CN113867514A - Immersed liquid cooling Tank centralized power supply management method, device and equipment - Google Patents

Immersed liquid cooling Tank centralized power supply management method, device and equipment Download PDF

Info

Publication number
CN113867514A
CN113867514A CN202111139445.4A CN202111139445A CN113867514A CN 113867514 A CN113867514 A CN 113867514A CN 202111139445 A CN202111139445 A CN 202111139445A CN 113867514 A CN113867514 A CN 113867514A
Authority
CN
China
Prior art keywords
management
liquid cooling
board
cooling tank
management board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202111139445.4A
Other languages
Chinese (zh)
Inventor
肖沙沙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Inspur Intelligent Technology Co Ltd
Original Assignee
Suzhou Inspur Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Inspur Intelligent Technology Co Ltd filed Critical Suzhou Inspur Intelligent Technology Co Ltd
Priority to CN202111139445.4A priority Critical patent/CN113867514A/en
Publication of CN113867514A publication Critical patent/CN113867514A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/28Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/20Cooling means
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2200/00Indexing scheme relating to G06F1/04 - G06F1/32
    • G06F2200/20Indexing scheme relating to G06F1/20
    • G06F2200/201Cooling arrangements using cooling fluid
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Human Computer Interaction (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The application discloses management method, device and equipment for centralized power supply of immersed liquid cooling Tank, wherein each power supply rack Powershelf of immersed liquid cooling Tank corresponds to a management board, and the method comprises the following steps: the method comprises the steps that firstly, a main management board is identified according to the ID of each management board in the immersed liquid cooling Tank, then, the main management board is connected with other slave management boards through a preset fixed IP in a network mode, and then PSU management information in corresponding Powershelf is collected from other slave management boards through the network connection. Therefore, the state monitoring and centralized management of all power supplies in the immersed liquid cooling Tank can be realized, the power supply fault location can be accurately and timely carried out on the basis of reducing the power supply redundancy design cost, and the usability and maintainability of the product are improved.

Description

Immersed liquid cooling Tank centralized power supply management method, device and equipment
Technical Field
The present application relates to the field of computer technologies, and in particular, to a virtual network traffic visualization method, apparatus, and device based on OpenFlow.
Background
In the big data era, more and more enterprises begin to own their data centers to deal with the increasingly severe data and service challenges of users, and a large number of servers, storage devices and network devices exist in the data centers, consuming a large amount of energy and emitting a large amount of heat. Although sophisticated fanning calculations are still in wide use. But the cooling technology is required to be energy-saving and environment-friendly to create a brand-new green data center besides the technical problems of higher and more difficult temperature reduction. Under this background, the submerged liquid cooling technology is beginning to become the engine for boosting the new development of large data centers.
However, at present, a Tank cabinet is generally adopted for the immersed liquid cooling, and particularly, AI server nodes are increasingly applied to the immersed liquid cooling Tank. And computer nodes in the immersed liquid cooling Tank adopt a distributed power supply mode to supply power, so that the power supply redundancy of the PSU of the single-node server is realized. Each server node is supplied with power in a distributed mode, 1+1 redundancy is adopted for ensuring reliability, and for the whole Tank power supply, the redundant PSU power accounts for 50%, so that the design cost is high. With the increasing power consumption of a single-node server in the future, the power supply capacity of 1 54U immersed Tank may require more than 100KW, and the design redundancy cost caused by single-node distributed power supply is higher. Therefore, how to realize centralized power supply management of the immersed liquid cooling Tank so as to reduce design cost and reduce resource waste is a problem to be solved urgently at present.
Disclosure of Invention
The embodiment of the application mainly aims to provide a method, a device and equipment for centralized power supply management of an immersed liquid cooling Tank, which can realize state monitoring and centralized management of all power supplies in the immersed liquid cooling Tank, accurately and timely position power supply faults on the basis of reducing power supply redundancy design cost, and improve the usability and maintainability of products.
In a first aspect, an embodiment of the present application provides a method for centralized power supply management of an immersed liquid-cooled Tank, where each power supply rack Powershelf of the immersed liquid-cooled Tank corresponds to one management board, and the method includes:
identifying a main management plate according to the ID of each management plate in the immersed liquid cooling Tank;
the master management board establishes network connection with other slave management boards through a preset fixed IP;
collecting PSU management information in the corresponding Powershelf from other slave management boards through the network connection;
the main management board is combined with power management information of the main management board, and collected PSU management information in each Powershell in the immersed liquid cooling Tank is analyzed, summarized and stored, so that centralized monitoring management of power information of the immersed liquid cooling Tank is realized.
Optionally, the method further includes:
presetting a one-to-one corresponding relation between each Powershelf and the ID of the management board;
according to the ID of each management board in the immersion liquid cooling Tank, discern the main management board, include:
and identifying a main management plate according to the one-to-one correspondence between each Powershelf and the ID of the management plate and the ID of each management plate in the immersed liquid cooling Tank.
Optionally, the method further includes:
presetting a fixed IP distribution relation between each management board ID and a second MAC network port in the management board;
the main management board establishes network connection with other slave management boards through a preset fixed IP, and the method comprises the following steps:
and the master management board establishes network connection with each other slave management board through the preset fixed IP distribution relation between each management board ID and the second MAC network port in the management board.
Optionally, the method further includes:
and configuring the ID of the management board by combining the IO Pin with a dial switch at the end of the power supply back board.
In a second aspect, the embodiment of the present application further provides an immersed liquid cooling Tank centralized power supply management device, each power supply rack Powershelf of immersed liquid cooling Tank corresponds to a management board, the device includes:
the identification unit is used for identifying a main management plate according to the ID of each management plate in the immersed liquid cooling Tank;
the establishing unit is used for establishing network connection between the master management board and each of the other slave management boards through a preset fixed IP;
the collection unit is used for collecting PSU management information in the corresponding Powershelf from the other slave management boards through the network connection;
and the management unit is used for analyzing, summarizing and storing the collected PSU management information in each Powershelf in the immersed liquid cooling Tank by combining the power management information of the main management board with the power management information of the main management board, so as to realize the centralized monitoring management of the power information of the immersed liquid cooling Tank.
Optionally, the apparatus further comprises:
the first setting unit is used for presetting a one-to-one corresponding relation between each Powershelf and the management board ID;
the identification unit is specifically configured to:
and identifying a main management plate according to the one-to-one correspondence between each Powershelf and the ID of the management plate and the ID of each management plate in the immersed liquid cooling Tank.
Optionally, the apparatus further comprises:
a second setting unit, configured to preset a fixed IP assignment relationship between each management board ID and a second MAC port in the management board;
the establishing unit is specifically configured to:
and the master management board establishes network connection with each other slave management board through the preset fixed IP distribution relation between each management board ID and the second MAC network port in the management board.
Optionally, the apparatus further comprises:
and the configuration unit is used for configuring the ID of the management board by combining the IO Pin with the dial switch at the end of the power supply back board.
The embodiment of the application further provides an immersed liquid cooling Tank centralized power supply management device, which includes: a processor, a memory, a system bus;
the processor and the memory are connected through the system bus;
the memory is configured to store one or more programs, the one or more programs including instructions, which when executed by the processor, cause the processor to perform any one implementation of the above described submerged liquid-cooled Tank centralized power management method.
The embodiment of the application further provides a computer-readable storage medium, wherein instructions are stored in the computer-readable storage medium, and when the instructions are run on the terminal equipment, the terminal equipment is enabled to execute any implementation mode of the immersed liquid cooling Tank centralized power supply management method.
In the centralized power supply management method for the immersed liquid cooling Tank, each power supply rack Powershell f of the immersed liquid cooling Tank corresponds to one management board, a main management board is identified according to the ID of each management board in the immersed liquid cooling Tank, then the main management board is connected with other slave management boards through a preset fixed IP to establish network connection, and PSU management information in the corresponding Powershell f is collected from other slave management boards through the network connection. Therefore, the state monitoring and centralized management of all power supplies in the immersed liquid cooling Tank can be realized, the power supply fault location can be accurately and timely carried out on the basis of reducing the power supply redundancy design cost, and the usability and maintainability of the product are improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a schematic flowchart of an immersed liquid-cooled Tank centralized power supply management method according to an embodiment of the present application;
fig. 2 is a schematic structural diagram illustrating that each Powershelf in the immersion liquid-cooled Tank cabinet according to the embodiment of the present application is provided with a management board;
fig. 3 is a schematic view of an overall structure of an immersion type liquid-cooled Tank according to an embodiment of the present disclosure;
fig. 4 is a schematic flow diagram for automatically identifying a master management board and a slave management board and allocating an IP for an immersed liquid-cooled BMC according to an embodiment of the present disclosure;
fig. 5 is an overall flowchart of an immersed liquid-cooled Tank centralized power supply management method according to an embodiment of the present application;
fig. 6 is a schematic composition diagram of an immersed liquid-cooling Tank centralized power supply management device according to an embodiment of the present application.
Detailed Description
At present, a Tank cabinet is usually adopted for the immersed liquid cooling, and particularly, AI server nodes are increasingly applied to the immersed liquid cooling Tank. And computer nodes in the immersed liquid cooling Tank adopt a distributed power supply mode to supply power, so that the power supply redundancy of the PSU of the single-node server is realized. Each server node is supplied with power in a distributed mode, 1+1 redundancy is adopted for ensuring reliability, and for the whole Tank power supply, the redundant PSU power accounts for 50%, so that the design cost is high. With the increasing power consumption of a single-node server in the future, the power supply capacity of 1 54U immersed Tank may require more than 100KW, and the design redundancy cost caused by single-node distributed power supply is higher. Therefore, how to realize centralized power supply management of the immersed liquid cooling Tank so as to reduce design cost and reduce resource waste is a problem to be solved urgently at present.
In order to solve the above-mentioned defects, an embodiment of the present application provides a centralized power supply management method for an immersion type liquid cooling Tank, where each power rack Powershelf of the immersion type liquid cooling Tank corresponds to one management board, a master management board is identified according to an ID of each management board in the immersion type liquid cooling Tank, then the master management board establishes a network connection with each of other slave management boards through a preset fixed IP, and then collects PSU management information in the corresponding Powershelf from each of the other slave management boards through the network connection. Therefore, the state monitoring and centralized management of all power supplies in the immersed liquid cooling Tank can be realized, the power supply fault location can be accurately and timely carried out on the basis of reducing the power supply redundancy design cost, and the usability and maintainability of the product are improved.
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
First embodiment
Referring to fig. 1, a schematic flow chart of an immersed liquid-cooled Tank centralized power supply management method provided in this embodiment is shown, where the method includes the following steps:
s101: and identifying the main management plate according to the ID of each management plate in the immersed liquid cooling Tank.
It should be noted that, in order to realize the state monitoring and centralized management of all power supplies in the immersion type liquid cooling Tank and reduce the power supply redundancy design cost. As shown in fig. 2, in the present application, 1 management board is configured for each Powershelf in the immersed liquid-cooled Tank cabinet, and a BMC management chip is designed on each management board. On the management board, the BMC chip is respectively designed into 2 groups of management networks through two MACs (i.e. MAC0 and MAC1 in fig. 2), and a management network port of MAC0 is used for a management network interface of the Tank external interconnection; and the management network of the MAC1 realizes the function of 1 expansion through a network switching chip and is used for a Tank internal centralized power supply management internet interface.
On the BMC board, the BMC chip is connected to an I2C Expander chip through a PMBUS, so that the PMBUS signal 1 is divided into a plurality of parts, the parts are respectively connected to PSUs corresponding to Powershelf, and the state information collection of all PSUs in the Powershelf is realized.
In addition, an optional implementation manner is that the BMC chip is designed to have a BMC ID Pin through its IO Pin, and 1 string resistance is added to each ID identification single-ended signal to reduce signal noise and improve signal reliability; each ID identification signal is pulled up to P3V3_ AUX, which realizes that the initial level of the ID identification signal is high in the standby state. The ID identification Pin foot is interconnected with the ID identification signal of the power supply back plate of the PowerShell, and different electric potentials are distinguished at the end of the power supply back plate through grounding and suspension attributes corresponding to different dial directions of the dial switch, so that the ID of the management plate is configured.
On this basis, in order to realize higher power supply support capability (such as supporting 100KW and above), when a plurality of powershelfs need to be deployed in the immersed liquid-cooled Tank cabinet, the overall structure of the immersed liquid-cooled Tank provided in the embodiment of the present application is as shown in fig. 3, wherein the Powershelf 1 corresponds to the management board 1 and can be automatically identified and configured as a main management board through the management board ID, and the management network port of the MAC0 is used as a management network interface for external interconnection of the Tank and is interconnected with a data center management switch (OOB) through a network cable, so as to realize monitoring and reporting of power supply information in the Tank; the management network of the MAC1 of the management board 1 realizes the function of 1 expansion through a network exchange chip, establishes management network ports 2 and 3 … n, is respectively connected with the network port 2 of the management board 2 and the network port n of the management board 3 network port 3 … management board n through network cables, realizes the interconnection of the management board 1 with the internal management networks of the management board 2 and the management board 3 … management board n, and the main management board 1 can collect power state monitoring information corresponding to Powershelf from the management board 2 and the management board 3 … management board n through the management networks, thereby realizing the management of the immersed liquid cooling Tank centralized power supply.
In order to realize centralized power supply management of the immersion type liquid cooling Tank, a main management board needs to be identified according to the ID of each management board in the immersion type liquid cooling Tank, so as to execute the subsequent step S102.
As shown in fig. 4, a one-to-one correspondence relationship between each Powershelf and the management board ID needs to be preset, for example, the management board ID of Powershelf 1 is set to "001", for example, the management board ID of Powershelf 2 is set to "010", and so on. In the production process, according to a configuration method of Powershelf power supply backboard ID identification signals mentioned in the design of an immersed liquid cooling management board framework, the power supply backboard ID identification signals are dialed to different directions through a dial switch and respectively correspond to 'suspension' and 'grounding'. And sequentially organizing and fixing the Powershelf with the management board ID attribute at the corresponding position of the Tank according to the corresponding sequence. The management board is inserted into Powershelf, and the server nodes are inserted into the liquid cooling Tank from top to bottom. After the Tank is led into a cooling liquid, the Tank is connected into a machine room for Power supply after being sealed, after the Power shelf is electrified, a BMC chip on the management board is electrified and started, the BMC chip identifies a Pin Pin through an ID, detects the level of a corresponding Power shelf Power supply backboard end (if '0' corresponds to 'grounding' and '1' corresponds to 'hanging'), identifies the ID of the management board according to a set comparison table of the Power shelf and the ID of the management board, automatically stores the ID information of the node into an FRU (Field Replace Unit), and automatically identifies the management board as a main management board or a slave management board according to the identified ID of the management board and automatically configures the fixed IP of a network port corresponding to MAC 1.
S102: and the master management board establishes network connection with other slave management boards through a preset fixed IP.
In this embodiment, after the master management board is identified in step S101, further, the master management board needs to establish a network connection with other slave management boards in the immersion liquid cooling Tank through a preset fixed IP, so as to execute the subsequent step S103.
Specifically, the master management board may establish network connection with each of the other slave management boards through a preset fixed IP assignment relationship between each management board ID and a second MAC port (i.e., MAC1 in the drawing) in the management board.
S103: through the network connection, PSU management information in the corresponding Powershelf is collected from the other slave management boards.
In this embodiment, after the master management board establishes network connection with each of the other slave management boards through the preset fixed IP in step S102, the PSU management information in the corresponding Powershelf is further collected from each of the other slave management boards through the network connection, so as to execute the subsequent step S104.
S104: the main management board is combined with power management information of the main management board, PSU management information in all Powershelf in the collected immersion type liquid cooling Tank is analyzed, collected and stored, and therefore centralized monitoring management of power information of the immersion type liquid cooling Tank is achieved.
In this embodiment, after the master management board collects the PSU management information in the corresponding Powershelf from each of the other slave management boards in step S103, the master management board further may analyze, summarize, and store the collected PSU management information in each Powershelf in the submerged liquid cooling Tank in combination with its own power management information, so as to implement centralized monitoring and management of the submerged liquid cooling Tank power supply information.
To facilitate understanding of the method for centralized power supply management of the immersion type liquid cooling Tank provided by the present application, next, the present application will introduce the overall process of the method for centralized power supply management of the immersion type liquid cooling Tank provided by the embodiment of the present application with reference to fig. 5:
as shown in fig. 5, the immersed liquid cooling Tank centralized power supply management method provided in the embodiment of the present application specifically includes: firstly, the management board ID and the management board master-slave one-to-one corresponding relation are set. If the management board ID is '001', the management board position main management board is set, if the management board ID is '010', '011', and the like, all the management boards are slave management boards, and only 1 management board in the whole Tank is ensured to be the main management board, and other management boards are all slave management boards. And meanwhile, the fixed IP distribution relation between the management board ID and each network port of the MAC1 is set. Referring to the flow of automatically identifying the master and slave and allocating the IP for the immersed liquid-cooled BMC shown in fig. 4, after the IP is automatically identified at each point on the management board, the fixed IP corresponding to the network port of the MAC1 is automatically configured according to the set automatically identified master-slave relationship, and the monitoring and management of the status information of the PSUs in the Powershelf are respectively started. The master management board establishes network connection with the slave management boards through a network according to the set fixed IP, and collects PSU management information in the corresponding Powershelf from each slave management board 2-n through the network. The main management board analyzes, summarizes and stores the collected Powershelf power management information in the Tank in real time by combining the collected power management information, and then the data center monitors and manages the Tank power information.
Like this, the immersed liquid cooling Tank that this application provided can support a plurality of powershelfs to concentrate the power supply, and PSU in the Powershelf can support 10+2 redundancies, compares traditional distributed power supply PSU 1+1 redundancies, reduces system cost by a wide margin. Moreover, the immersed liquid cooling Tank can flexibly expand the quantity of the Powershell, can meet the requirement of server node application with higher power consumption on high-power supply of the Tank, can meet the requirement of adapting to low-power-consumption service nodes by reducing the quantity of the Powershell, and reduces the system cost. Therefore, the state monitoring and management of all power supplies in the Tank are realized, the power supply fault location can be accurately and timely carried out, the usability of the product is improved, and the maintainability is improved.
To sum up, in the centralized power supply management method for the immersed liquid cooling Tank provided in the embodiment of the present application, each power shelf Powershelf of the immersed liquid cooling Tank corresponds to one management board, first, according to the ID of each management board in the immersed liquid cooling Tank, a master management board is identified, then, the master management board establishes network connection with other slave management boards through a preset fixed IP, and then, through the network connection, PSU management information in the corresponding Powershelf is collected from other slave management boards, further, the master management board can combine with its own power management information to analyze, summarize and store the collected PSU management information in each Powershelf in the immersed liquid cooling Tank, so as to realize centralized monitoring and management of the power supply information of the immersed liquid cooling Tank. Therefore, the state monitoring and centralized management of all power supplies in the immersed liquid cooling Tank can be realized, the power supply fault location can be accurately and timely carried out on the basis of reducing the power supply redundancy design cost, and the usability and maintainability of the product are improved.
Second embodiment
In this embodiment, a centralized power supply management apparatus for an immersion type liquid cooling Tank will be described, and for related contents, refer to the above method embodiments.
Referring to fig. 6, a schematic composition diagram of an immersion type liquid cooling Tank centralized power supply management device provided in this embodiment is shown, where the device includes:
the identification unit 601 is used for identifying a main management board according to the ID of each management board in the immersed liquid cooling Tank;
an establishing unit 602, configured to establish network connections between the master management board and each of the other slave management boards through a preset fixed IP;
a collecting unit 603, configured to collect PSU management information in the corresponding Powershelf from the other slave management boards through the network connection;
and the management unit 604 is used for analyzing, summarizing and storing the collected PSU management information in each Powershelf in the immersed liquid cooling Tank by combining the power management information of the main management board with the power management information of the main management board, so as to realize centralized monitoring and management of the power information of the immersed liquid cooling Tank.
In an implementation manner of this embodiment, the apparatus further includes:
the first setting unit is used for presetting a one-to-one corresponding relation between each Powershelf and the management board ID;
the identifying unit 601 is specifically configured to:
and identifying a main management plate according to the one-to-one correspondence between each Powershelf and the ID of the management plate and the ID of each management plate in the immersed liquid cooling Tank.
In an implementation manner of this embodiment, the apparatus further includes:
a second setting unit, configured to preset a fixed IP assignment relationship between each management board ID and a second MAC port in the management board;
the establishing unit 602 is specifically configured to:
and the master management board establishes network connection with each other slave management board through the preset fixed IP distribution relation between each management board ID and the second MAC network port in the management board.
In an implementation manner of this embodiment, the apparatus further includes:
and the configuration unit is used for configuring the ID of the management board by combining the IO Pin with the dial switch at the end of the power supply back board.
To sum up, in the centralized power supply management device for the immersion type liquid cooling Tank provided in the embodiment of the present application, each power shelf Powershelf of the immersion type liquid cooling Tank corresponds to one management board, first, according to the ID of each management board in the immersion type liquid cooling Tank, a main management board is identified, then, the main management board establishes network connection with other slave management boards through a preset fixed IP, and then, through the network connection, PSU management information in the corresponding Powershelf is collected from other slave management boards, further, the main management board can combine with the power management information of itself, analyze, summarize and store the collected PSU management information in each Powershelf in the immersion type liquid cooling Tank, so as to realize centralized monitoring and management of the power supply information of the immersion type liquid cooling Tank. Therefore, the state monitoring and centralized management of all power supplies in the immersed liquid cooling Tank can be realized, the power supply fault location can be accurately and timely carried out on the basis of reducing the power supply redundancy design cost, and the usability and maintainability of the product are improved.
Further, this application embodiment still provides an immersed liquid cooling Tank centralized power supply management equipment, includes: a processor, a memory, a system bus;
the processor and the memory are connected through the system bus;
the memory is configured to store one or more programs, the one or more programs including instructions, which when executed by the processor, cause the processor to perform any one of the above described methods of implementing the submerged liquid-cooled Tank centralized power management method.
Further, an embodiment of the present application further provides a computer-readable storage medium, where instructions are stored in the computer-readable storage medium, and when the instructions are executed on a terminal device, the terminal device is enabled to execute any implementation method of the above immersion type liquid cooling Tank centralized power supply management method.
As can be seen from the above description of the embodiments, those skilled in the art can clearly understand that all or part of the steps in the above embodiment methods can be implemented by software plus a necessary general hardware platform. Based on such understanding, the technical solution of the present application may be essentially or partially implemented in the form of a software product, which may be stored in a storage medium, such as a ROM/RAM, a magnetic disk, an optical disk, etc., and includes several instructions for enabling a computer device (which may be a personal computer, a server, or a network communication device such as a media gateway, etc.) to execute the method according to the embodiments or some parts of the embodiments of the present application.
It should be noted that, in the present specification, the embodiments are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments may be referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
It is further noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The utility model provides an immersion liquid cooling Tank centralized power supply management method which is characterized in that, every power strip of immersion liquid cooling Tank corresponds a management board, the method includes:
identifying a main management plate according to the ID of each management plate in the immersed liquid cooling Tank;
the master management board establishes network connection with other slave management boards through a preset fixed IP;
collecting PSU management information in the corresponding Powershelf from other slave management boards through the network connection;
the main management board is combined with power management information of the main management board, and collected PSU management information in each Powershell in the immersed liquid cooling Tank is analyzed, summarized and stored, so that centralized monitoring management of power information of the immersed liquid cooling Tank is realized.
2. The method of claim 1, further comprising:
presetting a one-to-one corresponding relation between each Powershelf and the ID of the management board;
according to the ID of each management board in the immersion liquid cooling Tank, discern the main management board, include:
and identifying a main management plate according to the one-to-one correspondence between each Powershelf and the ID of the management plate and the ID of each management plate in the immersed liquid cooling Tank.
3. The method of claim 1, further comprising:
presetting a fixed IP distribution relation between each management board ID and a second MAC network port in the management board;
the main management board establishes network connection with other slave management boards through a preset fixed IP, and the method comprises the following steps:
and the master management board establishes network connection with each other slave management board through the preset fixed IP distribution relation between each management board ID and the second MAC network port in the management board.
4. The method of claim 1, further comprising:
and configuring the ID of the management board by combining the IO Pin with a dial switch at the end of the power supply back board.
5. The utility model provides an immersion liquid cooling Tank centralized power supply management device which characterized in that, every power supply rack Powershell of immersion liquid cooling Tank corresponds a management board, the device includes:
the identification unit is used for identifying a main management plate according to the ID of each management plate in the immersed liquid cooling Tank;
the establishing unit is used for establishing network connection between the master management board and each of the other slave management boards through a preset fixed IP;
the collection unit is used for collecting PSU management information in the corresponding Powershelf from the other slave management boards through the network connection;
and the management unit is used for analyzing, summarizing and storing the collected PSU management information in each Powershelf in the immersed liquid cooling Tank by combining the power management information of the main management board with the power management information of the main management board, so as to realize the centralized monitoring management of the power information of the immersed liquid cooling Tank.
6. The apparatus of claim 5, further comprising:
the first setting unit is used for presetting a one-to-one corresponding relation between each Powershelf and the management board ID;
the identification unit is specifically configured to:
and identifying a main management plate according to the one-to-one correspondence between each Powershelf and the ID of the management plate and the ID of each management plate in the immersed liquid cooling Tank.
7. The apparatus of claim 5, further comprising:
a second setting unit, configured to preset a fixed IP assignment relationship between each management board ID and a second MAC port in the management board;
the establishing unit is specifically configured to:
and the master management board establishes network connection with each other slave management board through the preset fixed IP distribution relation between each management board ID and the second MAC network port in the management board.
8. The apparatus of claim 5, further comprising:
and the configuration unit is used for configuring the ID of the management board by combining the IO Pin with the dial switch at the end of the power supply back board.
9. The utility model provides an immersion liquid cooling Tank centralized power supply management equipment which characterized in that includes: a processor, a memory, a system bus;
the processor and the memory are connected through the system bus;
the memory is to store one or more programs, the one or more programs comprising instructions, which when executed by the processor, cause the processor to perform the method of any of claims 1-4.
10. A computer-readable storage medium having stored therein instructions that, when executed on a terminal device, cause the terminal device to perform the method of any one of claims 1-4.
CN202111139445.4A 2021-09-26 2021-09-26 Immersed liquid cooling Tank centralized power supply management method, device and equipment Withdrawn CN113867514A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111139445.4A CN113867514A (en) 2021-09-26 2021-09-26 Immersed liquid cooling Tank centralized power supply management method, device and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111139445.4A CN113867514A (en) 2021-09-26 2021-09-26 Immersed liquid cooling Tank centralized power supply management method, device and equipment

Publications (1)

Publication Number Publication Date
CN113867514A true CN113867514A (en) 2021-12-31

Family

ID=78991453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111139445.4A Withdrawn CN113867514A (en) 2021-09-26 2021-09-26 Immersed liquid cooling Tank centralized power supply management method, device and equipment

Country Status (1)

Country Link
CN (1) CN113867514A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI814389B (en) * 2022-04-28 2023-09-01 新加坡商鴻運科股份有限公司 Management method of power management controller of liquid submersion cooling tank and device thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI814389B (en) * 2022-04-28 2023-09-01 新加坡商鴻運科股份有限公司 Management method of power management controller of liquid submersion cooling tank and device thereof

Similar Documents

Publication Publication Date Title
US9800087B2 (en) Multi-level data center consolidated power control
US10429914B2 (en) Multi-level data center using consolidated power control
CN110661641B (en) Virtual network function VNF deployment method and device
CN107329811A (en) A kind of power consumption of data center adjusting method and device
CN107682411A (en) A kind of extensive SDN controllers cluster and network system
CN103838698A (en) I2C bus architecture and device availability query method
CN115643316A (en) Data processing method and device for Internet of things gateway, gateway equipment and storage medium
CN113783765A (en) Method, system, equipment and medium for realizing intercommunication between cloud internal network and cloud external network
CN109002354A (en) A kind of computing resource cubic elasticity telescopic method and system based on OpenStack
CN113867514A (en) Immersed liquid cooling Tank centralized power supply management method, device and equipment
CN109309633A (en) A kind of whole machine cabinet server node management method and device based on management interchanger
CN104753707A (en) System maintenance method and network switching equipment
CN110519354A (en) A kind of distributed objects storage system and its method for processing business and storage medium
US20120284274A1 (en) Method and device for service management
CN103138969A (en) Server rack system
CN116260725A (en) Bandwidth allocation method and device of server, electronic equipment and storage medium
CN113347046B (en) Network access method and device
CN110138689B (en) Arranging method and arranging device for data center network
CN111064643B (en) Node server and data interaction method and related device thereof
CN111475110A (en) Storage server
CN107239300A (en) A kind of intelligent cabinet RMC and MP batch refreshing methods
CN112688363A (en) Multi-machine parallel connection method of electric energy quality control equipment based on ad hoc network scheduling
CN112269459A (en) Power supply system and method for whole cabinet server
CN105490820B (en) A kind of POE method of supplying power to and device
CN108667932A (en) One kind two-shipper big data application attachment management device and method under load operation conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20211231