CN113978651A - Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system - Google Patents

Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system Download PDF

Info

Publication number
CN113978651A
CN113978651A CN202111311884.9A CN202111311884A CN113978651A CN 113978651 A CN113978651 A CN 113978651A CN 202111311884 A CN202111311884 A CN 202111311884A CN 113978651 A CN113978651 A CN 113978651A
Authority
CN
China
Prior art keywords
angle steel
installing
containment system
glue
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111311884.9A
Other languages
Chinese (zh)
Inventor
张豪
朱焊烽
李洪超
储文涛
戴伟啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN202111311884.9A priority Critical patent/CN113978651A/en
Publication of CN113978651A publication Critical patent/CN113978651A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a method for installing a liquid dome angle steel piece of a MARK3 type liquid cargo hold containment system, which comprises the following steps: step one, shielding, adhering and perforating liquid domes; secondly, confirming the bolt hole state; step three, determining the adhesion size; step four, adhesive tape is pasted; step five, slightly adjusting the angle of the steel part; sixthly, cleaning the adhesion surface; step seven, coating glue and installing the angle steel piece, and waiting for the glue to be hardened; step eight, surface treatment after hardening; and step nine, screwing the torsion on the nut and performing spot welding on the nut. Practice proves that the method is not easy to cause the damage of the FSB adhesion of the stainless steel in the corner area of the liquid dome in the construction process, the quality is reliable, and the good tightness experiment result of the liquid dome area is ensured. The invention has simple manufacturing process, convenient operation and high safety factor, and improves the working efficiency.

Description

Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system
Technical Field
The invention belongs to the technical field of construction of ship liquid cargo tanks, and particularly relates to a method for installing a liquid dome angle steel piece of a MARK3 type liquid cargo tank containment system.
Background
The installation of the liquid dome angle steel piece at the stainless steel adhesion part of the liquid dome angle area of the MARK3 type liquid cargo tank containment system is one of the key steps of the whole liquid dome angle area construction, and the construction quality of the area is the important weight for ensuring the complete shielding and the sealing performance of the liquid dome. If the installation strength and reliability of the liquid dome angle steel piece do not reach the standard, the liquid dome angle steel piece cannot play the deformation stress of FSB adhesion of the dispersion dome stainless steel, and the risk of secondary shielding leakage of the liquefied natural gas can occur in the transportation process of-170 ℃, so that the liquefied natural gas leakage is caused, and serious accidents of ship damage and death are caused. Therefore, the requirement on the installation accuracy of the liquid dome angle steel part is high, and a set of reliable angle steel part installation method is needed to ensure the construction quality.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides the method for installing the liquid dome angle steel piece of the MARK3 type liquid cargo hold containment system, which can control the extrusion glue forming and glue overflowing of the liquid dome stainless steel angle steel piece in the installation process, improve the installation reliability and the sealing property of the angle steel piece, improve the installation efficiency of the angle steel piece and reduce the leakage risk of the subsequent real ship operation.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention provides a method for installing a liquid dome angle steel piece of a MARK3 type liquid cargo hold containment system, which comprises the following steps:
step one, shielding, adhering and perforating liquid domes; digging bolt holes covered when FSB (free space group) in the stainless steel corner area of the liquid dome are adhered;
confirming the bolt hole state, and checking the screw tooth state of the bolt hole;
step three, determining the adhesion size according to the size of the angle steel, and drawing an adhesion area line at the position of the outer edge of each edge of the angle steel by using a pencil;
fourthly, pasting an adhesive tape on the periphery of the line of the adhesion area;
fifthly, slightly adjusting the angle of the steel part to enable the angle of the steel part to be matched with the angle of the stainless steel angle area of the liquid dome;
cleaning the adhesion surface;
coating glue on the angle steel piece and installing the angle steel piece, applying pressure on the angle steel piece to extrude the glue, and fixing the angle steel piece by using a bolt and a nut;
step eight, after the glue is hardened, carrying out surface treatment, tearing off the adhesive tape, and removing the redundant glue in the stainless steel corner area of the liquid dome;
step nine, spot welding the nut with the angle steel piece after torsion;
preferably, in the first step, the FSB notch at the bolt opening position is rounded.
In the second step, if the thread is damaged, tapping is performed again.
In the third step, 100% of edge glue overflow is needed after the angle steel is adhered, and the line of the adhered area exceeds the edge of the angle steel by 5-8 mm.
As a preferable technical scheme, in the sixth step, a dust collector is used to clean the adhesion area in cooperation with the brush head.
As a preferred technical solution, in the seventh step, a gap between the bolt and the glue is 1 mm.
As a preferable technical scheme, in the step eight, the glue is hardened at normal temperature for 24 hours.
Preferably, in the ninth step, the torque value applied to the nut is 3-5N/m, the spot welding is wire-added spot welding, and the spot welding positions are between the nut and the angle steel member and between the nut and the bolt.
Compared with the prior art, the invention has the following technical effects: practice proves that the method is not easy to cause the damage of the FSB adhesion of the stainless steel in the corner area of the liquid dome in the construction process, the quality is reliable, and the good tightness experiment result of the liquid dome area is ensured. The invention has simple manufacturing process, convenient operation and high safety factor, and improves the working efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural view of the installation of the angle steel member of the present invention.
Wherein the reference numerals are specified as follows: the liquid dome stainless steel corner region 1, the angle steel piece 2 and the nut 3.
Detailed Description
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention.
The embodiment provides an installation method of a liquid dome angle steel piece of a MARK3 type liquid cargo hold containment system, which comprises the following steps:
step one, shielding and adhering holes of the liquid dome, excavating bolt holes covered by the stainless steel corner area 1 of the liquid dome when the FSB is adhered (the opening needs to be kept round and smooth, and the FSB is prevented from being torn along the edge of an irregular cut);
confirming the bolt hole state, and checking the screw tooth state of the bolt hole;
step three, determining the adhesion size, and drawing an adhesion area line (100% of edge glue overflow is needed after the angle steel pieces are adhered) by adding 5mm of pencil on each side according to the size of the angle steel pieces 2;
sticking an adhesive tape, namely sticking the adhesive tape according to the line of the adhesive area drawn by the pencil;
fifthly, slightly adjusting the angle of the steel part 2 to enable the steel part to be matched with the angle of the liquid dome stainless steel angle area 1;
cleaning the adhesion surface, namely cleaning the adhesion area by using a dust collector and matching a brush head;
step seven, coating glue and installing the angle steel piece 2, extruding the glue (Bostik XPU 18411A 3/B) on the reverse side of the angle steel piece 2, and fixing the angle steel piece 2 by using a bolt and a nut 3 (the thickness of a glue layer after extrusion is about 1 mm);
step eight, waiting for glue hardening (at least 24 hours); after hardening, performing surface treatment, tearing off the adhesive tape, and removing redundant glue on the surface of the liquid dome stainless steel corner area 1;
ninth, the nut 3 is subjected to torsion and spot welding of the nut, a torque wrench is used for applying 3-5N/m of torsion on the nut 3, and then spot welding (the nut 3 and the bolt, the nut 3 and the angle steel piece 2) is completed (the temperature transmitted to the FSB during spot welding can not exceed 100 ℃)
In the first step, the bolt hole opening position FSB needs to be kept smooth, and the FSB is prevented from being torn along the edge of the irregular notch.
In the second step, the state of the screw thread of the bolt hole needs to be checked for subsequent bolt installation, and if the screw thread is damaged, tapping needs to be carried out again.
In the third step, 100% of edge glue overflow is needed after the angle steel piece 2 is adhered, and the line of the adhered area needs to exceed the size of the angle steel piece by 5-8 mm.
And in the third step and the fourth step, the used pencils and the used adhesive tapes are required to pass the GTT compatibility experiment certification.
In the fifth step, the angle between the prefabricated angle steel piece 2 and the liquid dome stainless steel angle area 1 may be mismatched, and a hammer or a specific bench clamp is required to adjust the angle so as to match the angle.
In the seventh step, enough Bostik XPU 18411 mixed glue needs to be coated on the back surface of the angle steel piece 2, and a glue gap of about 1mm is reserved when the angle steel piece 2 is fixed by bolts and nuts. The hardening time of the glue under the normal temperature (20-30 ℃) is at least 24 hours.
In the ninth step, the torque value applied to the nut 3 is 3-5N/m, spot welding is wire-added spot welding (308L welding wires are used, and the stainless steel materials involved in installation are all 304L materials), two positions are required to be completed, the spot welding temperature is controlled between the nut 3 and the angle steel piece 2 and between the nut 3 and the bolt, and the temperature transmitted to the adhesion of the stainless steel FSB in the liquid dome area cannot exceed 100 ℃.
Although the present invention has been described in detail with respect to the above embodiments, it will be understood by those skilled in the art that modifications or improvements based on the disclosure of the present invention may be made without departing from the spirit and scope of the invention, and these modifications and improvements are within the spirit and scope of the invention.

Claims (8)

  1. The method for installing the liquid dome angle steel piece of the MARK3 type liquid cargo tank containment system is characterized by comprising the following steps of:
    step one, shielding, adhering and perforating liquid domes; digging bolt holes covered when FSB (free space group) in the stainless steel corner area of the liquid dome are adhered;
    confirming the bolt hole state, and checking the screw tooth state of the bolt hole;
    step three, determining the adhesion size according to the size of the angle steel, and drawing an adhesion area line at the position of the outer edge of each edge of the angle steel by using a pencil;
    fourthly, pasting an adhesive tape on the periphery of the line of the adhesion area;
    fifthly, slightly adjusting the angle of the steel part to enable the angle of the steel part to be matched with the angle of the stainless steel angle area of the liquid dome;
    cleaning the adhesion surface;
    coating glue on the angle steel piece and installing the angle steel piece, applying pressure on the angle steel piece to extrude the glue, and fixing the angle steel piece by using a bolt and a nut;
    step eight, after the glue is hardened, carrying out surface treatment, tearing off the adhesive tape, and removing the redundant glue in the stainless steel corner area of the liquid dome;
    and step nine, spot welding the nut with the angle steel piece after torsion.
  2. 2. The method of installing liquid dome angle steel member of MARK3 type liquid cargo tank containment system of claim 1, wherein in the first step, the FSB cut-out at the bolt opening position is rounded.
  3. 3. The method for installing liquid dome angle steel member of MARK3 type liquid cargo tank containment system of claim 1, wherein in the second step, if the thread is damaged, the tapping is performed again.
  4. 4. The method for installing the liquid dome angle steel member of the MARK3 type liquid cargo tank containment system according to claim 1, wherein in the third step, after the angle steel is bonded, 100% of edge glue overflow is needed, and the bonding area line exceeds the edge of the angle steel by 5-8 mm.
  5. 5. The method for installing liquid dome angle steel of MARK3 type liquid cargo tank containment system of claim 1, wherein in the sixth step, a dust collector is used to clean the adhesion area in cooperation with a brush head.
  6. 6. The method for installing liquid dome angle steel member of MARK3 type liquid cargo compartment containment system of claim 1, wherein in the seventh step, the gap between the bolt and the glue is 1 mm.
  7. 7. The method for installing liquid dome angle steel member of MARK3 type liquid cargo tank containment system of claim 1, wherein in the eighth step, the glue is hardened at room temperature for 24 hours.
  8. 8. The method for installing liquid dome angle steel member of MARK3 type liquid cargo tank containment system according to claim 1, wherein in the ninth step, the torque value applied to the nut is 3-5N/m, the spot welding is wire spot welding, and the spot welding is between the nut and the angle steel member and between the nut and the bolt.
CN202111311884.9A 2021-11-08 2021-11-08 Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system Pending CN113978651A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111311884.9A CN113978651A (en) 2021-11-08 2021-11-08 Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111311884.9A CN113978651A (en) 2021-11-08 2021-11-08 Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system

Publications (1)

Publication Number Publication Date
CN113978651A true CN113978651A (en) 2022-01-28

Family

ID=79747007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111311884.9A Pending CN113978651A (en) 2021-11-08 2021-11-08 Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system

Country Status (1)

Country Link
CN (1) CN113978651A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115026452A (en) * 2022-05-27 2022-09-09 沪东中华造船(集团)有限公司 Welding method for composite dome sealing plate of liquid cargo hold containment system
CN115783174A (en) * 2022-09-22 2023-03-14 沪东中华造船(集团)有限公司 Method for accurately installing liquid dome bracket in liquid cargo tank of N0.96 containment system
CN115854249A (en) * 2022-11-24 2023-03-28 沪东中华造船(集团)有限公司 Method for adhering stainless steel in 173.6-degree angle area of film tank

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180061944A (en) * 2016-11-30 2018-06-08 대우조선해양 주식회사 Insulation system of membraine type storage tank and membrain type storage tank
CN109606570A (en) * 2018-10-31 2019-04-12 沪东中华造船(集团)有限公司 The application method of III type cargo tank of Mark, 90 ° of angular region intermodules time shielding clamp device
CN110939637A (en) * 2019-11-08 2020-03-31 沪东中华造船(集团)有限公司 Secondary shielding adhesion method for liquid dome area of LNG ship
CN111188986A (en) * 2020-01-10 2020-05-22 江苏雅克科技股份有限公司 Thin film type LNG insulation board special-shaped trihedron and preparation process thereof
CN113175234A (en) * 2021-05-08 2021-07-27 大连航天高科科技有限公司 Bonded angle steel tower reinforcing structure and reinforcing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180061944A (en) * 2016-11-30 2018-06-08 대우조선해양 주식회사 Insulation system of membraine type storage tank and membrain type storage tank
CN109606570A (en) * 2018-10-31 2019-04-12 沪东中华造船(集团)有限公司 The application method of III type cargo tank of Mark, 90 ° of angular region intermodules time shielding clamp device
CN110939637A (en) * 2019-11-08 2020-03-31 沪东中华造船(集团)有限公司 Secondary shielding adhesion method for liquid dome area of LNG ship
CN111188986A (en) * 2020-01-10 2020-05-22 江苏雅克科技股份有限公司 Thin film type LNG insulation board special-shaped trihedron and preparation process thereof
CN113175234A (en) * 2021-05-08 2021-07-27 大连航天高科科技有限公司 Bonded angle steel tower reinforcing structure and reinforcing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谷运飞等: "薄膜型LNG 货物围护系统模拟舱的建造关键技术", 《船舶与海洋工程》, vol. 31, no. 2, pages 62 - 67 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115026452A (en) * 2022-05-27 2022-09-09 沪东中华造船(集团)有限公司 Welding method for composite dome sealing plate of liquid cargo hold containment system
CN115026452B (en) * 2022-05-27 2024-06-11 沪东中华造船(集团)有限公司 Welding method for composite vault sealing plate of liquid cargo tank containment system
CN115783174A (en) * 2022-09-22 2023-03-14 沪东中华造船(集团)有限公司 Method for accurately installing liquid dome bracket in liquid cargo tank of N0.96 containment system
CN115783174B (en) * 2022-09-22 2024-06-11 沪东中华造船(集团)有限公司 Accurate installation method of liquid dome bracket in liquid cargo tank of N0.96 containment system
CN115854249A (en) * 2022-11-24 2023-03-28 沪东中华造船(集团)有限公司 Method for adhering stainless steel in 173.6-degree angle area of film tank
CN115854249B (en) * 2022-11-24 2024-05-10 沪东中华造船(集团)有限公司 Method for stainless steel adhesion in 173.6-degree angle area of thin film tank

Similar Documents

Publication Publication Date Title
CN113978651A (en) Method for installing liquid dome angle steel piece of MARK3 type liquid cargo tank containment system
CN111195678B (en) Economical creep aging forming method for large thin-wall component
CN114301382B (en) Photovoltaic module fixing frame, frame manufacturing method and assembling method
CN111195677B (en) Creep age forming method for large thin-wall component
CN214607952U (en) Heat preservation system as secondary shielding
CN112025615B (en) Fastening tool for glan head of motor train unit train
CN101758381A (en) Preparation method of titanium/steel compound plate with notch on compound layer
CN213974395U (en) Liquid cargo tank side temporary insulation module mounting structure
CN111656026B (en) Self-adhesive connecting assembly
CN110900494B (en) Auxiliary installation method for anchoring flat steel of ship containment system
CN209868738U (en) Secondary seal sliding sheet joint sawing tool for oil tank
CN207504038U (en) A kind of easy-to-mount battery modules
CN101872809B (en) Manual engaging clamp for aluminum frame of solar cell assembly
CN111761019B (en) Large-flat-head rivet and sealing riveting method thereof
CN220774746U (en) Square radome with edge pressing connection
CN218039517U (en) Box body boundary beam hanging point structure and battery pack
CN111365357A (en) Combined type superstrong waterproof gasket
CN219592864U (en) Circuit board with mounting holes for preventing breakage
CN113602365B (en) Floor seal structure behind car carbon-fibre composite
CN216112574U (en) High-adhesion anti-bending lining composite steel pipe end and pipe body structure
JPS62155311A (en) Method of repairing casing
CN213742013U (en) Veneer overall structure
CN212365404U (en) Module and LED display screen
CN108661277A (en) A kind of exterior formula facing board mounting structure of steel structure fireproofing layer and installation method
CN216813218U (en) Anti-corrosion internal and external plastic-coated composite steel pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination