CN113978168B - Mounting connecting piece for curtain wall copper relief - Google Patents

Mounting connecting piece for curtain wall copper relief Download PDF

Info

Publication number
CN113978168B
CN113978168B CN202111231781.1A CN202111231781A CN113978168B CN 113978168 B CN113978168 B CN 113978168B CN 202111231781 A CN202111231781 A CN 202111231781A CN 113978168 B CN113978168 B CN 113978168B
Authority
CN
China
Prior art keywords
gear
groove
wall
side wall
copper relief
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111231781.1A
Other languages
Chinese (zh)
Other versions
CN113978168A (en
Inventor
徐涛
周毅
林海
刘晓凤
陈树华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui New Infrastructure Co ltd
Original Assignee
Anhui New Infrastructure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui New Infrastructure Co ltd filed Critical Anhui New Infrastructure Co ltd
Priority to CN202111231781.1A priority Critical patent/CN113978168B/en
Publication of CN113978168A publication Critical patent/CN113978168A/en
Application granted granted Critical
Publication of CN113978168B publication Critical patent/CN113978168B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C3/00Processes, not specifically provided for elsewhere, for producing ornamental structures
    • B44C3/06Sculpturing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Abstract

The invention discloses an installation connecting piece for a curtain wall copper relief, which comprises an embedded anchor plate and an adjusting square tube, wherein two symmetrically arranged steel structure connecting plates are welded on the side wall of the embedded anchor plate, an upper groove and a lower groove are respectively formed in the side wall of the two steel structure connecting plates in a penetrating mode, two groups of supporting holes are formed in the side wall of the adjusting square tube in a penetrating mode, an upper rotating shaft and a lower rotating rod are respectively connected with the inner walls of the two groups of supporting holes in a penetrating and sliding mode, upper nuts are connected with the two ends of the upper rotating shaft in a threaded mode, and a deflection supporting mechanism is arranged in the adjusting square tube. The advantages are that: according to the invention, the connecting piece is installed in advance in the whole installation process, the copper relief is finally only needed to be lifted and fixed by the bolts, the operation is simple and safe, the side walls of the embedded anchor plates are propped against each other, so that the supporting ribs between the adjusting square pipes and the embedded anchor plates are formed, bending damage of the adjusting square pipes after stress of the adjusting square pipes and the embedded anchor plates is avoided, and the stability of copper relief installation is improved.

Description

Mounting connecting piece for curtain wall copper relief
Technical Field
The invention relates to the technical field of copper relief installation, in particular to an installation connecting piece for a curtain wall copper relief.
Background
The copper relief is refined by taking high-quality red copper which is not rusted and decolored as a raw material through a plurality of working procedures, and has excellent decorative effect;
when the copper relief is installed, the copper relief is generally installed at the high position of the wall surface, an installation connecting piece is generally required to be used for carrying, a plurality of exquisite relief is usually required, the back surface is not a plane surface, a sufficient gap is reserved between the upper end installation position and the wall surface during installation, otherwise, the copper relief cannot be installed smoothly, the existing installation connecting piece basically does not have adjustment capability, and most of the existing installation connecting piece only can adapt to the installation of the copper relief with the plane back surface, so that the overall adaptability is poor, even if the gap is reserved during manufacturing by a part, the copper relief cannot be adjusted, and meanwhile, the connecting piece is stressed and bent, so that the stability of connection is damaged.
Disclosure of Invention
The invention aims to solve the problem of inconvenient installation in the prior art, and provides an installation connecting piece for a curtain wall copper relief.
In order to achieve the above purpose, the present invention adopts the following technical scheme: the utility model provides a mounting connection spare of curtain copper relief, includes pre-buried anchor plate and regulation side's pipe, the lateral wall welding of pre-buried anchor plate has two steel structure connecting plates that the symmetry set up, two the lateral wall of steel structure connecting plate all runs through and has seted up upper groove and lower groove, two sets of supporting holes have been run through to the lateral wall of regulation side's pipe, two sets of sliding connection has pivot and lower bull stick respectively to run through the inner wall of supporting hole, the equal threaded connection in both ends of going up the pivot has the upper nut, the inside of regulation side's pipe is equipped with deflection supporting mechanism, the lateral wall welding of regulation side has the support pendant, the upper end of support pendant offsets has external pendant, the lateral wall of support pendant and external pendant all welds and has run through and has seted up two mounting holes.
In the installation connecting piece of the curtain wall copper relief, the adjusting and supporting mechanism comprises a pinion and a large gear which are respectively fixed on the upper rotating shaft and the side wall of the lower rotating rod, the side wall of the lower rotating rod is fixedly provided with a supporting plate, the side wall of the adjusting square tube is penetrated and provided with a yielding groove, the inner wall of the adjusting square tube is rotationally connected with an intermediate shaft, and the circumferential side wall of the intermediate shaft is fixedly provided with a reversing gear.
In the installation connecting piece of the curtain wall copper relief, the reversing gear is meshed with the large gear and the small gear, the radiuses of the large gear, the small gear and the reversing gear are decreased progressively, and the large gear, the small gear and the reversing gear are located in the adjusting square pipe.
In the installation connecting piece of the curtain wall copper relief, the side wall of the upper rotating shaft is fixedly provided with two locking gears, the two locking gears are respectively propped against the two upper nuts, the side wall of the lower rotating rod is slidably connected with two sliding sleeves, the circumferential side walls of the two sliding sleeves are respectively connected with lower locking gears through unidirectional bearings in a rotating mode, and the two locking gears are respectively meshed with the two lower locking gears.
In the installation connecting piece of the curtain wall copper relief, the two ends of the lower rotating rod are respectively fixed with a limiting screw, the side walls of the two limiting screws are respectively connected with limiting nuts in a threaded mode, the two limiting nuts are respectively propped against the two sliding sleeves, and the section of the lower rotating rod is square.
In the mounting connecting piece of the curtain wall copper relief, the side wall of the steel structure connecting plate is provided with a lower groove and an upper groove in a penetrating mode, and the lower groove and the upper groove are respectively communicated with the upper groove and the lower groove.
Compared with the prior art, the invention has the advantages that:
1. according to the invention, the connecting piece is installed in advance in the whole installation process, the copper relief is finally only needed to be lifted and fixed by bolts, the operation is simple and safe, the side walls of the embedded anchor plates are propped against each other, so that the supporting ribs between the adjusting square pipes and the embedded anchor plates are formed, bending damage of the adjusting square pipes after stress of the adjusting square pipes and the embedded anchor plates is avoided, and the stability of copper relief installation is improved;
2. in the invention, after the square tube is adjusted, the upper rotating shaft and the lower rotating rod cannot rotate, namely the supporting plate always keeps a fixed installation position and angle, so that deflection and abdication caused by bearing are avoided, and a good rib plate effect is achieved;
3. according to the invention, the square tube can be conveniently assembled and disassembled, and the angle of the supporting plate can be adjusted again, so that the connecting piece can be reused after being assembled and disassembled, and the gap between the square tube and the embedded anchor plate can be adjusted at will, so that the copper relief can be suitable for the installation of more copper relief, and the overall adaptability is stronger.
Drawings
FIG. 1 is a schematic view of a mounting connection for a copper relief of a curtain wall according to the present invention;
FIG. 2 is a side view of a mounting connection for a copper relief of a curtain wall in accordance with the present invention;
FIG. 3 is a side cross-sectional view of a mounting connection for a curtain wall copper relief according to the present invention;
FIG. 4 is a side view of a steel web portion of a curtain wall copper relief mounting connection in accordance with the present invention;
FIG. 5 is a schematic top view of a portion of a support hanger in a copper relief mounting connector for a curtain wall according to the present invention;
fig. 6 is a side view of an adjusting square tube in a mounting connection piece of a curtain wall copper relief.
In the figure: the novel steel structure comprises a pre-embedded anchor plate 1, an adjusting square tube 2, a steel structure connecting plate 3, an upper groove 4, a lower groove 5, an upper rotating shaft 6, a lower rotating rod 7, a small gear 8, a large gear 9, a middle shaft 10, a reversing gear 11, a supporting plate 12, a yielding groove 13, a lower groove 14, an upper groove 15, a locking gear 16, an upper nut 17, a sliding sleeve 18, a locking gear 19, a limiting screw 20, a limiting nut 21, an external hanging piece 22, a supporting hanging piece 23, a supporting rib 24, a mounting hole 25 and a supporting hole 26.
Detailed Description
The following examples are for illustrative purposes only and are not intended to limit the scope of the invention.
Examples
Referring to fig. 1-6, an installation connecting piece of curtain wall copper relief, including pre-buried anchor plate 1 and regulation side pipe 2, the lateral wall welding of pre-buried anchor plate 1 has two symmetrical steel structure connecting plates 3 that set up, upper groove 4 and lower groove 5 have all been run through to the lateral wall of two steel structure connecting plates 3, two sets of supporting holes 26 have been run through to the lateral wall of regulation side pipe 2, the inner wall of two sets of supporting holes 26 runs through sliding connection respectively has last pivot 6 and lower bull stick 7, the equal threaded connection in both ends of going up pivot 6 has upper nut 17, the inside of regulation side pipe 2 is equipped with deflection supporting mechanism, the lateral wall welding of regulation side pipe 2 has support pendant 23, the upper end counterbalance of support pendant 23 has external pendant 22, support pendant 23 and the lateral wall of external pendant 22 has all welded support rib 24 and has all run through and has been seted up two mounting holes 25, support rib 24 guarantees the intensity of support pendant 23 and external pendant 22, mounting hole 25 position corresponds, thereby realize bolt fixed connection, make copper relief can install smoothly and support.
The adjusting and supporting mechanism comprises a pinion 8 and a large gear 9 which are respectively fixed on the side walls of the upper rotating shaft 6 and the lower rotating rod 7, a supporting plate 12 is fixed on the side wall of the lower rotating rod 7, a yielding groove 13 is formed in the side wall of the adjusting square tube 2 in a penetrating manner, an intermediate shaft 10 is connected to the inner wall of the adjusting square tube 2 in a rotating manner, and a reversing gear 11 is fixed on the circumferential side wall of the intermediate shaft 10; the reversing gear 11 is meshed with the large gear 9 and the small gear 8, the radiuses of the large gear 9, the small gear 8 and the reversing gear 11 are decreased gradually, the large gear 9, the small gear 8 and the reversing gear are located in the square adjusting pipe 2, the large rotation of the upper rotating shaft 6 can cause the small rotation of the lower rotating rod 7, and even if the upper nut 17 is loosened, the large influence on the lower rotating rod 7 and the supporting plate 12 can be avoided.
The side wall of the upper rotating shaft 6 is fixedly provided with two locking gears 16, the two locking gears 16 respectively prop against the two upper nuts 17, the side wall of the lower rotating rod 7 is slidably connected with two sliding sleeves 18, the circumferential side walls of the two sliding sleeves 18 are respectively connected with a lower locking gear 19 through one-way bearings in a rotating way, the two locking gears 16 are respectively meshed with the two lower locking gears 19, and when the two locking gears 16 rotate, the directions of the locking gears 16 and the lower locking gears 19 are opposite.
Both ends of the lower rotating rod 7 are fixed with limiting screws 20, the side walls of the two limiting screws 20 are connected with limiting nuts 21 in a threaded mode, the two limiting nuts 21 are respectively propped against the two sliding sleeves 18, the section of the lower rotating rod 7 is square, the sliding sleeves 18 only can slide on the lower rotating rod 7 and cannot rotate, the lower locking gear 19 only can rotate on the sliding sleeves 18 in a unidirectional mode, the lower locking gear 19 is locked after rotating in a unidirectional mode, and therefore the fact that the sliding sleeves 18 rotate is guaranteed to drive the lower locking gear 19 to rotate.
The lateral wall of steel constructs connecting plate 3 runs through and has offered lower groove 14 and go up into groove 15, goes into groove 14 and go up into groove 15 respectively with last standing groove 4 and lower groove 5 intercommunication down, go into groove 14 and go up into groove 15 down and give way for the installation of pivot 6 and lower bull stick 7, guarantees the combination of regulation side pipe 2 and steel structure connecting plate 3, and steel constructs connecting plate 3 plays effectual supporting role to regulation side pipe 2.
In the invention, before the copper relief is installed, a plurality of embedded anchor plates 1 are fixed on an installation beam, and during formal installation, each embedded anchor plate 1 is independently operated, and a connecting component is added;
firstly, two steel structure connecting plates 3 are welded on the side wall of an embedded anchor plate 1, or the two steel structure connecting plates can be welded before the embedded anchor plate 1 is installed, then an adjusting square tube 2 is installed on the two steel structure connecting plates 3, and during installation, an upper rotating shaft 6 and a lower rotating rod 7 respectively enter an upper groove 4 and a lower groove 5 through an upper groove 15 and a lower groove 14, and support is provided by the upper groove 4 and the lower groove 5, so that the basic determination of the position of the adjusting square tube 2 is completed;
because part of the copper relief is of an arc-shaped structure, the installation position needs to keep a sufficient gap with the wall surface, the distance between the adjusting square tube 2 and the embedded anchor plate 1 is changed according to the thickness of the copper relief to be installed, so that a sufficient gap is left between the copper relief and the wall surface, smooth installation of the copper relief is ensured, and then the upper nut 17 is rotated, so that the position of the upper rotating shaft 6 is fastened and determined through threads, and the position of the adjusting square tube 2 is fixed;
finally, an external hanging piece 22 is welded on the copper relief to be installed, then the copper relief is hung, so that the external hanging piece is moved to the position of a supporting hanging piece 23, after the positions are matched with each other, the copper relief and the adjusting square tube 2 are combined through bolts penetrating through the installation holes 25, the copper relief is installed until the copper relief is installed, the connecting piece is installed in advance in the whole installation process, the copper relief is finally only needed to be hung and fixed through bolts, and the operation is simple and safe;
when the adjusting square tube 2 is fixed, the upper nut 17 drives the upper rotating shaft 6 to rotate before the fastening is completed, so that the pinion 8 on the upper rotating shaft 6 is driven to rotate, the reversing gear 11 meshed with the pinion 8 is driven to rotate, finally the large gear 9 meshed with the reversing gear 11 is driven to rotate, the lower rotating rod 7 fixed with the large gear 9 is driven to rotate along with the rotation, the supporting plate 12 is driven to deflect, the supporting plate 12 deflects to approach the embedded anchor plate 1 until the supporting plate is propped against the side wall of the embedded anchor plate 1, supporting ribs between the adjusting square tube 2 and the embedded anchor plate 1 are formed, bending damage of the adjusting square tube 2 after stress caused by the gap between the adjusting square tube 2 and the embedded anchor plate 1 is avoided, and the stability of copper relief installation is improved;
after the supporting plate 12 is propped against the embedded anchor plate 1, the large gear 9 cannot rotate any more, so that the upper rotating shaft 6 cannot rotate due to the clamping of the gear, then the upper nut 17 can form effective rotation difference with the upper rotating shaft 6, thereby realizing the fixation of the adjusting square tube 2, after the position of the upper rotating shaft 6 is determined, the position of the upper locking gear 16 on the upper rotating shaft is also determined, in this state, the sliding sleeve 18 can be sleeved on the side wall of the lower rotating rod 7, the lower locking gear 19 on the sliding sleeve 18 is rotated, the gear tooth position of the lower locking gear 19 corresponds to the gear tooth position of the upper locking gear 16, the sliding sleeve 18 is pushed into place, the lower locking gear 19 is smoothly meshed with the upper locking gear 16, then the limiting nut 21 is arranged on the limiting screw 20, and the limiting nut 21 is smoothly arranged due to the position of the lower rotating rod 7, so that the sliding sleeve 18 is tightly pressed, and the sliding sleeve 18 cannot be separated from the lower rotating rod 7;
in this state, the locking gear 16 is meshed with the lower locking gear 19, the pinion 8, the reversing gear 11 and the bull gear 9 are meshed in sequence, the locking gear 16 and the pinion 8 are installed on the upper rotating shaft 6, the lower locking gear 19 and the bull gear 9 are installed on the lower rotating rod 7, when the reversing gear 11 rotates, the steering directions of the pinion 8 and the bull gear 9 are consistent, the locking gear 16 and the lower locking gear 19 are directly meshed, when the rotating occurs, the steering directions of the two are opposite, so that the contradiction between the steering directions of the two is known, the upper rotating shaft 6 and the lower rotating rod 7 are in a rotating and blocking state after the lower locking gear 19 is installed, therefore, after the square adjusting pipe 2 is installed, the upper rotating shaft 6 and the lower rotating rod 7 cannot rotate, namely, the supporting plate 12 always keeps a fixed installation position and angle, so that the supporting plate 12 can not deflect and yield due to bearing, a good rib plate effect is achieved, when the square adjusting pipe 2 can be conveniently disassembled, the angle of the supporting plate 12 can be adjusted again, the connecting piece can be reused after being disassembled, and the gap between the square adjusting pipe 2 and the anchor plate 1 can be adjusted at will, and the whole is more suitable for copper relief.
The foregoing description of the preferred embodiments of the invention is not intended to limit the invention to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and scope of the invention are intended to be included within the scope of the invention.

Claims (3)

1. The utility model provides a mounting connection spare of curtain copper relief, includes pre-buried anchor plate (1) and regulation side pipe (2), its characterized in that, the lateral wall welding of pre-buried anchor plate (1) has two steel structure connecting plates (3) that set up symmetrically, two the lateral wall of steel structure connecting plates (3) all runs through and has seted up upper groove (4) and lower groove (5), two sets of supporting holes (26) have been run through to the lateral wall of regulation side pipe (2), two sets of sliding connection has upper rotating shaft (6) and lower bull stick (7) are run through respectively to the inner wall of supporting holes (26), the equal threaded connection in both ends of upper rotating shaft (6) has upper nut (17), the inside of regulation side pipe (2) is equipped with deflection supporting mechanism, the lateral wall welding of regulation side pipe (2) has support pendant (23), the upper end of support pendant (23) offsets has external pendant (22), the lateral wall of support pendant (23) and external pendant (22) all welds support rib (24) and all runs through and has seted up two mounting holes (25);
the adjusting and supporting mechanism comprises a pinion (8) and a bull gear (9) which are respectively fixed on the side walls of the upper rotating shaft (6) and the lower rotating rod (7), a supporting plate (12) is fixed on the side wall of the lower rotating rod (7), a yielding groove (13) is formed in the side wall of the adjusting square tube (2) in a penetrating mode, an intermediate shaft (10) is connected to the inner wall of the adjusting square tube (2) in a rotating mode, and a reversing gear (11) is fixed on the circumferential side wall of the intermediate shaft (10);
the reversing gear (11) is meshed with the large gear (9) and the small gear (8), the radiuses of the large gear (9), the small gear (8) and the reversing gear (11) are decreased progressively, and the large gear (9), the small gear (8) and the reversing gear are all located in the square adjusting pipe (2);
the side wall of the upper rotating shaft (6) is fixedly provided with two locking gears (16), the two locking gears (16) are respectively propped against the two upper nuts (17), the side wall of the lower rotating rod (7) is slidably connected with two sliding sleeves (18), the circumferential side walls of the two sliding sleeves (18) are respectively connected with lower locking gears (19) through unidirectional bearings in a rotating mode, and the two locking gears (16) are respectively meshed with the two lower locking gears (19).
2. The mounting connection piece of the curtain wall copper relief according to claim 1, characterized in that both ends of the lower rotating rod (7) are respectively fixed with a limiting screw rod (20), side walls of the two limiting screw rods (20) are respectively connected with limiting nuts (21) in a threaded mode, the two limiting nuts (21) respectively prop against the two sliding sleeves (18), and the section of the lower rotating rod (7) is square.
3. The mounting connection piece of the curtain wall copper relief according to claim 1 is characterized in that a lower inlet groove (14) and an upper inlet groove (15) are formed in the side wall of the steel structure connection plate (3) in a penetrating mode, and the lower inlet groove (14) and the upper inlet groove (15) are respectively communicated with the upper groove (4) and the lower groove (5).
CN202111231781.1A 2021-10-22 2021-10-22 Mounting connecting piece for curtain wall copper relief Active CN113978168B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111231781.1A CN113978168B (en) 2021-10-22 2021-10-22 Mounting connecting piece for curtain wall copper relief

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111231781.1A CN113978168B (en) 2021-10-22 2021-10-22 Mounting connecting piece for curtain wall copper relief

Publications (2)

Publication Number Publication Date
CN113978168A CN113978168A (en) 2022-01-28
CN113978168B true CN113978168B (en) 2023-04-28

Family

ID=79740260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111231781.1A Active CN113978168B (en) 2021-10-22 2021-10-22 Mounting connecting piece for curtain wall copper relief

Country Status (1)

Country Link
CN (1) CN113978168B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115122813B (en) * 2022-07-01 2024-04-16 浙江江能建设有限公司 High-strength supporting and connecting structure between landscape relief and gate

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2615276Y (en) * 2003-04-25 2004-05-12 扬州通达车船装备有限公司 Linking hold-down door lock
CN203296310U (en) * 2013-05-15 2013-11-20 安徽三建工程有限公司 Curtain wall pendant capable of being adjusted in three-dimensional mode
CN103291042B (en) * 2013-05-15 2015-09-09 安徽三建工程有限公司 A kind of can the curtain wall pendant of three-dimensional regulation
CN104490564A (en) * 2014-12-26 2015-04-08 罗希 Cervical vertebra and lumbar vertebra body-building device
US10516233B2 (en) * 2017-05-10 2019-12-24 Virginia Panel Corporation Configurable strain relieve plate

Also Published As

Publication number Publication date
CN113978168A (en) 2022-01-28

Similar Documents

Publication Publication Date Title
CN113978168B (en) Mounting connecting piece for curtain wall copper relief
CN212477748U (en) Simple foundation pit supporting structure
CN101158229A (en) Scaffold plug-fastening rotating extensible arm
CN211818117U (en) Fixing device for erecting building steel structure
CN112647594A (en) Fire-resistant energy-saving profile steel structure
CN208329622U (en) A kind of dedicated split bolt of building engineering construction
CN215168502U (en) Environment-friendly energy-saving type steel structure factory building has
CN109201939A (en) A kind of constructing device and its working method of energy saving building
CN115637839A (en) Quick assembly disassembly structure for building scaffold
CN205414885U (en) Hinge adjusting screw screws up device
CN210468745U (en) Circular pipe gallery support and circular pipe gallery using same
CN211286733U (en) Shear force wall bearing diagonal
CN218152711U (en) Quick support frame of anticorrosive construction of sewer line
CN211523518U (en) Bidirectional connecting piece for building steel structure
CN219240981U (en) Connection structure for curtain wall to be installed on steel structure
CN217679904U (en) Variable-angle decorative curtain wall
CN201129028Y (en) Telescopic cross bar
CN215564374U (en) Steel pipe scaffold wall connecting piece
CN217711453U (en) Architectural decoration rail guard
CN218623354U (en) Trapezoidal cross-section support based on self-stabilization
CN216184297U (en) Front plate spring mounting bracket assembly of rear suspension convenient to mount
CN215407358U (en) Connecting piece for connecting assembly type building components
CN220745188U (en) High-strength pipe for diagonal bracing of tower crane
CN216590532U (en) Special alloy stainless steel flange compensator for civil ships
CN215290636U (en) Steel structure connecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 230000 12 / F, block a, innovation Plaza, 222 Caihong Road, high tech Zone, Hefei City, Anhui Province

Applicant after: Anhui new infrastructure Co.,Ltd.

Address before: 230000 12 / F, block a, innovation Plaza, 222 Caihong Road, high tech Zone, Hefei City, Anhui Province

Applicant before: ANHUI SIJIAN HOLDING GROUP CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant