CN113789732A - Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam - Google Patents

Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam Download PDF

Info

Publication number
CN113789732A
CN113789732A CN202110863959.8A CN202110863959A CN113789732A CN 113789732 A CN113789732 A CN 113789732A CN 202110863959 A CN202110863959 A CN 202110863959A CN 113789732 A CN113789732 A CN 113789732A
Authority
CN
China
Prior art keywords
connecting piece
hollow
bridge
bolt hole
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110863959.8A
Other languages
Chinese (zh)
Inventor
杨浩
李善亮
张承善
谢晓阳
于光和
马春晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pudong New District Road Construction Development Co ltd
Original Assignee
Shanghai Pudong New District Road Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pudong New District Road Construction Development Co ltd filed Critical Shanghai Pudong New District Road Construction Development Co ltd
Priority to CN202110863959.8A priority Critical patent/CN113789732A/en
Publication of CN113789732A publication Critical patent/CN113789732A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a shear-resistant reinforcing method and a shear-resistant reinforcing device for a hollow plate beam. The shear-resistant reinforcing method of the hollow plate girder comprises the following steps: arranging a sunken area at the upper end of the bridge; at least one through hole is formed in a hinge joint of a hollow plate beam of the bridge, and the through hole is communicated with the recessed area; an upper connecting piece is fixedly arranged at the sunken area, and a lower connecting piece is fixedly arranged at the lower end of the bridge; a counter pull rod is arranged in the through hole, and two ends of the counter pull rod are fixedly connected to the upper connecting piece and the lower connecting piece respectively; and repairing the depressed area. According to the invention, the upper connecting piece, the lower connecting piece and the counter-pull rod form the reinforcing assembly, so that the transverse connection among the plate beams can be enhanced, the stress state of a single beam is weakened, and the vibration of the beam and the plate is avoided, thereby avoiding the cracking and discretization of the crack repairing adhesive.

Description

Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam
Technical Field
The invention relates to a shear-resistant reinforcing method and a shear-resistant reinforcing device for a hollow plate beam.
Background
The vicinity of the bridge support mainly bears shear load. Especially for fabricated hollow slab girder bridges, the transverse distribution of the load at the beam end ranges is close to zero. Thus, the shear forces at the beam ends of the plate beams are substantially all carried by the single beam.
Hollow slab beams are limited in their construction and their small thickness at the web often results in insufficient shear capacity at the beam-end shear maxima. Particularly, when the large-span prestressed hollow slab beam is adopted, initial tension of a prestressed tendon is added at the beam end, so that the web plate in the beam end area is in a bending shear force superposition state, and an oblique shear crack is often generated in the web plate in the beam end area of the hollow slab beam. The crack of the web plate can lead to the shortening of the service life of the concrete member, and the structural safety of the concrete member is seriously influenced.
At present, few methods for reinforcing the beam end of the existing hollow plate beam by shearing resistance are used, and mortar is generally injected into a cavity by pressure, so that the shearing resistance of the hollow plate beam is enhanced by a method for improving the shearing resistance section. However, the cavity grouting method needs to remove the top of the plate beam and damages the original structure.
Therefore, a method or a device which has little influence on the original structure and can improve the shearing resistance of the beam end of the hollow plate beam is needed to be found.
Disclosure of Invention
One of the objects of the present invention is to overcome at least one of the disadvantages of the prior art and to provide a method and a device for shear reinforcement of a hollow plate girder.
In order to achieve the above purpose, the invention is realized by the following technical scheme:
according to a first aspect of the present invention, a method for shear reinforcement of a hollow slab beam and a shear reinforcement device for a hollow slab beam are provided. The shear-resistant reinforcing method of the hollow plate girder comprises the following steps:
arranging a sunken area at the upper end of the bridge; at least one through hole is formed in a hinge joint of a hollow plate beam of the bridge, and the through hole is communicated with the recessed area;
an upper connecting piece is fixedly arranged at the sunken area, and a lower connecting piece is fixedly arranged at the lower end of the bridge;
a counter pull rod is arranged in the through hole, and two ends of the counter pull rod are fixedly connected to the upper connecting piece and the lower connecting piece respectively;
and repairing the depressed area.
Optionally, the bridge comprises the hollow slab beam and a pavement layer paved on the upper surface of the hollow slab beam;
when the sunken area is arranged at the upper end of the bridge, removing part of the pavement layer and part of the hollow slab beam, and exposing part of the upper surface of the hollow slab beam; wherein the recessed regions comprise a first recessed region in the pavement and a second recessed region in the hollow slab beam;
the upper connecting piece is anchored on the upper surface of the hollow slab beam, and part of the structure is located in the second concave area and is fixedly connected with the counter pull rod; the lower connecting piece is anchored on the lower surface of the hollow slab beam.
Optionally, the top surface of the upper connecting piece is concavely provided with a groove, and the groove extends into the second sunken area;
a first anchor backing plate is arranged on the bottom wall of the groove, and a first bolt hole is arranged on the first anchor backing plate and the bottom wall of the groove in a penetrating manner;
a second anchor backing plate is arranged on one side, back to the hollow plate beam, of the lower connecting piece, and a second bolt hole is formed in the lower connecting piece and the second anchor backing plate in a penetrating mode;
the axial direction of the first bolt hole, the axial direction of the through hole, and the axial direction of the second bolt hole are inclined at the same angle with respect to a vertical line;
the tie-rod is in a bolt structure and sequentially penetrates through the first bolt hole, the through hole and the second bolt hole, and the part of the tie-rod, which penetrates through the second bolt hole, is fastened with a nut.
Optionally, the fastening force of the nut on the pull rod penetrating through the second bolt hole portion is F, the breaking force of the pull rod is P, wherein F is less than or equal to P × 60%; and/or the presence of a gas in the gas,
the axial direction of the first bolt hole is inclined at an angle theta of 45-60 degrees relative to the vertical line.
Optionally, the minimum distance L2 between the starting end of the groove and the crack of the hollow slab beam in the length direction is more than or equal to 50 cm; and/or the presence of a gas in the gas,
the length of the groove is 10cm longer than that of the first connecting piece; and/or the presence of a gas in the gas,
the width of the groove is 10cm more than that of the first connecting piece.
Optionally, the paving layer comprises a concrete paving layer paved on the hollow slab beam and an asphalt paving layer paved on the concrete paving layer;
and filling fast-hardening concrete mortar and asphalt concrete in the depressed area when repairing the depressed area.
Optionally, the lengths L1 of the first connecting piece and the second connecting piece are equal, and the longest longitudinal distance of the crack region of the hollow slab beam is La, wherein L1 is more than or equal to La multiplied by 1.41.
Optionally, the through holes are distributed in the middle of the hinge joint of the hollow slab beam and drilled by drilling equipment.
According to a second aspect of the present invention, there is provided a hollow slab girder shear reinforcement device. This hollow slab beam reinforcing apparatus that shears includes:
the bridge comprises a bridge, wherein a concave area is arranged at the upper end of the bridge; the bridge comprises a hollow plate beam, at least one through hole is arranged in a hinge joint of the hollow plate beam, and the through hole is communicated with the recessed area;
the upper connecting piece is fixedly arranged in the concave area;
the lower connecting piece is fixedly arranged at the lower end of the bridge;
the opposite pull rod is arranged in the through hole, and two ends of the opposite pull rod are respectively and fixedly connected to the upper connecting piece and the lower connecting piece; and
and the repairing layer is filled in the depressed area and covers the upper connecting piece.
Optionally, the bridge further comprises a paving layer paved on the upper surface of the hollow slab beam; the concave regions comprise a first concave region positioned in the pavement layer and a second concave region positioned in the hollow slab beam; the upper connecting piece is anchored on the upper surface of the hollow slab beam; the lower connecting piece is anchored on the lower surface of the hollow slab beam.
The top surface of the upper connecting piece is concavely provided with a groove, and the groove extends into the second sunken area; a first anchor backing plate is arranged on the bottom wall of the groove, and a first bolt hole is arranged on the first anchor backing plate and the bottom wall of the groove in a penetrating manner; a second anchor backing plate is arranged on one side, back to the hollow plate beam, of the lower connecting piece, and a second bolt hole is formed in the lower connecting piece and the second anchor backing plate in a penetrating mode;
the axial direction of the first bolt hole, the axial direction of the through hole, and the axial direction of the second bolt hole are inclined at the same angle with respect to a vertical line;
the tie-rod is in a bolt structure and sequentially penetrates through the first bolt hole, the through hole and the second bolt hole, and the part of the tie-rod, which penetrates through the second bolt hole, is fastened with a nut.
Different from the prior art, in the shear-resistant reinforcing method and the shear-resistant reinforcing device for the hollow plate girder, provided by the invention, the upper end and the lower end of the hollow plate girder of the bridge are respectively and fixedly provided with the upper connecting piece and the lower connecting piece, and the two ends of the counter-pull rod are respectively and fixedly connected with the upper connecting piece and the lower connecting piece. The upper connecting piece, the lower connecting piece and the counter-pull rod form a reinforcing assembly, so that the transverse connection between the plate beams can be enhanced, the stress state of a single beam is weakened, and the vibration of the beam and the plate is avoided, so that the cracking and discretization of the crack repairing adhesive are avoided.
Other features of the present invention and advantages thereof will become apparent from the following detailed description of exemplary embodiments thereof, which proceeds with reference to the accompanying drawings.
Drawings
Fig. 1 is a sectional view of a hollow slab beam shear reinforcement device provided in accordance with an embodiment of the present invention, taken along a plane in which the length and height directions thereof are located.
Fig. 2 is a sectional view of a plane in which the shear reinforcement device for the hollow slab girder of fig. 1 is located in width and height directions.
Fig. 3 is a top view of the upper connector of fig. 2.
Fig. 4 is an enlarged schematic view of the upper connector of fig. 1.
Fig. 5 is an enlarged schematic view of the lower connector of fig. 1.
Detailed Description
The invention is described in detail below with reference to the attached drawing figures:
according to one aspect of the present invention, there is provided a shear reinforcing method for a hollow slab girder. Referring to fig. 1 and 2, the method for reinforcing a hollow slab beam includes the following steps:
first, a recessed area 12 is provided at the upper end of the bridge 1.
The bridge 1 comprises hollow slab beams 10. Hinge joints are formed in the hollow plate girders 10 of the bridge 1. At least one through-hole is provided in the hinge joint of the hollow plate girder 10, which through-hole communicates with the depressed area 12. In this embodiment, the hinge joint refers to post-cast concrete (pouring joint) between the prefabricated plate beams in the bridge 1 engineering, and the hinge joint connects the two plate beams and is performed before the bridge deck pavement construction after the plate beams are installed. For example, the bridge 1 is shown to have a longitudinal direction L, a height direction H, and a width direction W. The web of the hollow slab beam 10 in the beam end region is subjected to oblique shear cracks 14. In a plane formed by the length direction L and the height direction H of the bridge 1, the crack 14 has a longitudinal direction and a transverse direction, the longitudinal direction is the extending direction of the crack 14, and the transverse direction is perpendicular to the longitudinal direction.
Then, the upper connector 20 is fixedly disposed at the depressed region 12. The lower connecting piece 30 is fixedly arranged at the lower end of the bridge 1. In this way, the upper and lower ends of the hollow slab beam 10 of the bridge 1 are respectively fixedly provided with the upper and lower connecting members 20 and 30.
A tie rod 40 is disposed in the through hole. The opposite ends of the opposite pull rod 40 are fixedly connected to the upper and lower connectors 20 and 30, respectively.
Then, the bridge 1 is repaired in the depressed area of the upper end of the bridge 1, and the abutment (cap beam) 8 is installed at the end of the bridge.
In this embodiment, the bridge support 8 supports the bridge 1, and the abutment (cap beam) 8 is disposed at an end of the bridge 1. The upper and lower ends of the hollow slab beam 10 of the bridge 1 are respectively and fixedly provided with an upper connecting piece 20 and a lower connecting piece 30, and the two ends of the opposite pull rod 40 are respectively and fixedly connected with the upper connecting piece 20 and the lower connecting piece 30. The upper connecting piece 20, the lower connecting piece 30 and the counter-pull rod 40 form a reinforcing assembly, so that the transverse connection among the hollow plate beams 10 can be enhanced, the stress state of the single beam is weakened, the vibration of the beam and the plate is avoided, and the cracking and discretization of the crack 14 repairing glue are avoided.
In this embodiment, referring to fig. 1 to 3, a bridge 1 includes a hollow slab beam 10 and a pavement layer laid on the hollow slab beam 10. When the upper end of the bridge 1 is provided with the sunken area 12, a part of the pavement layer and a part of the hollow plate girder 10 at the upper end of the bridge 1 are removed, and the surface of the part of the hollow plate girder 10 is exposed. The recessed region 12 includes a first recessed region 120 in the pavement and a second recessed region 122 in the hollow slab beam 10. The exposed part of the surface of the hollow plate girder 10 may be disposed around the second recess region 122. The second recessed region 122 communicates with the through-hole.
The upper connecting member 20 may be anchored to the upper surface of the hollow plate girder 10 by a high-strength anchor bolt 50, and a part of the structure of the upper connecting member 20 is located in the second recess region 122 and is fixedly connected to the counter-pull rod 40. The lower connecting member 30 may be anchored to the lower surface of the hollow plate girder 10 by means of high-strength anchors 50.
Further, referring to fig. 2 and 3, the upper connecting member 20 is recessed with a groove 22 on the top surface. The groove 22 extends into the second recessed region 122. For example, the groove 22 may be provided at a middle position of the top surface of the upper connecting member 20. The bottom wall 224 of the groove 22 can be provided with a first anchor pad 24, and the first anchor pad 24 and the bottom wall 224 of the groove 22 are provided with a first bolt hole in a penetrating way.
The side of the lower connecting member 30 facing away from the hollow slab beam 10 may be provided with a second anchor pad 34. The lower connecting member 30 and the second anchor pad 34 are provided with second bolt holes therethrough.
Referring to fig. 1, 4 and 5, the axial direction of the first bolt hole, the axial direction of the through hole and the axial direction of the second bolt hole are inclined at the same angle with respect to the vertical line. Wherein the vertical line extends in the length direction L of the bridge 1.
The tie rod 40 is correspondingly arranged in a bolt structure. The tie rod 40 is inserted into the through hole from the first bolt hole. The tie rod 40 passes through the first bolt hole, the through hole and the second bolt hole in sequence, and part of the tie rod passes through the second bolt hole. And fastening the part of the pull rod 40 which penetrates out of the second bolt hole with a nut.
Correspondingly, the first anchor backing plate 24 and the second anchor backing plate 34 can be inclined at the same angle relative to the vertical line and are respectively in contact connection with the tie-rod 40 from the two axial ends so as to limit the axial position of the tie-rod 40 and realize the transverse reinforcing effect of the tie-rod 40 on the hollow slab beam 10.
Preferably, as shown in the figure, a nut is screwed with the second bolt hole portion through which the counter rod 40 penetrates, and the nut applies a fastening force F to the counter rod 40 penetrating the second bolt hole portion. The breaking force on the tie rod 40 is P. Wherein: f is less than or equal to P multiplied by 60 percent.
Preferably, as shown in the drawing, the axial direction of the first bolt hole may be set at an inclination angle θ of 45 ° to 60 ° with respect to the vertical line.
Preferably, as shown in the figure, the starting end of the groove 22 is at a minimum distance L from the slit 14 of the hollow slab beam 10 in the length direction L2≥50cm。
Preferably, the length of the groove 22 in the length direction L is 10cm greater than the length of the first connector, as shown.
Preferably, as shown in the drawing, the width of the groove 22 is 10cm more than the width of the first connecting member in the width direction W.
Preferably, the length L of the first and second connectors is as shown1The longitudinal longest distance in the region of the crack 14 of the hollow plate girder 10, which may be equally arranged, is La. Wherein: l is1≥La×1.41。
Preferably, as shown in the drawings, the through holes are distributed in the middle of the hinge joints of the hollow slab girder 10 and drilled by a drilling apparatus.
Preferably, as shown in the drawings, the pavement may include a concrete pavement 16 laid on the hollow slab girder 10 and an asphalt pavement 18 laid on the concrete pavement 16. In repairing the depressed area 12, a quick-hardening concrete mortar and an asphalt concrete are filled in the depressed area 12.
Further, as shown, after repairing the recessed area 12, the bottom of the hinge joint may be closed. And then injecting glue.
According to the same inventive concept, the invention also provides a shear-resisting reinforcing device for the hollow plate girder. Referring to fig. 1 and 2, the shear reinforcement device for a hollow slab girder includes a bridge girder 1, an upper connector 20, a lower connector 30, tie rods 40, and a repair layer. The bridge support 8 supports the bridge 1, and the abutment (capping beam) 8 is arranged at the end part of the bridge 1.
A recessed area 12 is provided at the upper end of the bridge 1. The bridge 1 comprises hollow slab beams 10. At least one through hole is provided in the hinge joint of the hollow plate girder 10, and the through hole communicates with the depressed area 12. In this embodiment, the hinge joint refers to post-cast concrete (crack pouring) between prefabricated plate beams in bridge engineering, and is used for connecting two plate beams before bridge deck pavement construction after the plate beams are installed. For example, the bridge 1 is shown to have a longitudinal direction L, a height direction H, and a width direction W. The web of the hollow slab beam 10 in the beam end region is subjected to oblique shear cracks 14. In a plane formed by the length direction L and the height direction H of the bridge 1, the crack 14 has a longitudinal direction and a transverse direction, the longitudinal direction is the extending direction of the crack 14, and the transverse direction is perpendicular to the longitudinal direction.
The upper connector 20 is fixedly disposed in the recessed area 12. The lower connecting member 30 is fixedly disposed at the lower end of the bridge 1. The tie-rod 40 is disposed in the through-hole. The opposite ends of the opposite pull rod 40 are fixedly connected to the upper and lower connectors 20 and 30, respectively. The repair layer is filled in the recess 12 and covers the upper connecting member 20.
In this embodiment, the upper and lower ends of the hollow slab beam 10 of the bridge 1 are respectively and fixedly provided with an upper connecting member 20 and a lower connecting member 30, and the two ends of the tie rod 40 are respectively and fixedly connected to the upper connecting member 20 and the lower connecting member 30. The upper connecting piece 20, the lower connecting piece 30 and the counter-pull rod 40 form a reinforcing assembly, so that the transverse connection among the hollow plate beams 10 can be enhanced, the stress state of the single beam is weakened, the vibration of the beam and the plate is avoided, and the cracking and discretization of the crack 14 repairing glue are avoided.
In this embodiment, referring to fig. 1 to 3, the bridge 1 further includes a paving layer laid on the hollow slab beam 10. When the upper end of the bridge 1 is provided with the sunken area 12, a part of the pavement layer and a part of the hollow plate girder 10 at the upper end of the bridge 1 are removed, and the surface of the part of the hollow plate girder 10 is exposed. The recessed region 12 includes a first recessed region 120 in the pavement and a second recessed region 122 in the hollow slab beam 10. The exposed part of the surface of the hollow plate girder 10 may be disposed around the second recess region 122. The second recessed region 122 communicates with the through-hole.
The upper connecting member 20 may be anchored to the upper surface of the hollow plate girder 10 by a high-strength anchor bolt 50, and a part of the structure of the upper connecting member 20 is located in the second recess region 122 and is fixedly connected to the counter-pull rod 40. The lower connecting member 30 may be anchored to the lower surface of the hollow plate girder 10 by means of high-strength anchors 50.
Further, referring to fig. 2 and 3, the upper connecting member 20 is recessed with a groove 22 on the top surface. The groove 22 extends into the second recessed region 122. For example, the groove 22 may be provided at a middle position of the top surface of the upper connecting member 20. The bottom wall 224 of the groove 22 can be provided with a first anchor pad 24, and the first anchor pad 24 and the bottom wall 224 of the groove 22 are provided with a first bolt hole in a penetrating way.
The side of the lower connecting member 30 facing away from the hollow slab beam 10 may be provided with a second anchor pad 34. The lower connecting member 30 and the second anchor pad 34 are provided with second bolt holes therethrough.
Referring to fig. 1, 4 and 5, the axial direction of the first bolt hole, the axial direction of the through hole and the axial direction of the second bolt hole are inclined at the same angle with respect to the vertical line. Wherein the vertical line extends in the length direction L of the bridge 1.
The tie rod 40 is correspondingly arranged in a bolt structure. The tie rod 40 can be threaded into the through hole from the first bolt hole. The tie rod 40 passes through the first bolt hole, the through hole and the second bolt hole in sequence, and part of the tie rod passes through the second bolt hole. And fastening the part of the pull rod 40 which penetrates out of the second bolt hole with a nut.
Correspondingly, the first anchor backing plate 24 and the second anchor backing plate 34 can be inclined at the same angle relative to the vertical line and are respectively in contact connection with the tie-rod 40 from the two axial ends so as to limit the axial position of the tie-rod 40 and realize the transverse reinforcing effect of the tie-rod 40 on the hollow slab beam 10.
Preferably, as shown, a nut is threadedly coupled to the tie rod 40 through the second bolt hole portion. By arranging the matching structure between the nut and the second bolt hole part through which the counter-pull rod 40 penetrates, the fastening force F exerted by the nut on the second bolt hole part through which the counter-pull rod 40 penetrates is less than or equal to Px 60%. Where P is the breaking force on the tie rod 40.
Preferably, as shown in the drawing, the axial direction of the first bolt hole may be set at an inclination angle θ of 45 ° to 60 ° with respect to the vertical line.
Preferably, as shown in the drawing, the axial direction of the first bolt hole may be set at an inclination angle θ of 45 ° to 60 ° with respect to the vertical line.
Preferably, as shown in the figure, the starting end of the groove 22 is at a minimum distance L from the slit 14 of the hollow slab beam 10 in the length direction L2≥50cm。
Preferably, the length of the groove 22 in the length direction L is 10cm greater than the length of the first connector, as shown.
Preferably, as shown in the drawings, the pavement may include a concrete pavement 16 laid on the hollow slab girder 10 and an asphalt pavement 18 laid on the concrete pavement 16. After removing a part of the pavement and a part of the hollow slab beam 10 and exposing a part of the upper surface of the hollow slab beam 10, the concave region 12 is formed.
Preferably, as shown, the repair layer may comprise quick-setting concrete mortar and asphalt concrete filled in the recessed area 12. And injecting glue in the repairing layer for reinforcement.
Preferably, the length L of the first and second connectors is as shown1The longitudinal longest distance in the region of the crack 14 of the hollow plate girder 10, which may be equally arranged, is La. Wherein: l is1≥La×1.41。
Preferably, as shown in the figure, the through holes may be drilled holes distributed in the middle of the hinge joints of the hollow slab girder 10.
In the invention, the upper end and the lower end of the hollow plate beam of the bridge are respectively and fixedly provided with an upper connecting piece and a lower connecting piece, and the two ends of the counter-pull rod are respectively and fixedly connected with the upper connecting piece and the lower connecting piece. The upper connecting piece, the lower connecting piece and the counter-pull rod form a reinforcing assembly, so that the transverse connection between the plate beams can be enhanced, the stress state of a single beam is weakened, and the vibration of the beam and the plate is avoided, so that the cracking and discretization of the crack repairing adhesive are avoided.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, and any modifications, equivalents or improvements that are within the spirit of the present invention are intended to be covered by the following claims.

Claims (10)

1. A shear reinforcement method for a hollow slab beam is characterized by comprising the following steps:
arranging a sunken area at the upper end of the bridge; at least one through hole is formed in a hinge joint of a hollow plate beam of the bridge, and the through hole is communicated with the recessed area;
an upper connecting piece is fixedly arranged at the sunken area, and a lower connecting piece is fixedly arranged at the lower end of the bridge;
a counter pull rod is arranged in the through hole, and two ends of the counter pull rod are fixedly connected to the upper connecting piece and the lower connecting piece respectively;
and repairing the depressed area.
2. The shear reinforcing method for the hollow plate girder according to claim 1, wherein:
the bridge comprises the hollow slab beam and a pavement layer paved on the upper surface of the hollow slab beam;
when the sunken area is arranged at the upper end of the bridge, removing part of the pavement layer and part of the hollow slab beam, and exposing part of the upper surface of the hollow slab beam; wherein the recessed regions comprise a first recessed region in the pavement and a second recessed region in the hollow slab beam;
the upper connecting piece is anchored on the upper surface of the hollow slab beam, and part of the structure is located in the second concave area and is fixedly connected with the counter pull rod; the lower connecting piece is anchored on the lower surface of the hollow slab beam.
3. The shear reinforcing method for the hollow plate girder according to claim 2, wherein:
the top surface of the upper connecting piece is concavely provided with a groove, and the groove extends into the second sunken area;
a first anchor backing plate is arranged on the bottom wall of the groove, and a first bolt hole is arranged on the first anchor backing plate and the bottom wall of the groove in a penetrating manner;
a second anchor backing plate is arranged on one side, back to the hollow plate beam, of the lower connecting piece, and a second bolt hole is formed in the lower connecting piece and the second anchor backing plate in a penetrating mode;
the axial direction of the first bolt hole, the axial direction of the through hole, and the axial direction of the second bolt hole are inclined at the same angle with respect to a vertical line;
the tie-rod is in a bolt structure and sequentially penetrates through the first bolt hole, the through hole and the second bolt hole, and the part of the tie-rod, which penetrates through the second bolt hole, is fastened with a nut.
4. The shear reinforcing method for the hollow plate girder according to claim 3, wherein:
the fastening force of the screw cap on the pull rod penetrating out of the second bolt hole part is F, the breaking force of the pull rod is P, and F is not more than Px 60%; and/or the presence of a gas in the gas,
the axial direction of the first bolt hole is inclined at an angle theta of 45-60 degrees relative to the vertical line.
5. The shear reinforcing method for the hollow plate girder according to claim 3, wherein:
the minimum distance L between the starting end of the groove and the crack of the hollow slab beam in the length direction2Not less than 50 cm; and/or the presence of a gas in the gas,
the length of the groove is 10cm longer than that of the first connecting piece; and/or the presence of a gas in the gas,
the width of the groove is 10cm more than that of the first connecting piece.
6. The shear reinforcing method for the hollow plate girder according to claim 2, wherein:
the paving layer comprises a concrete paving layer paved on the hollow slab beam and an asphalt paving layer paved on the concrete paving layer;
and filling fast-hardening concrete mortar and asphalt concrete in the depressed area when repairing the depressed area.
7. The shear reinforcing method for the hollow plate girder according to claim 1, wherein:
a length L of the first and second connectors1And the longest longitudinal distance of the crack area of the hollow plate beam is La, wherein L1≥La×1.41。
8. The shear reinforcing method for the hollow plate girder according to claim 1, wherein:
the through holes are distributed in the middle of the hinge joint of the hollow slab beam and drilled out through drilling equipment.
9. A shear reinforcement device for a hollow slab beam, comprising:
the bridge comprises a bridge, wherein a concave area is arranged at the upper end of the bridge; the bridge comprises a hollow plate beam, at least one through hole is arranged in a hinge joint of the hollow plate beam, and the through hole is communicated with the recessed area;
the upper connecting piece is fixedly arranged in the concave area;
the lower connecting piece is fixedly arranged at the lower end of the bridge;
the opposite pull rod is arranged in the through hole, and two ends of the opposite pull rod are respectively and fixedly connected to the upper connecting piece and the lower connecting piece; and
and the repairing layer is filled in the depressed area and covers the upper connecting piece.
10. The shear reinforcement device for a hollow plate beam according to claim 9, wherein:
the bridge also comprises a paving layer paved on the upper surface of the hollow slab beam; the concave regions comprise a first concave region positioned in the pavement layer and a second concave region positioned in the hollow slab beam; the upper connecting piece is anchored on the upper surface of the hollow slab beam; the lower connecting piece is anchored on the lower surface of the hollow slab beam.
The top surface of the upper connecting piece is concavely provided with a groove, and the groove extends into the second sunken area;
a first anchor backing plate is arranged on the bottom wall of the groove, and a first bolt hole is arranged on the first anchor backing plate and the bottom wall of the groove in a penetrating manner; a second anchor backing plate is arranged on one side, back to the hollow plate beam, of the lower connecting piece, and a second bolt hole is formed in the lower connecting piece and the second anchor backing plate in a penetrating mode;
the axial direction of the first bolt hole, the axial direction of the through hole, and the axial direction of the second bolt hole are inclined at the same angle with respect to a vertical line;
the tie-rod is in a bolt structure and sequentially penetrates through the first bolt hole, the through hole and the second bolt hole, and the part of the tie-rod, which penetrates through the second bolt hole, is fastened with a nut.
CN202110863959.8A 2021-07-29 2021-07-29 Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam Pending CN113789732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110863959.8A CN113789732A (en) 2021-07-29 2021-07-29 Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110863959.8A CN113789732A (en) 2021-07-29 2021-07-29 Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam

Publications (1)

Publication Number Publication Date
CN113789732A true CN113789732A (en) 2021-12-14

Family

ID=79181433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110863959.8A Pending CN113789732A (en) 2021-07-29 2021-07-29 Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam

Country Status (1)

Country Link
CN (1) CN113789732A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922125A (en) * 2022-05-07 2022-08-19 山东交通学院 PC beam type bridge, and reinforcing device and method for PC beam type bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922125A (en) * 2022-05-07 2022-08-19 山东交通学院 PC beam type bridge, and reinforcing device and method for PC beam type bridge

Similar Documents

Publication Publication Date Title
KR20030064362A (en) Structure and Method for Precast Deck-to-Girder Connections
KR100991869B1 (en) Single and continuous prestressed concrete girder bridge and the construction method
KR102009134B1 (en) Construction Method of Long Span Girder Bridge
CN111455806B (en) Construction method of bridge structure in hogging moment area of prestressed concrete beam
CN214005373U (en) Connecting structure of precast concrete bridge deck and steel plate beam
KR100352646B1 (en) Method to reinforce the endurance force of structure using tensile beam
KR100985139B1 (en) Reinforcement method and apparatus for upper concrete structure by using reinforcement members having reinforcement fibers thereon
CN113789732A (en) Shear-resistant reinforcing method and shear-resistant reinforcing device for hollow plate beam
JP2528432B2 (en) Reinforcement method for concrete structure using hollow PC steel rod
CN216108142U (en) Shearing-resistant reinforcing device for hollow plate girder
KR100310245B1 (en) Continuous Superstructure of Bridge Upper Structure
JP2018193709A (en) Concrete structure applying continuous fiber reinforcing material and concrete member joining method
CN111455877A (en) Clamping and reinforcing method for assembled concrete hole hollow slab bridge
JP7222824B2 (en) Wall balustrade reinforcement method and reinforcement structure
KR200241299Y1 (en) External steel wire reinforcement anchoring apparatus for concrete structure
CN111827140B (en) Unbonded external transverse prestress reinforced hinge joint cracking damaged plate beam structure and method
CN114657887A (en) Construction method of precast slab anti-cracking structure in hogging moment area of combined beam bridge
JP2007169950A (en) Expansion body for bridge, and bridge expansion structure using the same
CN109868744B (en) Full precast concrete bridge deck without cast-in-situ pavement layer
CN111945588A (en) Hinge joint reinforcing and maintaining method and device
KR100414261B1 (en) External steel wire reinforcement method for concrete structure and anchoring method therefor
KR100462925B1 (en) Method for reinforcing bridges using external steel wires and steel wire anchoring device applied to the same
CN111305066A (en) Hybrid combination beam steel-concrete combination section and mounting method thereof
KR20020059960A (en) Precasted Concrete using a Fiber Reinforced Concrete and method for construction
CN110541369A (en) Device and method for additionally arranging prestressed steel strand in hollow plate hinge joint space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination