CN113826078A - 资源调度与信息预测方法、设备、系统及存储介质 - Google Patents

资源调度与信息预测方法、设备、系统及存储介质 Download PDF

Info

Publication number
CN113826078A
CN113826078A CN201980095643.XA CN201980095643A CN113826078A CN 113826078 A CN113826078 A CN 113826078A CN 201980095643 A CN201980095643 A CN 201980095643A CN 113826078 A CN113826078 A CN 113826078A
Authority
CN
China
Prior art keywords
cost
unit
schedulable
target
schedulable unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201980095643.XA
Other languages
English (en)
Other versions
CN113826078B (zh
Inventor
奉有泉
卢毅军
李栈
陶原
赵旭
陈钢
宋军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alibaba Cloud Computing Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Publication of CN113826078A publication Critical patent/CN113826078A/zh
Application granted granted Critical
Publication of CN113826078B publication Critical patent/CN113826078B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Software Systems (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本申请实施例提供一种资源调度与信息预测方法、设备、系统及存储介质。在本申请实施例中,将成本代价的预测与资源调度相结合,通过预测可调度单元的成本代价,实现基于成本代价的资源调度,既可以优先调度成本代价较低的资源,又可以降低出现局部热点的概率,有利于降低整体功耗;另外,在成本代价预测过程中,同时考虑可调度单元所依赖的基础设施的功耗在可调度单元的成本代价中的贡献,可使预测出的成本代价更加合理和准确,进而可提高基于成本代价的资源调度的合理性。

Description

PCT国内申请,说明书已公开。

Claims (32)

  1. PCT国内申请,权利要求书已公开。
CN201980095643.XA 2019-09-11 2019-09-11 资源调度与信息预测方法、设备、系统及存储介质 Active CN113826078B (zh)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2019/105455 WO2021046774A1 (zh) 2019-09-11 2019-09-11 资源调度与信息预测方法、设备、系统及存储介质

Publications (2)

Publication Number Publication Date
CN113826078A true CN113826078A (zh) 2021-12-21
CN113826078B CN113826078B (zh) 2023-01-10

Family

ID=74866881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201980095643.XA Active CN113826078B (zh) 2019-09-11 2019-09-11 资源调度与信息预测方法、设备、系统及存储介质

Country Status (2)

Country Link
CN (1) CN113826078B (zh)
WO (1) WO2021046774A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118069896A (zh) * 2024-04-22 2024-05-24 北京壁仞科技开发有限公司 功耗数据处理方法、装置、电子设备及存储介质

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114024977B (zh) * 2021-10-29 2024-02-06 深圳市高德信通信股份有限公司 一种基于边缘计算的数据调度方法、装置及系统
CN115630772B (zh) * 2022-12-19 2023-05-09 国网浙江省电力有限公司宁波供电公司 综合能源检测配电方法、系统、设备及存储介质
CN117057527B (zh) * 2023-06-30 2024-05-14 东风设备制造有限公司 一种汽车制造设备工业物联网智慧运维方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860944A (zh) * 2009-04-13 2010-10-13 华为技术有限公司 通信系统的能效控制方法、装置和业务处理单元及系统
US20110208622A1 (en) * 2010-02-25 2011-08-25 International Business Machines Corporation Data center power cost accounting system
CN105243068A (zh) * 2014-07-09 2016-01-13 华为技术有限公司 数据库系统的查询方法、服务器和能耗测试系统
CN109800066A (zh) * 2018-12-13 2019-05-24 中国科学院信息工程研究所 一种数据中心节能调度方法及系统

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102624546B (zh) * 2012-02-28 2015-04-29 华为技术有限公司 功耗封顶的控制方法、设备和系统
CN104049716B (zh) * 2014-06-03 2017-01-25 中国科学院计算技术研究所 一种结合温度感知的计算机节能方法及系统
US9720797B2 (en) * 2015-06-30 2017-08-01 Nxp Usa, Inc. Flash memory controller, data processing system with flash memory controller and method of operating a flash memory controller
CN107844404A (zh) * 2016-09-20 2018-03-27 中国石油化工股份有限公司 一种机房用电量展示装置及方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860944A (zh) * 2009-04-13 2010-10-13 华为技术有限公司 通信系统的能效控制方法、装置和业务处理单元及系统
US20110208622A1 (en) * 2010-02-25 2011-08-25 International Business Machines Corporation Data center power cost accounting system
CN105243068A (zh) * 2014-07-09 2016-01-13 华为技术有限公司 数据库系统的查询方法、服务器和能耗测试系统
CN109800066A (zh) * 2018-12-13 2019-05-24 中国科学院信息工程研究所 一种数据中心节能调度方法及系统

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
贾维嘉等: "雾计算的概念、相关研究与应用", 《通信学报》 *
贾维嘉等: "雾计算的概念、相关研究与应用", 《通信学报》, vol. 39, no. 5, 31 May 2018 (2018-05-31), pages 153 - 165 *
齐文艳: "面向能耗优化的数据中心资源动态调度模型与方法", 《中国优秀博硕士学位论文全文数据库(硕士)》, no. 3, 15 March 2014 (2014-03-15), pages 137 - 18 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118069896A (zh) * 2024-04-22 2024-05-24 北京壁仞科技开发有限公司 功耗数据处理方法、装置、电子设备及存储介质

Also Published As

Publication number Publication date
CN113826078B (zh) 2023-01-10
WO2021046774A1 (zh) 2021-03-18

Similar Documents

Publication Publication Date Title
CN113826078B (zh) 资源调度与信息预测方法、设备、系统及存储介质
US11265369B2 (en) Methods and systems for intelligent distribution of workloads to multi-access edge compute nodes on a communication network
Zhang et al. Near-optimal and truthful online auction for computation offloading in green edge-computing systems
Zhou et al. Resource sharing and task offloading in IoT fog computing: A contract-learning approach
Liu et al. Adaptive multi-resource allocation for cloudlet-based mobile cloud computing system
CN111277437B (zh) 一种智能电网的网络切片资源分配方法
Gu et al. Optimal task placement with QoS constraints in geo-distributed data centers using DVFS
Li et al. Energy-aware task offloading with deadline constraint in mobile edge computing
Qiao et al. Online learning and optimization for computation offloading in D2D edge computing and networks
US20170139459A1 (en) Schedule-Based Energy Storage Device Selection
EP2962427A1 (en) Method and system to represent the impact of load variation on service outage over multiple links
Lin et al. Cost minimization with offloading to vehicles in two-tier federated edge and vehicular-fog systems
Perin et al. Towards sustainable edge computing through renewable energy resources and online, distributed and predictive scheduling
Fu et al. Traffic prediction-enabled energy-efficient dynamic computing resource allocation in cran based on deep learning
WO2021046777A1 (zh) 资源调度、申请与定价方法、设备、系统及存储介质
Qin et al. User‐Edge Collaborative Resource Allocation and Offloading Strategy in Edge Computing
Temesgene et al. Dynamic control of functional splits for energy harvesting virtual small cells: A distributed reinforcement learning approach
Chen et al. Maximization of value of service for mobile collaborative computing through situation-aware task offloading
Dai et al. A multi-objective optimization algorithm of task scheduling in WSN
Shalavi et al. Energy efficient deployment and orchestration of computing resources at the network edge: a survey on algorithms, trends and open challenges
Zhang A computing allocation strategy for Internet of things’ resources based on edge computing
CN115080341A (zh) 计算集群及其数据采集方法、设备及存储介质
Dlamini et al. LSTM‐Based Traffic Load Balancing and Resource Allocation for an Edge System
Durga et al. Context-aware adaptive resource provisioning for mobile clients in intra-cloud environment
CN113728294B (zh) 功耗控制与方案生成方法、设备、系统及存储介质

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220112

Address after: No.12 Zhuantang science and technology economic block, Xihu District, Hangzhou City, Zhejiang Province

Applicant after: Aliyun Computing Co.,Ltd.

Address before: Box 847, four, Grand Cayman capital, Cayman Islands, UK

Applicant before: ALIBABA GROUP HOLDING Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant