CN113863625A - Enclosure putty powder spraying equipment for building industry - Google Patents

Enclosure putty powder spraying equipment for building industry Download PDF

Info

Publication number
CN113863625A
CN113863625A CN202111394923.6A CN202111394923A CN113863625A CN 113863625 A CN113863625 A CN 113863625A CN 202111394923 A CN202111394923 A CN 202111394923A CN 113863625 A CN113863625 A CN 113863625A
Authority
CN
China
Prior art keywords
putty powder
putty
mounting
enclosure
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111394923.6A
Other languages
Chinese (zh)
Inventor
李晓莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Haorun Electromechanical Equipment Co ltd
Original Assignee
Shenzhen Haorun Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Haorun Electromechanical Equipment Co ltd filed Critical Shenzhen Haorun Electromechanical Equipment Co ltd
Priority to CN202111394923.6A priority Critical patent/CN113863625A/en
Publication of CN113863625A publication Critical patent/CN113863625A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B12/00Arrangements for controlling delivery; Arrangements for controlling the spray area
    • B05B12/16Arrangements for controlling delivery; Arrangements for controlling the spray area for controlling the spray area
    • B05B12/32Shielding elements, i.e. elements preventing overspray from reaching areas other than the object to be sprayed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/10Arrangements for collecting, re-using or eliminating excess spraying material the excess material being particulate
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B15/00Details of spraying plant or spraying apparatus not otherwise provided for; Accessories
    • B05B15/20Arrangements for agitating the material to be sprayed, e.g. for stirring, mixing or homogenising
    • B05B15/25Arrangements for agitating the material to be sprayed, e.g. for stirring, mixing or homogenising using moving elements, e.g. rotating blades
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The invention relates to spraying equipment, in particular to enclosing wall putty powder spraying equipment for building industry. Specific saying so provides one kind and reduces staff handheld device's power, evenly sprays paint to the wall, retrieves the putty that drops simultaneously, practices thrift the building for the building enclosure putty powder spraying equipment of cost. An enclosure putty powder spraying equipment for building industry comprises: bucket, pipeline, shower nozzle, putty are placed to putty powder and are prevented piling up knot mechanism and moving mechanism, and putty powder is placed bucket one side and is equipped with pipeline, and pipeline one side articulates there is the shower nozzle, and putty powder is placed bucket one side and is equipped with putty and prevent piling up knot mechanism, and putty powder is placed the barrel head portion and is equipped with moving mechanism. Prevent piling up knot mechanism and moving mechanism through setting up putty, drive the stirring leaf and rotate and constantly stir putty powder, prevent that putty powder from piling up and taking place to pile up the knot for a long time, influence the spraying.

Description

Enclosure putty powder spraying equipment for building industry
Technical Field
The invention relates to spraying equipment, in particular to enclosing wall putty powder spraying equipment for building industry.
Background
The existing putty spraying machine is a small machine for stirring, pumping and spraying high-quality putty powder, and is suitable for house protection, plastering, primer sizing and the like.
When a worker sprays a large-area wall surface, the coverage area of the sprayed putty cannot be as large as that of the wall surface, so that the worker needs to hold the spray head and move the spray head, the putty is uniformly covered at each position of the wall surface, the worker easily feels fatigue after long-time work due to the fact that the spray head is always lifted, the wall surface cannot be accurately sprayed, the putty is sprayed on the wall surface after the putty is sprayed, and the spraying quality of the wall surface is reduced while the putty is wasted.
Therefore need design one kind and reduce staff handheld device's power, evenly spray paint the wall, retrieve the putty that drops simultaneously, practice thrift the building for the building enclosure putty powder spraying equipment of cost.
Disclosure of Invention
In order to overcome the defects that a worker is easy to fatigue after holding the spray head for a long time, the working efficiency is influenced, and raw materials are wasted, the technical problem to be solved is as follows: the utility model provides a reduce staff handheld device's power, evenly spray paint the wall, retrieve the putty that drops simultaneously, practice thrift the building industry enclosure putty powder spraying equipment of cost.
The technical scheme of the invention is as follows: the utility model provides an enclosure putty powder spraying equipment for building industry, prevents piling up mechanism and moving mechanism including putty powder placing barrel, pipeline, shower nozzle, putty, and putty powder placing barrel one side is equipped with pipeline, and pipeline one side articulates there is the shower nozzle, and putty powder placing barrel one side is equipped with putty and prevents piling up the mechanism, and putty powder placing barrel head portion is equipped with moving mechanism.
Optionally, putty prevents piling up mechanism including handheld frame, mounting disc, mount pad, servo motor and stirring leaf, and the putty powder is placed the bucket both sides and all is equipped with the mounting disc, and the mounting disc lower part outside all is equipped with handheld frame, and the mounting disc upper portion outside all is equipped with the mount pad, and the mount pad bottom is equipped with servo motor, and the putty powder is placed the rotary type between the bucket and is equipped with the stirring leaf, the axis of rotation of stirring leaf all with servo motor's output shaft.
Optionally, moving mechanism is equipped with the mounting panel including mounting panel, spacing post, buffer spring and pulley, mounting panel bottom slidingtype, and mounting panel top both sides all are equipped with spacing post, are connected with buffer spring between spacing post and the mounting panel, and mounting panel bottom rotary type is equipped with the pulley.
Optionally, still including the mechanism that prevents spilling, the mechanism that prevents spilling falls including the guide cylinder, the gag lever post, the head rod, connect the flitch, the cam, contact lever and first spacing spring, mount pad one side is equipped with the guide cylinder, the gliding style is equipped with the gag lever post on the guide cylinder, be connected with first spacing spring between gag lever post and the guide cylinder inner wall, gag lever post one side is connected with the head rod, be connected with between the head rod and connect the flitch, the head rod middle part is connected with the contact lever, be connected with the cam in the pivot, the cam cooperates with the contact lever.
Optionally, the waste collecting mechanism comprises a mounting nut, a connecting support and a collecting groove plate, the mounting nut is arranged on two sides of the first connecting rod in a threaded mode, the connecting support is arranged on the mounting nut in a threaded mode, the collecting groove plate is connected between the connecting supports, and the collecting groove plate is located at the bottom of the material receiving plate.
Optionally, still including putty powder intermittent type inflow mechanism, putty powder intermittent type inflow mechanism is including the guide way board, the contact post, the second connecting rod, the jam post, flow in pipeline and the spacing spring of second, the mounting disc top is equipped with the guide way board, sliding type connection has the second connecting rod between the guide way board, second connecting rod both sides all are equipped with the contact post, contact post and cam cooperation, be connected with the spacing spring of second between second connecting rod top and the guide way inboard wall, second connecting rod middle part is equipped with the jam post, be connected with the flow in pipeline between the mounting disc upper portion, flow in pipeline and jam post sliding type connection.
Optionally, the splash-proof mechanism comprises an installation column, an installation block and a separation plate, the installation column is arranged on one side of the installation disc, the installation block is arranged on the outer side of the installation column, and the separation plate is arranged on one side of the installation block.
Optionally, the top of the putty powder placing barrel is provided with a feeding hole.
The invention has the beneficial effects that: through the arrangement of the putty anti-stacking mechanism and the moving mechanism, the stirring blade is driven to rotate to continuously stir the putty powder, so that the putty powder is prevented from being stacked for a long time to affect spraying, the pulley can support the whole equipment to stably move on the wall surface, and the basic function is realized in cooperation with spraying; by arranging the anti-spilling mechanism and the waste material collecting mechanism, putty powder generated in spraying is recovered, so that the cost is saved; through setting up the spill proof mechanism, the division board can prevent that the putty powder that the spraying produced from wafting into on the people.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of the putty anti-stacking mechanism and the moving mechanism of the present invention.
Fig. 3 is a schematic perspective view of the anti-spillage mechanism of the present invention.
Fig. 4 is a schematic perspective view of the waste collection mechanism of the present invention.
Fig. 5 is a schematic perspective view of the intermittent flowing mechanism of putty powder of the present invention.
Fig. 6 is a schematic perspective view of the splash-out mechanism of the present invention.
FIG. 7 is a schematic cross-sectional view of the putty anti-piling mechanism of the present invention.
Fig. 8 is a schematic cross-sectional view of the anti-spillage mechanism of the present invention.
Description of reference numerals: 1_ putty powder placing barrel, 2_ conveying pipeline, 3_ spray head, 4_ putty anti-stacking mechanism, 41_ handheld frame, 42_ mounting disc, 43_ mounting seat, 44_ servo motor, 45_ stirring blade, 5_ moving mechanism, 51_ mounting plate, 52_ spacing column, 53_ buffer spring, 54_ pulley, 6_ anti-spilling mechanism, 61_ guide cylinder, 62_ spacing rod, 63_ first connecting rod, 64_ receiving plate, 65_ cam, 66_ contact rod, 67_ first spacing spring, 7_ waste collecting mechanism, 71_ mounting nut, 72_ connecting bracket, 73_ collecting groove plate, 8_ putty powder intermittent inflow mechanism, 81_ guide groove plate, 82_ contact column, 83_ second connecting rod, 84_ blocking column, 85_ inflow pipeline, 86_ second spacing spring, 9_ spill-out mechanism, 91_ mounting column, 92_ mounting block and 93_ isolation plate.
Detailed Description
The following description is only a preferred embodiment of the present invention, and does not limit the scope of the present invention.
Example 1
The utility model provides an enclosure putty powder spraying equipment for building industry, as shown in figure 1, figure 2 and figure 7, including putty powder place bucket 1, pipeline 2, shower nozzle 3, putty prevent piling up 4 and moving mechanism 5, putty powder place 1 front side of bucket and be equipped with pipeline 2, pipeline 2 front side articulates there is shower nozzle 3, putty powder place 1 left side of bucket and be equipped with putty and prevent piling up 4, putty powder place 1 bottom of bucket and be equipped with moving mechanism 5.
Putty prevents piling up mechanism 4 is including handheld frame 41, mounting disc 42, mount pad 43, servo motor 44 and stirring leaf 45, the putty powder is placed the 1 left and right sides of bucket and all is equipped with mounting disc 42, the mounting disc 42 lower part outside all is equipped with handheld frame 41, the mounting disc 42 upper portion outside all is equipped with mount pad 43, mount pad 43 bottom is equipped with servo motor 44, the putty powder is placed the rotary type between the bucket 1 and is equipped with stirring leaf 45, the axis of rotation of stirring leaf 45 all with servo motor 44's output shaft.
Moving mechanism 5 is including mounting panel 51, spacing post 52, buffer spring 53 and pulley 54, and mounting disc 42 bottom slidingtype is equipped with mounting panel 51, and the mounting panel 51 top left and right sides all is equipped with spacing post 52, is connected with buffer spring 53 between spacing post 52 and the mounting disc 42, and mounting panel 51 bottom rotary type is equipped with pulley 54.
The staff can place the putty powder in putty powder places bucket 1, start servo motor 44 function, servo motor 44's output shaft rotates and drives stirring leaf 45 through the pivot and rotate and continuously stir the putty powder, the putty powder that the stirring finishes can be on 2 infiltration shower nozzles 3 of pipeline, the staff can hand handheld frame 41 and drive its upper part and remove afterwards, press shower nozzle 3 on the wall, 3 atress of shower nozzle begin to operate the putty powder blowout, it can whitewash the wall to drive 3 removal of shower nozzle, buffer spring 53 can drive equipment and be in balanced state during, the cooperation work, whitewash finishes, it can to stop servo motor 44 function.
Example 2
On the basis of embodiment 1, as shown in fig. 3, 4 and 8, the anti-spillage mechanism 6 is further included, the anti-spillage mechanism 6 includes a guide cylinder 61, a limiting rod 62, a first connecting rod 63, a material receiving plate 64, a cam 65, a contact rod 66 and a first limiting spring 67, the guide cylinder 61 is arranged on the front side of the mounting seat 43, the limiting rod 62 is slidably arranged on the guide cylinder 61, the first limiting spring 67 is connected between the limiting rod 62 and the front side of the inner wall of the guide cylinder 61, the first connecting rod 63 is connected on the rear side of the limiting rod 62, the material receiving plate 64 is connected between the front sides of the first connecting rods 63, the contact rod 66 is connected on the front side of the middle portion of the first connecting rod 63, the cam 65 is connected on the rotating shaft, and the cam 65 is matched with the contact rod 66.
Still including garbage collection mechanism 7, garbage collection mechanism 7 is including mounting nut 71, linking bridge 72 and collection frid 73, and the equal screw thread formula in the anterior left and right sides of head rod 63 is equipped with mounting nut 71, and equal screw thread formula is equipped with linking bridge 72 on mounting nut 71, is connected with collection frid 73 between the linking bridge 72, collects frid 73 and is located and connects flitch 64 bottom.
The rotating shaft rotates to drive the cam 65 to rotate and continuously contact with the contact rod 66, when the contact rod 66 contacts with the cam 65, the contact rod 66 moves backwards to drive the material receiving plate 64 to move backwards through the first connecting rod 63 to collect the dropped putty powder during painting, the dropped putty powder can filter solid garbage falling on a wall body through the material receiving plate 64, the residual putty powder flows into the collecting groove plate 73, at the moment, the first connecting rod 63 moves backwards to drive the first limiting spring 67 to be compressed through the limiting rod 62, when the contact rod 66 does not contact with the cam 65, the first limiting spring 67 resets and drives the first connecting rod 63 to move forwards through the limiting rod 62 to reset, the first connecting rod 63 moves forwards to drive the material receiving plate 64 to move forwards to reset, when the collecting groove plate 73 is filled, a worker can separate from the first connecting rod 63 by rotating the mounting nut 71, the collecting groove plate 73 is not fixed any more, and then pouring out and recovering the putty powder in the collecting groove plate 73, and after the recovery is finished, installing and resetting the connecting bracket 72 and the collecting groove plate 73.
Example 3
On the basis of embodiment 2, as shown in fig. 5 and 6, the putty powder intermittent inflow mechanism 8 is further included, the putty powder intermittent inflow mechanism 8 includes guide groove plates 81, contact posts 82, second connecting rods 83, blocking posts 84, an inflow pipeline 85 and second limiting springs 86, the guide groove plates 81 are arranged at the top of the mounting plate 42, the second connecting rods 83 are connected between the guide groove plates 81 in a sliding manner, the contact posts 82 are arranged on the left and right sides of the second connecting rods 83, the contact posts 82 are matched with the cams 65, the second limiting springs 86 are connected between the tops of the second connecting rods 83 and the inner walls of the guide groove plates 81, the blocking posts 84 are arranged in the middle of the second connecting rods 83, the inflow pipeline 85 is connected between the upper portions of the mounting plate 42, and the inflow pipeline 85 is connected with the blocking posts 84 in a sliding manner.
Still including splashproof play mechanism 9, splashproof play mechanism 9 is equipped with erection column 91 including erection column 91, installation piece 92 and division board 93, and the mounting disc 42 front side is equipped with erection column 91, and the erection column 91 outside is equipped with installation piece 92, and the installation piece 92 rear side is equipped with division board 93.
The staff can insert the pipeline of suction putty powder into inflow pipeline 85, initial state blocking column 84 blocks inflow pipeline 85, the putty powder can not flow in, cam 65 rotates constantly and contacts with contact column 82, when contact column 82 contacts with cam 65, contact column 82 moves up and drives blocking column 84 through second connecting rod 83 and upwards remove and no longer block up inflow pipeline 85, the putty powder alright flow in putty powder through inflow pipeline 85 and place the bucket 1 in, accomplish the material loading, second connecting rod 83 upward movement drives second spacing spring 86 and is compressed this moment, when contact column 82 does not contact with cam 65, second spacing spring 86 resets and drives blocking column 84 through second connecting rod 83 and downwards move and block up inflow pipeline 85 once more, stop the material loading, division board 93 can prevent that the putty powder that the spraying produced from wafting into on the people's body during operation.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. The utility model provides an enclosure putty powder spraying equipment for building industry which characterized in that, including: bucket (1), pipeline (2), shower nozzle (3), putty are prevented piling up knot mechanism (4) and moving mechanism (5) are placed to putty powder, and putty powder is placed bucket (1) one side and is equipped with pipeline (2), and pipeline (2) one side articulates there is shower nozzle (3), and putty powder is placed bucket (1) one side and is equipped with putty and prevent piling up knot mechanism (4), and putty powder is placed bucket (1) bottom and is equipped with moving mechanism (5).
2. The enclosure putty powder spraying apparatus for construction industry as recited in claim 1, wherein the putty piling preventing mechanism (4) comprises: handheld frame (41), mounting disc (42), mount pad (43), servo motor (44) and stirring leaf (45), putty powder is placed bucket (1) both sides and all is equipped with mounting disc (42), mounting disc (42) lower part outside all is equipped with handheld frame (41), mounting disc (42) upper portion outside all is equipped with mount pad (43), mount pad (43) bottom is equipped with servo motor (44), putty powder is placed the rotary type and is equipped with stirring leaf (45) between bucket (1), the axis of rotation of stirring leaf (45) all with the output shaft of servo motor (44).
3. A fencing putty powder spraying apparatus for construction industry as set forth in claim 2 wherein the moving mechanism (5) includes: mounting panel (51), spacing post (52), buffer spring (53) and pulley (54), mounting panel (42) bottom slidingtype is equipped with mounting panel (51), and mounting panel (51) top both sides all are equipped with spacing post (52), are connected with buffer spring (53) between spacing post (52) and mounting panel (42), and mounting panel (51) bottom rotary type is equipped with pulley (54).
4. A fencing putty powder spraying apparatus for construction industry as set forth in claim 3 further including a spill prevention mechanism (6), the spill prevention mechanism (6) including: guide cylinder (61), gag lever post (62), head rod (63), connect flitch (64), cam (65), contact bar (66) and first limiting spring (67), mount pad (43) one side is equipped with guide cylinder (61), the gliding gag lever post (62) that is equipped with on guide cylinder (61), be connected with first limiting spring (67) between gag lever post (62) and guide cylinder (61) inner wall, gag lever post (62) one side is connected with head rod (63), be connected with between head rod (63) and connect flitch (64), head rod (63) middle part is connected with contact bar (66), be connected with cam (65) in the pivot, cam (65) and contact bar (66) cooperation.
5. The enclosure putty powder spraying apparatus for construction industry as recited in claim 4, further comprising a waste collecting means (7), wherein the waste collecting means (7) comprises: mounting nut (71), linking bridge (72) and collection frid (73), the equal screw thread formula in head rod (63) both sides is equipped with mounting nut (71), and equal screw thread formula is equipped with linking bridge (72) on mounting nut (71), is connected with between linking bridge (72) and collects frid (73), and collection frid (73) are located and connect flitch (64) bottom.
6. The enclosure putty powder spraying apparatus for construction industry as recited in claim 5, further comprising a putty powder intermittent inflow mechanism (8), wherein the putty powder intermittent inflow mechanism (8) comprises: guide slot board (81), contact column (82), second connecting rod (83), block up post (84), inflow pipeline (85) and second spacing spring (86), mounting disc (42) top is equipped with guide slot board (81), sliding type is connected with second connecting rod (83) between guide slot board (81), second connecting rod (83) both sides all are equipped with contact column (82), contact column (82) and cam (65) cooperation, be connected with second spacing spring (86) between second connecting rod (83) top and guide slot board (81) inner wall, second connecting rod (83) middle part is equipped with and blocks up post (84), be connected with inflow pipeline (85) between mounting disc (42) upper portion, inflow pipeline (85) and block up post (84) sliding type connection.
7. An enclosure putty powder spraying apparatus for construction industry as set forth in claim 6 further including a splash guard mechanism (9), the splash guard mechanism (9) including: the mounting plate comprises mounting columns (91), mounting blocks (92) and a partition plate (93), wherein the mounting columns (91) are arranged on one side of the mounting plate (42), the mounting blocks (92) are arranged on the outer sides of the mounting columns (91), and the partition plate (93) is arranged on one side of the mounting blocks (92).
8. The enclosure putty powder spraying apparatus for construction industry of claim 1, wherein: the top of the putty powder placing barrel (1) is provided with a feeding hole.
CN202111394923.6A 2021-11-23 2021-11-23 Enclosure putty powder spraying equipment for building industry Pending CN113863625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111394923.6A CN113863625A (en) 2021-11-23 2021-11-23 Enclosure putty powder spraying equipment for building industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111394923.6A CN113863625A (en) 2021-11-23 2021-11-23 Enclosure putty powder spraying equipment for building industry

Publications (1)

Publication Number Publication Date
CN113863625A true CN113863625A (en) 2021-12-31

Family

ID=78985220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111394923.6A Pending CN113863625A (en) 2021-11-23 2021-11-23 Enclosure putty powder spraying equipment for building industry

Country Status (1)

Country Link
CN (1) CN113863625A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB478882A (en) * 1936-07-22 1938-01-24 Victor Snow Robinson Improvements in or relating to spraying apparatus for cement, paints and other liquids and substances
AU7234096A (en) * 1995-10-05 1997-04-28 Herberts Powder Coatings Ab Method and device for handling powder in powder coating plants
CN107762116A (en) * 2017-10-12 2018-03-06 长沙市凤英机械科技有限公司 A kind of efficiently metope Integrated Processing Unit
CN108797952A (en) * 2017-04-27 2018-11-13 应鸽龙 Metope slurry putty scrape smear, spray, joint filling multifunctional equipment
CN109465227A (en) * 2018-12-13 2019-03-15 江苏航润机械有限公司 A kind of logical box body cleaning device for surface
CN210508270U (en) * 2019-08-13 2020-05-12 陕西工业职业技术学院 Spraying head for spraying building exterior wall coating
CN111622471A (en) * 2020-06-10 2020-09-04 陈蓉蓉 Building wall whitewashes device of adjustable angle of whitewashing
CN213774334U (en) * 2020-09-17 2021-07-23 晋江天佑建材有限公司 Putty powder machine of plastering a wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB478882A (en) * 1936-07-22 1938-01-24 Victor Snow Robinson Improvements in or relating to spraying apparatus for cement, paints and other liquids and substances
AU7234096A (en) * 1995-10-05 1997-04-28 Herberts Powder Coatings Ab Method and device for handling powder in powder coating plants
CN108797952A (en) * 2017-04-27 2018-11-13 应鸽龙 Metope slurry putty scrape smear, spray, joint filling multifunctional equipment
CN107762116A (en) * 2017-10-12 2018-03-06 长沙市凤英机械科技有限公司 A kind of efficiently metope Integrated Processing Unit
CN109465227A (en) * 2018-12-13 2019-03-15 江苏航润机械有限公司 A kind of logical box body cleaning device for surface
CN210508270U (en) * 2019-08-13 2020-05-12 陕西工业职业技术学院 Spraying head for spraying building exterior wall coating
CN111622471A (en) * 2020-06-10 2020-09-04 陈蓉蓉 Building wall whitewashes device of adjustable angle of whitewashing
CN213774334U (en) * 2020-09-17 2021-07-23 晋江天佑建材有限公司 Putty powder machine of plastering a wall

Similar Documents

Publication Publication Date Title
CN214143886U (en) Dust fall protector of quartering hammer
CN113463486B (en) Stadium prevents shop front device that ftractures
CN113073818A (en) Wall surface painting equipment for building construction and use method thereof
CN113863625A (en) Enclosure putty powder spraying equipment for building industry
CN113944301A (en) Indoor wall whitewashes device for building
CN201821582U (en) Printed circuit board (PCB) film shedding device
CN207392381U (en) A kind of sewage well and its well lid
CN112547341A (en) Fireproof material spraying equipment
CN210767730U (en) Spraying device for indoor and outdoor decoration
CN209579968U (en) A kind of precast beam pedestal
CN207204701U (en) Wood moulding building materials cleaning device
CN110538828A (en) Ore is gathered and is accomodate and use belt cleaning device
JPH06285436A (en) Jet cleaning device for continuous casting roll segment
CN115068144A (en) Complete glazing device for false tooth
CN211026601U (en) Waste collection device for construction
CN108166732B (en) Large-scale motorized spraying equipment
CN208276973U (en) A kind of printing cutting dust-extraction unit
CN113089969A (en) Spraying equipment for engineering construction
CN218543644U (en) Visual monitoring device with cleaning function for construction of power engineering transformer substation
CN218191346U (en) Sand and stone separator with dust fall splashproof function
CN219906204U (en) Aggregate bin dust fall device
CN211513950U (en) Spraying dust removal device of material shed
CN220779573U (en) Dust fall pipeline for concrete production
CN217698015U (en) Plant draws uses extraction device convenient to clearance
CN214033525U (en) Ground belt cleaning device for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211231