CN113756283A - Device for rapidly processing multiple karst caves of pile foundation and using method - Google Patents

Device for rapidly processing multiple karst caves of pile foundation and using method Download PDF

Info

Publication number
CN113756283A
CN113756283A CN202111220031.4A CN202111220031A CN113756283A CN 113756283 A CN113756283 A CN 113756283A CN 202111220031 A CN202111220031 A CN 202111220031A CN 113756283 A CN113756283 A CN 113756283A
Authority
CN
China
Prior art keywords
annular cavity
flexible annular
pile foundation
length
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111220031.4A
Other languages
Chinese (zh)
Inventor
李小玥
卢新荣
崔晓铁
蒋满仓
黄增林
卢良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202111220031.4A priority Critical patent/CN113756283A/en
Publication of CN113756283A publication Critical patent/CN113756283A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a device for rapidly processing multiple karst caves of a pile foundation and a using method thereof, wherein the device for rapidly processing the multiple karst caves of the pile foundation comprises a material conveying pipe, a material discharging pipe, a one-way valve, a flexible annular cavity, vertical supporting bars and annular supporting bars, the material conveying pipe is connected with the top of the flexible annular cavity through the one-way valve, the material discharging pipe is communicated with the top of the flexible annular cavity, the flexible annular cavity is in a strip shape and can be compressed and folded under the unfilled state, and can be expanded and unfolded when being filled, a plurality of vertical supporting bars are longitudinally arranged on the outer wall of the inner side of the flexible annular cavity, and a plurality of annular supporting bars are used for fixing the vertical supporting bars. The invention reduces the difficulty of plugging multiple karst caves of the pile foundation, and is more effective than the existing plugging mode after the deployment is finished.

Description

Device for rapidly processing multiple karst caves of pile foundation and using method
Technical Field
The invention relates to the field of underground pile foundations, in particular to a device for rapidly processing multiple karst caves of a pile foundation and a using method.
Background
In the process of pile foundation construction, when multiple karsts are encountered, the plugging difficulty is influenced by the position and the complex geological conditions, and the construction quality is difficult to be better ensured. Therefore, the multi-solution-cavity pile foundation is quickly, intuitively and effectively processed, and the construction efficiency and reliability can be obviously improved.
At present, a common pile foundation karst cave plugging device is difficult to deploy, has a complex structure and is difficult to transport due to large volume. Secondly, due to the complex conditions of geological conditions, it is difficult to ensure the efficiency and reliability of construction.
Disclosure of Invention
The invention aims to provide a device for rapidly processing multiple karst caves of a pile foundation and a using method thereof, and aims to solve the problems that the blockage efficiency of the karst caves of the pile foundation is low, the blockage effect of the karst caves of the pile foundation is poor, the blockage condition of the karst caves of the pile foundation is not intuitive and the like in the related technology.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows: the utility model provides a device and application method of many solution caves of rapid processing pile foundation, includes conveying pipeline, discharging pipe, check valve, flexible annular cavity, vertical support bar, hoop support bar, the conveying pipeline passes through the check valve with flexible annular cavity top is connected, the discharging pipe with flexible annular cavity top communicates with each other, flexible annular cavity is rectangular shape, and can be compressed, folding under the state that is not filled, and can expand, expand when being filled, a plurality of vertical support bar is vertically set up on the inboard outer wall of flexible annular cavity, and is a plurality of the hoop support bar is used for fixed vertical support bar.
Further, the length of the flexible annular cavity in the height direction is not less than the length of the basic cavern needing to be plugged in the vertical direction.
Further, the flexible annular cavity body can expand and unfold in the longitudinal direction and the outer side direction and seal the dissolving hole.
Further, the one-way valve only allows material to enter the flexible annular cavity from the feed delivery pipe.
Furthermore, a hanging point is buried in the flexible annular cavity.
Furthermore, a track and a corresponding camera are arranged on the material conveying pipe.
Furthermore, the length of the material conveying pipe and the length of the material discharging pipe are both larger than the length from the ground to the top of the flexible annular cavity.
The invention also provides a use method of the device for quickly processing the pile foundation multi-karst cave, which is characterized by comprising the following operation steps:
1) measuring the length of each karst cave of the foundation along the vertical direction;
2) selecting a flexible annular cavity with a longer height direction according to the length of the uppermost unblocked cavern in the height direction;
3) the flexible annular cavity is hung into the pile foundation and is hung at the same height with the karst cave, and the flexible annular cavity is ensured to cover the whole karst cave;
4) grouting materials are conveyed into the flexible annular cavity through the conveying pipe, and the monitoring camera is used for ensuring that the flexible annular cavity is fully expanded and is fully attached to the concave and convex parts of the karst cave after being unfolded;
5) monitoring the pressure of the discharge pipe, and stopping conveying the material into the material conveying pipe on the premise of keeping the pressure of the discharge pipe after the steps are completed and reach the standard;
6) and (5) repeating the steps 1) to 5) until all the karst caves are plugged after the grouting material in the flexible annular cavity is solidified.
According to the technical scheme, the invention mainly comprises flexible materials, can be compressed and folded in an unfilled state, and can be expanded and unfolded when being filled, so that the flexible materials can be unfolded after being transported to an installation site, thereby reducing the transportation difficulty and the risk of damage in the transportation process. Meanwhile, after the device is unfolded, better plugging can be realized on the variable conditions of the karst cave, and a camera is provided, so that the field personnel can conveniently control the construction quality of the karst cave in real time.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 is a device for rapidly processing multiple caverns of a pile foundation and a method for using the same according to an embodiment of the present invention;
in the figure: conveying pipeline 1, discharging pipe 2, check valve 3, flexible annular cavity 4, vertical support bar 5, hoop support bar 6.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
Spatially relative terms, such as "above … …," "above … …," "above … …," "above," and the like, may be used herein for ease of description to describe one device or feature's spatial relationship to another device or feature as illustrated in the figures. It will be understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if a device in the figures is turned over, devices described as "above" or "on" other devices or configurations would then be oriented "below" or "under" the other devices or configurations. Thus, the exemplary term "above … …" can include both an orientation of "above … …" and "below … …". The device may be otherwise variously oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.
An exemplary embodiment according to the present application will now be described in more detail with reference to fig. 1. These exemplary embodiments may, however, be embodied in many different forms and should not be construed as limited to only the embodiments set forth herein. It is to be understood that these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the concept of the exemplary embodiments to those skilled in the art, in the drawings, it is possible to enlarge the thicknesses of layers and regions for clarity, and the same devices are denoted by the same reference numerals, and thus the description thereof will be omitted.
Referring to fig. 1, an embodiment of the present invention provides a device for rapidly processing multiple caverns of a pile foundation, including a material conveying pipe 1, a material discharging pipe 2, a check valve 3, a flexible annular cavity 4, vertical support bars 5, and circumferential support bars 6, where the material conveying pipe 1 is connected to the top of the flexible annular cavity 4 through the check valve 3, the material discharging pipe 2 is communicated with the top of the flexible annular cavity 4, the flexible annular cavity 4 is strip-shaped and can be compressed and folded in an unfilled state, and can expand and unfold when being filled, a plurality of the vertical support bars 5 are longitudinally arranged on the inner side wall of the flexible annular cavity 4, and a plurality of the circumferential support bars 6 are used for fixing the vertical support bars 5.
As shown in fig. 1, in an embodiment of the present application, the length of the flexible annular cavity 4 in the height direction is not less than the length of the basic cavern to be blocked in the vertical direction. The flexible annular cavity 4 can expand and unfold in the longitudinal and outer directions and seal the hole dissolving opening. The one-way valve 3 only allows material to enter the flexible annular cavity 4 from the feed delivery pipe 1. And a hanging point is embedded in the flexible annular cavity 4. And the conveying pipe 1 is provided with a track and a corresponding camera. The length of the material conveying pipe 1 and the length of the material discharging pipe 2 are both larger than the length from the ground to the top of the flexible annular cavity 4.
Corresponding to the embodiment of the device, the application also provides an embodiment of a using method of the device for rapidly processing the pile foundation multi-karst cave. The method comprises the following steps: 1) measuring the length of each karst cave of the foundation along the vertical direction;
2) selecting a flexible annular cavity with a longer height direction according to the length of the uppermost unblocked cavern in the height direction;
3) the flexible annular cavity is hung into the pile foundation and is hung at the same height with the karst cave, and the flexible annular cavity is ensured to cover the whole karst cave;
4) grouting materials are conveyed into the flexible annular cavity through the conveying pipe, and the monitoring camera is used for ensuring that the flexible annular cavity is fully expanded and is fully attached to the concave and convex parts of the karst cave after being unfolded;
5) monitoring the pressure of the discharge pipe, and stopping conveying the material into the material conveying pipe on the premise of keeping the pressure of the discharge pipe after the steps are completed and reach the standard;
6) and (5) repeating the steps 1) to 5) until all the karst caves are plugged after the grouting material in the flexible annular cavity is solidified.
The invention uses the expandable and fillable equipment to rapidly plug the multi-solution cave of the pile foundation and visualizes the whole plugging process so as to achieve the aims of improving the plugging efficiency and improving the construction quality control. Meanwhile, as the flexible cavity is used as the main body, the construction cost is reduced, and compared with the traditional plugging mode, the multi-cave batch and high-quality plugging is realized. Therefore, the plugging speed can be increased, and the karst cave plugging can be visualized so as to ensure the effectiveness.
In addition, it is intended that other embodiments of the present application will be apparent to those skilled in the art from consideration of the specification and practice of the inventive concepts disclosed herein. This application is intended to cover any variations, uses, or adaptations of the disclosure following, in general, the principles of the disclosure and including such departures from the present disclosure as come within known or customary practice within the art to which the disclosure pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the application being indicated by the following claims.
It will be understood that the present application is not limited to the precise arrangements described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the application is limited only by the appended claims.

Claims (8)

1. The utility model provides a device of many solution cavities of rapid processing pile foundation, includes conveying pipeline, discharging pipe, check valve, flexible annular cavity, vertical support bar, hoop support bar, the conveying pipeline passes through the check valve with flexible annular cavity top is connected, the discharging pipe with flexible annular cavity top communicates with each other, flexible annular cavity is rectangular shape, and can be compressed, folding under the state that is not filled, and can expand, expand when being filled, expand, a plurality of vertical support bar is vertically set up on the inboard outer wall of flexible annular cavity, it is a plurality of hoop support bar is used for fixed vertical support bar.
2. The device for rapidly processing the multi-cavern of the pile foundation according to claim 1, wherein the length of the flexible annular cavity in the height direction is not less than the length of the multi-cavern of the foundation to be plugged in the vertical direction.
3. The apparatus for rapidly processing multiple caverns of pile foundation according to claim 1, wherein the flexible annular chamber can expand and unfold in the longitudinal and lateral directions and seal the cavern opening.
4. The apparatus of claim 1, wherein said one-way valve only allows material to enter said flexible annular cavity from said delivery conduit.
5. The device for rapidly processing the multiple solution cavities of the pile foundation according to claim 1, wherein a hanging point is buried on the flexible annular cavity.
6. The apparatus according to claim 1, wherein the conveying pipe is provided with a track and a corresponding camera.
7. The apparatus of claim 1, wherein the length of each of said feed pipe and said discharge pipe is greater than the length from the ground to the top of said flexible annular cavity.
8. The use method of the device for rapidly processing the pile foundation multi-karst cave according to any one of claims 1 to 7, is characterized by comprising the following operation steps:
1) measuring the length of each karst cave of the foundation along the vertical direction;
2) selecting a flexible annular cavity with a longer height direction according to the length of the uppermost unblocked cavern in the height direction;
3) the flexible annular cavity is hung into the pile foundation and is hung at the same height with the karst cave, and the flexible annular cavity is ensured to cover the whole karst cave;
4) grouting materials are conveyed into the flexible annular cavity through the conveying pipe, and the monitoring camera is used for ensuring that the flexible annular cavity is fully expanded and is fully attached to the concave and convex parts of the karst cave after being unfolded;
5) monitoring the pressure of the discharge pipe, and stopping conveying the material into the material conveying pipe on the premise of keeping the pressure of the discharge pipe after the steps are completed and reach the standard;
6) and (5) repeating the steps 1) to 5) until all the karst caves are plugged after the grouting material in the flexible annular cavity is solidified.
CN202111220031.4A 2021-10-20 2021-10-20 Device for rapidly processing multiple karst caves of pile foundation and using method Pending CN113756283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111220031.4A CN113756283A (en) 2021-10-20 2021-10-20 Device for rapidly processing multiple karst caves of pile foundation and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111220031.4A CN113756283A (en) 2021-10-20 2021-10-20 Device for rapidly processing multiple karst caves of pile foundation and using method

Publications (1)

Publication Number Publication Date
CN113756283A true CN113756283A (en) 2021-12-07

Family

ID=78784083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111220031.4A Pending CN113756283A (en) 2021-10-20 2021-10-20 Device for rapidly processing multiple karst caves of pile foundation and using method

Country Status (1)

Country Link
CN (1) CN113756283A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115679955A (en) * 2022-10-09 2023-02-03 重庆大学 Construction device and construction method for pile foundation in solution cavity

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200066058A (en) * 2018-11-30 2020-06-09 박경식 Grout method with fiber pile
KR20200079092A (en) * 2018-12-24 2020-07-02 박경식 Grout method for reservoir bank
CN111733823A (en) * 2020-06-15 2020-10-02 中冶地集团西北岩土工程有限公司 Grouting pipe burying structure and broken pile processing method in cast-in-situ bored pile pouring process
CN112761174A (en) * 2020-12-30 2021-05-07 山东正元建设工程有限责任公司 Grouting plugging method suitable for large karst cave under high-flow-rate flowing water condition
CN113047264A (en) * 2021-03-16 2021-06-29 中国地质大学(武汉) Air bag hole sealing type cloth bag grouting method
CN113217092A (en) * 2021-05-31 2021-08-06 山东大学 Filling method of deformable karst cave
CN216304619U (en) * 2021-10-20 2022-04-15 中天建设集团有限公司 Device for rapidly processing multiple solution caves of pile foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200066058A (en) * 2018-11-30 2020-06-09 박경식 Grout method with fiber pile
KR20200079092A (en) * 2018-12-24 2020-07-02 박경식 Grout method for reservoir bank
CN111733823A (en) * 2020-06-15 2020-10-02 中冶地集团西北岩土工程有限公司 Grouting pipe burying structure and broken pile processing method in cast-in-situ bored pile pouring process
CN112761174A (en) * 2020-12-30 2021-05-07 山东正元建设工程有限责任公司 Grouting plugging method suitable for large karst cave under high-flow-rate flowing water condition
CN113047264A (en) * 2021-03-16 2021-06-29 中国地质大学(武汉) Air bag hole sealing type cloth bag grouting method
CN113217092A (en) * 2021-05-31 2021-08-06 山东大学 Filling method of deformable karst cave
CN216304619U (en) * 2021-10-20 2022-04-15 中天建设集团有限公司 Device for rapidly processing multiple solution caves of pile foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115679955A (en) * 2022-10-09 2023-02-03 重庆大学 Construction device and construction method for pile foundation in solution cavity
CN115679955B (en) * 2022-10-09 2024-06-04 重庆大学 Construction device and construction method for pile foundation in solution cavity

Similar Documents

Publication Publication Date Title
CN216304619U (en) Device for rapidly processing multiple solution caves of pile foundation
CN113756283A (en) Device for rapidly processing multiple karst caves of pile foundation and using method
CN103276722B (en) A kind of low clearance pile frame and using method thereof
CN106638569B (en) Device and method for improving bearing capacity and stability of pile
CN206438467U (en) Flood protection device and its apply section
CN107858999A (en) Flexible anti-flood wall
CN115305968B (en) Side-expandable vibration isolation air bag and application method thereof
CN207191959U (en) A kind of storage facilities and pumping system
CN206359954U (en) Flood protection device and its apply section
WO2005006842A3 (en) Dynamic foam insulation/shading system with inflatable bags
CN104612166B (en) The combination supporting device of a kind of supporting hole wall and method for protecting support
RS20090420A (en) Method for erection of generally cylindrical structures and apparatus in accordance with method
CN111691469B (en) Expanded underwater protection structure and deployment and detection method
CN208361880U (en) A kind of offshore drilling platform chemicals dosing plant
CN104773408A (en) Movable folding type drilling fluid storage device
CN104891213A (en) Ship unloader
CN207046464U (en) One kind handling frame
WO2019114224A1 (en) Bag-shaped filling structure for underground coal mine and use method therefor
AT515803B1 (en) Leak protection lining for a tank, method for its introduction and method for refurbishing a tank
CN110485510A (en) A kind of forced recharge well construction of gradation and its application method
CN205206363U (en) Overhanging type is unloaded, and platform is movable prevents throwing thing net
AU2013100401A4 (en) Weigh down apparatus and method for stockpile covers
CN204384530U (en) A kind of no-station pole canopy discharging frame
CN106592522A (en) Flood prevention device and road section adopting same
CN106629215A (en) Multi-dimensional Z-shape large balloon folding method

Legal Events