CN113774817B - Assembled highway bridge rapid construction equipment - Google Patents

Assembled highway bridge rapid construction equipment Download PDF

Info

Publication number
CN113774817B
CN113774817B CN202111077387.7A CN202111077387A CN113774817B CN 113774817 B CN113774817 B CN 113774817B CN 202111077387 A CN202111077387 A CN 202111077387A CN 113774817 B CN113774817 B CN 113774817B
Authority
CN
China
Prior art keywords
track
connecting pipe
baffle
fixedly connected
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111077387.7A
Other languages
Chinese (zh)
Other versions
CN113774817A (en
Inventor
钱海炜
曹越新
干兆辉
徐凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhoushan Changhong International Shipbuilding Co ltd
Original Assignee
Zhoushan Changhong International Shipbuilding Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoushan Changhong International Shipbuilding Co ltd filed Critical Zhoushan Changhong International Shipbuilding Co ltd
Priority to CN202111077387.7A priority Critical patent/CN113774817B/en
Publication of CN113774817A publication Critical patent/CN113774817A/en
Application granted granted Critical
Publication of CN113774817B publication Critical patent/CN113774817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention aims to solve the maintenance problem of highway piers, belongs to the field of highway bridge construction, and discloses an assembly type highway bridge rapid construction device which comprises a first track and a second track, wherein end caps are symmetrically arranged at the inner ends of the first track and the second track, baffles are sleeved in the first track and the second track, a first connecting pipe and a second connecting pipe are arranged on the surfaces of the first track and the second track, a connecting frame is fixedly connected between the first connecting pipe and the second connecting pipe, a rack is fixedly connected on the outer surfaces of the first connecting pipe and the second connecting pipe, a motor is fixedly arranged in the rack, a rotary disc is arranged in the middle of the motor, and a first connecting block is fixedly connected on the surfaces of the first connecting pipe and the second connecting pipe. According to the invention, the baffle is guided by arranging the first rail and the second rail, and then the baffle is driven by the motor, so that a certain space can be formed by using the baffle, the water level around the inside of the pier can be conveniently controlled, and the pier can be conveniently maintained.

Description

Assembled highway bridge rapid construction equipment
Technical Field
The invention relates to the field of highway bridge construction, in particular to an assembly type rapid highway bridge construction device.
Background
The highway bridge engineering refers to the whole work of planning, designing, constructing, maintaining, repairing and the like of structures of a highway across water areas, valleys and all traffic channels.
Can install the pier below the bridge, when the pier maintains, because the existence of river, will influence the construction to the pier for the maintenance and the construction of pier cause the influence, and the current difficult water level around the pier is controlled, influence constructor's installation, if not maintain the bridge, will make the bridge appear collapsing, it is dangerous relatively, influence the quick construction to the pier, consequently, need design an assembled highway bridge quick construction equipment to solve the problem of pier construction urgently.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provides an assembly type highway bridge rapid construction device.
The invention is realized by the following technical scheme:
the utility model provides an assembled highway bridge equipment of being under construction fast, including first track and second track, the end cap is installed to first track and the equal symmetry in second track inner, all the cover has the baffle in first track and the second track, first connecting pipe and second connecting pipe are all equipped with on first track and second track surface, fixedly connected with link between first connecting pipe and the second connecting pipe, the equal fixedly connected with frame in first connecting pipe and second connecting pipe surface, the inside fixed mounting of frame has the motor, the motor mid-mounting has the carousel, first connecting pipe and the equal fixedly connected with first connecting block in second connecting pipe surface, first connecting block endotheca has the sleeve pipe, sleeve pipe surface fixedly connected with piston rod, the piston rod outer end is equipped with the pneumatic cylinder, the pneumatic cylinder surface is equipped with the second connecting block, second connecting block outer end fixed mounting has the rotary rod, rotary rod outer end fixed mounting has the cardboard, the cardboard lateral wall is equipped with fastening screw, fixed mounting has the water pump on the first track, the inlet end of water pump is connected with first pipe, the liquid outlet end of water pump is connected with the second pipe.
Preferably, the first rail and the second rail are both U-shaped.
Preferably, the end cap is of annular construction.
Preferably, a rotating shaft is arranged between the sleeve and the first connecting block.
Preferably, the side walls of the first connecting pipe and the second connecting pipe are provided with grooves corresponding to the baffle plates.
Preferably, the baffle is made of steel materials, and the surface of the baffle is a frosted surface.
Compared with the prior art, the invention has the beneficial effects that:
the baffle plate is conveniently guided by the guide of the first rail and the second rail, the baffle plate plays a role in prolonging by the arrangement of the baffle plate, so that the distance between the first rail and the second rail is conveniently controlled, the enclosed space is conveniently controlled, a certain space is formed around a pier by the cooperation of the rails and the baffle plate, the water level in the enclosed space can be controlled by combining the arrangement of a water pump, and further the surrounding water can be pumped away when the pier is maintained, so that convenience is provided for installation of constructors. According to the invention, the baffle is guided by arranging the first rail and the second rail, and then the baffle is driven by the motor, so that a certain space can be formed by using the baffle, the water level around the inside of the pier can be conveniently controlled, and the pier can be conveniently maintained.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of a second track of the present invention;
FIG. 3 is an extended schematic view of the baffle of the present invention;
description of reference numerals: 1. first track, 2, fastening screw, 3, end cap, 4, second track, 5, cardboard, 6, baffle, 7, pneumatic cylinder, 8, piston rod, 9, first connecting pipe, 10, first connecting block, 11, sleeve pipe, 12, frame, 13, motor, 14, carousel, 15, second connecting block, 16, rotary rod, 17, link, 18, second connecting pipe, 19, first pipe, 20, water pump, 21, second pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
the utility model provides an assembled highway bridge rapid construction equipment, including first track 1 and second track 4, end cap 3 is all installed to first track 1 and the equal symmetry in second track 4 inner, all the cover has baffle 6 in first track 1 and the second track 4, first connecting pipe 9 and second connecting pipe 18 are all equipped with on first track 1 and the surface of second track 4, fixedly connected with link 17 between first connecting pipe 9 and the second connecting pipe 18, first connecting pipe 9 and the equal fixedly connected with frame 12 of second connecting pipe 18 surface, the inside fixed mounting of frame 12 has motor 13, motor 13 mid-mounting has carousel 14, first connecting pipe 9 and the equal fixedly connected with first connecting block 10 in second connecting pipe 18 surface, first connecting block 10 endotheca has sleeve pipe 11, sleeve pipe 11 fixed surface is connected with piston rod 8, the piston rod 8 outer end is equipped with pneumatic cylinder 7, pneumatic cylinder 7 surface is equipped with second connecting block 15, second connecting block 15 outer end fixed mounting has rotary rod 16, rotary rod 16 fixed mounting has cardboard 5, go out the cardboard 5 lateral wall and be equipped with fastening screw 2, fixed mounting has water pump 20 on first track 1, water pump 20's end 19, the first pipe 21 of water pump 20 is connected with the pipe 21 pipe.
The first track 1 and the second track 4 are both of U-shaped structures.
The end cap 3 is of annular configuration.
A rotating shaft is arranged between the sleeve 11 and the first connecting block 10.
The side walls of the first connecting pipe 9 and the second connecting pipe 18 are both provided with grooves corresponding to the baffle 6.
The baffle 6 is made of steel materials, and the surface of the baffle 6 is a frosted surface.
The method comprises the following operation steps: firstly, the device is sleeved outside a pier, the clamping plate 5 is clamped on a bridge, the fixed installation of the device is realized, the lifting control can be performed on the device through the control of the hydraulic cylinder 7, the first rail 1 and the second rail 4 form a certain space at the periphery of the pier, then an operator inserts the first guide pipe 19 into the enclosed space, the switch of the water pump 20 is turned on, the water enclosed into the space is pumped out, the water around the pier can be pumped out, the pier is maintained and repaired, the influence of the water around the pier can be avoided, which is equivalent to the formation of the enclosure around the pier, the baffle 6 can be pushed by using the rotary table 14 through the control of the motor 13, the enclosed space is extended by using the baffle 6, after the pier is maintained and repaired, the device is taken down, and the maintenance of the pier can be realized.
The present embodiment is only for explaining the present invention, and not for limiting the present invention, and those skilled in the art can make modifications without inventive contribution to the present embodiment as needed after reading the present specification, but all of which are protected by patent law within the scope of the claims of the present invention.

Claims (2)

1. The utility model provides a quick construction of assembled highway bridge is equipped, includes first track (1) and second track (4), characterized by: the inner ends of the first track (1) and the second track (4) are symmetrically provided with end caps (3), the first track (1) and the second track (4) are sleeved with baffles (6), the surfaces of the first track (1) and the second track (4) are respectively provided with a first connecting pipe (9) and a second connecting pipe (18), a connecting frame (17) is fixedly connected between the first connecting pipe (9) and the second connecting pipe (18), the outer surfaces of the first connecting pipe (9) and the second connecting pipe (18) are respectively fixedly connected with a rack (12), the inside of the rack (12) is fixedly provided with a motor (13), the middle part of the motor (13) is provided with a turntable (14), the surfaces of the first connecting pipe (9) and the second connecting pipe (18) are respectively fixedly connected with a first connecting block (10), the inner end of the first connecting block (10) is sleeved with a sleeve (11), the surface of the sleeve (11) is fixedly connected with a piston rod (8), the piston rod (8) is provided with a hydraulic cylinder (7), the surface of the hydraulic cylinder (7) is provided with a second connecting block (15), the outer end of the second connecting block (15) is fixedly provided with a rotary rod (16), the outer end of the rotary rod (5), the fixing screw (5) is fixedly provided with a fastening clamp plate (5), and a side wall of the first clamp plate (1) is provided with a fastening screw (20), the liquid inlet end of the water pump (20) is connected with a first conduit (19), and the liquid outlet end of the water pump (20) is connected with a second conduit (21); the first track (1) and the second track (4) are both U-shaped structures; the end cap (3) is of an annular structure; a rotating shaft is arranged between the sleeve (11) and the first connecting block (10); grooves corresponding to the baffle plates (6) are formed in the side walls of the first connecting pipe (9) and the second connecting pipe (18); the operation steps are as follows, firstly, the equipment is sleeved outside a bridge pier, a clamping plate (5) is clamped on the bridge pier to realize fixed installation of the equipment, the equipment can be controlled to lift through controlling a hydraulic cylinder (7), a first track (1) and a second track (4) form a certain space on the periphery of the bridge pier, then an operator inserts a first guide pipe (19) into the enclosed space, a switch of a water pump (20) is turned on to pump out water in the enclosed space, so that the water around the bridge pier can be pumped out, the bridge pier can be maintained and repaired, so that the influence of the surrounding water is avoided, namely, an enclosure is formed around the bridge pier, through controlling a motor (13), a rotary disc (14) can be used for pushing the baffle (6), the enclosed space can be extended through the baffle (6), and after maintenance and repair are completed, the equipment is taken down, so that the maintenance of the bridge pier can be realized.
2. The assembly type highway bridge rapid construction equipment according to claim 1, which is characterized in that: the baffle (6) is made of steel materials, and the surface of the baffle (6) is a frosted surface.
CN202111077387.7A 2021-09-15 2021-09-15 Assembled highway bridge rapid construction equipment Active CN113774817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111077387.7A CN113774817B (en) 2021-09-15 2021-09-15 Assembled highway bridge rapid construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111077387.7A CN113774817B (en) 2021-09-15 2021-09-15 Assembled highway bridge rapid construction equipment

Publications (2)

Publication Number Publication Date
CN113774817A CN113774817A (en) 2021-12-10
CN113774817B true CN113774817B (en) 2023-02-28

Family

ID=78843708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111077387.7A Active CN113774817B (en) 2021-09-15 2021-09-15 Assembled highway bridge rapid construction equipment

Country Status (1)

Country Link
CN (1) CN113774817B (en)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU478319B2 (en) * 1975-07-03 1975-09-18 Kaiser Steel Corporation Cofferdam device for offshore structure
JP2003020611A (en) * 2001-07-04 2003-01-24 Shimizu Corp Float foundation structure
JP2003253685A (en) * 2002-03-01 2003-09-10 Shiraishi Corp Simple temporary coffering method around column type structural body
KR20060109130A (en) * 2005-04-15 2006-10-19 인하대학교 산학협력단 Elevation adjustable bridge column device
KR20110115650A (en) * 2010-04-16 2011-10-24 김명길 Water obstruct for pier repair construction work
KR101128993B1 (en) * 2011-08-04 2012-03-27 (주)비포엔지니어링 Structure for bridge post having reduction of non-point pollutant and landscaping function
CN104234064A (en) * 2014-10-01 2014-12-24 杜东升 Bridge pier cofferdam reinforcing structure and constructing method thereof
CN104278619A (en) * 2014-10-31 2015-01-14 常州慧运复合材料有限公司 Composite anti-collision cofferdam for bridge bearing platform
CN104386219A (en) * 2014-10-15 2015-03-04 舟山长宏国际船舶修造有限公司 Subsequent docking process of self-elevating platform pile shoe
CN107604933A (en) * 2017-10-31 2018-01-19 中铁十六局集团第三工程有限公司 One kind reclines formula steel boxed cofferdam
CN107780423A (en) * 2017-11-24 2018-03-09 河南水建集团有限公司 Adjustable water cofferdam
CN207314367U (en) * 2017-06-29 2018-05-04 杭州江润科技有限公司 Combined steel sheet-pile cofferdam high water level difference cushion cap
CN208152062U (en) * 2018-05-10 2018-11-27 李钊 A kind of water conservancy construction cofferdam device
JP6650981B1 (en) * 2018-09-25 2020-02-19 第一建設工業株式会社 Installation method of temporary closing structure used for pier repair and reinforcement work
JP6664681B1 (en) * 2019-01-21 2020-03-13 アザイ技術コンサルタント株式会社 Temporary deadline structure, construction method, and waterproof cover used for the construction method
CN211773796U (en) * 2020-01-07 2020-10-27 中交第三航务工程勘察设计院有限公司 Be applied to cofferdam structure of pier construction
CN212153425U (en) * 2020-04-13 2020-12-15 赵德芳 Cofferdam for hydraulic engineering construction
CN112144387A (en) * 2020-10-10 2020-12-29 马征 Protection device for pier during seawater tide rising and ebb and construction method
CN112323833A (en) * 2020-11-10 2021-02-05 武汉市城市防洪勘测设计院有限公司 Water conservancy construction cofferdam device and use method thereof
CN112663465A (en) * 2020-12-15 2021-04-16 韦宗松 Bridge construction equipment of environment-friendly

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3776654A (en) * 1971-07-22 1973-12-04 Brown Co D Expansion joint and bridge joint seals
CN111893935B (en) * 2020-07-20 2021-12-17 郑州铁路职业技术学院 Apply to road safety device of removing obstacles of freight train transportation

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU478319B2 (en) * 1975-07-03 1975-09-18 Kaiser Steel Corporation Cofferdam device for offshore structure
JP2003020611A (en) * 2001-07-04 2003-01-24 Shimizu Corp Float foundation structure
JP2003253685A (en) * 2002-03-01 2003-09-10 Shiraishi Corp Simple temporary coffering method around column type structural body
KR20060109130A (en) * 2005-04-15 2006-10-19 인하대학교 산학협력단 Elevation adjustable bridge column device
KR20110115650A (en) * 2010-04-16 2011-10-24 김명길 Water obstruct for pier repair construction work
KR101128993B1 (en) * 2011-08-04 2012-03-27 (주)비포엔지니어링 Structure for bridge post having reduction of non-point pollutant and landscaping function
CN104234064A (en) * 2014-10-01 2014-12-24 杜东升 Bridge pier cofferdam reinforcing structure and constructing method thereof
CN104386219A (en) * 2014-10-15 2015-03-04 舟山长宏国际船舶修造有限公司 Subsequent docking process of self-elevating platform pile shoe
CN104278619A (en) * 2014-10-31 2015-01-14 常州慧运复合材料有限公司 Composite anti-collision cofferdam for bridge bearing platform
CN207314367U (en) * 2017-06-29 2018-05-04 杭州江润科技有限公司 Combined steel sheet-pile cofferdam high water level difference cushion cap
CN107604933A (en) * 2017-10-31 2018-01-19 中铁十六局集团第三工程有限公司 One kind reclines formula steel boxed cofferdam
CN107780423A (en) * 2017-11-24 2018-03-09 河南水建集团有限公司 Adjustable water cofferdam
CN208152062U (en) * 2018-05-10 2018-11-27 李钊 A kind of water conservancy construction cofferdam device
JP6650981B1 (en) * 2018-09-25 2020-02-19 第一建設工業株式会社 Installation method of temporary closing structure used for pier repair and reinforcement work
JP6664681B1 (en) * 2019-01-21 2020-03-13 アザイ技術コンサルタント株式会社 Temporary deadline structure, construction method, and waterproof cover used for the construction method
CN211773796U (en) * 2020-01-07 2020-10-27 中交第三航务工程勘察设计院有限公司 Be applied to cofferdam structure of pier construction
CN212153425U (en) * 2020-04-13 2020-12-15 赵德芳 Cofferdam for hydraulic engineering construction
CN112144387A (en) * 2020-10-10 2020-12-29 马征 Protection device for pier during seawater tide rising and ebb and construction method
CN112323833A (en) * 2020-11-10 2021-02-05 武汉市城市防洪勘测设计院有限公司 Water conservancy construction cofferdam device and use method thereof
CN112663465A (en) * 2020-12-15 2021-04-16 韦宗松 Bridge construction equipment of environment-friendly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
船台下水横梁结构强度与布置;董明海等;《造船技术》;20191028;第47卷(第5期);正文第50-54页、第92页 *

Also Published As

Publication number Publication date
CN113774817A (en) 2021-12-10

Similar Documents

Publication Publication Date Title
CN109972655B (en) Prefabricated pipe gallery mechanical and hydraulic combined type integrally-installed and disassembled steel template and installation method
CN108858737B (en) Track movable precast beam steel pedestal
CN113774817B (en) Assembled highway bridge rapid construction equipment
CN203248171U (en) Full fracture surface needle beam trolley without beam frame
CN109339098B (en) Portable support template of utility tunnel
CN215943302U (en) Novel movable end die fixing structure
CN202447878U (en) Simple aligning line rack for installation centre line of detachable equipment
CN202450424U (en) Inspection well milling device locating device
CN206122409U (en) Horizontal press
CN211171843U (en) Combined water conservancy control equipment
CN112936524A (en) Novel movable end die fixing structure
CN211110919U (en) Novel prefabricated part suspension splicing machine
CN207813038U (en) The smooth prosthetic device of building iron template
CN219621638U (en) Traffic guiding device convenient to installation
CN219862336U (en) Full-hydraulic movable trestle with good protection performance
CN217127927U (en) Concrete vibrating device for municipal construction road surface leveling
CN216193909U (en) Highway is repaired with demolising device
CN212735241U (en) Machine tool cover shell
CN216994792U (en) Wave-making water flow tank with adjustable mechanism
CN213087438U (en) Novel steel form assembly
CN219348746U (en) Interchangeable integrated flaw detection equipment
CN219062636U (en) Hydraulic machine for construction and installation of large-caliber PCCP (prestressed concrete cylinder pipe)
CN221143687U (en) Construction equipment is reformed transform in building structure reinforcement
CN221320685U (en) Bridge concrete guardrail template positioner
CN212714593U (en) Automatic adjustable bridge maintenance device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant