and fixing and the like through the arrangement of a first support column, a second support column, a third support column and a winding rope.
In order to solve the technical problems, the invention is realized by the following technical scheme:
the invention relates to a maintenance device based on garden cement pavement construction, which comprises a first support column and a second support column; a first reel and a second reel are rotatably mounted at the top of the first strut, a first winding rope and a second winding rope are respectively wound on the first reel and the second reel, and the end parts of the first winding rope and the second winding rope are fixed at the end part of the second strut; at least one third support is also connected to the first and/or second roping between the first and second support.
Further, second pillar and third pillar all include a second pillar body, the second pillar body includes base A, base A upper surface is provided with an outer tube A, telescopic has cup jointed interior loop bar A on the outer tube A, the port department of outer tube A is provided with locking bolt A.
Furthermore, a connecting structure for connecting the first winding rope and the second winding rope is arranged on the outer side of the rotating ring of the third strut; the connecting structure comprises a rope tying hole, a rope tying column or a wire spool.
Furthermore, a transverse plate A and a transverse plate B which are arranged in parallel are arranged on the outer side of the rotating ring of the second support; the end part of the transverse plate A is provided with a through hole, the through hole is movably penetrated and provided with a pulling rod, the end part of the pulling rod is connected with a base plate, a spring is connected between the base plate and the transverse plate A, the bottom side surface of the base plate is provided with an inserting column, and the end part of the transverse plate B is provided with an inserting hole for inserting the inserting column; the base plate upper surface is close to an edge side of swivel ring is provided with an arc baffle, be provided with on the diaphragm A and be used for the arc trompil that arc baffle runs through and passes through.
Furthermore, the first support column comprises a base B, an outer sleeve B is arranged on the upper surface of the base B, an inner sleeve rod B is telescopically sleeved on the outer sleeve B, and a locking bolt B is arranged at a port of the outer sleeve B; the top of the inner loop bar B is provided with a fixing column, and a bearing A and a bearing B which are respectively used for installing the first reel and the second reel are installed on the fixing column in a matched and sleeved mode.
A convex block A is arranged on the outer side surface of an inner sleeve rod B positioned below the first reel, and a locking bolt A is arranged on the convex block A; and a projection B is arranged on the outer side surface of the inner sleeve rod B above the second reel, and a locking bolt B is arranged on the projection B.
Furthermore, a bearing groove is formed in the top of the inner sleeve rod B, a bearing C is installed in the bearing groove in a matched mode, a fixing column is installed on the bearing C in a matched mode, a rotating operation plate is installed at the end portion of the fixing column in a matched mode, and a positioning rod with one end inserted into the first reel/the second reel penetrates through the rotating operation plate; a pair of convex blocks C are arranged on the first reel, positioning insertion blocks A are arranged on the upper surfaces of the convex blocks C, and blind holes A are formed in the positioning insertion blocks A; the upper surface of the second reel is provided with a pair of positioning insertion blocks B, and blind holes B are formed in the positioning insertion blocks B; a first hole and a second hole which are concentric with the blind hole A and the blind hole B are respectively formed in the two ends of the rotating operation plate, and the positioning rod penetrates through the first hole and/or the second hole; the end part of the positioning rod is inserted into the blind hole A and the blind hole B and is in threaded connection with the blind hole A and the blind hole B.
Furthermore, a rectangular mounting groove is formed in the top of the fixing column, and a threaded hole is formed in the bottom side face of the rectangular mounting groove; a rectangular insert block inserted into the rectangular mounting groove is arranged on the bottom side surface of the rotating operation plate, and a fixing bolt in threaded connection with the threaded hole penetrates through the thread on the rotating operation plate; and a sleeve pipe sleeved on the peripheral side of the fixed column is arranged on the bottom side surface of the rotating operation plate.
The invention has the following beneficial effects:
according to the invention, the protection of the construction position of the cement road surface is realized through the arrangement of the first support, the second support, the third support and the winding ropes, and two groups of winding ropes are respectively wound through the two reels, so that the winding ropes are convenient to retract and release while the integral surrounding protection operation is facilitated.
Of course, it is not necessary for any product in which the invention is practiced to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of the curing device of the present invention.
FIG. 2 is a schematic view of a third pillar structure according to the present invention.
Fig. 3 is a partially enlarged view of a portion a in fig. 2.
FIG. 4 is a schematic view of a first pillar structure of the present invention.
Fig. 5 is a partially enlarged view of fig. 4 at B.
Fig. 6 is a front view of fig. 4.
Fig. 7 is a cross-sectional view taken along line a-a in fig. 6.
Fig. 8 is a partial enlarged view of fig. 7 at C.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "opening," "upper," "lower," "thickness," "top," "middle," "length," "inner," "peripheral," and the like are used in an orientation or positional relationship that is merely for convenience in describing and simplifying the description, and do not indicate or imply that the referenced component or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be considered as limiting the present invention.
Example 1
Referring to fig. 1 to 8, the present invention relates to a maintenance device based on garden cement pavement construction, which comprises a first pillar 1 and a second pillar 2; a first reel 14 and a second reel 15 are rotatably mounted at the top of the first strut 1, a first winding rope 21 and a second winding rope 22 are respectively wound on the first reel 14 and the second reel 15, and the end parts of the first winding rope 21 and the second winding rope 22 are fixed at the end part of the second strut 2; at least a third strut 3 is also connected to the first and/or second roping 21, 22 between the first strut 1 and the second strut 2.
The second support column 2 and the third support column 3 both comprise a second support column body, the second support column body comprises a base A31, the upper surface of the base A31 is provided with an outer sleeve A32, and an inner sleeve rod A33 is telescopically sleeved on the outer sleeve A32; a connecting structure for connecting the first winding rope 21 and the second winding rope 22 is arranged outside the rotating ring 34 of the third support 3; the connection structure includes a tether hole to which ends of the first and second tethers 21, 22 are fastened.
The outer side of the rotating ring 34 of the second pillar 2 is provided with two horizontal plates A37 and B38 which are arranged in parallel; the end part of the transverse plate A37 is provided with a through hole 371, the through hole 371 is movably penetrated and provided with a pulling rod 39, the end part of the pulling rod 39 is connected with a substrate 391, a spring 392 is connected between the substrate 391 and the transverse plate A37, the bottom side surface of the substrate 391 is provided with an insert column 393, and the end part of the transverse plate B38 is provided with an insert hole 381 for inserting the insert column 393; an arc-shaped baffle 394 is arranged on one edge side of the upper surface of the base plate 391 close to the rotating ring 34, and an arc-shaped opening 372 for the arc-shaped baffle 394 to penetrate through is arranged on the transverse plate A37; when the rope pulling device is used, the pulling rod 39 is pulled upwards, the first rope winding 21 and the second rope winding 22 can be placed in through a gap formed by the inserting column 393 and the transverse plate B38, then external force is released, the inserting column 393 is inserted into the inserting hole 381 under the action of the spring 392, the first rope winding 21 and the second rope winding 22 are in contact with the arc-shaped baffle 394, and the first rope winding 21 and the second rope winding 22 are prevented from contacting the spring 392 and winding on the spring 392 through the arrangement of the arc-shaped baffle 394.
The first strut 1 comprises a base B10, an outer sleeve B11 is arranged on the upper surface of the base B10, an inner sleeve rod B12 is telescopically sleeved on the outer sleeve B11, and a locking bolt B111 is arranged at the port of the outer sleeve B11; the top of the inner sleeve rod B12 is provided with a fixing column 13, and a bearing A133 and a bearing B134 which are respectively used for mounting the first reel 14 and the second reel 15 are sleeved on the fixing column 13 in a matching mode. A lug A121 is arranged on the outer side surface of the inner sleeve rod B12 positioned below the first reel 14, and a locking bolt A122 is arranged on the lug A121; a projection B131 is provided on the outer side surface of the inner rod B12 above the second reel 15, and a locking bolt B132 is provided on the projection B131.
In embodiment 2, as shown in fig. 5 and 8, in order to better control the rotation of the rotation operating plate 17, a bearing groove 16 is provided at the top of the inner lever B12, a bearing C161 is fittingly installed in the bearing groove 16, a fixing post 162 is fittingly installed on the bearing C161, the rotation operating plate 17 is fittingly installed at the end of the fixing post 162, and a positioning rod 18 having one end inserted into the first reel 14/the second reel 15 is penetratingly provided on the rotation operating plate 17; the first reel 14 is provided with a pair of convex blocks C141, the upper surfaces of the convex blocks C141 are provided with positioning insertion blocks A142, and the positioning insertion blocks A142 are provided with blind holes A; the upper surface of the second reel 15 is provided with a pair of positioning insertion blocks B151, and blind holes B are formed in the positioning insertion blocks B151; a first hole 174 and a second hole 175 which are concentric with the blind hole A and the blind hole B are respectively arranged at two ends of the rotating operation plate 17, and the positioning rod 18 penetrates through the first hole 174 and/or the second hole 175; the end of the positioning rod 18 is inserted into the blind hole A and the blind hole B, and is in threaded connection with the blind hole A and the blind hole B. Handles 176 are provided at both ends of the rotary operation plate 17. At this time, the rotation operating plate 17 is controlled to rotate along the bearing C161 through the handle 176, and then the end portion of the positioning rod 18 can be controlled to be inserted into the blind hole a and the blind hole B, so that the first reel 14 and the second reel 15 are driven while the rotation operating plate 17 rotates, winding is performed synchronously, after the second winding rope 22 on the second reel 15 is completely wound, the positioning rod 18 is pulled out from the blind hole B, and the first winding rope 21 is continuously and completely wound on the first reel 14 through rotation.
When paying off is needed, the positioning rod 18 is pulled out of the blind hole A and the blind hole B, the first support 1 and the second support 2 are controlled to be placed at the places where the positioning rod needs to be placed, and then the first winding rope 21 and the second winding rope 22 between the first support 1 and the second support 2 are connected with the third support 3 to form a structure shown in the figure 1.
When the paying-off and winding operations are completed, the rotation of the lock bolts B132 and a122 completes the definition of the second reel 15 and the first reel 14, avoiding the rotation of the second reel 15 and the first reel 14.
A rectangular mounting groove 163 is formed in the top of the fixing column 162, and a threaded hole 164 is formed in the bottom side surface of the rectangular mounting groove 163; a rectangular insertion block 173 inserted into the rectangular installation groove 163 is disposed on the bottom side surface of the rotating operation plate 17, and a fixing bolt 172 in threaded connection with the threaded hole 164 is threaded through the rotating operation plate 17; and the bottom side surface of the rotating operation board 17 is provided with a sleeve 171 which is sleeved on the peripheral side of the fixing column 162, and the installation and the disassembly of the rotating operation board 17 are facilitated through the arrangement of the rectangular installation groove 163, the rectangular insertion block 173 and the like.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (5)

1. Curing means based on gardens cement road surface construction, its characterized in that: comprises a first pillar (1) and a second pillar (2); a first reel (14) and a second reel (15) are rotatably mounted at the top of the first strut (1), a first winding rope (21) and a second winding rope (22) are respectively wound on the first reel (14) and the second reel (15), and the ends of the first winding rope (21) and the second winding rope (22) are fixed at the end of the second strut (2); at least one third support column (3) is connected to the first winding rope (21) and/or the second winding rope (22) between the first support column (1) and the second support column (2);
the first support column (1) comprises a base B (10), an outer sleeve B (11) is arranged on the upper surface of the base B (10), an inner sleeve rod B (12) is sleeved on the outer sleeve B (11) in a telescopic mode, and a locking bolt B (111) is arranged at the port of the outer sleeve B (11); wherein a fixing column (13) is arranged at the top of the inner sleeve rod B (12), and a bearing A (133) and a bearing B (134) which are respectively used for mounting the first reel (14) and the second reel (15) are sleeved on the fixing column (13) in a matching way;
a lug A (121) is arranged on the outer side surface of an inner sleeve rod B (12) positioned below the first reel (14), and a locking bolt A (122) is arranged on the lug A (121); a lug B (131) is arranged on the outer side surface of the inner sleeve rod B (12) above the second reel (15), and a locking bolt B (132) is arranged on the lug B (131);
a bearing groove (16) is formed in the top of the inner sleeve rod B (12), a bearing C (161) is installed in the bearing groove (16) in a matching mode, a fixing column (162) is installed on the bearing C (161) in a matching mode, a rotating operation plate (17) is installed at the end portion of the fixing column (162) in a matching mode, and a positioning rod (18) with one end inserted into the first reel (14)/the second reel (15) penetrates through the rotating operation plate (17);
a pair of protruding blocks C (141) are arranged on the first reel (14), positioning insertion blocks A (142) are arranged on the upper surfaces of the protruding blocks C (141), and blind holes A are formed in the positioning insertion blocks A (142); a pair of positioning insertion blocks B (151) are arranged on the upper surface of the second reel (15), and blind holes B are formed in the positioning insertion blocks B (151); a first hole (174) and a second hole (175) which are concentric with the blind hole A and the blind hole B are respectively formed in two ends of the rotating operation plate (17), and the positioning rod (18) penetrates through the first hole (174) and/or the second hole (175); the end part of the positioning rod (18) is inserted into the blind hole A and the blind hole B and is in threaded connection with the blind hole A and the blind hole B;
a rectangular mounting groove (163) is formed in the top of the fixing column (162), and a threaded hole (164) is formed in the bottom side face of the rectangular mounting groove (163); a rectangular inserting block (173) inserted into the rectangular installing groove (163) is arranged on the bottom side face of the rotating operation plate (17), and a fixing bolt (172) in threaded connection with the threaded hole (164) penetrates through the rotating operation plate (17); a sleeve (171) sleeved on the peripheral side of the fixed column (162) is arranged on the bottom side surface of the rotating operation plate (17);
two transverse plates A (37) and a transverse plate B (38) which are arranged in parallel are arranged on the outer side of the rotating ring (34) of the second support column (2); the plug-in type LED lamp comprises a transverse plate A (37), a through hole (371) is formed in the end portion of the transverse plate A (37), a pulling rod (39) is movably arranged at the through hole (371) in a penetrating mode, the end portion of the pulling rod (39) is connected with a base plate (391), a spring (392) is connected between the base plate (391) and the transverse plate A (37), plug-in columns (393) are arranged on the bottom side face of the base plate (391), and inserting holes (381) used for the plug-in columns (393) to insert are formed in the end portion of the transverse plate B (38).
2. The maintenance device based on gardens cement road surface construction of claim 1, characterized in that, second pillar (2) and third pillar (3) all include a second pillar body, the second pillar body includes base A (31), base A (31) upper surface is provided with an outer tube A (32), telescopic cover inner loop pole A (33) on outer tube A (32), the port department of outer tube A (32) is provided with locking bolt A.
3. The maintenance device based on garden cement pavement construction according to claim 2, characterized in that a connection structure for connecting the first and second winding ropes (21, 22) is provided outside the rotating ring (34) of the third pillar (3);
the connecting structure comprises a rope tying hole, a rope tying column or a wire spool.
4. The maintenance device based on garden cement road surface construction of claim 1, characterized in that, an arc-shaped baffle (394) is arranged on the upper surface of the base plate (391) near one edge side of the rotating ring (34), and an arc-shaped opening (372) for the arc-shaped baffle (394) to pass through is arranged on the transverse plate A (37).
5. The maintenance device based on garden cement pavement construction according to claim 1, characterized in that a third pillar (3) is connected to the first (21) and/or second (22) roping between the first (1) and second (2) pillars.
CN202111541736.6A 2021-12-16 2021-12-16 Maintenance device based on gardens cement road surface construction Active CN114016455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111541736.6A CN114016455B (en) 2021-12-16 2021-12-16 Maintenance device based on gardens cement road surface construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111541736.6A CN114016455B (en) 2021-12-16 2021-12-16 Maintenance device based on gardens cement road surface construction

Publications (2)

Publication Number Publication Date
CN114016455A CN114016455A (en) 2022-02-08
CN114016455B true CN114016455B (en) 2023-04-14

Family

ID=80068985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111541736.6A Active CN114016455B (en) 2021-12-16 2021-12-16 Maintenance device based on gardens cement road surface construction

Country Status (1)

Country Link
CN (1) CN114016455B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN214943069U (en) * 2021-03-29 2021-11-30 马鞍山郑蒲港建设工程有限公司 Assembled maintenance railing of building engineering

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9447603B2 (en) * 2014-11-05 2016-09-20 Howard C. Simmons Universal bifurcated stanchion for handrail systems
CN206859829U (en) * 2017-06-29 2018-01-09 雷凯 A kind of municipal works fence
CN209585807U (en) * 2019-01-11 2019-11-05 任玲阁 A kind of construction safety guardrail
CN214168368U (en) * 2020-10-22 2021-09-10 苏州金新达绣品有限公司 Thread wheel carrier for embroidery machine head
CN213679292U (en) * 2020-10-26 2021-07-13 佛山市戴迪斯科光电科技有限公司 Sensor wire harness positioning device with good buffering protection function
CN112390167A (en) * 2020-11-17 2021-02-23 金螳螂精装科技(苏州)有限公司 Assembled hoist device is used in wallboard installation with stable function

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN214943069U (en) * 2021-03-29 2021-11-30 马鞍山郑蒲港建设工程有限公司 Assembled maintenance railing of building engineering

Also Published As

Publication number Publication date
CN114016455A (en) 2022-02-08

Similar Documents

Publication Publication Date Title
CN114016455B (en) Maintenance device based on gardens cement road surface construction
RU2488203C1 (en) Antenna post for radio relay station
CN211011100U (en) Lifting street lamp convenient to maintain
US3741525A (en) Pump-pulling apparatus for wells
CN209652817U (en) A kind of road construction alarming device
CN203654880U (en) Safety fence
CN213087615U (en) Multifunctional rod
JP2020084523A (en) Triangular cone
CN214035046U (en) Security fence for tourist attraction
CN213817058U (en) Cable winding and unwinding devices of cable shaft
CN211262246U (en) Engineering is managed with straightness detection device that hangs down
CN211666302U (en) A pay-off for construction
DE10034912A1 (en) Transportable large screen
CN206859829U (en) A kind of municipal works fence
CN216813618U (en) Hand-operated self-supporting air rod
KR200237895Y1 (en) Prevention device the national flag is rolled
CN208004972U (en) A kind of welding wire wire-unfolding rack
CN208533541U (en) A kind of supporting device and pattern foundation pit supporting structure equipment
CN214397149U (en) Device is laid to sighting rod
CN107060332B (en) Unilateral Screw arbor with nut at both-ends system
CN211018035U (en) Insulating operating rod
CN213086631U (en) Multifunctional rod support arm body connecting structure
CN218242224U (en) GPS-RTK base station radio station antenna prevents empting fixing device
CN212671365U (en) Warning device for construction site and construction vehicle
CN217581545U (en) Warning device for safety maintenance of power plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant