CN113935715A - Technical scheme proposal management method and device based on block chain - Google Patents

Technical scheme proposal management method and device based on block chain Download PDF

Info

Publication number
CN113935715A
CN113935715A CN202111226148.3A CN202111226148A CN113935715A CN 113935715 A CN113935715 A CN 113935715A CN 202111226148 A CN202111226148 A CN 202111226148A CN 113935715 A CN113935715 A CN 113935715A
Authority
CN
China
Prior art keywords
technical
proposal
operator
editing
editing operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111226148.3A
Other languages
Chinese (zh)
Inventor
段星辰
尹莉莉
李荣荣
王宇虹
杨青刚
高勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bank of China Ltd
Original Assignee
Bank of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bank of China Ltd filed Critical Bank of China Ltd
Priority to CN202111226148.3A priority Critical patent/CN113935715A/en
Publication of CN113935715A publication Critical patent/CN113935715A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6209Protecting access to data via a platform, e.g. using keys or access control rules to a single file or object, e.g. in a secure envelope, encrypted and accessed using a key, or with access control rules appended to the object itself

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Bioethics (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a technical scheme proposal management method and a device based on a block chain, which relate to the technical field of the block chain, wherein the method comprises the following steps: receiving the editing operation of an operator on the technical scheme proposal constituent elements stored in the block chain network, and determining the flow nodes where the editing operation occurs; sending an editing notification to a next process node of the process node subjected to the editing operation according to a preset complete editing process so that an operator of the next process node can edit the technical scheme proposal constituent elements of the process node; and when the complete compiling process is executed to the appointed process node, generating the technical scheme proposal according to the technical scheme proposal constituting elements edited by each process node and the preset technical scheme proposal constituting rules. The invention can utilize the block chain network to store the technical proposal constituent elements, is convenient for operators of each process node to synchronize, share and collect the prior information, and improves the generation efficiency of the technical proposal.

Description

Technical scheme proposal management method and device based on block chain
Technical Field
The invention relates to the technical field of block chains, in particular to a technical scheme proposal management method and a device based on block chains.
Background
This section is intended to provide a background or context to the embodiments of the invention that are recited in the claims. The description herein is not admitted to be prior art by inclusion in this section.
The technical proposal is a key ring in software engineering activities. The general writing flow is as follows: architects enter the product systems involved in delineation (typically tens to hundreds of products) according to the needs of business personnel; a service engineer sends mails to departments related to the product system, and each department feeds back a product evaluator; after all product evaluators are determined, the architect sends the technical solution written by them to the product evaluators in the form of an email. The product evaluator compiles the work instruction to issue development and the tester confirms, and after no problem, the mail feeds back the work instruction of each product of the architect, and the architect integrates the work instruction into the technical scheme proposal. And the related products on the same link, whose working descriptions have dependency relationship (i.e. the implementation description of a certain product depends on the upstream and downstream products), are subjected to information transfer by architects.
Changes in demand input or adjustments to the architecture plan may result in new or reduced product scope being involved, the business engineer may need to re-collect the product assessors, the architect may need to adjust the technical solution specification and mail to the product assessors, the product assessors may need to adjust the working specification and synchronize online to the developers, testers, architects and upstream and downstream products. This approach has the following problems:
(1) product range adjustment, technical scheme description change, and long link, the corresponding product evaluator cannot be identified and notified in time, and the newly added product evaluator cannot share the existing information;
(2) related products on the same link cannot be adjusted at any time according to the latest working instruction of the dependent products, and architects are difficult to quickly collect and synchronize, so that the working efficiency is influenced.
Disclosure of Invention
The embodiment of the invention provides a technical scheme proposal management method based on a block chain, which is used for timely notifying each process node to carry out corresponding change when the technical scheme proposal constituent element is changed, and simultaneously, storing the technical scheme proposal constituent element by using the block chain network, thereby facilitating the synchronization, sharing and collection of the existing information of operators of each process node and improving the generation efficiency of the technical scheme proposal, and the method comprises the following steps:
receiving the editing operation of an operator on the technical scheme proposal constituent elements stored in the block chain network, and determining the flow nodes where the editing operation occurs;
sending an editing notification to a next process node of the process node subjected to the editing operation according to a preset complete editing process so that an operator of the next process node can edit the technical scheme proposal constituent elements of the process node;
and when the complete compiling process is executed to the appointed process node, generating the technical scheme proposal according to the technical scheme proposal constituting elements edited by each process node and the preset technical scheme proposal constituting rules.
An embodiment of the present invention further provides a block chain-based technical solution proposal management apparatus, which is configured to notify each process node of a change in time when a technical solution proposal constituent element is changed, and store the technical solution proposal constituent element by using a block chain network, thereby facilitating synchronization, sharing, and collection of existing information by operators of each process node, and improving generation efficiency of the technical solution proposal, and the apparatus includes:
the communication module is used for receiving the editing operation of an operator on the technical scheme proposal constituent elements stored in the block chain network, and the determining module determines the flow nodes of the editing operation;
the communication module is also used for sending an editing notification to a next process node of the process node with the editing operation according to a preset complete editing process so that an operator of the next process node can edit the technical scheme recommendation constituting elements of the process node;
and the proposal generating module is used for generating the technical scheme proposal according to technical scheme proposal constituting elements edited by each flow node and preset technical scheme proposal constituting rules when the complete compiling flow is executed to the appointed flow node.
The embodiment of the invention also provides computer equipment which comprises a memory, a processor and a computer program which is stored on the memory and can run on the processor, wherein the processor executes the computer program to realize the technical scheme proposal management method based on the block chain.
An embodiment of the present invention further provides a computer-readable storage medium, where a computer program for executing the above technical solution recommendation management method based on a block chain is stored in the computer-readable storage medium.
In the embodiment of the invention, the technical scheme proposal constituent elements are stored by using the block chain network, so that the proposal constituent elements are not easy to be falsified, are not easy to be omitted when being frequently changed, and can effectively trace the change history; after one of the components is changed, an editing notification is sent to the next process node in time according to the process node where the editing operation occurs and the complete compiling process, so that the next process node is reminded to change the components of the process node according to the editing content of the previous process node, and therefore related persons can obtain the editing notification in time and carry out corresponding adjustment in time, and the office efficiency is improved; and then, when the complete compiling process is executed to the appointed process node, the technical scheme proposal can be generated according to the constituent elements stored by each process node, so that the automatic collection of the constituent elements and the compiling of the technical scheme proposal are realized, the manpower and material resources are greatly liberated, and the generating efficiency of the technical scheme proposal is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts. In the drawings:
FIG. 1 is a flowchart of a block chain based method for proposal recommendation management in an embodiment of the present invention;
FIG. 2 is another flowchart of a block chain based method for proposal recommendation management in an embodiment of the present invention;
FIG. 3 is another flowchart of a block chain based method for proposal recommendation management in an embodiment of the present invention;
FIG. 4 is a schematic structural diagram of a block chain-based technical proposal recommendation management apparatus according to an embodiment of the present invention;
fig. 5 is a system architecture diagram of a computer device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings. The exemplary embodiments and descriptions of the present invention are provided to explain the present invention, but not to limit the present invention.
An embodiment of the present invention provides a block chain-based technical solution proposal management method, as shown in fig. 1, the method includes:
step 101, receiving an editing operation of an operator on a technical scheme proposal component element stored in a block chain network, and determining a process node where the editing operation occurs.
The components are components of the technical solution recommendation, for example, the components include a product range defined by an architect, a written technical solution, a work instruction written by each product evaluator, and a review and confirmation of the work instruction by a developer and a tester.
Because the content responsible in the technical scheme proposal compiling process is different, the operator of each process node has different roles and has different role authorities. Specifically, the role authority includes auditing, reading only, and reading and writing, for example, an architect role is responsible for defining a product range and writing a technical scheme, and the role authority is readable and writable; and the roles of the developers and the testers are responsible for checking and confirming the working instruction, and the role authority is audit. Through the authority control of different roles, the condition that the responsible content of the operators in other roles is changed due to errors or other reasons and the like of the operators in one role can be avoided, and the safety is improved.
As shown in fig. 2, before receiving an editing operation of an operator on a technical proposal constituent element stored in a blockchain network, the following steps 201 and 202 may be further performed, and after the steps 201 and 202 are performed, the step 101 may be performed as the following step 1011:
201. and when detecting that the operator initiates an editing operation on the technical scheme proposal constituent elements stored in the block chain network, acquiring the role authority of the operator.
202. And judging whether the editing operation is in the role authority range of the operator.
1011. And if the editing operation is within the role authority range of the operator, receiving the editing operation of the operator, and determining the flow node where the editing operation occurs.
Specifically, whether the editing operation occurs may be detected by inputting content in the input box, or whether the editing operation occurs may be detected by whether an operator triggers an editing button, and the detection of the editing operation may be implemented by an existing scheme in the prior art, which is not limited herein.
In the embodiment of the invention, the role authority of the operator can be determined according to the login account of the operator, or the role of the operator can be determined according to the login account of the operator, so that the role authority of the operator is further determined. When the role authority is directly determined through the login account, the block chain network stores the corresponding relation between the login account and the role authority; when the role is determined through the login account and then the role authority is determined, the corresponding relationship of the login account, the account and the role authority is stored in the block chain network, for example, the login account of an operator is jiagou, the role of the account is determined to be an architect, and the role authority is readable and writable.
Operations within the role authority range are accepted, operations not within the role authority range are rejected, for example, if the role authority of the architect is readable and writable, the architect is accepted in the input technical scheme, and the auditing operation of the architect on the work instruction is rejected; if the role authority of the developer is audit, the operation of the developer who wants to modify the work description is rejected, and the operation of auditing the work description is accepted.
Each flow node corresponds to a node in the block chain, different nodes store different components, and after determining which part of the components are edited, it can be determined which flow node is subjected to editing operation.
It should be noted that the editing operation includes inputting the content of a completely new component in a newly initiated technical proposal authoring flow, and also includes modifying the content of some or all of the components in an edited technical proposal authoring flow.
And 102, sending an editing notification to a next process node of the process node subjected to the editing operation according to a preset complete editing process so that an operator of the next process node can edit the technical scheme proposal constituent elements of the process node.
The preset complete writing process comprises a fixed operation sequence of each process node, for example, a first process node is used for an architect to define a product range and edit a technical scheme; after the architect finishes editing, pushing the flow to a second flow node, and writing a working description for the product evaluator by the second flow node; after the work instruction is compiled, the whole process is pushed to the third process node to confirm the work instruction for developers and testers, so that the progress of the process nodes one by one ensures the orderly compiling of the technical proposal.
In the embodiment of the present invention, a certain flow node may need multiple operators to edit together, for example, after an architect defines a product range, a product evaluator of each defined product needs to be notified to write a work description, and after a flow is pushed to the flow node written by the work description, multiple corresponding operators of the flow node may be notified to edit according to the defined product. For other process nodes, a plurality of operators may be notified to perform editing according to the editing content of the process node.
Considering that, possibly, after a component of a certain flow node is changed, a previous flow node needs to be changed correspondingly except for a subsequent flow node, or a part of the subsequent flow node needs to be changed correspondingly, and other flow nodes do not need to be changed, in the embodiment of the present invention, a preset complete writing flow includes a correlation between the flow node and the flow node, and after a technical scheme proposal component of one of the flow nodes having the correlation is changed, the technical scheme proposal components of other flow nodes are changed correspondingly, so that a relevant related person can be ensured to receive an editing notification in time, thereby ensuring the consistency of the technical scheme proposal content.
Thus, as shown in fig. 3, step 102, according to the preset complete compiling flow, sends an editing notification to the next flow node of the flow node where the editing operation occurs, so that the operator of the next flow node edits the technical solution proposal component of the flow node, and may be executed as following step 1021:
and 1021, sending the editing notification to other process nodes which have the correlation with the process node having the editing operation according to the correlation between the process node and the process node, and sequentially sending the editing notification according to the sequence in the complete editing process so that the operator of the process node having the correlation edits the technical scheme proposal composition element of the process node.
The edit notification may include an edit record of the previous process node, so that the operator receiving the edit notification can clarify the content edited by the previous operator without checking one by one.
The operator of the process node that has received the edit notification may or may not modify the constituent elements of the process node according to the edit content of the previous operator. Whether or not the modification is made depends on the actual situation.
And 103, when the complete compiling process is executed to the designated process nodes, generating the technical scheme proposal according to the technical scheme proposal constituting elements edited by each process node and the preset technical scheme proposal constituting rules.
The preset technical proposal forming rules are used for standardizing how to generate a complete technical proposal according to the forming elements. For example, in the technical proposal recommendation, the first part of content is the work instruction, the second part of content is the technical proposal content, the text part of the text uses song body, the title adopts bold song body, and the like. The construction rules of the technical proposal can be set according to actual needs.
In order to enable the editing process to be traced, in the embodiment of the invention, an editing record is generated according to each editing operation of the technical scheme proposal constituent elements, and the editing record comprises changed content, changed time, operator name and changed reason; all edit records are stored to the blockchain network. The change reason can be filled by an operator, and the name of the operator can be determined according to the login account of the operator. Every modification is recorded, specific editing contents can be recorded to a certain operator, and tracing and management and control are facilitated.
In the embodiment of the invention, the technical scheme proposal constituent elements are stored by using the block chain network, so that the proposal constituent elements are not easy to be falsified, are not easy to be omitted when being frequently changed, and can effectively trace the change history; after one of the components is changed, an editing notification is sent to the next process node in time according to the process node where the editing operation occurs and the complete compiling process, so that the next process node is reminded to change the components of the process node according to the editing content of the previous process node, and therefore related persons can obtain the editing notification in time and carry out corresponding adjustment in time, and the office efficiency is improved; and then, when the complete compiling process is executed to the appointed process node, the technical scheme proposal can be generated according to the constituent elements stored by each process node, so that the automatic collection of the constituent elements and the compiling of the technical scheme proposal are realized, the manpower and material resources are greatly liberated, and the generating efficiency of the technical scheme proposal is improved.
The embodiment of the invention also provides a technical scheme proposal management device based on the block chain, which is described in the following embodiment. Because the principle of solving the problem of the device is similar to the technical scheme proposal management method based on the block chain, the implementation of the device can refer to the implementation of the technical scheme proposal management method based on the block chain, and repeated parts are not repeated.
As shown in fig. 4, the apparatus 400 includes:
a communication module 401, configured to receive an editing operation of an operator on a technical solution recommendation component stored in a blockchain network, where a determination module 402 determines a process node where the editing operation occurs;
the communication module 401 is further configured to send an editing notification to a next process node of the process node where the editing operation occurs according to a preset complete editing process, so that an operator of the next process node edits a technical scheme recommendation component of the process node;
the proposal generating module 403 is configured to generate a technical solution proposal according to technical solution proposal constituting elements edited by each flow node and preset technical solution proposal constituting rules when the complete compiling flow is executed to the designated flow node.
In an implementation manner of the embodiment of the present invention, the apparatus further includes:
the recording module is used for generating an editing record according to each editing operation of the technical scheme proposal constituent elements, and the editing record comprises changed contents, changed time, operator names and changed reasons;
and the storage module is used for storing all the editing records to the block chain network.
In an implementation manner of the embodiment of the present invention, a preset complete compiling flow includes a correlation between a flow node and a flow node, and after a technical scheme proposal constituent element of one flow node in the flow nodes having the correlation is changed, technical scheme proposal constituent elements of other flow nodes are changed correspondingly;
a communication module to:
and according to the correlation between the process nodes and the process nodes, sequentially sending an editing notification to other process nodes which have correlation with the process nodes in which the editing operation occurs according to the sequence in the complete writing process.
In an implementation manner of the embodiment of the present invention, an operator of each process node has different role permissions, and the role permissions include auditing, read-only, readable and writable;
the device still includes:
the acquisition module is used for acquiring the role authority of the operator when detecting that the operator initiates an editing operation on the technical scheme proposal constituent elements stored in the block chain network;
the judging module is used for judging whether the editing operation is within the role authority range of the operator;
a communication module to: and when the editing operation is within the role authority range of the operator, receiving the editing operation of the operator.
In the embodiment of the invention, the technical scheme proposal constituent elements are stored by using the block chain network, so that the proposal constituent elements are not easy to be falsified, are not easy to be omitted when being frequently changed, and can effectively trace the change history; after one of the components is changed, an editing notification is sent to the next process node in time according to the process node where the editing operation occurs and the complete compiling process, so that the next process node is reminded to change the components of the process node according to the editing content of the previous process node, and therefore related persons can obtain the editing notification in time and carry out corresponding adjustment in time, and the office efficiency is improved; and then, when the complete compiling process is executed to the appointed process node, the technical scheme proposal can be generated according to the constituent elements stored by each process node, so that the automatic collection of the constituent elements and the compiling of the technical scheme proposal are realized, the manpower and material resources are greatly liberated, and the generating efficiency of the technical scheme proposal is improved.
An embodiment of the present invention further provides a computer device, and fig. 5 is a schematic diagram of the computer device in the embodiment of the present invention, where the computer device is capable of implementing all steps in the technical solution proposal recommendation management method based on a block chain in the embodiment of the present invention, and the computer device specifically includes the following contents:
a processor (processor)501, a memory (memory)502, a communication Interface (Communications Interface)503, and a communication bus 504;
the processor 501, the memory 502 and the communication interface 503 complete mutual communication through the communication bus 504; the communication interface 503 is used for implementing information transmission between related devices;
the processor 501 is used to call the computer program in the memory 502, and when the processor executes the computer program, the above-mentioned method for managing technical proposal based on block chain is realized.
An embodiment of the present invention further provides a computer-readable storage medium, where a computer program for executing the above technical solution recommendation management method based on a block chain is stored in the computer-readable storage medium.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are only exemplary embodiments of the present invention, and are not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. A technical scheme proposal management method based on block chains is characterized by comprising the following steps:
receiving the editing operation of an operator on the technical scheme proposal constituent elements stored in the block chain network, and determining the flow nodes where the editing operation occurs;
sending an editing notification to a next process node of the process node subjected to the editing operation according to a preset complete editing process so that an operator of the next process node can edit the technical scheme proposal constituent elements of the process node;
and when the complete compiling process is executed to the appointed process node, generating the technical scheme proposal according to the technical scheme proposal constituting elements edited by each process node and the preset technical scheme proposal constituting rules.
2. The method of claim 1, further comprising:
generating an editing record according to each editing operation of the technical scheme proposal constituent elements, wherein the editing record comprises changed content, changed time, operator name and changed reason;
all edit records are stored to the blockchain network.
3. The method according to claim 1, wherein the preset complete compiling flow includes the correlation between the process nodes and the process nodes, and after the technical solution proposal constituent element of one of the process nodes having the correlation is changed, the technical solution proposal constituent elements of other process nodes are changed correspondingly;
the sending of the editing notification to the next process node of the process node where the editing operation occurs according to the preset complete editing process includes:
and according to the correlation between the process nodes and the process nodes, sequentially sending an editing notification to other process nodes which have correlation with the process nodes in which the editing operation occurs according to the sequence in the complete writing process.
4. The method according to any one of claims 1 to 3, wherein the operator of each process node has different role rights, including auditing, read-only, and read-writable;
before receiving an editing operation of an operator on a technical solution proposal component element stored in the blockchain network, the method further comprises the following steps:
when detecting that an operator initiates an editing operation on a technical scheme proposal constituent element stored in a block chain network, acquiring the role authority of the operator;
judging whether the editing operation is within the role authority range of an operator;
receiving an editing operation of an operator on technical scheme proposal constituent elements stored in a blockchain network, wherein the editing operation comprises the following steps:
and if the editing operation is within the role authority range of the operator, receiving the editing operation of the operator.
5. A block chain based solution proposal management apparatus, comprising:
the communication module is used for receiving the editing operation of an operator on the technical scheme proposal constituent elements stored in the block chain network, and the determining module determines the flow nodes of the editing operation;
the communication module is also used for sending an editing notification to a next process node of the process node with the editing operation according to a preset complete editing process so that an operator of the next process node can edit the technical scheme recommendation constituting elements of the process node;
and the proposal generating module is used for generating the technical scheme proposal according to technical scheme proposal constituting elements edited by each flow node and preset technical scheme proposal constituting rules when the complete compiling flow is executed to the appointed flow node.
6. The apparatus of claim 5, further comprising:
the recording module is used for generating an editing record according to each editing operation of the technical scheme proposal constituent elements, wherein the editing record comprises changed contents, changed time, operator names and changed reasons;
and the storage module is used for storing all the editing records to the block chain network.
7. The apparatus according to claim 5, wherein the preset complete compiling flow includes the correlation between the process nodes and the process nodes, and after the technical solution proposal constituent element of one of the process nodes having the correlation is changed, the technical solution proposal constituent elements of other process nodes are changed correspondingly;
a communication module to:
and according to the correlation between the process nodes and the process nodes, sequentially sending an editing notification to other process nodes which have correlation with the process nodes in which the editing operation occurs according to the sequence in the complete writing process.
8. The apparatus according to any one of claims 5 to 7, wherein the operator of each process node has different role rights, the role rights including audit, read-only, and read-writable;
the device further comprises:
the system comprises an acquisition module, a processing module and a processing module, wherein the acquisition module is used for acquiring the role permission of an operator when the operator is detected to initiate the editing operation on the technical scheme proposal constituent elements stored in the block chain network;
the judging module is used for judging whether the editing operation is within the role authority range of an operator;
a communication module to: and when the editing operation is within the role authority range of the operator, receiving the editing operation of the operator.
9. A computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor implements the method of any one of claims 1 to 4 when executing the computer program.
10. A computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer program for executing the method of any one of claims 1 to 4.
CN202111226148.3A 2021-10-21 2021-10-21 Technical scheme proposal management method and device based on block chain Pending CN113935715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111226148.3A CN113935715A (en) 2021-10-21 2021-10-21 Technical scheme proposal management method and device based on block chain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111226148.3A CN113935715A (en) 2021-10-21 2021-10-21 Technical scheme proposal management method and device based on block chain

Publications (1)

Publication Number Publication Date
CN113935715A true CN113935715A (en) 2022-01-14

Family

ID=79280748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111226148.3A Pending CN113935715A (en) 2021-10-21 2021-10-21 Technical scheme proposal management method and device based on block chain

Country Status (1)

Country Link
CN (1) CN113935715A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108920514A (en) * 2018-05-31 2018-11-30 百度在线网络技术(北京)有限公司 A kind of information storage means based on block chain, device, equipment and storage medium
CN112269572A (en) * 2020-10-26 2021-01-26 北京知道未来信息技术有限公司 Flow processing method, device, server and computer readable storage medium
CN112800742A (en) * 2021-04-14 2021-05-14 北京智慧易科技有限公司 Method, system and equipment for compiling standard file
CN112887078A (en) * 2021-02-02 2021-06-01 中国银联股份有限公司 Method and device for editing blocks in block chain
CN113408259A (en) * 2021-06-09 2021-09-17 微易签(杭州)科技有限公司 Method, system, device and storage medium for filling in files based on block chain

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108920514A (en) * 2018-05-31 2018-11-30 百度在线网络技术(北京)有限公司 A kind of information storage means based on block chain, device, equipment and storage medium
CN112269572A (en) * 2020-10-26 2021-01-26 北京知道未来信息技术有限公司 Flow processing method, device, server and computer readable storage medium
CN112887078A (en) * 2021-02-02 2021-06-01 中国银联股份有限公司 Method and device for editing blocks in block chain
CN112800742A (en) * 2021-04-14 2021-05-14 北京智慧易科技有限公司 Method, system and equipment for compiling standard file
CN113408259A (en) * 2021-06-09 2021-09-17 微易签(杭州)科技有限公司 Method, system, device and storage medium for filling in files based on block chain

Similar Documents

Publication Publication Date Title
US8949770B2 (en) Automated management of software requirements verification
CN112184177B (en) Project supervision method, equipment and storage medium
Bittner et al. Feature trace recording
CN111274136B (en) Onboard software test management system and test process management method
CN105573274A (en) TS16949 association object control method based on PLM system
Foundjem et al. Release synchronization in software ecosystems: Empirical Study on OpenStack
CN113935715A (en) Technical scheme proposal management method and device based on block chain
Fagerström et al. Verdict machinery: On the need to automatically make sense of test results
Flink et al. Orchestrating tool chains for model-based systems engineering with RCE
Li Jira 8 Essentials: Effective issue management and project tracking with the latest Jira features
CN110471681A (en) Automatic variation, system, device and the storage medium of application program
CN115185825A (en) Interface test scheduling method and device
CN114911773A (en) Universal meta-model design method
Al-Saiyd The impact of reusing open-source software model in software maintenance
Song et al. Lessons from developing nonfunctional requirements for a software platform
Di Ciccio12 et al. Studies on the discovery of declarative control flows from error-prone data
CN111026654A (en) Automatic testing method based on interface
Geisser et al. Evaluating the applicability of requirements engineering tools for distributed software development
Store Qualities and Issues of Branching: A Method Proposal for Formulating a Branching Strategy
Duangkeaw et al. Monitoring Call activity and Service Task Invocations for BPMN
Javed et al. Automated inconsistency detection in feature models: A generative programming based approach
CN103455324A (en) Model for business development process
Yousef et al. Service traceability in SOA-based software systems: a traceability network add-in for BPAOntoSOA framework
Armstrong et al. Release synchronization in software ecosystems
Liaghat et al. Using Reo Formalism for Compliance Checking of Architecture Evolution with Evolutionary Rules

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination