CN113913585A - Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag - Google Patents

Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag Download PDF

Info

Publication number
CN113913585A
CN113913585A CN202010664842.2A CN202010664842A CN113913585A CN 113913585 A CN113913585 A CN 113913585A CN 202010664842 A CN202010664842 A CN 202010664842A CN 113913585 A CN113913585 A CN 113913585A
Authority
CN
China
Prior art keywords
slag
molten iron
desulfurized
desulphurization
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010664842.2A
Other languages
Chinese (zh)
Other versions
CN113913585B (en
Inventor
洪建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Meishan Iron and Steel Co Ltd
Original Assignee
Shanghai Meishan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Meishan Iron and Steel Co Ltd filed Critical Shanghai Meishan Iron and Steel Co Ltd
Priority to CN202010664842.2A priority Critical patent/CN113913585B/en
Publication of CN113913585A publication Critical patent/CN113913585A/en
Application granted granted Critical
Publication of CN113913585B publication Critical patent/CN113913585B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/064Dephosphorising; Desulfurising
    • C21C7/0645Agents used for dephosphorising or desulfurising
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The invention discloses a method for reducing the proportion of large-size desulfurized slag in molten iron desulfurized slag, which mainly solves the technical problems of high proportion of large-size desulfurized slag and low cooling efficiency of the molten iron desulfurized slag in the existing molten iron desulfurized slag treatment process. The technical scheme is that the method for reducing the proportion of the large-size desulfurized slag in the molten iron desulfurized slag comprises the following steps: 1) adding hot-rolled iron scale into the molten iron desulphurization slag empty slag tank; 2) pouring molten iron desulphurization slag into a molten iron desulphurization slag tank filled with hot-rolled iron scale, and controlling the volume of the molten iron desulphurization slag to be less than or equal to 50% of the volume of the molten iron desulphurization slag tank; 3) carrying out digestion treatment on the molten iron desulphurization slag by using water; 4) slag turning is carried out on the desulfurized slag in the molten iron desulfurized slag tank; 5) and crushing the molten iron desulphurization slag subjected to digestion treatment, and carrying out magnetic separation on the crushed desulphurization slag. The method provided by the invention reduces the proportion of the molten iron desulphurization slag with the block diameter of more than or equal to 500mm in the molten iron desulphurization slag by 25%, and reduces the treatment cost of the molten iron desulphurization slag.

Description

Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag
Technical Field
The invention relates to a method for recycling iron in molten iron treatment slag, in particular to a method for reducing the proportion of large-size desulfurized slag in molten iron desulfurized slag, and specifically relates to a method for recycling iron in molten iron desulfurized slag by reducing the proportion of large-size desulfurized slag in molten iron desulfurized slag.
Background
A large amount of waste slag is generated in the production process of ferrous metallurgy, including converter slag, desulfurized slag, casting slag and the like. The main components of the waste residue comprise tricalcium silicate, dicalcium silicate and the like. After years of production practice, the comprehensive utilization technology of waste slag in the steel industry has been developed greatly, and the waste slag is processed by various production processes such as crushing, screening, magnetic separation and the like to finally produce products such as high-grade slag steel blocks, slag steel particles, slag steel powder, slag iron particles, slag iron powder and the like to be returned to steel production for reutilization, while the tailings products can be reused as building materials, cement raw materials, road pavement materials and the like, so that the emission of solid waste of steel is greatly reduced, and the environmental pollution is reduced.
The iron ore powder of the iron-making raw material contains a certain amount of sulfur, and before molten iron enters a steel-making furnace, desulfurization treatment must be carried out outside the furnace so as to reduce the sulfur content of the molten iron and improve the quality of steel. Adding desulfurizing agents such as lime, calcium carbide, soda ash, magnesium powder and the like into molten iron before the molten iron enters a converter for smelting, and carrying out operations such as stirring, slagging-off and the like to obtain the generated metallurgical slag, namely the desulfurized slag.
The skilled person usually refers to the desulfurized slag with the block diameter of more than or equal to 500mm as the large-block diameter desulfurized slag.
The general desulfurized slag treatment process comprises the steps of filling a desulfurized slag tank, adding water, cooling, quenching, turning over slag, carrying out solid-state crushing on desulfurized slag, sorting materials by using an electric trolley, returning iron slag blocks to a steel company, and taking the rest slag as a raw material for construction.
The process mainly has two problems in the cooling and quenching process, one is that the large-block diameter desulfurized slag is too much, the treatment is difficult, and the crushing operation cost is high; secondly, the cooling effect of the high-temperature large-block-diameter desulfurized slag is not ideal, and when the outer surface of the large-block-diameter desulfurized slag is cooled, the core part of the large-block-diameter desulfurized slag is still in a red slag state, so that red slag is contained, a large amount of dust is generated, spray explosion occurs in the slag dumping process, and great potential safety hazards are brought to field operators.
Chinese patent application publication No. CN1199099A discloses a modifying agent for desulfurized slag, which is characterized in that a sodium carbonate desulfurized slag modifying agent is added to desulfurized slag on the surface of a ladle to improve the desulfurization effect, and desulfurized slag is scraped into a slag pot after desulfurization, so that iron is inevitably carried in during the slag scraping process, and slag iron is formed, so that the above problems are not solved by the present patent.
The application publication No. CN104120205A discloses a method for recycling iron in molten iron desulphurization slag, which realizes the recycling of iron in the molten iron desulphurization slag by digesting and crushing the molten iron desulphurization slag, reasonably screening and magnetically separating the molten iron desulphurization slag, but the generation of the desulphurization slag with the block diameter of more than or equal to 500mm can not be controlled from the source.
The prior art lacks a method for effectively reducing the proportion of large-block-diameter desulfurized slag in molten iron desulfurized slag.
Disclosure of Invention
The invention aims to provide a method for reducing the proportion of large-diameter desulfurized slag in molten iron desulfurized slag, which mainly solves the technical problems of high proportion of large-diameter desulfurized slag and low cooling efficiency of the molten iron desulfurized slag in the existing molten iron desulfurized slag treatment process.
The method improves the cooling efficiency of the molten iron desulphurization slag by reducing the proportion of the large-block-diameter desulphurization slag in the molten iron desulphurization slag, thoroughly eliminates the potential safety hazard of the molten iron desulphurization slag treatment operation, improves the recovery rate of iron in the molten iron desulphurization slag, and reduces the recovery cost of iron in the molten iron desulphurization slag.
The technical scheme of the invention is that the method for reducing the proportion of large-diameter desulfurized slag in molten iron desulfurized slag comprises the following steps:
1) adding hot-rolled iron scale into the molten iron desulphurization slag empty tank, wherein the adding amount of the hot-rolled iron scale is 5-10% of the mass of the desulphurization slag planned to be processed by a single tank;
2) pouring molten iron desulphurization slag into a molten iron desulphurization slag tank filled with hot-rolled iron scale, and controlling the volume of the molten iron desulphurization slag to be less than or equal to 50% of the volume of the molten iron desulphurization slag tank;
3) carrying out digestion treatment on the molten iron desulphurization slag by using water, wherein the digestion time is 28-32 h;
4) turning the desulfurized slag in the molten iron desulfurized slag tank, and pouring the desulfurized slag in the molten iron desulfurized slag tank into a slag pool when the temperature of the outer surface of the side wall of the molten iron desulfurized slag tank and the outer surface of the bottom of the tank is less than or equal to 150 ℃;
5) the method comprises the steps of crushing the molten iron desulphurization slag subjected to digestion treatment, crushing the desulphurization slag in a slag pool by a drop hammer method, carrying out magnetic separation on the crushed desulphurization slag, wherein the block diameter of the molten iron desulphurization slag is more than or equal to 10mm, and the molten iron desulphurization slag is used in a steel-returning process or an iron-making process, and is used as a building raw material with the block diameter of less than 10 mm.
Further, in the step 3), the height between the opening of the slag tank and the slag pool is controlled to be less than or equal to 200mm in the process of turning the desulfurized slag in the molten iron desulfurized slag tank.
The block diameter of the large-block-diameter desulphurization slag is more than or equal to 500 mm.
The method of the invention is based on the following research of the applicant:
through years of experimental research, the applicant finds that the excessive amount of molten iron desulphurization slag in a molten iron desulphurization slag tank causes insufficient water quenching treatment of the molten iron desulphurization slag, the internal molten iron desulphurization slag is wrapped together in the cooling process to form large-diameter desulphurization slag, the block diameter of the large-diameter desulphurization slag is larger than or equal to 500mm, the hardness of the large-diameter desulphurization slag is high, the crushing is difficult, the crushing efficiency is low, the large-diameter desulphurization slag is generally decomposed into small-diameter desulphurization slag through a flame cutting process, and the treatment cost of the molten iron desulphurization slag is greatly increased.
The invention adds hot rolling iron scale in the molten iron desulphurization slag empty slag tank, the main component of the hot rolling iron scale is ferric oxide, and W [ FeO ] in the hot rolling iron scale]Not less than 75 percent, carbon can be precipitated from the desulfurized slag containing molten iron in the natural cooling process, the exothermic reductive reaction can be carried out once the carbon meets iron oxide, and the reaction formula is C +2 FeO-2 Fe + CO2×) ×; the reaction is exothermic, and prevents molten iron in the desulfurized slag from wrapping all components together due to natural cooling interconnection to generate large desulfurized slag iron blocks, so that the formation of large desulfurized blocks is reduced, and hot rolled iron scale is a solid waste resource generated by steel companies and required to be treated, so that the resource is sufficient, and the enterprise cost is not increased. Through multiple tests, the addition amount is 5-10% of the amount of the desulphurization slag processed by the slag pot plan.
According to the invention, the slag removing amount in the desulfurization slag tank is not more than half of the volume of the slag tank, water is added for quenching treatment, the water reacts with calcium oxide in the desulfurization slag to expand, the expansion force destroys the just formed slag iron block or prevents the formation of slag iron blocks, and further the generation amount of the desulfurization slag iron blocks is reduced. The principle that free calcium oxide in the slag reacts with water to produce light calcium oxide and has an expansion effect is utilized, so that the desulfurization slag is loosened due to expansion, the desulfurization slag is promoted to be fully separated from iron particles and iron powder, and the chemical reaction is as follows: CaO + H2O=Ca(OH)2
The quenching time of the water quenching and cooling is not less than 28h, so that the components in the slag are fully reacted, and the red slag in the slag is fully cooled, so that the problems that the red slag is contained, a large amount of dust is generated and spray explosion occurs in the slag dumping process due to non-ideal cooling effect are avoided, and great potential safety hazards are brought to field operators.
Through years of experimental research, the applicant finds that when the temperature of the side and the bottom of the slag tank is not higher than 150 ℃, the interior of the desulphurization slag does not contain red slag, and the slag turning operation is safe and controllable.
Compared with the prior art, the invention has the following positive effects: 1. the method provided by the invention reduces the proportion of the molten iron desulphurization slag with the block diameter of more than or equal to 500mm in the molten iron desulphurization slag by 25%, and reduces the treatment cost of the molten iron desulphurization slag. 2. The desulphurization slag has good quenching effect, no red slag or spray explosion phenomenon occurs during slag turning, and the operation safety of molten iron desulphurization slag treatment is improved.
Detailed Description
The invention is further described below with reference to specific examples.
Embodiment 1, a method for reducing the proportion of large-size desulfurized slag in molten iron desulfurized slag comprises the following steps:
1) adding hot-rolled iron scale into the molten iron desulphurization slag empty tank, wherein the adding amount of the hot-rolled iron scale is 5-10% of the mass of the desulphurization slag planned to be processed by a single tank;
2) pouring molten iron desulphurization slag into a molten iron desulphurization slag tank filled with hot-rolled iron scale, and controlling the volume of the molten iron desulphurization slag to be less than or equal to 50% of the volume of the molten iron desulphurization slag tank;
3) carrying out digestion treatment on the molten iron desulphurization slag by using water, wherein the digestion time is 30 h;
4) turning the desulfurized slag in the molten iron desulfurized slag tank, and pouring the desulfurized slag in the molten iron desulfurized slag tank into a slag pool when the temperature of the outer surface of the side wall of the molten iron desulfurized slag tank and the outer surface of the bottom of the tank is less than or equal to 100 ℃, wherein the height between the tank opening of the slag tank and the slag pool is controlled to be less than or equal to 200mm in the process of turning the slag;
5) the method comprises the steps of crushing the molten iron desulphurization slag subjected to digestion treatment, crushing the desulphurization slag in a slag pool by a drop hammer method, carrying out magnetic separation on the crushed desulphurization slag, wherein the block diameter of the molten iron desulphurization slag is more than or equal to 10mm, and the molten iron desulphurization slag is used in a steel-returning process or an iron-making process, and is used as a building raw material with the block diameter of less than 10 mm.
The method comprises the following steps that the desulfurized iron slag blocks generated by an original process of a certain company for five months continuously are 3856 tons, 4181 tons, 4021 tons, 3998 tons, 4032 tons and 3958 tons respectively, after the method is adopted, the desulfurized iron slag blocks generated by the company for five months continuously are 2716 tons, 2937 tons, 2806 tons, 2935 tons and 2886 tons respectively, and the reduction amounts of the desulfurized iron slag blocks are 29.56%, 29.75%, 29.81%, 27.20% and 27.08% respectively; meanwhile, red slag and dust are not generated in all slag turning processes, and spray explosion is avoided, so that the safety of operating personnel and operating equipment is greatly improved, and the environmental pollution is reduced.
In addition to the above embodiments, the present invention may have other embodiments. All technical solutions formed by adopting equivalent substitutions or equivalent transformations fall within the protection scope of the claims of the present invention.

Claims (2)

1. A method for reducing the proportion of large-size desulfurized slag in molten iron desulfurized slag is characterized by comprising the following steps:
1) adding hot-rolled iron scale into the molten iron desulphurization slag empty tank, wherein the adding amount of the hot-rolled iron scale is 5-10% of the mass of the desulphurization slag planned to be processed by a single tank;
2) pouring molten iron desulphurization slag into a molten iron desulphurization slag tank filled with hot-rolled iron scale, and controlling the volume of the molten iron desulphurization slag to be less than or equal to 50% of the volume of the molten iron desulphurization slag tank;
3) carrying out digestion treatment on the molten iron desulphurization slag by using water, wherein the digestion time is 28-32 h;
4) turning the desulfurized slag in the molten iron desulfurized slag tank, and pouring the desulfurized slag in the molten iron desulfurized slag tank into a slag pool when the temperature of the outer surface of the side wall of the molten iron desulfurized slag tank and the outer surface of the bottom of the tank is less than or equal to 150 ℃;
5) the method comprises the steps of crushing the molten iron desulphurization slag subjected to digestion treatment, crushing the desulphurization slag in a slag pool by a drop hammer method, carrying out magnetic separation on the crushed desulphurization slag, wherein the block diameter of the molten iron desulphurization slag is more than or equal to 10mm, and the molten iron desulphurization slag is used in a steel-returning process or an iron-making process, and is used as a building raw material with the block diameter of less than 10 mm.
2. The method for reducing the proportion of the large slag iron in the molten iron desulphurization slag according to claim 1, wherein in the step 3), when the desulphurization slag in the molten iron desulphurization slag tank is turned, the height between the tank opening of the slag tank and the slag pool is controlled to be less than or equal to 200 mm.
CN202010664842.2A 2020-07-10 2020-07-10 Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag Active CN113913585B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010664842.2A CN113913585B (en) 2020-07-10 2020-07-10 Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010664842.2A CN113913585B (en) 2020-07-10 2020-07-10 Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag

Publications (2)

Publication Number Publication Date
CN113913585A true CN113913585A (en) 2022-01-11
CN113913585B CN113913585B (en) 2023-01-20

Family

ID=79232366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010664842.2A Active CN113913585B (en) 2020-07-10 2020-07-10 Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag

Country Status (1)

Country Link
CN (1) CN113913585B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5562113A (en) * 1978-11-06 1980-05-10 Kenji Kumagai Preparation of soluble agent for desulfurization slag for blast furnace, in accumulating mixer or topedocar using sodium or potassium feldspar
JPH08193210A (en) * 1995-01-18 1996-07-30 Nkk Corp Method for using metal in molten slag
CN101338348A (en) * 2008-07-28 2009-01-07 武汉钢铁(集团)公司 Slag diluent for molten iron desulphurization slag
CN102168163A (en) * 2011-03-23 2011-08-31 上海梅山钢铁股份有限公司 Heating slag melting agent for smelting low-silicon liquid iron and preparation method of the heating slag melting agent
CN103031410A (en) * 2011-11-29 2013-04-10 新疆八一钢铁股份有限公司 Method for treating desulfuration residue by preparing efficient blocker with waste materials of steelmaking
CN104032094A (en) * 2014-06-19 2014-09-10 攀钢集团攀枝花钢铁研究院有限公司 Desulfurization slag modifying agent and molten iron desulfurization method
CN104120205A (en) * 2013-04-28 2014-10-29 上海梅山钢铁股份有限公司 Method for recycling iron in molten iron desulphurization residue
CN104789718A (en) * 2015-03-13 2015-07-22 中冶宝钢技术服务有限公司 Steel slag recycling method
CN105039637A (en) * 2015-08-18 2015-11-11 攀钢集团攀枝花钢铁研究院有限公司 Magnesium-bearing cooling agent for extracting vanadium and preparation method of magnesium-bearing cooling agent

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5562113A (en) * 1978-11-06 1980-05-10 Kenji Kumagai Preparation of soluble agent for desulfurization slag for blast furnace, in accumulating mixer or topedocar using sodium or potassium feldspar
JPH08193210A (en) * 1995-01-18 1996-07-30 Nkk Corp Method for using metal in molten slag
CN101338348A (en) * 2008-07-28 2009-01-07 武汉钢铁(集团)公司 Slag diluent for molten iron desulphurization slag
CN102168163A (en) * 2011-03-23 2011-08-31 上海梅山钢铁股份有限公司 Heating slag melting agent for smelting low-silicon liquid iron and preparation method of the heating slag melting agent
CN103031410A (en) * 2011-11-29 2013-04-10 新疆八一钢铁股份有限公司 Method for treating desulfuration residue by preparing efficient blocker with waste materials of steelmaking
CN104120205A (en) * 2013-04-28 2014-10-29 上海梅山钢铁股份有限公司 Method for recycling iron in molten iron desulphurization residue
CN104032094A (en) * 2014-06-19 2014-09-10 攀钢集团攀枝花钢铁研究院有限公司 Desulfurization slag modifying agent and molten iron desulfurization method
CN104789718A (en) * 2015-03-13 2015-07-22 中冶宝钢技术服务有限公司 Steel slag recycling method
CN105039637A (en) * 2015-08-18 2015-11-11 攀钢集团攀枝花钢铁研究院有限公司 Magnesium-bearing cooling agent for extracting vanadium and preparation method of magnesium-bearing cooling agent

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘勇等: "铁水喷吹脱硫渣新型隔断剂的开发试验", 《特殊钢》 *
张明博: "低钛高炉渣制备LF精炼渣及其脱硫性能与实验研究", 《北方钒钛》 *
石枚梅等: "铁水预处理KR脱硫渣特点和资源化处理工艺的开发", 《特殊钢》 *

Also Published As

Publication number Publication date
CN113913585B (en) 2023-01-20

Similar Documents

Publication Publication Date Title
Jayasankar et al. Production of pig iron from red mud waste fines using thermal plasma technology
JP5560947B2 (en) Method for recovering iron and phosphorus from steelmaking slag, blast furnace slag fine powder or blast furnace slag cement, and phosphoric acid resource raw material
CN109022644B (en) Method for recovering slag desulfurization and dephosphorization in cooperation with ferrite in full-three-removal process
CN110106312B (en) Process for producing LF (ladle furnace) slagging agent by using electrolytic aluminum carbon slag
CN115679097B (en) Method for recycling ironmaking gas ash by using converter slag and refining dust
CN113493868A (en) High scrap ratio converter smelting method based on molten reduced molten iron
CN110073161B (en) Electric stove
CN112342375A (en) Method for recovering iron in metallurgical dust and mud
CN115505745A (en) Method for treating fly ash in sintering process by using steel slag thermal coupling technology
EP1198599B1 (en) Method for conditioning slag with the addition of metallurgical residual materials and an installation for the same
CN112981028B (en) Method for extracting iron element from red mud
CN111139332B (en) Slag former and light and thin scrap steel mixed processing furnace entering process
CN113913585B (en) Method for reducing proportion of large-size desulfurized slag in molten iron desulfurized slag
JP5720497B2 (en) Method for recovering iron and phosphorus from steelmaking slag
CN115716738B (en) Production process of high-strength steel slag brick
CN108558244B (en) Device and method for preparing cement mixture by utilizing thermal state converter slag
JP7311683B1 (en) Method and system for combining copper slag recycling and CO2 mineralization with solid industrial waste
US4010023A (en) Manufacture of alumina for use in the basic oxygen furnace
JP5712747B2 (en) Method for recovering iron and phosphorus from steelmaking slag
JPH0141681B2 (en)
JPH0375615B2 (en)
CN108220521A (en) A kind of desiliconization of hot metal agent and its application method using iron red mud as matrix
JPH02239138A (en) Method for reforming steel making slag
JP2757707B2 (en) Hot metal dephosphorization slag treatment method
KR101863916B1 (en) Composition of Steelmaking Flux for Desulfurization and Deoxidation Using By-proudut of Magnesium Smelting Process and Waste By-product of Aluminum Smelting Process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant