CN113791254A - Make things convenient for single-phase electric energy meter of dismouting - Google Patents
Make things convenient for single-phase electric energy meter of dismouting Download PDFInfo
- Publication number
- CN113791254A CN113791254A CN202110973548.4A CN202110973548A CN113791254A CN 113791254 A CN113791254 A CN 113791254A CN 202110973548 A CN202110973548 A CN 202110973548A CN 113791254 A CN113791254 A CN 113791254A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- shade
- meter body
- phase electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004576 sand Substances 0.000 claims description 9
- 238000009434 installation Methods 0.000 abstract description 12
- 238000012423 maintenance Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000000428 dust Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/02—Constructional details
- G01R11/04—Housings; Supporting racks; Arrangements of terminals
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Measuring Volume Flow (AREA)
Abstract
The invention discloses a single-phase electric energy meter convenient to disassemble and assemble, which comprises an installation seat and an electric energy meter body, wherein a wiring area is arranged on the electric energy meter body, four wiring holes are formed in the lower side of the wiring area, raised lines are vertically distributed on two sides of the electric energy meter body, a baffle plate used for bearing the electric energy meter body is arranged at the bottom end of the installation seat, four through holes corresponding to the wiring holes are formed in the baffle plate, limiting plates are arranged on two sides of the installation seat, sliding grooves for the raised lines to slide are formed in the limiting plates, a dustproof shade is arranged at the end of the installation seat, a transparent baffle plate is arranged on the shade, and the transparent baffle plate is rotatably connected with the shade, so that a worker can conveniently disassemble and assemble the single-phase electric energy meter.
Description
[ technical field ] A method for producing a semiconductor device
The invention relates to a single-phase electric energy meter convenient to disassemble and assemble, and belongs to the technical field of single-phase electric energy meters.
[ background of the invention ]
An electric energy meter is an instrument for measuring electric energy, also called watt-hour meter, fire meter, kilowatt-hour meter, and refers to instruments for measuring various electric quantities. When using a power meter, it is noted that the power meter can be directly connected to the circuit for measurement at low voltage (not more than 500 volts) and low current (tens of amperes). Under the condition of high voltage or large current, the electric energy meter cannot be directly connected with a circuit and needs to be matched with a voltage transformer or a current transformer for use.
Single-phase electric energy meter among the prior art is generally with screw with single-phase electric energy meter direct mount in the table case when the installation, and this kind of single-phase electric energy meter is generally comparatively troublesome when dismantling the maintenance, need use more instrument just can dismantle, brings inconvenience for maintenance personal.
[ summary of the invention ]
The invention aims to provide a single-phase electric energy meter convenient to disassemble and assemble, which can be conveniently disassembled and assembled by workers.
The technical scheme adopted by the invention is as follows:
the utility model provides a make things convenient for single-phase electric energy meter of dismouting, includes mount pad and electric energy meter body, be equipped with the wiring district on the electric energy meter body, wiring district downside is equipped with four wiring holes, electric energy meter body both sides all are equipped with the sand grip of vertical distribution, the mount pad bottom is equipped with and is used for bearing the baffle of electric energy meter body, be equipped with on the baffle four with the corresponding through-hole in wiring hole, the mount pad both sides all are equipped with the limiting plate, be equipped with the confession on the limiting plate the gliding spout of sand grip, the mount pad end is equipped with and is used for dirt-proof shade, be equipped with transparent baffle on the shade, transparent baffle with the shade rotates to be connected.
The beneficial effects of the invention are as follows:
in the invention, the two sides of the electric energy meter body are both provided with vertically distributed convex strips, the bottom end of the mounting seat is provided with a baffle for bearing the electric energy meter body, the two sides of the mounting seat are both provided with limiting plates, the limiting plates are provided with sliding grooves for the convex strips to slide, when the electric energy meter body is mounted, the electric energy meter body can be placed on the baffle, the baffle is provided with four through holes, the four through holes correspond to four wiring holes at the lower end of the electric energy meter body, a worker can complete wiring of the electric energy meter body through the through holes, then the convex strips at the two sides of the electric energy meter body are inserted into the sliding grooves of the limiting plates in the mounting process, the sliding grooves are matched with the convex strips to limit the electric energy meter body to be separated from the mounting seat, and the electric energy meter body can be dismounted only by moving the electric energy meter body upwards, the electric energy meter mounting and dismounting device has the advantages that the electric energy meter can be mounted and dismounted more quickly and conveniently without using tools, so that the maintenance and mounting difficulty of workers is greatly reduced, and the working efficiency of the workers can also be improved.
In addition, the installation seat is provided with a dustproof shade, the shade is provided with a transparent baffle, the transparent baffle is rotatably connected with the shade, after the electric energy meter body is installed, the upper end of the electric energy meter body is positioned in the shade, so that dust infected on the surface of the electric energy meter body can be greatly reduced, the cleanness of the surface of the electric energy meter body is kept, and workers can conveniently read the electric energy meter body.
Preferably, be equipped with the count table that is used for showing power consumption on the electric energy meter body, transparent baffle is in the dead ahead of count table.
Preferably, the upper end of the sliding groove is provided with a guide opening for the protruding strip to enter conveniently.
Preferably, the guide port is a tapered port.
Preferably, a rotating shaft is arranged on the shade, and the transparent baffle is rotatably connected with the shade through the rotating shaft.
Preferably, the shade is provided with a connecting hole, and the shade is detachably connected with the mounting seat through a screw.
Preferably, the mounting seat is provided with a mounting hole, and the mounting seat is fixed through a screw.
Other features and advantages of the present invention will be disclosed in more detail in the following detailed description of the invention and the accompanying drawings.
[ description of the drawings ]
The invention is further described below with reference to the accompanying drawings:
FIG. 1 is a front view of an embodiment of the present invention;
FIG. 2 is a front view of a mount in an embodiment of the invention;
fig. 3 is a cross-sectional view of a mount in an embodiment of the invention.
[ detailed description ] embodiments
The technical solutions of the embodiments of the present invention are explained and illustrated below with reference to the drawings of the embodiments of the present invention, but the following embodiments are only preferred embodiments of the present invention, and not all embodiments. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative effort belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless explicitly defined otherwise.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
As shown in fig. 1 to 3, this embodiment shows a make things convenient for single-phase electric energy meter of dismouting, including mount pad 1 and electric energy meter body 2, be equipped with the wiring district on the electric energy meter body 2, wiring district downside is equipped with four wiring holes, 2 both sides of electric energy meter body all are equipped with the sand grip of vertical distribution, 1 bottom of mount pad is equipped with and is used for bearing the baffle 11 of electric energy meter body 2, be equipped with on the baffle 11 four with the corresponding through-hole 111 in wiring hole, 1 both sides of mount pad all are equipped with limiting plate 12, be equipped with the confession on limiting plate 12 the gliding spout 121 of sand grip, 1 end of mount pad is equipped with and is used for dirt-proof shade 13, be equipped with transparent baffle 14 on the shade 13, transparent baffle 14 with shade 13 rotates to be connected.
In this embodiment, the two sides of the electric energy meter body 2 are both provided with vertically distributed convex strips, the bottom end of the mounting seat 1 is provided with a baffle 11 for bearing the electric energy meter body 2, the two sides of the mounting seat 1 are both provided with limiting plates 12, the limiting plates 12 are provided with sliding chutes 121 for the convex strips to slide, the upper ends of the sliding chutes 121 are provided with guide ports 122 for the convex strips to enter, the guide ports 122 are cone-shaped ports, the convex strips can be guided into the sliding chutes 121 by the cone-shaped ports, so that the electric energy meter body 2 can be more conveniently and rapidly mounted, when the electric energy meter body 2 is mounted, the electric energy meter body 2 can be placed on the baffle 11, the baffle 11 is provided with four through holes 111, the four through holes 111 correspond to the four wiring holes at the lower end of the electric energy meter body 2, and a worker can complete wiring of the electric energy meter body 2 through the through holes 111, secondly in the installation the sand grip of 2 both sides of electric energy meter body all inserts in the spout 121 of limiting plate 12, spout 121 and sand grip cooperate the restriction the electric energy meter body 2 breaks away from mount pad 1, only need when dismantling 2 up-shift with the electric energy meter body alright realize dismantling electric energy meter body 2, need not the use of tools to install and dismantle, this embodiment can make the installation of electric energy meter more swiftly convenient with the dismantlement to reduce the degree of difficulty of staff's maintenance and installation by a wide margin, also can improve staff's work efficiency.
In addition, the installation base 1 is provided with the dustproof shade 13, the shade 13 is provided with the connecting hole, the shade 13 is detachably connected with the installation base 1 through a screw, the shade 13 is provided with the transparent baffle 14, the shade 13 is provided with the rotating shaft 141, the transparent baffle 14 is rotatably connected with the shade 13 through the rotating shaft 141, after the electric energy meter body 2 is installed, the upper end of the electric energy meter body 2 is positioned inside the shade 13, so that dust on the surface of the electric energy meter body 2 can be greatly reduced, the cleanness of the surface of the electric energy meter body 2 is kept, and workers can conveniently read the electric energy meter body 2.
Secondly, in the embodiment, the mounting base 1 is provided with a mounting hole, the mounting base 1 is fixed by a screw, when a worker installs the electric energy meter body 2, firstly, the mounting base 1 is mounted at a designated position through a fixing piece and a mounting hole, a worker turns over the transparent baffle 14 to put the electric energy meter body 2 into the mounting base 1, the electric energy meter body 2 is limited on the mounting seat 1 through the matching of the convex strips and the sliding grooves 121, then the transparent baffle 14 is put down to realize the mounting of the electric energy meter body 2, the dismounting process of the electric energy meter body 2 is similar to the mounting process, it is not necessary to describe herein, the installation and disassembly processes of the electric energy meter body 2 in this embodiment are very simple and fast, the maintenance and the change degree of difficulty of staff to electric energy meter body 2 can be reduced, staff's work efficiency is improved.
While the invention has been described with reference to specific embodiments thereof, it will be understood by those skilled in the art that the invention is not limited thereto, and may be embodied in many different forms without departing from the spirit and scope of the invention as set forth in the following claims. Any modification which does not depart from the functional and structural principles of the present invention is intended to be included within the scope of the claims.
Claims (7)
1. The utility model provides a make things convenient for single-phase electric energy meter of dismouting which characterized in that: including mount pad and electric energy meter body, be equipped with the wiring district on the electric energy meter body, wiring district downside is equipped with four wiring holes, electric energy meter body both sides all are equipped with the sand grip of vertical distribution, the mount pad bottom is equipped with and is used for bearing the baffle of electric energy meter body, be equipped with on the baffle four with the corresponding through-hole in wiring hole, the mount pad both sides all are equipped with the limiting plate, be equipped with the confession on the limiting plate the gliding spout of sand grip, the mount pad end is equipped with and is used for dirt-proof shade, be equipped with transparent baffle on the shade, transparent baffle with the shade rotates to be connected.
2. The single-phase electric energy meter convenient to disassemble and assemble according to claim 1, characterized in that: the electric energy meter is characterized in that a counting meter used for displaying power consumption is arranged on the electric energy meter body, and the transparent baffle is located in front of the counting meter.
3. The single-phase electric energy meter convenient to disassemble and assemble according to claim 1, characterized in that: the spout upper end is equipped with the convenience the direction mouth that the sand grip got into.
4. The single-phase electric energy meter convenient to disassemble and assemble according to claim 3, characterized in that: the guide opening is a conical opening.
5. The single-phase electric energy meter convenient to disassemble and assemble according to claim 1, characterized in that: the transparent baffle is connected with the shade in a rotating mode through the rotating shaft.
6. The single-phase electric energy meter convenient to disassemble and assemble according to claim 1, characterized in that: be equipped with the connecting hole on the shade, the shade passes through screw and mount pad realization releasable connection.
7. The single-phase electric energy meter convenient to disassemble and assemble according to claim 1, characterized in that: the mounting seat is provided with a mounting hole and is fixed through a screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110973548.4A CN113791254A (en) | 2021-08-24 | 2021-08-24 | Make things convenient for single-phase electric energy meter of dismouting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110973548.4A CN113791254A (en) | 2021-08-24 | 2021-08-24 | Make things convenient for single-phase electric energy meter of dismouting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113791254A true CN113791254A (en) | 2021-12-14 |
Family
ID=78876354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110973548.4A Pending CN113791254A (en) | 2021-08-24 | 2021-08-24 | Make things convenient for single-phase electric energy meter of dismouting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113791254A (en) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201508377U (en) * | 2009-09-14 | 2010-06-16 | 苏州工业园区和顺电气有限公司 | Outdoor prepayment electric meter box |
CN205353164U (en) * | 2016-02-29 | 2016-06-29 | 吴成梅 | Multi -functional electric energy meter support |
CN108089042A (en) * | 2017-12-14 | 2018-05-29 | 浙江晨泰科技股份有限公司 | A kind of water proof type intelligent electric meter |
CN108333402A (en) * | 2018-03-28 | 2018-07-27 | 四川安创云通能源技术服务有限公司 | A kind of outdoor rainproof ammeter box |
CN207937493U (en) * | 2018-01-05 | 2018-10-02 | 宁波奥克斯高科技有限公司 | Three-phase integrated ammeter box |
CN209561902U (en) * | 2019-03-26 | 2019-10-29 | 浙江柳南电气有限公司 | A kind of visual window construction on ammeter box |
CN209993882U (en) * | 2019-05-25 | 2020-01-24 | 黄玉坤 | Panel turnover type electrical cabinet |
CN210323160U (en) * | 2019-06-13 | 2020-04-14 | 南京恒纶电气设备有限公司 | Mounting seat of quick-mounting type multifunctional electric energy meter |
CN211905474U (en) * | 2019-12-28 | 2020-11-10 | 中建旭阳电力安装工程有限公司 | Electric energy meter convenient to installation |
CN211955613U (en) * | 2020-03-30 | 2020-11-17 | 科陆国际技术有限公司 | Combined electric energy meter convenient to disassemble and assemble |
CN112684230A (en) * | 2021-01-04 | 2021-04-20 | 国网福建省电力有限公司泉州供电公司 | Electric energy meter structure for preventing electricity from stealing |
CN213181709U (en) * | 2020-09-14 | 2021-05-11 | 华邦电力科技股份有限公司 | High-precision three-phase electric energy meter |
CN112858747A (en) * | 2021-02-20 | 2021-05-28 | 国网河南省电力公司周口供电公司 | Outdoor high-voltage metering device capable of achieving anti-electricity-stealing function and using method |
CN213903631U (en) * | 2020-12-29 | 2021-08-06 | 苏睿 | Electric energy meter for circuit test |
-
2021
- 2021-08-24 CN CN202110973548.4A patent/CN113791254A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201508377U (en) * | 2009-09-14 | 2010-06-16 | 苏州工业园区和顺电气有限公司 | Outdoor prepayment electric meter box |
CN205353164U (en) * | 2016-02-29 | 2016-06-29 | 吴成梅 | Multi -functional electric energy meter support |
CN108089042A (en) * | 2017-12-14 | 2018-05-29 | 浙江晨泰科技股份有限公司 | A kind of water proof type intelligent electric meter |
CN207937493U (en) * | 2018-01-05 | 2018-10-02 | 宁波奥克斯高科技有限公司 | Three-phase integrated ammeter box |
CN108333402A (en) * | 2018-03-28 | 2018-07-27 | 四川安创云通能源技术服务有限公司 | A kind of outdoor rainproof ammeter box |
CN209561902U (en) * | 2019-03-26 | 2019-10-29 | 浙江柳南电气有限公司 | A kind of visual window construction on ammeter box |
CN209993882U (en) * | 2019-05-25 | 2020-01-24 | 黄玉坤 | Panel turnover type electrical cabinet |
CN210323160U (en) * | 2019-06-13 | 2020-04-14 | 南京恒纶电气设备有限公司 | Mounting seat of quick-mounting type multifunctional electric energy meter |
CN211905474U (en) * | 2019-12-28 | 2020-11-10 | 中建旭阳电力安装工程有限公司 | Electric energy meter convenient to installation |
CN211955613U (en) * | 2020-03-30 | 2020-11-17 | 科陆国际技术有限公司 | Combined electric energy meter convenient to disassemble and assemble |
CN213181709U (en) * | 2020-09-14 | 2021-05-11 | 华邦电力科技股份有限公司 | High-precision three-phase electric energy meter |
CN213903631U (en) * | 2020-12-29 | 2021-08-06 | 苏睿 | Electric energy meter for circuit test |
CN112684230A (en) * | 2021-01-04 | 2021-04-20 | 国网福建省电力有限公司泉州供电公司 | Electric energy meter structure for preventing electricity from stealing |
CN112858747A (en) * | 2021-02-20 | 2021-05-28 | 国网河南省电力公司周口供电公司 | Outdoor high-voltage metering device capable of achieving anti-electricity-stealing function and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113791254A (en) | Make things convenient for single-phase electric energy meter of dismouting | |
CN209295824U (en) | A kind of dedicated air port measurement mounting device of central air-conditioning | |
CN208189169U (en) | A kind of bilingual Chinese-English mark guiding device applied to museum | |
CN208125787U (en) | Adjustable electricity meter fixing support | |
CN214432880U (en) | Dustproof entrepreneurship data storage cabinet | |
CN210219107U (en) | Multipurpose electric power monitoring instrument mounting rack | |
CN209894369U (en) | Detection apparatus for be used for data center air current to organize | |
CN209606477U (en) | A kind of power measure meters being easily installed | |
CN207880340U (en) | A kind of list dual-colored LED electrical screen | |
CN208125789U (en) | A kind of fixed bracket of electric energy metering device | |
CN219328812U (en) | Special surface wind speed measuring device for hot wire type fume chamber | |
CN208537603U (en) | Single household single-phase electricity electricity box | |
CN214895464U (en) | Along with intelligent electric heating power consumption metering device of line formula | |
CN211236175U (en) | Traveling wave tube electronic load device for Beidou positioning | |
CN217425496U (en) | Electric energy meter device convenient to dismouting | |
CN212360112U (en) | Pneumatic pump with base convenient to disassemble | |
CN221803063U (en) | Electromagnetic flowmeter instrument convenient to maintenance | |
CN217361317U (en) | Outdoor transformer shell with heat dissipation function | |
CN204116489U (en) | A kind of electronic instrument being convenient to install | |
CN219761598U (en) | Protective housing for navigation | |
CN216045280U (en) | Adjustable ball screw | |
CN216248186U (en) | Multifunctional electric power instrument of high-voltage cabinet | |
CN217684189U (en) | Novel dust collector mounting structure | |
CN217425172U (en) | Airflow flow driving device of laser gas analyzer | |
CN221197720U (en) | V-shaped evaporator convenient for disassembly and assembly of air filter screen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |