CN113866580A - Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment - Google Patents

Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment Download PDF

Info

Publication number
CN113866580A
CN113866580A CN202111403658.3A CN202111403658A CN113866580A CN 113866580 A CN113866580 A CN 113866580A CN 202111403658 A CN202111403658 A CN 202111403658A CN 113866580 A CN113866580 A CN 113866580A
Authority
CN
China
Prior art keywords
insulation
low
equipment
alarm
voltage direct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111403658.3A
Other languages
Chinese (zh)
Inventor
徐硕
王勇
许中
马智远
周凯
饶毅
代晓丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202111403658.3A priority Critical patent/CN113866580A/en
Publication of CN113866580A publication Critical patent/CN113866580A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a method and a system for evaluating the insulation damage probability of low-voltage direct current system equipment, which utilize insulation monitors to monitor the insulation damage of the equipment of a low-voltage direct current power supply system, record the alarm time length of each insulation monitor, calculate the equipment insulation damage probability of the low-voltage direct current power supply system according to the ratio of the alarm time length to the total monitoring time length, therefore, the equipment insulation damage probability of the low-voltage direct-current power supply system is calculated according to the actual monitoring data, the equipment insulation damage probability is not dependent on the empirical parameters of the equipment insulation damage probability, the accuracy is higher, the reliability of the safety risk quantitative evaluation result of the low-voltage direct-current system is improved, the problem that when the safety risk quantitative evaluation is carried out on the low-voltage direct-current power supply system equipment in the prior art is solved, only the experience parameters of the equipment insulation damage probability can be used, the accuracy is low, and the reliability of the safety risk quantitative evaluation result is low.

Description

Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment
Technical Field
The invention relates to the technical field of low-voltage direct-current power supply systems, in particular to a method and a system for evaluating insulation damage probability of low-voltage direct-current system equipment.
Background
With the development of power electronic technology and the continuous access of new energy, Low Voltage Direct Current (LVDC) power supply systems are increasingly widely used in the field of civil power supply due to the characteristics of safety, reliability, economy and the like. When the accident occurrence probability of the low-voltage direct-current power supply system is quantified, one of the parameters which need to be considered most is the insulation damage probability of the equipment, however, at present, when the safety risk quantification evaluation is performed on the low-voltage direct-current power supply system equipment, only the empirical parameters of the insulation damage probability of the equipment can be used, the accuracy is low, and the reliability of the safety risk quantification evaluation result is low. Therefore, it is necessary to improve the accuracy of the insulation damage probability of the low-voltage dc power supply system device so as to improve the reliability of the safety risk quantitative evaluation result of the low-voltage dc power supply system.
Disclosure of Invention
The invention provides a method and a system for evaluating the insulation damage probability of low-voltage direct-current system equipment, which are used for solving the technical problem that the reliability of a safety risk quantitative evaluation result is low because only empirical parameters of the insulation damage probability of the equipment can be used when safety risk quantitative evaluation is carried out on low-voltage direct-current power supply system equipment in the prior art, and the accuracy is low.
In view of the above, a first aspect of the present invention provides a method for evaluating insulation damage probability of a low-voltage dc system device, including:
selecting n devices for outgoing lines of the same power bus in a low-voltage direct-current power supply system, and arranging m insulation monitors between the power bus and the n devices, wherein the m insulation monitors are respectively used for carrying out insulation monitoring on the n devices;
acquiring the alarm time length of each insulation monitor which generates insulation damage alarm within preset monitoring time;
Figure BDA0003367528390000011
measuring time, tiAlarm duration, p, for occurrence of insulation breakage alarm of ith insulation monitor1The probability of damage to the insulation of the equipment of the low-voltage DC power supply system.
Optionally, the preset monitoring time T is 8760 h.
Optionally, the alarm duration of the insulation monitor is a superposition of single alarm durations, and the single alarm duration is a difference between start and stop times of the alarm signal.
The second aspect of the present invention provides an insulation damage probability evaluation system for low-voltage dc system equipment, including:
the system comprises a platform building unit, a low-voltage direct-current power supply system and a monitoring unit, wherein the platform building unit is used for selecting n devices with the same power bus outgoing line in the low-voltage direct-current power supply system, and m insulation monitors are arranged between the power bus and the n devices, wherein the m insulation monitors are respectively used for carrying out insulation monitoring on the n devices;
the alarm duration acquiring unit is used for acquiring the alarm duration of each insulation monitor which generates the insulation damage alarm within the preset monitoring time;
the damage probability calculation module is used for calculating the equipment insulation damage probability of the low-voltage direct-current power supply system according to a preset equipment insulation damage probability calculation formula, wherein the preset equipment insulation damage probability calculation formula is as follows:
Figure BDA0003367528390000021
t is a preset monitoring time TiAlarm duration, p, for occurrence of insulation breakage alarm of ith insulation monitor1The probability of damage to the insulation of the equipment of the low-voltage DC power supply system.
Optionally, the preset monitoring time T is 8760 h.
Optionally, the alarm duration of the insulation monitor is a superposition of single alarm durations, and the single alarm duration is a difference between start and stop times of the alarm signal.
According to the technical scheme, the method for evaluating the insulation damage probability of the low-voltage direct-current system equipment has the following advantages:
the invention provides a method for evaluating the insulation damage probability of low-voltage direct current system equipment, which utilizes insulation monitors to monitor the insulation damage of the equipment of a low-voltage direct current power supply system, records the alarm time length of each insulation monitor, calculates the equipment insulation damage probability of the low-voltage direct current power supply system according to the proportion of the alarm time length to the total monitoring time length, therefore, the equipment insulation damage probability of the low-voltage direct-current power supply system is calculated according to the actual monitoring data, the equipment insulation damage probability is not dependent on the empirical parameters of the equipment insulation damage probability, the accuracy is higher, the reliability of the safety risk quantitative evaluation result of the low-voltage direct-current system is improved, the problem that when the safety risk quantitative evaluation is carried out on the low-voltage direct-current power supply system equipment in the prior art is solved, only the experience parameters of the equipment insulation damage probability can be used, the accuracy is low, and the reliability of the safety risk quantitative evaluation result is low.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other related drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of a method for evaluating insulation damage probability of low-voltage dc system equipment according to the present invention;
FIG. 2 is a schematic structural diagram of m insulation monitors arranged between a power bus and n devices according to the present invention;
fig. 3 is a schematic structural diagram of an insulation damage probability evaluation system for a low voltage dc system device according to the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
For easy understanding, referring to fig. 1, an embodiment of a method for estimating an insulation breakdown probability of a low-voltage dc system device according to the present invention includes:
step 101, selecting n devices of the same power bus outgoing line in a low-voltage direct-current power supply system, and arranging m insulation monitors between the power bus and the n devices, wherein the m insulation monitors are respectively used for insulation monitoring on the n devices.
As shown in fig. 2, in the embodiment of the present invention, n devices for outputting the same power bus are selected in the low-voltage dc power supply system, m insulation monitors are arranged between the power bus and the n devices, and the correspondence between the n devices and the m insulation monitors may be one-to-one or one-to-many, and may be specifically set according to an actual application scenario.
102, acquiring the alarm time length of each insulation monitor generating insulation damage alarm in the preset monitoring time.
The method comprises the following steps of recording the alarm time of each insulation monitor in preset monitoring time T, wherein the alarm time of each insulation monitor is the superposition of the alarm time of a single alarm, and the alarm time of the single alarm of each insulation monitor is the difference of the starting time and the stopping time of an alarm signal (namely the time from the insulation damage of equipment to the insulation damage repair is long, after the insulation damage of the equipment occurs, the insulation monitor can immediately give an alarm, and then the alarm can be stopped after the insulation damage is repaired, of course, in order to avoid the long-time non-repair of the insulation damage, the limit value of the alarm time can be set to be 2 h).
103, calculating the equipment insulation damage probability of the low-voltage direct current power supply system according to a preset equipment insulation damage probability calculation formula, wherein the preset equipment insulation damage probability calculation formula is as follows:
Figure BDA0003367528390000041
t is preset monitoringTime, tiAlarm duration, p, for occurrence of insulation breakage alarm of ith insulation monitor1The probability of damage to the insulation of the equipment of the low-voltage DC power supply system.
The preset monitoring time T is optimally selected from one year (8760h), the equipment insulation damage is not easy to be found and the alarm is not easy to be given when the time is too short, and the damage probability is difficult to be counted in time when the time is too long. If the preset monitoring time T is 8760h, the following steps are carried out:
Figure BDA0003367528390000042
the invention provides a method for evaluating the insulation damage probability of low-voltage direct current system equipment, which utilizes insulation monitors to monitor the insulation damage of the equipment of a low-voltage direct current power supply system, records the alarm time length of each insulation monitor, calculates the equipment insulation damage probability of the low-voltage direct current power supply system according to the proportion of the alarm time length to the total monitoring time length, therefore, the equipment insulation damage probability of the low-voltage direct-current power supply system is calculated according to the actual monitoring data, the equipment insulation damage probability is not dependent on the empirical parameters of the equipment insulation damage probability, the accuracy is higher, the reliability of the safety risk quantitative evaluation result of the low-voltage direct-current system is improved, the problem that when the safety risk quantitative evaluation is carried out on the low-voltage direct-current power supply system equipment in the prior art is solved, only the experience parameters of the equipment insulation damage probability can be used, the accuracy is low, and the reliability of the safety risk quantitative evaluation result is low.
For easy understanding, please refer to fig. 3, an embodiment of the system for estimating the insulation breakdown probability of the low voltage dc system device according to the present invention further includes:
the platform building unit 301 is used for selecting n pieces of equipment with the same power bus outgoing line in the low-voltage direct-current power supply system, and m insulation monitors are arranged between the power bus and the n pieces of equipment, wherein the m insulation monitors are respectively used for carrying out insulation monitoring on the n pieces of equipment;
an alarm duration obtaining unit 302, configured to obtain an alarm duration of each insulation monitor that generates an insulation damage alarm within a preset monitoring time;
a damage probability calculation module 303, configured to calculate an equipment insulation damage probability of the low-voltage dc power supply system according to a preset equipment insulation damage probability calculation formula, where the preset equipment insulation damage probability calculation formula is:
Figure BDA0003367528390000051
t is a preset monitoring time TiAlarm duration, p, for occurrence of insulation breakage alarm of ith insulation monitor1The probability of damage to the insulation of the equipment of the low-voltage DC power supply system.
The preset monitoring time T is 8760 h.
The alarm duration of the insulation monitor is the superposition of the single alarm duration, and the single alarm duration is the difference between the start time and the stop time of the alarm signal.
The invention provides an insulation damage probability evaluation system of low-voltage direct current system equipment, which utilizes insulation monitors to monitor the insulation damage of the equipment of a low-voltage direct current power supply system, records the alarm time length of each insulation monitor, calculates the equipment insulation damage probability of the low-voltage direct current power supply system according to the proportion of the alarm time length to the total monitoring time length, therefore, the equipment insulation damage probability of the low-voltage direct-current power supply system is calculated according to the actual monitoring data, the equipment insulation damage probability is not dependent on the empirical parameters of the equipment insulation damage probability, the accuracy is higher, the reliability of the safety risk quantitative evaluation result of the low-voltage direct-current system is improved, the problem that when the safety risk quantitative evaluation is carried out on the low-voltage direct-current power supply system equipment in the prior art is solved, only the experience parameters of the equipment insulation damage probability can be used, the accuracy is low, and the reliability of the safety risk quantitative evaluation result is low.
The insulation damage probability evaluation system for low-voltage dc system devices provided in the embodiments of the present invention is configured to execute the insulation damage probability evaluation method for low-voltage dc system devices in the foregoing embodiments, and the principle of the insulation damage probability evaluation system is consistent with the working principle of the insulation damage probability evaluation method for low-voltage dc system devices in the foregoing embodiments, and details thereof are not repeated here.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. A method for evaluating the insulation damage probability of low-voltage direct-current system equipment is characterized by comprising the following steps:
selecting n devices for outgoing lines of the same power bus in a low-voltage direct-current power supply system, and arranging m insulation monitors between the power bus and the n devices, wherein the m insulation monitors are respectively used for carrying out insulation monitoring on the n devices;
acquiring the alarm time length of each insulation monitor which generates insulation damage alarm within preset monitoring time;
calculating the equipment insulation damage probability of the low-voltage direct-current power supply system according to a preset equipment insulation damage probability calculation formula, wherein the preset equipment insulation damage probability calculation formula is as follows:
Figure FDA0003367528380000011
t is a preset monitoring time TiAlarm duration, p, for occurrence of insulation breakage alarm of ith insulation monitor1The probability of damage to the insulation of the equipment of the low-voltage DC power supply system.
2. The method for estimating the insulation breakage probability of the low-voltage direct-current system equipment according to claim 1, wherein the preset monitoring time T is 8760 h.
3. The method according to claim 1, wherein the alarm duration of the insulation monitor is a superposition of single alarm durations, and the single alarm duration is a difference between start and stop times of the alarm signal.
4. The utility model provides a low pressure direct current system equipment insulation breakage probability evaluation system which characterized in that includes:
the system comprises a platform building unit, a low-voltage direct-current power supply system and a monitoring unit, wherein the platform building unit is used for selecting n devices with the same power bus outgoing line in the low-voltage direct-current power supply system, and m insulation monitors are arranged between the power bus and the n devices, wherein the m insulation monitors are respectively used for carrying out insulation monitoring on the n devices;
the alarm duration acquiring unit is used for acquiring the alarm duration of each insulation monitor which generates the insulation damage alarm within the preset monitoring time;
the damage probability calculation module is used for calculating the equipment insulation damage probability of the low-voltage direct-current power supply system according to a preset equipment insulation damage probability calculation formula, wherein the preset equipment insulation damage probability calculation formula is as follows:
Figure FDA0003367528380000012
t is a preset monitoring time TiAlarm duration, p, for occurrence of insulation breakage alarm of ith insulation monitor1The probability of damage to the insulation of the equipment of the low-voltage DC power supply system.
5. The system for estimating the insulation breakage probability of low-voltage direct-current system equipment according to claim 4, wherein the preset monitoring time T is 8760 h.
6. The system according to claim 4, wherein the alarm duration of the insulation monitor is a superposition of single alarm durations, and the single alarm duration is a difference between start and stop times of the alarm signal.
CN202111403658.3A 2021-11-22 2021-11-22 Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment Pending CN113866580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111403658.3A CN113866580A (en) 2021-11-22 2021-11-22 Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111403658.3A CN113866580A (en) 2021-11-22 2021-11-22 Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment

Publications (1)

Publication Number Publication Date
CN113866580A true CN113866580A (en) 2021-12-31

Family

ID=78985304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111403658.3A Pending CN113866580A (en) 2021-11-22 2021-11-22 Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment

Country Status (1)

Country Link
CN (1) CN113866580A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038262A (en) * 2007-04-03 2007-09-19 西安交通大学 Device and method for online monitoring power supply system external Insulation filthy status
CN105676077A (en) * 2014-11-18 2016-06-15 北京兴迪仪器有限责任公司 High-voltage cable partial discharge on-line monitoring alarm method, device and system
US20170315205A1 (en) * 2016-04-27 2017-11-02 Bender Gmbh & Co. Kg Methods and devices for testing the function of an insulation monitoring device
CN111209535A (en) * 2019-12-25 2020-05-29 国家电网公司西北分部 Power equipment successive fault risk identification method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038262A (en) * 2007-04-03 2007-09-19 西安交通大学 Device and method for online monitoring power supply system external Insulation filthy status
CN105676077A (en) * 2014-11-18 2016-06-15 北京兴迪仪器有限责任公司 High-voltage cable partial discharge on-line monitoring alarm method, device and system
US20170315205A1 (en) * 2016-04-27 2017-11-02 Bender Gmbh & Co. Kg Methods and devices for testing the function of an insulation monitoring device
CN111209535A (en) * 2019-12-25 2020-05-29 国家电网公司西北分部 Power equipment successive fault risk identification method and system

Similar Documents

Publication Publication Date Title
CN103323707B (en) Based on the transformer fault rate Forecasting Methodology of half Markov process
CN116433009A (en) Abnormality monitoring method and device for power transformation equipment and storage medium
CN105067963A (en) Distribution network fault early warning method and system based on transient waveforms
US20150171655A1 (en) Lithium battery auto-depassivation system and method
US20140159755A1 (en) Partial discharge charge amount measuring method and device
CN104300532A (en) Voltage sag evaluation process based on matrix factor
CN117929909A (en) Hidden danger detection system for high-voltage switch cabinet
CN113866580A (en) Method and system for evaluating insulation damage probability of low-voltage direct-current system equipment
CN114417574A (en) Method and device for calculating severity of turn-to-turn short circuit
CN116465059A (en) Energy-saving air conditioner operation supervision system based on data analysis
CN103954887A (en) Power line insulation monitoring method based on instant fault
CN104578038B (en) Real-time voltage monitoring, over-pressure safety device and method for communication chip
CN111308217A (en) Method and device for intelligently monitoring grounding resistance, storage medium and computer equipment
CN116311814A (en) High-voltage switch cabinet running state analysis and active early warning system and method
CN103344824B (en) The electric flux integration method measuring based on markers
CN110726866B (en) High-voltage-level voltage qualification rate monitoring method and device
CN114636883A (en) Alternating current based power system fault determination method and device and storage medium
CN210958281U (en) Multi-source mutual-feed wide-input frequency converter module
CN111749951B (en) Hydraulic mechanism fault monitoring method and device, computer equipment and storage medium
CN105182228A (en) Easy evaluation method of circuit breaker online operation capability
CN108646193B (en) Storage battery capacity evaluation method and terminal
CN106707071A (en) System and method for calculating remaining service life of power supply lightning protection device
CN103679562B (en) Grid measurement data monitoring method and system
CN110705729A (en) Fault detection method and device for track power supply system, server and storage medium
CN112798869A (en) Capacitance detection method and system for unit series type converter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211231

RJ01 Rejection of invention patent application after publication