CN113993140A - Method, equipment and device for optimizing physical resource block PRB utilization rate - Google Patents

Method, equipment and device for optimizing physical resource block PRB utilization rate Download PDF

Info

Publication number
CN113993140A
CN113993140A CN202010731248.0A CN202010731248A CN113993140A CN 113993140 A CN113993140 A CN 113993140A CN 202010731248 A CN202010731248 A CN 202010731248A CN 113993140 A CN113993140 A CN 113993140A
Authority
CN
China
Prior art keywords
converted
ses
determining
prb
idle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010731248.0A
Other languages
Chinese (zh)
Other versions
CN113993140B (en
Inventor
杜永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN202010731248.0A priority Critical patent/CN113993140B/en
Publication of CN113993140A publication Critical patent/CN113993140A/en
Application granted granted Critical
Publication of CN113993140B publication Critical patent/CN113993140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Abstract

The invention discloses a method, equipment and a device for optimizing the utilization rate of a Physical Resource Block (PRB), which are used for improving the utilization rate of the PRB and effectively improving the throughput in unit time. The method comprises the following steps: determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission; and allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of the idle PRB on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the position of the PRB used by the SE to be converted.

Description

Method, equipment and device for optimizing physical resource block PRB utilization rate
Technical Field
The invention relates to the technical field of wireless communication, in particular to a method, equipment and a device for optimizing Physical Resource Block (PRB) utilization rate.
Background
In an LTE (Long Term Evolution) system, the types of transmission include new transmission, adaptive retransmission, and non-adaptive retransmission. Both the new transmission and the adaptive retransmission require a PDCCH (Physical Downlink Control Channel) to allocate a CCE (Control Channel Element) Resource for giving specific information indicating on which PRBs (Physical Resource blocks) can be transmitted. And the non-adaptive retransmission does not need any PDCCH resource, and only directly retransmits at the position of the last subframe transmission.
For PDCCH, although the current transmission scheme does not need any CCE resource for non-adaptive retransmission, which can save the overhead of CCE resources, in one TTI (Transport Time Interval), if there are non-adaptive retransmissions in multiple PRB locations, the entire spectrum may be divided into multiple PRB available fragments; if a large data volume service arrives and a small data volume service is less, the number of continuous PRBs cannot meet the transmission requirement of the current large data volume, and the small data volume cannot fully occupy PRB fragments, the PRB fragments cannot be fully occupied; therefore, the efficiency is low in terms of the efficiency of PRB utilization for the entire TTI.
Disclosure of Invention
The invention provides a method, equipment and a device for optimizing the utilization rate of a Physical Resource Block (PRB), which are used for improving the utilization rate of the PRB and effectively improving the throughput in unit time.
In a first aspect, the present invention provides a method for optimizing physical resource block PRB utilization, where the method includes:
determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
and allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of the idle PRB on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the position of the PRB used by the SE to be converted.
As an optional implementation manner, determining an SE to be converted from each scheduling element SE of the non-adaptive retransmission includes:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
As an optional implementation manner, determining, as an SE to be converted, an SE having idle PRBs on both adjacent sides in each SE of the non-adaptive retransmission, includes:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
As an optional implementation manner, determining, from among the non-adaptively retransmitted SEs, an allocation order of each SE in an SE having idle PRBs on both adjacent sides, includes:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
As an optional implementation manner, before determining an SE to be converted from each scheduling element SE of the non-adaptive retransmission, the method further includes:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
As an optional implementation, allocating CCE resources to the SE to be converted includes:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
As an optional implementation, allocating CCE resources to the SE to be converted includes:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
As an optional implementation, allocating CCE resources to the SE to be converted further includes:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
In a second aspect, the present invention provides a network side device for optimizing physical resource block PRB utilization, where the network side device includes: a processor and a memory for storing programs executable by the processor, the processor for reading the programs in the memory and performing the steps of the method of:
determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
and allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of the idle PRB on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the position of the PRB used by the SE to be converted.
As an alternative embodiment, the treatment appliance is configured to:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
As an alternative embodiment, the treatment appliance is configured to:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
As an alternative embodiment, the treatment appliance is configured to:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
As an optional implementation manner, the processor is specifically further configured to:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
As an alternative embodiment, the treatment appliance is configured to:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
As an alternative embodiment, the treatment appliance is configured to:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
As an optional implementation manner, the processor is specifically further configured to:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
In a third aspect, the present invention provides an apparatus for optimizing physical resource block PRB utilization, including: the device comprises a determining module and a converting module, wherein:
the determining module is used for determining the SE to be converted from each scheduling unit SE of the non-adaptive retransmission;
the conversion module is configured to allocate a Control Channel Element (CCE) resource to the SE to be converted according to a position of an idle PRB on a first segment of a time slot and/or a last segment of the time slot corresponding to the SE to be converted, where the CCE resource is used to indicate a position of a PRB used by the SE to be converted.
As an optional implementation manner, the determining module is specifically configured to:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
As an optional implementation manner, the determining module is specifically configured to:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
As an optional implementation manner, the determining module is specifically configured to:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
As an optional implementation, the apparatus further comprises a condition module configured to:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
As an optional implementation, the conversion module is specifically configured to:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
As an optional implementation, the conversion module is specifically configured to:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
As an optional implementation, the conversion module is further configured to:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
In a fourth aspect, the present invention provides a computer storage medium having stored thereon a computer program which, when executed by a processor, performs the steps of the method of the first aspect.
The method, the equipment and the device for optimizing the physical resource block PRB utilization rate have the following beneficial effects that:
the embodiment of the invention has remarkable effect when being applied to the conditions of more non-adaptive transmission, serious spectrum fragmentation and more large data volume services; the embodiment of the invention converts the non-adaptive retransmission SE fragments into the adaptive retransmission SE fragments, and adjusts the adaptive retransmission SE fragments to two sides of the frequency spectrum, so that enough continuous PRBs can be vacant in the middle section of the frequency spectrum to bear the large-data-volume service.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without inventive exercise.
Fig. 1 is a flowchart of a method for optimizing PRB utilization according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of the determination of SE to be converted according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of another method for determining SE to be converted according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of a last method for determining the SE to be converted provided by the embodiment of the present invention;
fig. 5 is a flowchart of a first specific implementation method for optimizing PRB utilization according to an embodiment of the present invention;
fig. 6 is a flowchart of a second specific implementation method for optimizing PRB utilization according to an embodiment of the present invention;
fig. 7 is a flowchart of a third specific implementation method for optimizing PRB utilization according to an embodiment of the present invention;
fig. 8 is a flowchart of a fourth specific implementation method for optimizing PRB utilization according to an embodiment of the present invention;
fig. 9 is a schematic diagram of a network side device for optimizing the utilization rate of a physical resource block PRB according to an embodiment of the present invention;
fig. 10 is a schematic diagram of an apparatus for optimizing physical resource block PRB utilization according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail with reference to the accompanying drawings, and it is apparent that the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The term "and/or" in the embodiments of the present invention describes an association relationship of associated objects, and indicates that three relationships may exist, for example, a and/or B may indicate: a exists alone, A and B exist simultaneously, and B exists alone. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship.
The application scenario described in the embodiment of the present invention is for more clearly illustrating the technical solution of the embodiment of the present invention, and does not form a limitation on the technical solution provided in the embodiment of the present invention, and it can be known by a person skilled in the art that with the occurrence of a new application scenario, the technical solution provided in the embodiment of the present invention is also applicable to similar technical problems. In the description of the present invention, the term "plurality" means two or more unless otherwise specified.
In an LTE (Long Term Evolution) system, improving the utilization rate of PRB (Physical Resource Block), not only can improve the utilization efficiency of a frequency spectrum, but also has a significant effect on improving the throughput of the whole cell; for operators, under the condition of keeping the bandwidth unchanged, the increase of the throughput in unit time can directly bring the income of turnover.
Therefore, the method provided by the embodiment of the present invention increases the number of available continuous PRBs by reducing the fragments of PRBs, so as to improve the utilization efficiency of the spectrum.
As shown in fig. 1, an embodiment of the present invention provides a method for optimizing PRB utilization, which includes the following specific implementation steps:
step 100, determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
step 101, allocating a Control Channel Element (CCE) resource for the SE to be converted according to the position of an idle PRB on a first segment of a time slot and/or a last segment of the time slot corresponding to the SE to be converted, wherein the CCE resource is used for indicating the position of the PRB used by the SE to be converted.
The method for optimizing the PRB utilization rate can be applied to partial scenes, and particularly has more non-adaptive transmission, so that the spectrum fragmentation is serious; and/or in the case of heavy data traffic. The method comprises the steps of converting a Scheduling Element (SE) fragment of a non-adaptive retransmission in the middle into an SE of the adaptive retransmission, and adjusting the converted SE to two sides of a frequency spectrum, so that enough continuous PRBs can be vacant in the middle of the frequency spectrum to bear large-data-volume services.
It should be noted that, the method for optimizing the utilization rate of the PRB is provided in the embodiment of the present invention, and is a method for optimizing the utilization rate of PRB resources on each timeslot by using a timeslot as a unit.
In the implementation, according to the service requirement, the SE to be converted can be determined from each scheduling unit SE of the non-adaptive retransmission; or randomly determining the SE to be converted from each scheduling unit SE of the non-adaptive retransmission; or determining the SE to be converted from each scheduling unit SE of the non-adaptive retransmission according to the preset priority of each SE of the non-adaptive retransmission;
as an optional implementation manner, the SE to be converted may also be determined from each scheduling element SE of the non-adaptive retransmission by any one or more of the following methods:
method 1,
And determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
For a more intuitive explanation, as shown in fig. 2, there are 100 PRB resources on the slot, and the PRB resources on the slot corresponding to the black parts on both sides indicate that the PRB resources are occupied by other resource channels and belong to unavailable PRB resources; the PRB resources on the time slot corresponding to the white part represent idle PRB resources, the PRB resources on the time slot corresponding to the gray part represent PRB resources of non-adaptive retransmission, wherein the idle PRB resources are identified by fragment A, fragment B, fragment C and fragment D, and the PRB resources of non-adaptive retransmission are identified by SE.
Among SEs of non-adaptive retransmission, SEs with idle PRBs on two adjacent sides are SE1, SE2 and SE 3; thus, SE1, SE2, SE3 were determined as SE to be transformed.
As shown in fig. 3, there are 100 PRB resources on the timeslot, and the PRB resources on the timeslot corresponding to the black parts on both sides indicate that the timeslot is already occupied by other resource channels and belongs to unavailable PRB resources; the PRB resources on the time slot corresponding to the white part represent idle PRB resources, the PRB resources on the time slot corresponding to the gray part represent PRB resources of non-adaptive retransmission, wherein the idle PRB resources are identified by fragment A, fragment B and fragment C, and the PRB resources of non-adaptive retransmission are identified by SE.
Among the SEs of the non-adaptive retransmission, the SE with idle PRBs on two adjacent sides is the SE1, and therefore the SE1 is determined as the SE to be converted.
Method 2,
1) Determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
in the embodiment of the invention, the allocation sequence of each SE can be determined according to the number of PRBs occupied by SEs with idle PRBs on two adjacent sides, namely, the SEs occupying more PRBs and the SEs occupying less PRBs preferentially allocate CCE resources; or, determining the allocation sequence of each SE according to the importance degree of transmission data corresponding to the SE with idle PRBs on two adjacent sides; or, the allocation sequence of each SE may be determined according to the PRBs occupied by the SEs having idle PRBs on both adjacent sides and the total number of idle PRBs on both adjacent sides, that is, the SE having the greater total number preferentially allocates CCE resources to the SE having the smaller total number.
As an alternative implementation, the allocation order of each SE may also be determined by the following method:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides; wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
2) And selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
As shown in fig. 4, there are 100 PRB resources on the timeslot, and the PRB resources on the timeslot corresponding to the black parts on both sides indicate that the timeslot is already occupied by other resource channels and belongs to unavailable PRB resources; the PRB resources on the time slot corresponding to the white part represent idle PRB resources, the PRB resources on the time slot corresponding to the gray part represent PRB resources of non-adaptive retransmission, wherein the idle PRB resources are identified by fragment A, fragment B, fragment C and fragment D, and the PRB resources of non-adaptive retransmission are identified by SE.
And determining the allocation sequence of each SE according to the SEs with idle PRBs on two adjacent sides and the number of idle PRBs on two adjacent sides as follows:
firstly, determining SE (sequence of sequence) of idle PRBs on two adjacent sides as SE1, SE2 and SE 3;
secondly, the number of SE1 adjacent idle PRBs is 25, the number of SE2 adjacent idle PRBs is 30, and the number of SE3 adjacent idle PRBs is 16;
thirdly, according to the mode that the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resources compared with the SE of the idle PRB with a small adjacent quantity, determining the allocation sequence of each SE as follows: SE2, SE1, SE 3.
And finally, selecting 3 SEs according to the distribution sequence of the SEs, determining the SEs to be converted, namely selecting SE2, SE1 and SE3 as the SEs to be converted, and selecting the SE2, SE1 and SE3 as the sequence to be converted.
As an optional implementation manner, the SE to be converted may also be determined from each scheduling element SE of the non-adaptive retransmission by the following method:
and selecting a preset number of SEs from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SEs, and determining the SEs as the SEs to be converted.
In addition, in the embodiment of the present invention, before determining an SE to be converted from each scheduling unit SE for non-adaptive retransmission, the method further includes:
determining that any one or any plurality of the following conditions are satisfied:
the method comprises the following steps that 1, CCE resources are distributed to newly transmitted SEs currently;
it should be noted that the new transmission is a transmission type in the LTE system, and is taken as three transmission types in the LTE system together with the adaptive retransmission and the non-adaptive retransmission, where the new transmission indicates a new data transmission.
The condition 2 is that the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
it should be noted that TTI bundling is a method for transmitting a PUSCH (Physical Uplink Shared Channel) in a plurality of consecutive subframes, that is, a user equipment UE transmits a PUSCH in a bonded TTI;
the TTI bundling belongs to a characteristic in the VOLTE (Voice over Long-Term Evolution) standard.
And in condition 3, the currently retransmitted information does not accord with the retransmission of the clustered PUSCH Retx characteristic.
It should be noted that the clustered PUSCH ReTx characteristic is used to indicate that one user terminal UE may invoke multiple PRB resource segments in one slot.
As an optional implementation manner, in the embodiment of the present invention, CCE resources are allocated to the SE to be transformed, where the CCE resources include any one or any one of the following manners:
mode 1, allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of an idle PRB on a first segment of a time slot corresponding to the SE to be converted;
that is to say, in the embodiment of the present invention, a control channel element CCE resource may be allocated to the SE to be converted, so as to indicate that the SE to be converted uses a position of an idle PRB on a first segment of a time slot corresponding to the SE to be converted.
Mode 2, allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of an idle PRB on the time slot tail section corresponding to the SE to be converted;
that is to say, the embodiment of the present invention may allocate a control channel element CCE resource to the SE to be converted, where the CCE resource is used to indicate that the SE to be converted uses a position of an idle PRB on a slot tail corresponding to the SE to be converted.
Mode 3, allocating Control Channel Element (CCE) resources for the SE to be converted according to the positions of idle PRBs on the first segment and the last segment of the time slot corresponding to the SE to be converted;
that is to say, in the embodiment of the present invention, a control channel element CCE resource may be allocated to the SE to be converted, where the CCE resource is used to indicate that the SE to be converted uses the positions of idle PRBs on the first segment of the timeslot and the last segment of the timeslot, where the positions correspond to the SE to be converted.
In this way, it should be noted that, if there are multiple SEs to be converted, one of the SEs to be converted may be adjusted to the position of an idle PRB on the leading segment of a timeslot, and the other SE to be converted may be adjusted to the position of an idle PRB on the trailing segment of a timeslot; if the number of the SE to be converted is one, the SE to be converted may be adjusted to the position of the idle PRB on the leading segment of the timeslot, or the SE to be converted may be adjusted to the position of the idle PRB on the trailing segment of the timeslot.
Mode 4, limiting the number of newly transmitted SEs according to preset transmission requirements; and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
In this way, since the number of the newly transmitted SE is limited, the CCE resource occupied by the newly transmitted SE is limited, and a suitable CCE resource can be reserved for the non-adaptive to adaptive SE (i.e., the SE to be converted), thereby performing allocation.
And 5, if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially allocating CCE resources for the SE to be converted.
In this way, in order to avoid the influence on the newly transmitted SE when the CCE resources are allocated, a set number of SEs to be converted may be selected according to the actual situation, CCE resources are preferentially allocated to the set number of SEs to be converted, and CCE resources are then allocated to the newly transmitted SE.
As an optional implementation manner, in the embodiment of the present invention, allocating CCE resources to the SE to be transformed further includes:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
In summary, the method for optimizing the PRB utilization ratio provided in the embodiment of the present invention is characterized in that, in a processing manner of the non-adaptive retransmission SE, the position of the non-adaptive retransmission SE on the PUSCH is adjusted by converting the non-adaptive retransmission SE into the adaptive retransmission SE, and the non-adaptive retransmission SE is adjusted to both sides of a frequency spectrum as much as possible. In addition, in the processing process, attention needs to be paid to the conversion from the non-adaptive retransmission SE to the adaptive retransmission SE, the number of the conversions, the influence on the PDCCH resource, and the influence on the newly transmitted data. The number of the corresponding convertible products can be selected according to the actual situation of the network, so that the situation that the number of the convertible products is large and the application of CCE resources is newly transmitted is avoided. Compared with the prior art, the method provided by the embodiment of the invention can effectively improve the cell throughput for most communication networks.
Embodiment 2, as shown in fig. 5, an embodiment of the present invention provides a first specific implementation method for optimizing PRB utilization, which includes the following specific steps:
step 500, determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission;
step 501, determining the allocation sequence of each SE according to the number of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides; the SE of the idle PRB with a large adjacent quantity preferentially allocates CCE resources compared with the SE of the idle PRB with a small adjacent quantity;
502, selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted;
step 503, allocating a Control Channel Element (CCE) resource for the SE to be converted according to the position of an idle PRB on the first segment of the time slot and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resource is used for indicating the position of the PRB used by the SE to be converted.
Embodiment 3, as shown in fig. 6, an embodiment of the present invention provides a second specific implementation method for optimizing PRB utilization, which includes the following specific steps:
step 600, currently, CCE resources are required to be allocated to newly transmitted SE;
601, determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission;
step 602, determining the allocation sequence of each SE according to the number of idle PRBs on two adjacent sides in the SEs with idle PRBs on two adjacent sides; the SE of the idle PRB with a large adjacent quantity preferentially allocates CCE resources compared with the SE of the idle PRB with a small adjacent quantity;
603, selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted;
step 604, limiting the number of newly transmitted SEs according to a preset transmission requirement;
step 605, according to the position of the idle PRB on the first segment of the time slot and/or the last segment of the time slot corresponding to the SE to be converted, allocating CCE resources to the SE to be converted, excluding CCE resources corresponding to the newly transmitted SE.
Embodiment 4, as shown in fig. 7, an embodiment of the present invention provides a third specific implementation method for optimizing PRB utilization, which includes the following specific steps:
step 700, the current retransmitted information does not conform to the characteristic of TTI bundling in transmission time interval bundling;
701, determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission;
step 702, determining the allocation sequence of each SE according to the number of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides; the SE of the idle PRB with a large adjacent quantity preferentially allocates CCE resources compared with the SE of the idle PRB with a small adjacent quantity;
703, selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted;
step 704, including newly transmitted SE and SE to be converted in the current time slot;
step 705, preferentially allocating Control Channel Element (CCE) resources to the SE to be converted according to the position of the idle PRB on the first segment of the time slot and/or the last segment of the time slot corresponding to the SE to be converted.
Embodiment 5, as shown in fig. 8, an embodiment of the present invention provides a fourth specific implementation method for optimizing PRB utilization, including the following specific steps:
step 800, the current retransmitted information does not accord with the retransmitted clustered PUSCH ReTx characteristic of the clustered physical uplink shared channel;
step 801, determining SEs with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission;
step 802, determining the allocation sequence of each SE according to the number of idle PRBs on two adjacent sides in the SEs with idle PRBs on two adjacent sides; the SE of the idle PRB with a large adjacent quantity preferentially allocates CCE resources compared with the SE of the idle PRB with a small adjacent quantity;
step 803, selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted;
step 804, allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of an idle PRB on the first segment of the time slot and/or the last segment of the time slot corresponding to the SE to be converted;
step 805, if the CCE resource allocated to the SE to be transformed conflicts with the CCE resource allocated to the newly transmitted or adaptively retransmitted SE, stopping or newly allocating the CCE resource to the SE to be transformed.
Embodiment 6 is based on the same inventive concept, and an embodiment of the present invention further provides a network side device for optimizing the utilization rate of a physical resource block PRB.
As shown in fig. 9, the network-side device includes: a processor 900 and a memory 901, the memory 901 is used for storing programs executable by the processor 900, the processor 900 is used for reading the programs in the memory 901 and executing the steps of the following method:
determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
and allocating CCE resources for the SE to be converted according to the positions of idle PRBs on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the positions of the PRBs used by the SE to be converted.
It should be noted that the network side device in the embodiment of the present invention may be a gNB, a macro base station, a micro base station, a CU (Central Unit), a DU (Distributed Unit), or the like in 5G.
As an optional implementation, the processor 900 is specifically configured to:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
As an optional implementation, the processor 900 is specifically configured to:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
As an optional implementation, the processor 900 is specifically configured to:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
As an optional implementation manner, the processor 900 is specifically further configured to:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
As an optional implementation, the processor 900 is specifically configured to:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
As an optional implementation, the processor 900 is specifically configured to:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
As an optional implementation manner, the processor 900 is specifically further configured to:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
Embodiment 7 is based on the same inventive concept, and an embodiment of the present invention further provides a device for optimizing the utilization rate of a physical resource block PRB, where the device is a device in the method in the embodiment of the present invention, and the principle of the device for solving the problem is similar to that of the method, so that the implementation of the device may refer to the implementation of the method, and repeated details are not repeated.
As shown in fig. 10, the apparatus includes: a determination module 1000 and a conversion module 1001, wherein:
the determining module 1000 is configured to determine an SE to be converted from each scheduling unit SE that is not adaptively retransmitted;
the converting module 1001 is configured to allocate a Control Channel Element (CCE) resource to the SE to be converted according to a position of an idle PRB on a first segment of a time slot and/or a last segment of the time slot corresponding to the SE to be converted, where the CCE resource is used to indicate a position of a PRB used by the SE to be converted.
As an optional implementation manner, the determining module 1000 is specifically configured to:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
As an optional implementation manner, the determining module 1000 is specifically configured to:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
As an optional implementation manner, the determining module 1000 is specifically configured to:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
As an optional implementation, the apparatus further comprises a condition module configured to:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
As an optional implementation manner, the conversion module 1001 is specifically configured to:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
As an optional implementation manner, the conversion module 1001 is specifically configured to:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
As an optional implementation manner, the conversion module 1001 is further configured to:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
The present invention provides a computer storage medium having stored thereon a computer program which, when executed by a processor, performs the steps of:
determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
and allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of the idle PRB on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the position of the PRB used by the SE to be converted.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (18)

1. A method for optimizing Physical Resource Block (PRB) utilization rate is characterized by comprising the following steps:
determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
and allocating Control Channel Element (CCE) resources for the SE to be converted according to the position of the idle PRB on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the position of the PRB used by the SE to be converted.
2. The method of claim 1, wherein determining the SE to be translated from each Scheduling Element (SE) of the non-adaptive retransmission comprises:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
3. The method according to claim 2, wherein determining, as the SE to be converted, an SE having idle PRBs on two adjacent sides, among the SEs in the non-adaptive retransmission, comprises:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
4. The method according to claim 3, wherein determining an allocation order of SEs from SEs with idle PRBs on two adjacent sides in the non-adaptively retransmitted SEs comprises:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
5. The method of claim 1, wherein before determining the SE to be converted from each scheduling element SE for non-adaptive retransmission, further comprising:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
6. The method of claim 1, wherein allocating CCE resources for the SE to be transformed comprises:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
7. The method of claim 1, wherein allocating CCE resources for the SE to be transformed comprises:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
8. The method of claim 1, wherein allocating CCE resources for the SE to be transformed further comprises:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
9. A network side device for optimizing Physical Resource Block (PRB) utilization rate is characterized in that the network side device comprises: a processor and a memory for storing programs executable by the processor, the processor for reading the programs in the memory and performing the steps of the method of:
determining an SE to be converted from each scheduling unit SE of non-adaptive retransmission;
and allocating CCE resources for the SE to be converted according to the positions of idle PRBs on the first segment and/or the last segment of the time slot corresponding to the SE to be converted, wherein the CCE resources are used for indicating the positions of the PRBs used by the SE to be converted.
10. The network-side device of claim 9, wherein the processor is configured to perform:
and determining the SE with idle PRBs on two adjacent sides in each SE of the non-adaptive retransmission as the SE to be converted.
11. The network-side device of claim 10, wherein the processor is configured to perform:
determining the distribution sequence of each SE from the SEs with idle PRBs on two adjacent sides in the non-self-adaptive retransmission SE;
and selecting a preset number of SEs according to the distribution sequence of the SEs, and determining the SEs as the SEs to be converted.
12. The network-side device of claim 11, wherein the processor is configured to perform:
determining the allocation sequence of each SE according to the quantity of idle PRBs on two adjacent sides in the SEs with the idle PRBs on two adjacent sides;
wherein, the SE of the idle PRB with a large adjacent quantity preferentially allocates the CCE resource compared with the SE of the idle PRB with a small adjacent quantity.
13. The network-side device of claim 9, wherein the processor is further specifically configured to perform:
determining that any one or any plurality of the following conditions are satisfied:
currently, CCE resources are required to be allocated to newly transmitted SE;
the current retransmitted information does not accord with the TTI bundling characteristic of transmission time interval bundling;
the currently retransmitted information does not conform to the aggregated physical uplink shared channel retransmission clustered PUSCH ReTx characteristics.
14. The network-side device of claim 9, wherein the processor is configured to perform:
according to the preset transmission requirement, limiting the number of newly transmitted SEs;
and allocating CCE resources to the SE to be converted except the CCE resources corresponding to the newly transmitted SE.
15. The network-side device of claim 9, wherein the processor is configured to perform:
and if the current time slot comprises the newly transmitted SE and the SE to be converted, preferentially distributing CCE resources for the SE to be converted.
16. The network-side device of claim 9, wherein the processor is further specifically configured to perform:
and if the CCE resources allocated to the SE to be converted conflict with the CCE resources allocated to the newly transmitted or adaptively retransmitted SE, stopping or reallocating the CCE resources to the SE to be converted.
17. An apparatus for optimizing physical resource block, PRB, utilization, the apparatus comprising: the device comprises a determining module and a converting module, wherein:
the determining module is used for determining the SE to be converted from each scheduling unit SE of the non-adaptive retransmission;
the conversion module is configured to allocate a Control Channel Element (CCE) resource to the SE to be converted according to a position of an idle PRB on a first segment of a time slot and/or a last segment of the time slot corresponding to the SE to be converted, where the CCE resource is used to indicate a position of a PRB used by the SE to be converted.
18. A computer storage medium having a computer program stored thereon, the program, when executed by a processor, implementing the steps of the method according to any one of claims 1 to 8.
CN202010731248.0A 2020-07-27 2020-07-27 Method, equipment and device for optimizing utilization rate of physical resource block PRB Active CN113993140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010731248.0A CN113993140B (en) 2020-07-27 2020-07-27 Method, equipment and device for optimizing utilization rate of physical resource block PRB

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010731248.0A CN113993140B (en) 2020-07-27 2020-07-27 Method, equipment and device for optimizing utilization rate of physical resource block PRB

Publications (2)

Publication Number Publication Date
CN113993140A true CN113993140A (en) 2022-01-28
CN113993140B CN113993140B (en) 2023-08-08

Family

ID=79731463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010731248.0A Active CN113993140B (en) 2020-07-27 2020-07-27 Method, equipment and device for optimizing utilization rate of physical resource block PRB

Country Status (1)

Country Link
CN (1) CN113993140B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090175233A1 (en) * 2008-01-07 2009-07-09 Nokia Corporation Method, Apparatus And Computer Program To Map A Downlink Resource To A Related Uplink Transmission
CN101583193A (en) * 2009-06-24 2009-11-18 中国科学院计算技术研究所 Distribution method for wireless resource ascended by base station terminal in LTE system and device
US20110249640A1 (en) * 2010-04-09 2011-10-13 Futurewei Technologies, Inc. System and Method for Transmitting Control Information
CN104378185A (en) * 2014-12-04 2015-02-25 武汉虹信通信技术有限责任公司 Scheduling method and device for bundling subframes in LTE (long term evolution) system
WO2018024088A1 (en) * 2016-08-05 2018-02-08 中兴通讯股份有限公司 Information indication method, device and system
WO2019137261A1 (en) * 2018-01-09 2019-07-18 京信通信系统(中国)有限公司 Cell resource scheduling method, master control station device, slave station device and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090175233A1 (en) * 2008-01-07 2009-07-09 Nokia Corporation Method, Apparatus And Computer Program To Map A Downlink Resource To A Related Uplink Transmission
CN101583193A (en) * 2009-06-24 2009-11-18 中国科学院计算技术研究所 Distribution method for wireless resource ascended by base station terminal in LTE system and device
US20110249640A1 (en) * 2010-04-09 2011-10-13 Futurewei Technologies, Inc. System and Method for Transmitting Control Information
CN104378185A (en) * 2014-12-04 2015-02-25 武汉虹信通信技术有限责任公司 Scheduling method and device for bundling subframes in LTE (long term evolution) system
WO2018024088A1 (en) * 2016-08-05 2018-02-08 中兴通讯股份有限公司 Information indication method, device and system
WO2019137261A1 (en) * 2018-01-09 2019-07-18 京信通信系统(中国)有限公司 Cell resource scheduling method, master control station device, slave station device and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
MOTOROLA: "R1-073409 "MU-MIMO PHICH Assignment for Adaptive and non-Adaptive HARQ"", 3GPP TSG_RAN\\WG1_RL1, no. 1 *

Also Published As

Publication number Publication date
CN113993140B (en) 2023-08-08

Similar Documents

Publication Publication Date Title
US20220295534A1 (en) Method and apparatus for transmitting downlink control information
US9204454B2 (en) Interference coordination in wireless network cloud environment
EP2387858B1 (en) Method and apparatus for scheduling data transmission on multiple carriers
WO2018076565A1 (en) Resource allocation method and resource allocation device
US20110299490A1 (en) Methods and Apparatus for Physical Uplink Control Channel (PUCCH) Load Control by Physical Downlink Control Channel (PDCCH) Restrictions
CN109526056A (en) Resource selection method, device and computer equipment, storage medium under multicarrier
CN106455087B (en) Method and device for determining competition resources
US8599736B2 (en) Method and apparatus for transmission mode selection in cooperative relay
US8660083B2 (en) Uplink scheduling in a cellular system
US20220287070A1 (en) Scheduling indication method and apparatus, and storage medium
US20130188564A1 (en) Resource allocation in an orthogonal frequency division multiplexing system
JP5173786B2 (en) Radio base station apparatus and radio communication system
CN104602346B (en) The distribution method of physical uplink control channel resource
WO2020143773A1 (en) Transmission resource selection method and apparatus
CN111555839B (en) Method and equipment for allocating uplink carrier resources in carrier aggregation
JP6904511B2 (en) Information transmission method and equipment
US20180310291A1 (en) Control signal sending method and apparatus
US11381978B2 (en) Method and device for allocating radio resources in a radio communication system
CN109041118B (en) Resource allocation method and communication equipment
KR20070078308A (en) Method for scheduling data traffic in wireless communication system
CN103490870A (en) Frequency band utilization method and device
CN109842948B (en) Enhanced control channel resource allocation method and device for 3D-MIMO base station
CN113993140B (en) Method, equipment and device for optimizing utilization rate of physical resource block PRB
US11044742B2 (en) Uplink scheduling method based on a dynamic frame structure, uplink scheduling device, and base station
US20170055230A1 (en) Physical downlink control channel power coordination

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant