CN113783222A - Power generation method - Google Patents
Power generation method Download PDFInfo
- Publication number
- CN113783222A CN113783222A CN202010518185.0A CN202010518185A CN113783222A CN 113783222 A CN113783222 A CN 113783222A CN 202010518185 A CN202010518185 A CN 202010518185A CN 113783222 A CN113783222 A CN 113783222A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- power
- nuclear power
- box
- land
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 34
- 238000010248 power generation Methods 0.000 title claims abstract description 31
- 230000005611 electricity Effects 0.000 description 9
- 230000002093 peripheral effect Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 230000004888 barrier function Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000011089 mechanical engineering Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Wind Motors (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The embodiment of the invention provides a power generation method, which is applied to a power generation system, wherein the power generation system comprises an offshore wind power generator and a land wind power generator, the offshore wind power generator is arranged in a sea area corresponding to a nuclear power plant, the land wind power generator is arranged on land corresponding to the nuclear power plant, and the method comprises the following steps: generating power through the offshore wind turbine to obtain first electric energy; generating power through the land wind power generator to obtain second electric energy; transmitting the first electrical energy to a box transformer corresponding to the land wind generator; and sending the second electric energy and the first electric energy received by the box type transformer to a power grid. The embodiment of the invention can improve the utilization rate of land and sea resources in and around the nuclear power plant.
Description
Technical Field
The present invention relates to the field of mechanical engineering, and more particularly to a method of generating electricity.
Background
The construction of nuclear power plants requires the expropriation of water areas and lands in peripheral areas, and the nuclear power plants are generally selected from areas rich in wind fields near the sea when sites are selected. Nuclear power plants require a water area with a certain area as a final heat sink; a certain area of land needs to be conquered to construct a matched temporary building and an installation site; a certain area of land needs to be used for building a road, and transportation in a nuclear power plant is guaranteed; the land with a certain area is required to construct entity protection and boundaries, and the safety of the nuclear power plant is guaranteed. The unit cost of the nuclear power plant is taken into account in the areas, but the utilization rate of land and sea resources in and around the nuclear power plant is low.
Disclosure of Invention
The embodiment of the invention provides a power generation method which is applied to a power generation system, wherein the power generation system comprises an offshore wind power generator and a land wind power generator, the offshore wind power generator is arranged in a sea area corresponding to a nuclear power plant, and the land wind power generator is arranged on a land corresponding to the nuclear power plant, so that the problem of low utilization rate of land and sea area resources in and around the nuclear power plant is solved.
The embodiment of the invention provides a power generation method, which is applied to a power generation system, wherein the power generation system comprises an offshore wind power generator and a land wind power generator, the offshore wind power generator is arranged in a sea area corresponding to a nuclear power plant, and the land wind power generator is arranged on land corresponding to the nuclear power plant, and the method comprises the following steps:
generating power through the offshore wind turbine to obtain first electric energy;
generating power through the land wind power generator to obtain second electric energy;
transmitting the first electrical energy to a box transformer corresponding to the land wind generator;
and sending the second electric energy and the first electric energy received by the box type transformer to a power grid.
Therefore, in the embodiment of the invention, the offshore wind driven generator and the land wind driven generator are used for generating electricity, and the obtained electric energy is sent to the power grid through the corresponding box-type transformers. Thereby achieving the technical effect of improving the utilization rate of land and sea resources in and around the nuclear power plant.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without inventive labor.
FIG. 1 is a schematic flow diagram of a method of generating electricity according to an embodiment of the present invention;
FIG. 2a is a schematic view of an offshore wind turbine provided by an embodiment of the present invention;
FIG. 2b is a schematic view of a land-based wind turbine provided in accordance with an embodiment of the present invention;
FIG. 3 is a schematic flow diagram of another method of generating power provided by an embodiment of the present invention;
fig. 4 is a schematic flow chart of another power generation method provided by the embodiment of the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, fig. 1 is a schematic flow chart of a power generation method according to an embodiment of the present invention, and as shown in fig. 1, the power generation method is applied to a power generation system, where the power generation system includes an offshore wind turbine and a land wind turbine, the offshore wind turbine is disposed in a sea area corresponding to a nuclear power plant, and the land wind turbine is disposed on a land corresponding to the nuclear power plant, and the method includes the following steps:
the offshore wind power generators can be wind power generators arranged in the peripheral sea areas of the nuclear power plant, wind energy can be converted into electric energy with rated voltage and rated frequency, the offshore wind power generators are arranged along a group pile sea area and are constructed along with sea area engineering, and each offshore wind power generator is provided with a built-in box-type transformer. For example: as shown in fig. 2a, a box transformer is built into the offshore wind turbine.
In addition, the first electric energy can be electric energy which is generated by the offshore wind turbine and used for converting wind energy into electric energy meeting rated frequency and rated voltage, and the first electric energy can be transmitted by connecting box-type transformers built in the offshore wind turbine with each other. For example: the offshore wind turbine generates power to obtain first electric energy, and box-type transformers built in the offshore wind turbine can transmit the first electric energy to box-type transformers near corresponding terrestrial wind turbines through interconnection of the box-type transformers.
102, generating power through the land wind driven generator to obtain second electric energy;
the land wind power generator can be a wind power generator arranged on the land around the nuclear power plant, can convert wind energy into electric energy with rated voltage and rated frequency, is arranged along the boundary of a group pile land and is constructed together with a land barrier, and in addition, a box-type transformer is arranged near the land wind power generator, for example: as shown in fig. 2b, the box transformer is located in the vicinity of the land wind turbine.
In addition, the second electric energy can be the electric energy which is generated by converting wind energy into rated frequency and rated voltage by a land wind power generator, and the second electric energy can also be transmitted by connecting box type transformers near the land wind power generator with each other, for example: the land wind power generator generates second electric power, and the box-type transformer near the land wind power generator can transmit the second electric power to the box-type transformer near the land wind power generator through the interconnection of the box-type transformers.
103, transmitting the first electric energy to a box type transformer corresponding to the land wind driven generator;
the box-type transformers corresponding to the land wind driven generators can be arranged near the land wind driven generators, and each land wind driven generator can correspond to one box-type transformer nearby. For example: the box-type transformer corresponding to the land wind driven generator No. 1 is a box-type transformer close to the land wind driven generator No. 1; the box-type transformer corresponding to the land wind power generator No. 2 is a box-type transformer near the land wind power generator No. 2, and the like.
In addition, the first electric energy is transmitted to the box type transformer corresponding to the land wind driven generator, wind energy of the offshore wind driven generator can be converted into voltage and frequency meeting nuclear power self-use through the box type transformer arranged in the offshore wind driven generator, and the first electric energy is transmitted to the box type transformer of the adjacent land wind driven generator through mutual connection of the box type transformers. For example: the offshore wind driven generator No. 3 generates power to obtain first electric energy, the first electric energy is converted into voltage and frequency meeting the self-use of nuclear power through the box type transformer No. 3 arranged in the offshore wind driven generator, and then the first electric energy is transmitted to the box type transformer No. 4 close to the corresponding terrestrial wind driven generator through the mutual connection of the box type transformers.
And 104, transmitting the second electric energy and the first electric energy received by the box type transformer to a power grid.
Wherein the second power and the first power received by the box transformer may be powers satisfying preset condition voltages and frequencies. For example: when the voltage and frequency of the preset condition are, then the second power and the receiving of the first power by the box transformer may be the power that has been converted by the box transformer to meet the voltage and frequency of the preset condition.
In addition, the second electric energy and the first electric energy received by the box-type transformer can be transmitted to the power grid in various power transmission modes, such as: the mode 1 can be that the self-use bus of the nuclear power plant is connected through a cable, under the normal condition, the self-use bus of the nuclear power plant can charge the storage battery of the nuclear power plant, and when the nuclear power plant has a serious accident, whether the mobile diesel engine is replaced by the self-use bus power supply is determined according to the current climatic conditions. Another example is: the mode 2 can be that the wind field is boosted by a pre-installed booster station and then is independently sent to a power grid or is merged into nuclear power and sent to the power grid together.
In this embodiment, the steps 101 and 102 are not performed sequentially, wherein the first electric energy and the second electric energy can be obtained simultaneously. For example: when the offshore wind turbine generates electricity, the land wind turbine may generate electricity.
In the embodiment, the offshore wind turbine is used for generating electricity to obtain first electric energy; generating power through the land wind power generator to obtain second electric energy; transmitting the first electrical energy to a box transformer corresponding to the land wind generator; and sending the second electric energy and the first electric energy received by the box type transformer to a power grid. Thereby achieving the technical effect of improving the utilization rate of land and sea resources in and around the nuclear power plant.
Referring to fig. 3, fig. 3 is a schematic flow chart of another power generation method according to an embodiment of the present invention, as shown in fig. 3, applied to a power generation system including an offshore wind turbine and a land wind turbine, including the following steps:
301, generating power through the offshore wind turbine to obtain first electric energy;
optionally, step 303 may include:
and converting the voltage and the frequency which meet preset conditions through a box type transformer arranged in the offshore wind turbine into the voltage and the frequency which meet preset conditions, and outputting the converted first electric energy to a box type transformer corresponding to the land wind turbine group pile.
The box-type transformer built in the offshore wind turbine is connected with the box-type transformer corresponding to the land wind turbine group pile, and the first electric energy can be transmitted to the box-type transformer corresponding to the land wind turbine group pile through the mutual connection of the box-type transformers. Therefore, the first electric energy obtained by the offshore wind driven generator for generating electricity can be obtained, and the utilization rate of sea resources is improved.
Optionally, the preset condition voltage and frequency may include:
the voltage and the frequency for the nuclear power plant are met.
The voltage and the frequency meeting the self-use requirement of the nuclear power plant can be obtained by converting a box type transformer arranged in the offshore wind driven generator, the voltage and the frequency meeting the self-use requirement of the nuclear power plant are converted by the box type transformer arranged in the offshore wind driven generator, and partial electric energy connected to a self-use bus of the nuclear power plant can be connected through a cable without being converted by other steps.
This embodiment can implement each process implemented in the method embodiments of fig. 1 to fig. 2, and is not described here again to avoid repetition. In the embodiment, the electric energy generated by the offshore wind driven generator can be converted by the box-type transformer arranged in the offshore wind driven generator and then can be accessed to the nuclear power plant, so that a standby power supply can be added to the nuclear power plant unit, and the safety of the nuclear power plant unit is improved.
Optionally, the power generation system may include:
and the offshore wind power generators are distributed according to the distance from the nuclear power plant, the density and the dislocation.
When the offshore wind driven generators are arranged in the sea area around the nuclear power plant, the offshore wind driven generators can be arranged along the sea area of the group pile sea area and can be constructed along with the sea area engineering.
In the embodiment, according to the plurality of offshore wind driven generators which are far away from the nuclear power plant, close to and dense and distributed in a staggered manner, the wind field can be effectively utilized in the sea area around the nuclear power plant, the unit manufacturing cost is reduced, and a barrier which interferes with the passage of the small and slow aircrafts is formed, so that the utilization rate of the sea area resources around the nuclear power plant can be improved.
Optionally, the power generation system may further include:
and the plurality of land wind driven generators are distributed according to the distance from the nuclear power plant, the density and the dislocation.
When the land wind driven generators are arranged in the peripheral area of the nuclear power plant, the land wind driven generators can be arranged along the land boundary of the group pile and constructed together with the land barrier; when the land wind driven generator is arranged in the temporary building area, the construction can be carried out after the group piling construction is finished. For example: the area 1 is a road area around a nuclear power plant, and then, an offshore wind driven generator can be arranged in the area and constructed together with the area 1; the area 2 is a temporary building area around the nuclear power plant, so that the offshore wind driven generator can be constructed after the nuclear power plant group pile construction is finished.
In the embodiment, according to the plurality of land wind driven generators which are far away from the nuclear power plant, close to the nuclear power plant and distributed in a staggered manner, the distance between the wind driven generators can also effectively interfere the low-speed and low-speed small aircraft to pass through, and the buildings and equipment such as containment vessels or important facility equipment are guaranteed not to be endangered when the wind driven generators closest to the buildings collapse, so that the greening, roads, construction land, physical protection and wind field in the peripheral area of the nuclear power plant can be comprehensively utilized, and the resource utilization rate of the peripheral land area of the nuclear power plant is improved.
Optionally, after step 303, the method may include the following steps:
304, sending the second electric energy and a first part of electric energy received by the box type transformer from the first electric energy to a power grid;
the first part of electric energy of the first electric energy may be electric energy of the first electric energy transmitted to the vicinity of the wind farm pre-installed booster station and boosted by the wind farm pre-installed booster station. For example:
in the embodiment, the electric energy converted by the wind driven generator can be sent to a power grid and can be used as a standby power supply of the nuclear power plant unit, standby power generation equipment of the nuclear power plant unit is reduced, unit capacity cost of the nuclear power plant unit is reduced, and utilization rate of land and sea resources in and around the nuclear power plant is improved.
Optionally, after step 303, the method may include the following steps:
and 305, sending a second part of the second electric energy and the first electric energy received by the box type transformer to a nuclear power plant.
The second part of the electric energy of the first electric energy may be the electric energy of the first electric energy transmitted to the vicinity of the wind farm pre-installed booster station without passing through the booster part of the wind farm pre-installed booster station.
In the embodiment, the electric energy converted by the wind driven generator can meet the self-use of nuclear power, and can be used as a nuclear power plant unit under the emergency condition, so that the capacity expansion of the nuclear power plant unit is comprehensively increased, and the unit capacity cost of the nuclear power plant unit is reduced. For example: the second part of the electric energy of the first electric energy can be accessed into the self-use bus of the nuclear power plant through the cable to charge the storage battery of the nuclear power plant, and whether the power supply of the self-use bus of the nuclear power plant is accessed into the nuclear power plant through the cable to replace a mobile diesel engine or not can be determined according to the current climatic conditions when a serious accident occurs in the nuclear power plant.
Referring to fig. 4, fig. 4 is a schematic flow chart of another power generation method according to an embodiment of the present invention, as shown in fig. 4, applied to a power generation system including an offshore wind turbine and a land wind turbine, including the following steps:
optionally, the method further includes:
and 405, boosting the second electric energy and the first electric energy received by the box-type transformer through a wind field preassembly booster station, and sending the second electric energy and the first electric energy to a power grid after boosting.
For example: as shown in fig. 4, after the second electric energy and the box-type transformer receive the first electric energy and transmit the first electric energy to the vicinity of the wind farm pre-installed booster station, the second electric energy and the first electric energy may enter the wind farm pre-installed booster station to be boosted, and the second electric energy and the first electric energy may be sent to the power grid after boosting.
In the embodiment, the electric energy sent to the power grid can be used as a standby power supply of the nuclear power plant unit to replace a part of nuclear power or be sent to the power grid together with the nuclear power, so that the unit capacity cost of the nuclear power plant unit can be reduced.
Optionally, step 405 may include:
and the second electric energy and the first electric energy received by the box-type transformer are boosted through an air field preassembly booster station, and the boosted second electric energy and the boosted first electric energy are independently sent to a power grid.
In the embodiment, the capacity expansion of the nuclear power plant unit is increased by transmitting the electric energy obtained by generating electricity by the offshore wind driven generator and the land wind driven generator to the power grid, so that the resource utilization rate of land and sea areas in and around the nuclear power plant can be improved.
Optionally, the sending the second electric energy and the first electric energy to the power grid after the voltage boosting may include:
the second electric energy and the first electric energy after being boosted are independently sent to a power grid;
and the second electric energy and the first electric energy after being boosted are merged into nuclear power and are sent to a power grid together.
In the embodiment, the electric energy obtained by the power generation of the offshore wind driven generator and the land wind driven generator is transmitted to the power grid together with the nuclear power, so that the standby power generation equipment of the nuclear power plant unit can be reduced, and the unit capacity cost of the nuclear power plant unit is reduced.
Optionally, the method further includes:
and 406, receiving the first electric energy by the second electric energy and the box-type transformer near a wind field pre-installed booster station through a cable, and sending the first electric energy to a nuclear power plant.
For example: after the second electric energy and the box-type transformer receive the first electric energy and transmit the first electric energy to the vicinity of the wind field pre-installed booster station, the second electric energy and the box-type transformer can be connected to the nuclear power plant through a cable, and the electric energy transmitted to the nuclear power plant can be boosted without the aid of the wind field pre-installed booster station.
According to the embodiment, the electric energy obtained by power generation of the offshore wind driven generator and the land wind driven generator can be divided, a part of electric energy sent to the nuclear power plant can be accessed near the wind field pre-installed booster station through the cable, and the expansion of the nuclear power plant unit can be increased and the unit capacity cost of the nuclear power plant unit can be reduced by sending part of electric energy to the nuclear power plant.
Optionally, step 406 may include:
the second electric energy and the first electric energy received by the box type transformer are charged to a storage battery of the nuclear power plant through a self-service bus of the nuclear power plant by cables near a wind field pre-installed booster station.
The nuclear power plant self-use bus accesses the electric energy through a cable near the wind field pre-installed booster station without entering the wind field pre-installed booster station for boosting.
In the embodiment, part of the electric energy sent to the nuclear power plant can be charged to the storage battery of the nuclear power plant under the normal condition, and the capacity expansion of the nuclear power plant unit is increased.
Optionally, step 406 may further include:
the second electric energy and the first electric energy received by the box type transformer near the wind field pre-installed booster station through cables can be supplied with power through a self-service bus of a nuclear power plant.
For example: when a severe accident occurs in a nuclear power plant, whether the mobile diesel engine is replaced by self-powered bus can be determined according to the current climatic conditions.
In this embodiment, the nuclear power plant may use the offshore wind turbine and the land turbine to generate electricity to obtain electric energy for power supply under certain conditions, so as to improve the resource utilization rate of the peripheral area of the nuclear power plant.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (10)
1. A power generation method is applied to a power generation system, the power generation system comprises an offshore wind power generator and a land wind power generator, the offshore wind power generator is arranged in a sea area corresponding to a nuclear power plant, the land wind power generator is arranged on a land corresponding to the nuclear power plant, and the method is characterized by comprising the following steps:
generating power through the offshore wind turbine to obtain first electric energy;
generating power through the land wind power generator to obtain second electric energy;
transmitting the first electrical energy to a box transformer corresponding to the land wind generator;
and sending the second electric energy and the first electric energy received by the box type transformer to a power grid.
2. The method of claim 1, wherein said sending said second power and said first power received by said box transformer to a power grid comprises:
sending a first part of the second electric energy and the first electric energy received by the box type transformer to a power grid;
the method further comprises the following steps:
and sending a second part of the second electric energy and the first electric energy received by the box type transformer to a nuclear power plant.
3. The method of claim 2, wherein the power generation system comprises:
and the offshore wind power generators are distributed according to the distance from the nuclear power plant, the density and the dislocation.
4. The method of claim 2, wherein the power generation system comprises:
and the plurality of land wind driven generators are distributed according to the distance from the nuclear power plant, the density and the dislocation.
5. The method according to any one of claims 1 to 4, wherein said transferring said first electric energy to a box transformer corresponding to said terrestrial wind turbine farm stack comprises:
and converting the voltage and the frequency which meet preset conditions through a box type transformer arranged in the offshore wind turbine into the voltage and the frequency which meet preset conditions, and outputting the converted first electric energy to a box type transformer corresponding to the land wind turbine group pile.
6. The method of claim 5, wherein the preset conditions of voltage and frequency comprise:
the voltage and the frequency for the nuclear power plant are met.
7. The method of any one of claims 1 to 4, wherein said sending said second power and said first power received by said box transformer to a power grid comprises:
and receiving the first electric energy by the second electric energy and the box-type transformer through an air field preassembly booster station for boosting, and sending the second electric energy and the first electric energy to a power grid after boosting.
8. The method of claim 7, wherein said sending said second electrical energy and said first electrical energy to a grid after boosting comprises:
the second electric energy and the first electric energy after being boosted are independently sent to a power grid;
and the second electric energy and the first electric energy after being boosted are merged into nuclear power and are sent to a power grid together.
9. The method of any one of claims 1 to 4, wherein said sending said second power and said first power received by said box transformer to a power grid comprises:
and the second electric energy and the first electric energy received by the box-type transformer are sent to a nuclear power plant by a cable near a wind field pre-installed booster station.
10. The method of claim 9, wherein said sending said second electrical energy and said first electrical energy received by said box transformer to a nuclear power plant comprises:
charging a storage battery of the nuclear power plant through a self-service bus of the nuclear power plant;
the power is supplied by a self-service bus of a nuclear power plant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010518185.0A CN113783222A (en) | 2020-06-09 | 2020-06-09 | Power generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010518185.0A CN113783222A (en) | 2020-06-09 | 2020-06-09 | Power generation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113783222A true CN113783222A (en) | 2021-12-10 |
Family
ID=78834355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010518185.0A Pending CN113783222A (en) | 2020-06-09 | 2020-06-09 | Power generation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113783222A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013038966A (en) * | 2011-08-09 | 2013-02-21 | Japan Radio Co Ltd | Power supply unit |
CN105226714A (en) * | 2015-10-29 | 2016-01-06 | 国网山东省电力公司电力科学研究院 | A kind of offshore wind farm direct current converges transmission system and method for designing |
CN107634543A (en) * | 2017-11-21 | 2018-01-26 | 国网上海市电力公司 | A kind of offshore wind farm booster system and step-up method |
CN108092315A (en) * | 2018-01-08 | 2018-05-29 | 三峡大学 | A kind of exchange piconet networking system suitable for offshore wind farm consumption |
CN109284878A (en) * | 2018-11-26 | 2019-01-29 | 武汉大学 | A kind of multi-source Optimization Scheduling for considering wind-powered electricity generation, nuclear power, water-storage and coordinating |
CN110048458A (en) * | 2019-04-30 | 2019-07-23 | 国网福建省电力有限公司 | A kind of offshore wind farm orderly withdrawal method under typhoon environment |
CN110474321A (en) * | 2019-07-25 | 2019-11-19 | 中广核工程有限公司 | Combined cleaning energy electricity generation system and its operation method |
-
2020
- 2020-06-09 CN CN202010518185.0A patent/CN113783222A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013038966A (en) * | 2011-08-09 | 2013-02-21 | Japan Radio Co Ltd | Power supply unit |
CN105226714A (en) * | 2015-10-29 | 2016-01-06 | 国网山东省电力公司电力科学研究院 | A kind of offshore wind farm direct current converges transmission system and method for designing |
CN107634543A (en) * | 2017-11-21 | 2018-01-26 | 国网上海市电力公司 | A kind of offshore wind farm booster system and step-up method |
CN108092315A (en) * | 2018-01-08 | 2018-05-29 | 三峡大学 | A kind of exchange piconet networking system suitable for offshore wind farm consumption |
CN109284878A (en) * | 2018-11-26 | 2019-01-29 | 武汉大学 | A kind of multi-source Optimization Scheduling for considering wind-powered electricity generation, nuclear power, water-storage and coordinating |
CN110048458A (en) * | 2019-04-30 | 2019-07-23 | 国网福建省电力有限公司 | A kind of offshore wind farm orderly withdrawal method under typhoon environment |
CN110474321A (en) * | 2019-07-25 | 2019-11-19 | 中广核工程有限公司 | Combined cleaning energy electricity generation system and its operation method |
Non-Patent Citations (2)
Title |
---|
中国核电: "中国核电首个分散式风电项目并网发电", pages 1, Retrieved from the Internet <URL:https://www.sohu.com/a/231544379_100154324> * |
杨晓冉: "聚焦丨中国能源报:徐大堡核电站探建多能互补基地", Retrieved from the Internet <URL:https://www.sohu.com/a/244840963_673510> * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lazaridis | Economic comparison of HVAC and HVDCSolutions for large offshore wind farms underspecial consideration of reliability | |
Colmenar-Santos et al. | Offshore wind energy: A review of the current status, challenges and future development in Spain | |
Vasconcelos et al. | Advanced control solutions for operating isolated power systems: Examining the Portuguese islands | |
Erlich et al. | Offshore wind power generation technologies | |
US9178357B2 (en) | Power generation and low frequency alternating current transmission system | |
Beik et al. | An offshore wind generation scheme with a high-voltage hybrid generator, HVDC interconnections, and transmission | |
US20160036221A1 (en) | Dc connection system for renewable power generators | |
Zubiaga et al. | Energy transmission and grid integration of AC offshore wind farms | |
Robak et al. | Substations for offshore wind farms: a review from the perspective of the needs of the Polish wind energy sector | |
Alagab et al. | Review of wind farm power collection schemes | |
Pan et al. | Integration technology and practice for long‐distance offshore wind power in China | |
CN113783222A (en) | Power generation method | |
Zhou et al. | Optimization of an annular wave energy converter in a wind-wave hybrid system | |
Chozas et al. | Integration of wave and offshore wind energy in a European offshore grid | |
Eager et al. | Hybrid renewable energy systems for future power grids | |
Okoronkwo et al. | Design considerations of the Katsina wind farm in Nigeria | |
Adeuyi et al. | Briefing: The North Sea grid | |
CN203504196U (en) | Wave power generation and offshore wind plant combined power transmission equipment | |
Elgeziry et al. | Integration enhancement of grid-connected wind farms using HVDC systems: Egyptian network case study | |
Carlini et al. | Integration of Wind Offshore Generation into the Italian Transmission Network: connection solutions and case study | |
Ghezelayagh | Protection & Control Systems of Wind Farm Power Plants: Setting, Design and Integration to grid (Onshore & Offshore) | |
Danapour et al. | Transformer-less integrated wind turbine-power transmission line systems | |
Sun | Advanced methods for offshore windfarm planning | |
Prada‐Gil et al. | Offshore Wind Power Plants (OWPPS) | |
Maclean | Electrical system design for the proposed one gigawatt beatrice offshore wind farm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |