CN113852950B - Intelligent mobility tracking scheduling method and device for computing network - Google Patents

Intelligent mobility tracking scheduling method and device for computing network Download PDF

Info

Publication number
CN113852950B
CN113852950B CN202110720019.3A CN202110720019A CN113852950B CN 113852950 B CN113852950 B CN 113852950B CN 202110720019 A CN202110720019 A CN 202110720019A CN 113852950 B CN113852950 B CN 113852950B
Authority
CN
China
Prior art keywords
computing power
information
request
power service
service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110720019.3A
Other languages
Chinese (zh)
Other versions
CN113852950A (en
Inventor
王紫程
王晔彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Communication Technology Co Ltd
Original Assignee
Shandong Inspur Scientific Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Inspur Scientific Research Institute Co Ltd filed Critical Shandong Inspur Scientific Research Institute Co Ltd
Priority to CN202110720019.3A priority Critical patent/CN113852950B/en
Publication of CN113852950A publication Critical patent/CN113852950A/en
Application granted granted Critical
Publication of CN113852950B publication Critical patent/CN113852950B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management
    • H04W8/02Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks
    • H04W8/08Mobility data transfer
    • H04W8/16Mobility data transfer selectively restricting mobility data tracking
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/51Discovery or management thereof, e.g. service location protocol [SLP] or web services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0083Determination of parameters used for hand-off, e.g. generation or modification of neighbour cell lists
    • H04W36/0085Hand-off measurements
    • H04W36/0088Scheduling hand-off measurements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/08Reselecting an access point
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Databases & Information Systems (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides an intelligent mobility tracking scheduling method and device for a computing network, wherein the method comprises the following steps: according to a mobility tracking scheduling request based on User Equipment (UE) sent by a received computing power service arrangement end, checking the information opening authority of the UE to a service platform; acquiring power service network requirement information and idle power resource information of a power service arrangement end based on successful verification of UE information opening authority, acquiring cell information and measurement information of a service platform based on the UE, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information; and returning the computing power service instantiation request and the instance termination request based on the target node to the computing power service orchestration end. According to the invention, the UE information opening authority of the scheduling end is checked, so that the scheduling end passing the check generates an instantiation request and an instantiation termination request according to the acquired information, thereby facilitating the switching of the power service in the target node in advance and improving the switching efficiency.

Description

Intelligent mobility tracking scheduling method and device for computing network
Technical Field
The invention relates to the technical field of mobile communication, in particular to an intelligent mobility tracking scheduling method and device for a computing network.
Background
Artificial intelligence (Artificial Intelligence, AI) and 5G technologies promote the wide application of computation-intensive services, promote the explosive development of emerging services such as internet of things, large videos and internet of vehicles, and the like, make the existing network architecture and the cloud centralized deployment mode difficult to meet the service requirements, and enable the network and the cloud to migrate along with the service flow direction and the edge through edge computing to become a new trend of industry. Computing power has become a key element for supporting intelligent social development, computing power is distributed in different network levels (end, side and cloud), computing power resources of each level are different, and meanwhile, an edge computing ecological system covers different computing power providers and comprises the following components: cloud providers, application/service providers, network operators, small and medium-sized enterprises, supercomputers and even individuals, how to integrate and utilize computing power resources of all levels and parties is challenging.
With the maturation and large-scale deployment of 5G network technologies, in order to exert the characteristics of low latency, large bandwidth and the like in a wide-area coverage scene, computing nodes need to be widely deployed. In the situations of rapid movement of users and the like, the computing nodes face the challenge of rapid switching among the nodes, meanwhile, as the computing nodes deployed at the edge have limited resources, computing services need to be instantiated according to needs, and the difficulty is brought to the guarantee of the mobile computing service quality.
Disclosure of Invention
The invention provides an intelligent mobility tracking scheduling method and device for a computational power network, which are used for solving the defects of unstable computational power service connection and higher time delay caused by difficulty in sensing the position and movement trend of a user in the prior art, optimizing the scheduling flow among computing nodes, improving the switching efficiency among the computing nodes, reducing the switching time delay and improving the mobile computing service quality.
The invention provides an intelligent mobility tracking scheduling method for a computing network, which comprises the following steps: according to a mobility tracking scheduling request based on User Equipment (UE) sent by a received computing power service arrangement end, checking the information opening authority of the UE to a service platform; acquiring computing power service network requirement information and idle computing power resource information of the computing power service arrangement end based on the success of the UE information open authority verification, acquiring cell information and measurement information of the service platform based on the UE, and calculating to obtain a computing power service instantiation request and an instance termination request based on a target node based on the acquired information; and returning the computing power service instantiation request and the instance termination request based on the target node to the computing power service orchestration end.
According to the intelligent mobility tracking scheduling method for the computing power network provided by the invention, according to the mobility tracking scheduling request based on the user equipment UE sent by the received computing power service arrangement end, the information opening authority of the user equipment UE is checked for a service platform, and the method comprises the following steps: receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service arrangement end; and sending a verification request based on the UE information opening permission to a service platform according to the UE, and verifying successfully based on the authorized UE information opening permission returned by the service platform.
According to the intelligent mobility tracking scheduling method for the power computing network provided by the invention, the power computing service network requirement information and idle power computing resource information of the power computing service arrangement end are acquired based on the success of the UE information open authority verification, and the method comprises the following steps: based on the success of the verification of the information opening authority of the UE, a mobility tracking scheduling request for obtaining the information opening authority is sent to the computing power service arrangement end; and receiving the power service network requirement information and the idle power resource information returned by the power service orchestration terminal based on the mobility tracking scheduling request.
The invention provides an intelligent mobility tracking scheduling method for a computing network, which comprises the following steps: checking the tracking authority of the UE to the computing power service application terminal according to the received mobility tracking scheduling request based on the UE sent by the computing power service application terminal; based on the success of the UE tracking authority verification, a mobility tracking scheduling request for obtaining the UE tracking authority is sent to a scheduling end; receiving a mobility tracking scheduling request returned by the scheduling end for obtaining information opening authority, obtaining computing power service network requirement information and idle computing power resource information of the computing power service application end, and sending the information to the scheduling end; and receiving and executing a computing power service instantiation request and an instance termination request which are returned by the dispatching end and are based on the target node.
According to the intelligent mobility tracking scheduling method for the power computing network provided by the invention, the tracking authority of the UE is checked for the power computing service application terminal according to the received mobility tracking scheduling request based on the user equipment UE sent by the power computing service application terminal, and the method comprises the following steps: receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service application terminal; and sending a verification request of local UE tracking permission to the computing power service application terminal according to the UE, and based on the authorized UE tracking permission returned by the computing power service application terminal, successfully verifying.
According to the intelligent mobility tracking scheduling method facing to the power network provided by the invention, the power service instantiation request and the instance termination request which are returned by the scheduling end and are based on the target node are received and executed, and the method comprises the following steps: receiving a computing power service instantiation request and an instance termination request which are returned by the scheduling end and are based on a target node; and switching the computing power service of the current computing power node based on the computing power service instantiation request and the instance termination request of the target node, and stopping redundant computing power service of the current computing power node relative to the target node.
The invention also provides an intelligent mobility tracking and scheduling device oriented to the power computing network, which comprises the following steps: the information authority verification module is used for verifying the information opening authority of the UE to the service platform according to the received mobility tracking scheduling request based on the UE sent by the computing power service arrangement end; the request generation module is used for acquiring the power service network requirement information and idle power resource information from the power service arrangement end based on the success of the UE information open permission verification, acquiring the cell information and measurement information of the UE from the service platform, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information; and the information return module returns the computing power service instantiation request and the instance termination request based on the target node to the computing power service arrangement end.
The invention also provides an intelligent mobility tracking and scheduling device oriented to the power computing network, which comprises the following steps: the tracking permission verification module is used for verifying the tracking permission of the User Equipment (UE) to the computing power service application terminal according to the received mobility tracking scheduling request based on the UE sent by the computing power service application terminal; the request sending module is used for sending a mobility tracking scheduling request for obtaining the UE tracking permission to a scheduling end based on the success of the UE tracking permission verification; the information acquisition module is used for receiving a mobility tracking scheduling request returned by the scheduling end for obtaining information opening permission, acquiring computing power service network requirement information and idle computing power resource information from the computing power service application end, and sending the computing power service network requirement information and idle computing power resource information to the scheduling end; and the command execution module is used for receiving and executing the computing power service instantiation request and the instance termination request which are returned by the scheduling end and are based on the target node.
The invention also provides an electronic device comprising a memory, a processor and a computer program stored on the memory and capable of running on the processor, wherein the processor realizes the steps of the intelligent mobility tracking scheduling method facing the power network when executing the program.
The present invention also provides a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, implements the steps of the intelligent mobility tracking scheduling method for a power-oriented network as described in any one of the above.
According to the intelligent mobility tracking scheduling method and device for the computing power network, the computing power network arrangement end obtains the tracking authority of the corresponding UE through checking the tracking authority of the UE, so that the computing power service network requirement information and idle computing power resource information of the UE can be tracked and scheduled conveniently; the method comprises the steps that through checking the UE information opening authority, a dispatching end obtains the information opening authority of a corresponding UE, cell information and measurement information of the corresponding UE information are conveniently obtained, the dispatching end is conveniently instantiated according to acquired computing power service network requirement information, idle computing power resource information, cell information and measurement information, an instantiation request and an instantiation ending request are generated, the computing power service orchestration end is conveniently and timely ended when switching the instantiation computing power service in a target node according to the instantiation request and the instantiation ending request, redundant computing power service of a current computing power node relative to a next target node is timely ended, and synchronization between suspension and node switching of redundant computing power service is achieved, so that switching efficiency among computing nodes is improved, switching time delay is reduced, and mobile computing service quality is improved.
Drawings
In order to more clearly illustrate the invention or the technical solutions of the prior art, the following description will briefly explain the drawings used in the embodiments or the description of the prior art, and it is obvious that the drawings in the following description are some embodiments of the invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic flow chart of an intelligent mobility tracking and scheduling method for a computing network, which is provided by the invention;
fig. 2 is a second flow chart of the intelligent mobility tracking and scheduling method for the computing network provided by the invention;
FIG. 3 is a third flow chart of the intelligent mobility tracking and scheduling method for the computing network provided by the invention;
fig. 4 is a schematic structural diagram of an intelligent mobility tracking and scheduling device facing a computing network provided by the invention;
fig. 5 is a second schematic structural diagram of the intelligent mobility tracking and scheduling device facing the computational power network;
fig. 6 is a schematic structural diagram of an electronic device provided by the present invention.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is apparent that the described embodiments are some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Fig. 1 shows a flow diagram of an intelligent mobility tracking and scheduling method for a computing network, which includes:
s11, checking the information opening authority of the UE to a service platform according to a mobility tracking scheduling request based on the UE sent by a received computing power service arrangement end;
s12, based on the success of the UE information open authority verification, acquiring the power service network requirement information and idle power resource information of a power service arrangement end, acquiring cell information and measurement information of a service platform based on the UE, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information;
s13, the computing power service instantiation request and the instance termination request based on the target node are returned to the computing power service orchestration end.
It should be noted that S0N in the present specification does not represent the sequence of the intelligent mobility tracking and scheduling method for the power network, and the intelligent mobility tracking and scheduling method for the power network of the present invention is specifically described below.
S11, checking the information opening authority of the UE to the service platform according to the received mobility tracking scheduling request based on the UE sent by the computing power service arrangement end.
In this embodiment, the intelligent mobility tracking scheduling method for the power-calculation network disclosed by the invention is described by taking a scheduling end as one side. It should be noted that the mobility tracking scheduling request based on the user equipment UE, which is sent by the computing power service orchestration end and received by the scheduling end, contains at least one user equipment UE.
In an alternative embodiment, the mobility tracking scheduling request based on the user equipment UE comprises at least one user equipment UE; alternatively, the mobility tracking scheduling request comprises at least one group of at least two user equipments, UEs.
In order to determine whether the scheduling end has the information opening authority for acquiring the corresponding UE in the service platform, after the scheduling end receives the mobility tracking scheduling request based on the UE sent by the computing power service orchestration end, the scheduling end checks the information opening authority of the UE to the service platform. The method specifically comprises the following steps: receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service arrangement end; and sending a verification request based on the UE information opening permission to the service platform according to the UE, and verifying the verification success based on the authorized UE information opening permission returned by the service platform.
After receiving a verification request based on the UE information opening authority sent by the scheduling end, the service platform judges whether the information authority pre-stored in the service platform has the UE information opening authority or not according to the UE contained in the mobility tracking scheduling request based on the user equipment UE, if so, the service platform returns the authorized UE information opening authority to the scheduling end, the verification is successful, and the subsequent scheduling end can acquire corresponding UE information from the service platform; otherwise, the verification fails.
In an alternative embodiment, the service platform is a wireless network intelligent control platform (RAN Intelligent Controller, RIC) or a wireless network capability open platform (Network Exposure Function, NEF).
In an alternative embodiment, before the scheduling end receives the mobility tracking scheduling request based on the user equipment UE sent by the computing power service orchestration end, the checking of the UE tracking authority of the mobility tracking scheduling request is needed, which specifically includes: the method comprises the steps that a computing power service arrangement end receives a mobility tracking scheduling request based on UE sent by a computing power service application end; the power computing service arrangement end checks the tracking authority of the UE to the power computing service application end, obtains the tracking authority of the UE based on the successful check, and sends a mobility tracking scheduling request based on the UE after obtaining the tracking authority to the scheduling end.
It should be noted that, the verifying, by the computing power service orchestration end, the tracking authority of the UE to the computing power service application end includes: the power computing service arrangement end sends a verification request based on the UE tracking authority to the power computing service application end; after receiving the verification request based on the UE tracking authority, the computing power service application end judges whether the UE tracking authority is available in the pre-stored tracking authorities or not according to the UE, if so, the computing power service application end returns authorized UE tracking authorities to the computing power service orchestration end, verification is successful, and the subsequent computing power service orchestration end can track the corresponding UE.
S12, based on the success of the UE information open authority verification, acquiring the power service network requirement information and idle power resource information of a power service arrangement end, acquiring cell information and measurement information of a service platform based on the UE, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information.
In this embodiment, the acquiring the cell information and the measurement information of the service platform based on the UE based on the success of the UE information open right verification includes: based on successful verification of the UE information opening authority, sending a UE information acquisition request to a service platform; and receiving cell information and measurement information of the UE returned by the service platform based on the UE information acquisition request.
Specifically, after the scheduling end receives the authorized information opening authority based on the user equipment UE returned by the service platform, the scheduling end has the authority to acquire the corresponding UE information. In addition, after the scheduling end sends a UE information acquisition request to the service platform, the service platform sends the UE information acquisition request to the base station side based on the received UE information acquisition request; the service platform receives the cell information and the measurement information of the UE returned by the base station side based on the UE information acquisition request, and returns the cell information and the measurement information to the scheduling end.
The cell information and measurement information of the UE are corresponding UE information returned by the UE or the UE group included in the mobility tracking scheduling request, and the cell information and measurement information of the UE include: cell ID, cell location, UE identity, reference signal received power RSRP, signal to interference plus noise ratio SINR, etc.
In addition, based on successful verification of the information opening authority of the UE, acquiring the information of the demand of the computing power service network and the information of the idle computing power resource of the computing power service orchestration end, including: based on the success of the verification of the information opening authority of the UE, a mobility tracking scheduling request for obtaining the information opening authority is sent to a computing power service arrangement terminal; and receiving the computing power service network requirement information and the idle computing power resource information returned by the computing power service arrangement terminal based on the mobility tracking scheduling request for obtaining the information opening authority.
It should be noted that after the open authority verification based on the UE is successful, the scheduling end returns a mobility tracking scheduling request for obtaining the information open authority to the power service orchestration end, and the power service orchestration end sends a power acquisition request to the power service application end passing the UE tracking authority verification based on the mobility tracking scheduling request for obtaining the information open authority; the computing power service arrangement end receives the computing power service network requirement information returned by the computing power service application end based on the computing power acquisition request, and returning the computing power service network requirement information returned by the computing power service application end and the idle computing power resource information of the computing power service arrangement end to the scheduling end.
It should be noted that the idle computing power resource information is schedulable computing power resource information. The power service network requirement information and the idle power resource information comprise power service delay requirement, power service bandwidth requirement, power resource position, service area limitation, service providing capability, available bandwidth, service quality QoS grade and the like.
Calculating to obtain a computing power service instantiation request and an instance termination request based on the target node based on the acquired information, wherein the computing power service instantiation request and the instance termination request comprise the following steps: and determining an instance structure based on the target node according to the acquired computing power service network requirement information and the idle computing power resource information, and filling the instance structure according to the acquired cell information and the measurement information based on the UE to form an instance request based on the target node. It should be noted that in performing the calculation based on the acquired information, the calculation may be performed using an AI algorithm.
The target node is the node after the current computing node is switched. Because redundancy exists in the power computing service based on the current power computing node relative to the target node after the current power computing node is switched to the target node, an instantiation termination request is generated based on the actual power computing service of the current power computing node and the power computing service required by the target node, so that when the power computing service of the current power computing node is switched based on the power computing service instantiation request and the instance termination request of the target node, the redundant power computing service of the current power computing service relative to the target node is stopped, and the suspension of the redundant power computing service and the switching of the power computing service are synchronously realized, thereby improving the switching efficiency among the computing nodes, reducing the switching delay and improving the mobile computing service quality.
S13, the computing power service instantiation request and the instance termination request based on the target node are returned to the computing power service orchestration end.
After receiving the request for instantiating the power service based on the target node and the request for terminating the instance, the power service orchestration terminal switches the power service of the current power node to the power service suitable for the target node in advance, and stops redundant power service relative to the target node.
Fig. 2 shows a flow diagram of an intelligent mobility tracking and scheduling method for a computing network, the method comprising:
s21, checking the tracking authority of the UE to the power computing service application terminal according to the received mobility tracking scheduling request based on the UE sent by the power computing service application terminal;
s22, based on successful verification of the UE tracking authority, a mobility tracking scheduling request for acquiring the UE tracking authority is sent to a scheduling end;
s23, receiving a mobility tracking scheduling request returned by a scheduling end for obtaining information opening authority, obtaining computing power service network requirement information and idle computing power resource information of a computing power service application end, and sending the computing power service network requirement information and idle computing power resource information to the scheduling end;
s24, receiving and executing a computing power service instantiation request and an instance termination request which are returned by the dispatching end and are based on the target node.
It should be noted that S0N in the present specification does not represent the sequence of the intelligent mobility tracking and scheduling method for the power network, and the intelligent mobility tracking and scheduling method for the power network of the present invention is specifically described below.
Step S21, according to the received mobility tracking scheduling request based on the user equipment UE sent by the computing power service application end, checking the tracking authority of the UE to the computing power service application end.
In this embodiment, the intelligent mobility tracking scheduling method for the power computing network disclosed by the invention is described by taking the power computing service arrangement end as one side. It should be noted that the mobility tracking scheduling request based on the user equipment UE, which is sent by the computing power service application end and received by the computing power service orchestration end, contains at least one user equipment UE.
In an alternative embodiment, the mobility tracking scheduling request based on the user equipment UE comprises at least one user equipment UE; alternatively, the mobility tracking scheduling request comprises at least one group of at least two user equipments, UEs.
In order to determine whether the computing power service orchestration terminal has the tracking authority of the UE, after the computing power service application terminal received by the computing power service orchestration terminal sends a mobility tracking scheduling request based on the UE of the user equipment, the computing power service orchestration terminal checks the tracking authority of the UE with the computing power service application terminal. The method specifically comprises the following steps: receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service application terminal; and sending a verification request based on the UE tracking permission to the computing power service application terminal according to the UE, and verifying successfully based on the authorized UE tracking permission returned by the computing power service application terminal.
After receiving a verification request based on the tracking authority of the UE sent by the power computing service arrangement end, the power computing service application end judges whether the UE tracking authority stored in the power computing service application end in advance has the tracking authority of the UE, if so, the power computing service application end returns the authorized UE tracking authority to the power computing service arrangement end, the verification is successful, and the subsequent power computing service arrangement end can carry out tracking scheduling on the UE; otherwise, the verification fails.
Step S22, based on the success of the UE tracking authority verification, a mobility tracking scheduling request for obtaining the UE tracking authority is sent to a scheduling end.
It should be noted that, in this embodiment, after the UE-based tracking permission verification is successful, the method further includes: and sending a mobility tracking scheduling request for obtaining the UE tracking authority to a power service application end so as to track the UE at any time and schedule the UE.
Step S23, receiving a mobility tracking scheduling request returned by the scheduling end for obtaining the information opening authority, obtaining the computing power service network requirement information and the idle computing power resource information of the computing power service application end, and sending the information to the scheduling end.
Specifically, after receiving a mobility tracking scheduling request for obtaining information opening permission returned by a scheduling end, a computing power service scheduling end sends a computing power acquisition request to a computing power service application end passing UE tracking permission verification based on the mobility tracking scheduling request for obtaining information opening permission; the computing power service arrangement end receives the computing power service network requirement information returned by the computing power service application end based on the computing power acquisition request, and returning the computing power service network requirement information returned by the computing power service application end and the idle computing power resource information of the computing power service arrangement end to the scheduling end.
It should be noted that the idle computing power resource information is schedulable computing power resource information. The power service network requirement information and the idle power resource information comprise power service delay requirement, power service bandwidth requirement, power resource position, service area limitation, service providing capability, available bandwidth, service quality QoS grade and the like. In addition, the mobility tracking scheduling request for the scheduling end to obtain the information opening authority may refer to the foregoing embodiments, and will not be described herein.
Step S24, a computing power service instantiation request and an instance termination request which are returned by the dispatching end and are based on the target node are received and executed.
In this embodiment, receiving and executing a computing power service instantiation request and an instance termination request returned by a scheduling end, where the computing power service instantiation request and the instance termination request are based on a target node include: receiving a computing power service instantiation request and an instance termination request which are returned by a scheduling end and are based on a target node; and switching the computing power service of the current computing power node based on the computing power service instantiation request and the instance termination request of the target node, and stopping the redundant computing power service of the current computing power node relative to the target node.
The target node is the node after the current computing node is switched. Because redundancy may exist in the power computing service based on the current power computing node relative to the target node after the current power computing node is switched to the target node, an instantiation termination request needs to be generated based on the actual power computing service of the current power computing node and the power computing service required by the target node, so that when the power computing service is instantiated in advance in the target node switching, the power computing service of the current power computing node for the target settlement redundancy is stopped, and the suspension of the redundant power computing service and the switching of the power computing service are synchronously realized, thereby improving the switching efficiency between the computing nodes, reducing the switching delay and improving the mobile computing service quality.
In an alternative embodiment, after the power service orchestration end sends the acquired power service network requirement information and the idle power resource information to the scheduling end, the scheduling end calculates the power service instantiation request and the instance termination request based on the target node based on the acquired information, and specific steps may be described with reference to the foregoing embodiments, which are not repeated herein.
Fig. 3 shows a flow diagram of an intelligent mobility tracking and scheduling method for a computing network, the method comprising:
s31, the computing power service application end sends a mobility tracking scheduling request based on User Equipment (UE) to the computing power service orchestration end;
s32, the power calculation service arrangement end checks the tracking authority of the UE to the power calculation service application end according to the received mobility tracking scheduling request based on the UE, and sends the mobility tracking scheduling request for obtaining the UE tracking authority to the power calculation service application end based on the successful check;
s33, after the UE tracking authority check is successful, the computing power service orchestration end sends a mobility tracking scheduling request based on the UE to the scheduling end;
s34, the scheduling end checks the information opening authority of the UE to the service platform according to the received mobility tracking scheduling request based on the UE, and based on the success of the check of the information opening authority of the UE, acquires the cell information and the measurement information based on the UE in the service platform, acquires the power calculation service network requirement information and the idle power calculation resource information of the power calculation service arrangement end, and calculates and obtains the power calculation service instantiation request and the instance termination request based on the target node based on the acquired information;
S35, the dispatching end returns the computing power service instantiation request and the instance termination request based on the target node to the computing power service arrangement end;
s36, the computing power service orchestration terminal receives and executes the computing power service instantiation request and the instance termination request which are returned by the scheduling terminal and are based on the target node.
When the scheduling end acquires the cell information and the vehicle information based on the UE in the service platform, the scheduling end sends a UE information acquisition request to the service platform; the service platform acquires cell information and measurement information of the UE at the base station side based on the UE information acquisition request and returns the cell information and the measurement information to the scheduling end; when a scheduling end obtains the computing power service network requirement information and the idle computing power resource information of a computing power service arrangement end, the scheduling end sends a mobility tracking scheduling request for obtaining information opening permission to the computing power service arrangement end; the computing power service arrangement end sends a computing power acquisition request to the computing power service application end according to the received mobility tracking scheduling request for obtaining the information opening authority; the computing power service application end returns computing power service network requirement information based on the computing power acquisition request; and the computing power service arrangement end returns the idle computing power resource information in the computing power service arrangement end and the computing power service network requirement information returned by the computing power service application end to the scheduling end.
In addition, after the computing power service arrangement end verifies the tracking authority of the UE to the computing power service application end, the method further comprises the following steps: based on the verification success, the computing power service arrangement end sends a mobility tracking scheduling request for obtaining the UE tracking authority to the computing power service application end.
In summary, the embodiment of the invention enables the computing power network arrangement terminal to obtain the tracking authority of the corresponding UE through checking the tracking authority of the UE, thereby facilitating tracking and scheduling of the computing power service network requirement information and the idle computing power resource information of the UE; the method comprises the steps that through checking the UE information opening authority, a dispatching end obtains the information opening authority of a corresponding UE, cell information and measurement information of the corresponding UE information are conveniently obtained, the dispatching end is conveniently instantiated according to acquired computing power service network requirement information, idle computing power resource information, cell information and measurement information, an instantiation request and an instantiation ending request are generated, the computing power service orchestration end is conveniently and timely ended when switching the instantiation computing power service in a target node according to the instantiation request and the instantiation ending request, redundant computing power service of a current computing power node relative to a next target node is timely ended, and synchronization between suspension and node switching of redundant computing power service is achieved, so that switching efficiency among computing nodes is improved, switching time delay is reduced, and mobile computing service quality is improved.
The intelligent mobility tracking scheduling device facing the computational power network, which is provided by the invention, is described below, and the intelligent mobility tracking scheduling device facing the computational power network, which is described below, and the intelligent mobility tracking scheduling method facing the computational power network, which is described above, can be referred to correspondingly.
Fig. 4 shows a schematic structural diagram of an intelligent mobility tracking scheduling apparatus for an algorithm network, which is applied to a scheduling end, and the apparatus includes:
the information authority checking module 41 checks the information opening authority of the UE to the service platform according to the received mobility tracking scheduling request based on the UE sent by the computing power service arrangement end;
the request generation module 42 acquires the power service network requirement information and idle power resource information from the power service arrangement terminal based on the success of the UE information open authority verification, acquires the cell information and measurement information of the UE from the service platform, and calculates and obtains a power service instantiation request and an instance termination request based on the target node based on the acquired information;
the information return module 43 returns the computing power service instantiation request and the instance termination request based on the target node to the computing power service orchestration end.
In the present embodiment, the information authority verification module 41 includes: a first receiving unit for receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service arrangement end; and the information authority verification unit is used for sending a verification request based on the UE information opening authority to the service platform according to the UE, and verifying the UE information opening authority based on the authorization returned by the service platform. Further, the information authority checking unit comprises an information request sending subunit, a User Equipment (UE) information opening authority checking unit and a User Equipment (UE) information opening authority checking unit, wherein the information request sending subunit sends a checking request based on UE information opening authority to the service platform; and the information request receiving subunit receives the authorized UE information opening permission returned by the service platform.
The request generation module 42 includes: a first information acquisition unit for acquiring the computing power service network requirement information and the idle computing power resource information of the computing power service arrangement terminal; a second information acquisition unit for acquiring cell information and measurement information of the service platform based on the UE; the computing unit is used for computing based on the information acquired by the first information acquisition unit and the second information acquisition unit to obtain a computing power service instantiation request and an instance termination request based on the target node; and the calculating unit is used for calculating and obtaining a computing power service instantiation request and an instance termination request based on the target node based on the acquired information.
Specifically, the first information acquisition unit includes: a tracking request sending subunit, for sending a mobility tracking scheduling request for obtaining information opening authority to the computing power service orchestration terminal; and the tracking request receiving subunit is used for receiving the computing power service network requirement information and the idle computing power resource information returned by the computing power service orchestration terminal based on the mobility tracking scheduling request for obtaining the information opening authority. In addition, the second information acquisition unit includes: an information request sending subunit, which sends a UE information acquisition request to the service platform; and the information request receiving subunit is used for receiving the cell information and the measurement information of the UE returned by the service platform based on the UE information acquisition request.
Fig. 5 shows a schematic structural diagram of an intelligent mobility tracking and scheduling device facing a computing network, which is applied to a computing service scheduling end and comprises:
the tracking authority verification module 51 verifies the tracking authority of the User Equipment (UE) to the computing power service application terminal according to the received mobility tracking scheduling request based on the UE sent by the computing power service application terminal;
the request sending module 52 is used for sending a mobility tracking scheduling request for obtaining the UE tracking permission to a scheduling end based on the success of the UE tracking permission verification;
the information acquisition module 53 receives a mobility tracking scheduling request returned by the scheduling end for obtaining information opening authority, acquires computing power service network requirement information and idle computing power resource information from the computing power service application end, and sends the information to the scheduling end;
the command execution module 54 receives and executes the computing power service instantiation request and the instance termination request returned by the dispatcher and based on the target node.
In this embodiment, the tracking right verification module 51 includes: the second information receiving unit is used for receiving a mobility tracking scheduling request based on User Equipment (UE) sent by the computing power service application end; and the tracking permission verification unit is used for sending a verification request based on the UE tracking permission to the computing power service application end according to the UE, and verifying the UE tracking permission based on the authorization returned by the computing power service application end. Further, the tracking right checking unit comprises a tracking request sending subunit, which sends a checking request based on the UE tracking right to the computing power service application end; and the tracking request receiving subunit receives the authorized UE tracking permission returned by the computing power service application terminal.
The information acquisition module 53 includes: a tracking request sending unit for sending a mobility tracking scheduling request for obtaining information opening authority to a computing power service arrangement terminal; a tracking request receiving unit for receiving the computing power service network requirement information and idle computing power resource information returned by the computing power service orchestration terminal based on the mobility tracking scheduling request for obtaining the information opening authority; and the information return unit is used for sending the acquired computing power service network requirement information and the self-idle computing power resource information to the scheduling end.
Specifically, the tracking request receiving unit includes: a computing force request sending subunit, for sending a computing force obtaining request to a computing force service application terminal; the computing power request receiving subunit receives computing power service network requirement information returned by the computing power service application terminal based on the computing power acquisition request; the computing power acquisition unit acquires self-idle computing power resource information.
In an alternative embodiment, the intelligent mobility tracking and scheduling device for the computing power network comprises a computing power service application end, a computing power service arrangement end, a scheduling end and a service platform, wherein:
the power computing service application end sends a mobility tracking scheduling request based on User Equipment (UE) to the power computing service orchestration end;
The power computing service orchestration terminal checks the tracking authority of the UE to the power computing service application terminal according to the received mobility tracking scheduling request based on the UE, and sends the mobility tracking scheduling request for obtaining the UE tracking authority to the power computing service application terminal based on the success of the checking;
after the UE tracking authority check is successful, the computing power service orchestration end sends a mobility tracking scheduling request based on the UE to the scheduling end;
the scheduling end checks the information opening authority of the UE to the service platform according to the received mobility tracking scheduling request based on the UE, and based on the success of the checking of the information opening authority of the UE, acquires cell information and measurement information based on the UE in the service platform, acquires the computing power service network requirement information and idle computing power resource information of the computing power service arrangement end, and calculates and obtains a computing power service instantiation request and an instance termination request based on the acquired information;
the dispatching end returns the computing power service instantiation request and the instance termination request based on the target node to the computing power service orchestration end;
and the computing power service orchestration terminal receives and executes the computing power service instantiation request and the instance termination request which are returned by the scheduling terminal and are based on the target node.
Fig. 6 illustrates a physical schematic diagram of an electronic device, as shown in fig. 6, which may include: processor 61, communication interface (Communications Interface) 62, memory 63 and communication bus 64, wherein processor 61, communication interface 62, memory 63 accomplish each other's communication through communication bus 64. Processor 61 may invoke logic instructions in memory 63 to perform a method of intelligent mobility tracking scheduling for a power-oriented network, the method comprising: according to a mobility tracking scheduling request based on User Equipment (UE) sent by a received computing power service arrangement end, checking the information opening authority of the UE to a service platform; acquiring power service network requirement information and idle power resource information of a power service arrangement end based on successful verification of UE information opening authority, acquiring cell information and measurement information of a service platform based on the UE, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information; returning a computing power service instantiation request and an instance termination request based on the target node to a computing power service arrangement end; or checking the tracking authority of the UE to the power computing service application terminal according to the received mobility tracking scheduling request based on the UE sent by the power computing service application terminal; based on successful verification of the UE tracking authority, a mobility tracking scheduling request for acquiring the UE tracking authority is sent to a scheduling end; receiving a mobility tracking scheduling request returned by a scheduling end for obtaining information opening authority, obtaining computing power service network requirement information and idle computing power resource information of a computing power service application end, and sending the information to the scheduling end; and receiving and executing a computing power service instantiation request and an instance termination request which are returned by the dispatching end and are based on the target node.
Further, the logic instructions in the memory 63 described above may be implemented in the form of software functional units and may be stored in a computer-readable storage medium when sold or used as a stand-alone product. Based on this understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution, in the form of a software product stored in a storage medium, comprising several instructions for causing a computer device (which may be a personal computer, a server, a network device, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk, or an optical disk, or other various media capable of storing program codes.
In another aspect, the present invention also provides a computer program product comprising a computer program stored on a non-transitory computer readable storage medium, the computer program comprising program instructions which, when executed by a computer, enable the computer to perform the method of intelligent mobility tracking scheduling for a computing network provided by the methods described above, the method comprising: according to a mobility tracking scheduling request based on User Equipment (UE) sent by a received computing power service arrangement end, checking the information opening authority of the UE to a service platform; acquiring power service network requirement information and idle power resource information of a power service arrangement end based on successful verification of UE information opening authority, acquiring cell information and measurement information of a service platform based on the UE, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information; returning a computing power service instantiation request and an instance termination request based on the target node to a computing power service arrangement end; or checking the tracking authority of the UE to the power computing service application terminal according to the received mobility tracking scheduling request based on the UE sent by the power computing service application terminal; based on successful verification of the UE tracking authority, a mobility tracking scheduling request for acquiring the UE tracking authority is sent to a scheduling end; receiving a mobility tracking scheduling request returned by a scheduling end for obtaining information opening authority, obtaining computing power service network requirement information and idle computing power resource information of a computing power service application end, and sending the information to the scheduling end; and receiving and executing a computing power service instantiation request and an instance termination request which are returned by the dispatching end and are based on the target node.
In yet another aspect, the present invention further provides a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, is implemented to perform the above-provided intelligent mobility tracking scheduling method for a computing network, the method comprising: according to a mobility tracking scheduling request based on User Equipment (UE) sent by a received computing power service arrangement end, checking the information opening authority of the UE to a service platform; acquiring power service network requirement information and idle power resource information of a power service arrangement end based on successful verification of UE information opening authority, acquiring cell information and measurement information of a service platform based on the UE, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information; returning a computing power service instantiation request and an instance termination request based on the target node to a computing power service arrangement end; or checking the tracking authority of the UE to the power computing service application terminal according to the received mobility tracking scheduling request based on the UE sent by the power computing service application terminal; based on successful verification of the UE tracking authority, a mobility tracking scheduling request for acquiring the UE tracking authority is sent to a scheduling end; receiving a mobility tracking scheduling request returned by a scheduling end for obtaining information opening authority, obtaining computing power service network requirement information and idle computing power resource information of a computing power service application end, and sending the information to the scheduling end; and receiving and executing a computing power service instantiation request and an instance termination request which are returned by the dispatching end and are based on the target node.
The apparatus embodiments described above are merely illustrative, wherein the elements illustrated as separate elements may or may not be physically separate, and the elements shown as elements may or may not be physical elements, may be located in one place, or may be distributed over a plurality of network elements. Some or all of the systems may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art will understand and implement the present invention without undue burden.
From the above description of the embodiments, it will be apparent to those skilled in the art that the embodiments may be implemented by means of software plus necessary general hardware platforms, or of course may be implemented by means of hardware. Based on this understanding, the foregoing technical solution may be embodied essentially or in a part contributing to the prior art in the form of a software product, which may be stored in a computer readable storage medium, such as ROM/RAM, a magnetic disk, an optical disk, etc., including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the method described in the respective embodiments or some parts of the embodiments.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and are not limiting; although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. An intelligent mobility tracking and scheduling method for a computing network is characterized by comprising the following steps:
according to a mobility tracking scheduling request based on User Equipment (UE) sent by a received computing power service arrangement end, checking the information opening authority of the UE to a service platform;
acquiring computing power service network requirement information and idle computing power resource information of the computing power service arrangement end based on the success of the UE information open authority verification, acquiring cell information and measurement information of the service platform based on the UE, and calculating to obtain a computing power service instantiation request and an instance termination request based on a target node based on the acquired information;
Returning the computing power service instantiation request and the instance termination request based on the target node to the computing power service orchestration end;
the computing power service instantiation request and the instance termination request based on the acquired information are calculated, and the computing power service instantiation request and the instance termination request based on the target node are obtained by calculation, and the computing power service instantiation request and the instance termination request based on the target node comprise the following steps:
determining an instance structure based on the target node according to the acquired computing power service network requirement information and idle computing power resource information, and filling the instance structure according to the acquired cell information and measurement information based on the UE to form an instance request based on the target node;
generating an instance termination request based on an actual computing power service of the current computing power node and a computing power service required by the target node; the target node is a node after the current computing node is switched.
2. The intelligent mobility tracking scheduling method for an operator network according to claim 1, wherein the verifying the information opening authority of the UE to the service platform according to the mobility tracking scheduling request based on the UE sent by the received operator service orchestration terminal includes:
receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service arrangement end;
And sending a verification request based on the UE information opening permission to a service platform according to the UE, and verifying successfully based on the authorized UE information opening permission returned by the service platform.
3. The intelligent mobility tracking and scheduling method for an operator network according to claim 1, wherein the acquiring the operator service network requirement information and the idle operator resource information of the operator service orchestration terminal based on the success of the UE information open authority verification includes:
based on the success of the verification of the information opening authority of the UE, a mobility tracking scheduling request for obtaining the information opening authority is sent to the computing power service arrangement end;
and receiving the power service network requirement information and the idle power resource information returned by the power service orchestration terminal based on the mobility tracking scheduling request.
4. An intelligent mobility tracking and scheduling method for a computing network is characterized by comprising the following steps:
checking the tracking authority of the UE to the computing power service application terminal according to the received mobility tracking scheduling request based on the UE sent by the computing power service application terminal;
based on the success of the UE tracking authority verification, a mobility tracking scheduling request for obtaining the UE tracking authority is sent to a scheduling end;
Receiving a mobility tracking scheduling request returned by the scheduling end for obtaining information opening authority, obtaining computing power service network requirement information and idle computing power resource information of the computing power service application end, and sending the information to the scheduling end;
receiving and executing a computing power service instantiation request and an instance termination request which are returned by the scheduling end and are based on the target node;
before receiving and executing the computing power service instantiation request and the instance termination request which are returned by the dispatching end and are based on the target node, the method comprises the following steps:
determining an instance structure based on the target node according to the acquired computing power service network requirement information and idle computing power resource information, and filling the instance structure according to the acquired cell information and measurement information based on the UE to form an instance request based on the target node;
generating an instance termination request based on an actual computing power service of the current computing power node and a computing power service required by the target node; the target node is a node after the current computing node is switched.
5. The intelligent mobility tracking scheduling method for an operator network according to claim 4, wherein the verifying the tracking authority of the UE with the operator service application according to the received mobility tracking scheduling request based on the UE sent by the operator service application includes:
Receiving a mobility tracking scheduling request based on User Equipment (UE) sent by a computing power service application terminal;
and sending a verification request of local UE tracking permission to the computing power service application terminal according to the UE, and based on the authorized UE tracking permission returned by the computing power service application terminal, successfully verifying.
6. The intelligent mobility tracking scheduling method for a computing power network according to claim 4, wherein the receiving and executing the computing power service instantiation request and the instance termination request returned by the scheduling end based on the target node comprises:
receiving a computing power service instantiation request and an instance termination request which are returned by the scheduling end and are based on a target node;
and switching the computing power service of the current computing power node based on the computing power service instantiation request and the instance termination request of the target node, and stopping redundant computing power service of the current computing power node relative to the target node.
7. An intelligent mobility tracking and scheduling device for a computing network, which is characterized by comprising:
the information authority verification module is used for verifying the information opening authority of the UE to the service platform according to the received mobility tracking scheduling request based on the UE sent by the computing power service arrangement end;
The request generation module is used for acquiring the power service network requirement information and idle power resource information from the power service arrangement end based on the success of the UE information open permission verification, acquiring the cell information and measurement information of the UE from the service platform, and calculating to obtain a power service instantiation request and an instance termination request based on a target node based on the acquired information;
the information return module returns the computing power service instantiation request and the instance termination request based on the target node to the computing power service arrangement end;
the request generation module is further configured to: determining an instance structure based on the target node according to the acquired computing power service network requirement information and idle computing power resource information, and filling the instance structure according to the acquired cell information and measurement information based on the UE to form an instance request based on the target node; generating an instance termination request based on an actual computing power service of the current computing power node and a computing power service required by the target node; the target node is a node after the current computing node is switched.
8. An intelligent mobility tracking and scheduling device for a computing network, which is characterized by comprising:
The tracking permission verification module is used for verifying the tracking permission of the User Equipment (UE) to the computing power service application terminal according to the received mobility tracking scheduling request based on the UE sent by the computing power service application terminal;
the request sending module is used for sending a mobility tracking scheduling request for obtaining the UE tracking permission to a scheduling end based on the success of the UE tracking permission verification;
the information acquisition module is used for receiving a mobility tracking scheduling request returned by the scheduling end for obtaining information opening permission, acquiring computing power service network requirement information and idle computing power resource information from the computing power service application end, and sending the computing power service network requirement information and idle computing power resource information to the scheduling end;
the request generation module determines an instance structure based on the target node according to the acquired computing power service network requirement information and the idle computing power resource information, fills in the instance structure according to the acquired cell information and the measurement information based on the UE, and forms an instantiation request based on the target node; generating an instance termination request based on an actual computing power service of the current computing power node and a computing power service required by the target node; the target node is a node after the current computing node is switched;
and the command execution module is used for receiving and executing the computing power service instantiation request and the instance termination request which are returned by the scheduling end and are based on the target node.
9. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor, when executing the program, implements the steps of the intelligent mobility tracking scheduling method for a power network according to any one of claims 1 to 3 or the steps of the intelligent mobility tracking scheduling method for a power network according to any one of claims 4 to 6.
10. A non-transitory computer readable storage medium having stored thereon a computer program, wherein the computer program when executed by a processor implements the steps of the intelligent power network oriented mobility tracking scheduling method of any one of claims 1 to 3 or the steps of the intelligent power network oriented mobility tracking scheduling method of any one of claims 4 to 6.
CN202110720019.3A 2021-06-28 2021-06-28 Intelligent mobility tracking scheduling method and device for computing network Active CN113852950B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110720019.3A CN113852950B (en) 2021-06-28 2021-06-28 Intelligent mobility tracking scheduling method and device for computing network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110720019.3A CN113852950B (en) 2021-06-28 2021-06-28 Intelligent mobility tracking scheduling method and device for computing network

Publications (2)

Publication Number Publication Date
CN113852950A CN113852950A (en) 2021-12-28
CN113852950B true CN113852950B (en) 2023-06-09

Family

ID=78975052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110720019.3A Active CN113852950B (en) 2021-06-28 2021-06-28 Intelligent mobility tracking scheduling method and device for computing network

Country Status (1)

Country Link
CN (1) CN113852950B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116709447A (en) * 2022-02-25 2023-09-05 华为技术有限公司 Switching method and related device
CN116208625B (en) * 2023-05-06 2023-07-25 浪潮通信技术有限公司 Information synchronization method, device, electronic equipment and computer readable storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595266A (en) * 2018-04-18 2018-09-28 北京奇虎科技有限公司 Based on the unused resource application process and device, computing device for calculating power in region
CN112422346A (en) * 2020-11-19 2021-02-26 北京航空航天大学 Variable-period mobile edge computing unloading decision method considering multi-resource limitation
CN113037786A (en) * 2019-12-09 2021-06-25 中国电信股份有限公司 Intelligent computing power scheduling method, device and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111651253B (en) * 2020-05-28 2023-03-14 中国联合网络通信集团有限公司 Computing resource scheduling method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595266A (en) * 2018-04-18 2018-09-28 北京奇虎科技有限公司 Based on the unused resource application process and device, computing device for calculating power in region
CN113037786A (en) * 2019-12-09 2021-06-25 中国电信股份有限公司 Intelligent computing power scheduling method, device and system
CN112422346A (en) * 2020-11-19 2021-02-26 北京航空航天大学 Variable-period mobile edge computing unloading decision method considering multi-resource limitation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于用户轨迹数据的移动推荐系统研究;孟祥武;李瑞昌;张玉洁;纪威宇;;软件学报(第10期);全文 *
移动边缘计算系统中的卸载和计算联合优化;李霆;;电脑知识与技术(第25期);全文 *

Also Published As

Publication number Publication date
CN113852950A (en) 2021-12-28

Similar Documents

Publication Publication Date Title
CN112188533B (en) Method and device for reporting network performance
CN113852950B (en) Intelligent mobility tracking scheduling method and device for computing network
EP3403180B1 (en) User equipment selection for mobile edge computing
Siriwardhana et al. Micro-operator driven local 5G network architecture for industrial internet
CN111565404A (en) Data distribution method and device
CN111642011B (en) Method for managing wireless resources and nRT RIC
CN111200810B (en) Method, device and system for acquiring capability information of terminal
CN107690149B (en) Method for triggering network policy update, management function entity and core network equipment
CN114157667A (en) Computing power network service system and method facing gateway equipment
CN113316158A (en) Method and device for deploying application instance and readable storage medium
CN111083187A (en) Industrial application service processing method and system
CN107249192B (en) State monitoring method and device for shared network slices
CN112135305B (en) Network optimization method and device and wireless network optimization control functional element
Coll-Perales et al. Improving the Latency of 5G V2N2V Communications in Multi-MNO Scenarios using MEC Federation
CN112867064B (en) Load balancing method, device, storage medium and source base station
CN102025725B (en) Safety system of telecommunication service environment and its implementation
WO2022152871A1 (en) Method of managing a vehicle internet service in a cellular network of at least fourth generation 4g
Bondavalli et al. QoS Perceived by Users of Ubiquitous UMTS: Compositional Models and Thorough Analysis.
CN107949009B (en) Method and device for detecting LTE network access result and computer storage medium
CN112615919A (en) Resource allocation method, resource allocation device and block chain
CN114630265A (en) Near real-time wireless intelligent controller architecture and wireless function enhancement method thereof
CN111417086A (en) Resource management method and base station
Zeng et al. Research on lightweight core network solutions for 5G private networks
KR102613601B1 (en) Wireless communication method and system for providing continuity of mission critical service
CN115460053B (en) Service calling method, device and edge computing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231101

Address after: 266107 No. 2, Xiangtan Road, Danshan Industrial Park, Chengyang District, Qingdao, Shandong

Patentee after: Inspur Communication Technology Co.,Ltd.

Address before: 250101 Inspur science and Technology Park, 1036 Inspur Road, hi tech Zone, Jinan City, Shandong Province

Patentee before: Shandong Inspur Scientific Research Institute Co.,Ltd.

TR01 Transfer of patent right