CN113726007B - Intelligent recorder master station management method and system based on transparent system architecture - Google Patents

Intelligent recorder master station management method and system based on transparent system architecture Download PDF

Info

Publication number
CN113726007B
CN113726007B CN202110911070.2A CN202110911070A CN113726007B CN 113726007 B CN113726007 B CN 113726007B CN 202110911070 A CN202110911070 A CN 202110911070A CN 113726007 B CN113726007 B CN 113726007B
Authority
CN
China
Prior art keywords
recorder
intelligent
maintenance
data
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110911070.2A
Other languages
Chinese (zh)
Other versions
CN113726007A (en
Inventor
李波
莫杰锋
温文剑
邱廷钰
杨梓文
黄妍
黄志诚
田小靖
邹建明
伍红文
胡燕
黄如文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuzhou Power Supply Bureau of Guangxi Power Grid Co Ltd
Original Assignee
Wuzhou Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuzhou Power Supply Bureau of Guangxi Power Grid Co Ltd filed Critical Wuzhou Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority to CN202110911070.2A priority Critical patent/CN113726007B/en
Publication of CN113726007A publication Critical patent/CN113726007A/en
Application granted granted Critical
Publication of CN113726007B publication Critical patent/CN113726007B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00036Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
    • H02J13/0004Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides an intelligent recorder master station management method and system based on a transparent system architecture, wherein an intelligent recorder master station is connected with a recorder, recorder data are extracted, operation and maintenance analysis processing is carried out on the recorder operation and maintenance data, a fault diagnosis report, an intelligent operation and maintenance report and a recorder defect report are generated, comprehensive decision analysis processing is carried out on the reports, an accident processing scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme are generated, and finally fault or defect information is pushed to related personnel or a dispatching system. The invention solves the problem of insufficient intellectualization and transparentization of the master station management of the intelligent recorder by the design of a transparentization framework and the reinforcement of comprehensive decision support and visual operation support of the master station of the intelligent recorder, realizes one-stop management and improves the level of regulation and control intellectualization.

Description

Intelligent recorder master station management method and system based on transparent system architecture
Technical Field
The invention relates to the field of relay protection, in particular to an intelligent recorder master station management method and system based on a transparent system architecture.
Background
The intelligent substation is an important fulcrum for intelligent power grid construction, and the operation reliability of the intelligent substation is related to the stability of the whole power grid. The original monitoring equipment has small monitoring surface, non-uniform data format, rough alarm information, complete dependence on manual arrangement and analysis, large workload and low efficiency. Therefore, in 2018, the power industry provides a new generation of four-in-one intelligent recorder, integrates new functions such as protection action analysis, secondary system visualization, equipment operation and maintenance on the basis of the original fault wave recording function, and can comprehensively reflect the operation conditions of a primary power transmission and transformation system, a secondary relay protection system, network equipment, network messages and the like of a transformer substation.
At present, a new generation of intelligent recorder is in a test point stage, and no intelligent master station system matched with the new generation of intelligent recorder exists, so that the traditional master station system for recording waves is still used. The traditional master station only has the functions of calling and analyzing the fault wave recording files, and is not supported for the newly added functions of protection action analysis, secondary system visualization, equipment operation and maintenance and the like. Therefore, the application range of the new-generation intelligent recorder is limited to the transformer substation, and the intelligent recorder cannot be extended to the power grid dispatching level, so that the intelligent recorder is not beneficial to effective utilization and popularization.
At present, there are two main types of master station systems for managing a recorder: the first is a signal-protecting master station and the second is a wave-recording master station. The information-protection main station mainly depends on the information-protection sub-station at the substation end, and because the management equipment is more, the information to be collected is complex, the reliability of the system is low, the problems of low uploading success rate, long time consumption, no fault analysis function and the like exist, and the operation effect is not ideal, the mode of independently constructing the wave-recording main station is adopted at present. The existing wave recording master station systems are limited by the operation characteristics of wave recorders, and mainly have the following defects:
1) The information is opaque, the centralized management and control difficulty is high, and the construction cost of the main station is high.
At the transition stage of the intelligent substation of the current conventional substation item, IEC103, IEC61850 and private protocols coexist, and in addition, the same type of communication protocols of all factories are different. In order to realize one-stop compatible access, a huge system model needs to be established according to the information technology architecture of the existing master station system, and the workload is huge and the reliability is low, so that the problems that a plurality of stock devices cannot be accessed and the incremental device joint debugging period is long still exist.
2) The data is opaque, the analysis and diagnosis means are not enough, and the accident handling flow is complex.
Because of lack of standardization requirements, the wave recording files generated by wave recorders of various manufacturers have differences in file format, sampling frequency, channel definition, naming mode and the like, only uniform opening of the wave files can be realized, and as for fault analysis, the fault analysis mostly depends on manual analysis of a plant station side device or a dispatching side, the data utilization rate is low, and the automation level is insufficient.
3) The calculation is opaque, the system energy consumption is high, the large-scale data processing speed is low, and the efficiency is low.
The large information volume and concentrated burst of wave recording data under the rapidly expanding power grid scale become industry problems, and the traditional multi-machine collaborative scheduling architecture and the multi-thread task processing mechanism have difficulty in coping with the increasing processing demands of mass data. Because of the opacity of the system resource allocation and task coordination mechanism, the CPU load rate of the master station system is high, the load rate is maintained above 25% for a long time under the normal running condition, the load rate exceeds 50% under the big data processing condition, and the conditions of blocking and downtime occur, but the cost is greatly improved but the effect is very little by improving the equipment configuration and increasing the equipment quantity.
4) The operation is opaque, the reliability of the system is poor, the maintenance workload is large, and the labor cost is high.
The system has low reliability, high coupling performance to factors such as models, environments, configuration and the like, and is easy to fail in data uploading or analysis due to reasons such as inconsistent models, severe network environments, configuration errors, file deletion and the like. Meanwhile, the evaluation and early warning mechanism for the target and the self running situation is imperfect, the fault analysis and the troubleshooting depend on manual work, and the daily maintenance workload is great.
With the improvement of the complexity of the power grid environment, the effectiveness of relying on artificial experience and cognition is greatly reduced, the main reason is that the running state of the power grid is 'opaque', the power grid fault information perceived by a dispatcher is not timely and comprehensive, when the power grid is abnormal or has faults, massive and multi-point data are concentrated and burst-type to rise, the dispatcher is very easy to generate cognition disorder under the interference of large information quantity, the judgment is reduced, and accurate analysis and decision making are difficult to be made in a short time, and only experience judgment can be relied on. However, the power grid fault analysis needs a comprehensive work with multiple professions, disciplines and multiple systems, even a dispatcher with abundant experience can hardly ensure timely and accurate scientific decision making, so that the accident handling efficiency is low, the power failure time is prolonged, and even a secondary accident caused by equipment damage due to decision errors is easy to occur.
Furthermore, grid technology iterations are also accelerating. The new generation intelligent recorder has more huge information quantity, more complex network structure and message type, and sets higher professional 'threshold' for the modulator, but provides more multi-angle power grid operation information at the same time. Therefore, a scheduler needs a more intelligent recorder master station to fully consume and use this information, providing more powerful decision support.
In the context of a computer system architecture, "transparency" means that the underlying algorithms or instructions of the computer system may be used by a developer without the developer needing to operate their principles, i.e., present but not to be understood. Similarly, the complex message data and the transmission process thereof in the intelligent substation are not required to be known by the dispatcher, and only the power grid state reflected by the message is required to be displayed to the dispatcher after being processed.
In the operation of the power grid, the transparent power grid provided by the Chinese engineering institute Li Li institute is a visible, known and controllable power grid which is realized by combining the modern information technologies such as computer technology, data communication technology, sensor technology, artificial intelligence and the like with the power grid. The new generation of 'four-in-one' intelligent recorder is a powerful sensor, but the application technology of the intelligent recorder is lacking at a dispatching end, so that the design of a main station is supported by using the data base of the intelligent recorder to visualize the running state, sense the fault depth and control the power grid.
To summarize, no commonly applicable method exists at present, and the problem that the master station management of a recorder is not intelligent enough and transparent can be solved.
Disclosure of Invention
In view of the above, the invention provides a method, a system, a device and a storage medium for managing an intelligent recorder master station based on a transparent system architecture, which are used for solving the problems of insufficient intellectualization and transparency of recorder master station management.
The technical scheme of the invention is realized as follows:
the invention discloses a transparent system architecture-based intelligent recorder master station management method, which comprises the following steps:
s1, a recorder standing book and a recorder model protocol rule base of a power grid are established in advance, an operation and maintenance knowledge base is formed by deep learning according to historical operation and maintenance data, the recorder model protocol rule base is of an autonomous structure and comprises IEC103, IEC61850 and a private protocol used by a domestic main stream recorder model, the transparent access of conventional and intelligent multi-type recorders is realized, and the step S2 is continuously executed;
s2, the intelligent recorder master station establishes connection with the recorder through a protocol rule base, and the step S3 is continuously executed;
s3, the intelligent recorder master station actively calls a data list of the recorder at a first time preset at each interval, and the step S4 is continuously executed;
S4, the intelligent recorder master station judges whether the recorder is an intelligent recorder, and when the recorder is the intelligent recorder, the step S5 is continuously executed; when the recorder is a conventional recorder, continuing to execute the step S6;
s5, carrying out operation and maintenance analysis processing on the data which are called from the intelligent recorder, generating a fault diagnosis report and an intelligent operation and maintenance report, and continuously executing the step S7;
s6, carrying out operation and maintenance analysis processing on the data which are called from the conventional recorder, generating a fault diagnosis report and a recorder defect report, and continuously executing the step S7;
s7, carrying out comprehensive decision analysis processing on the fault diagnosis report, the intelligent operation and maintenance report and the recorder defect report to generate an accident handling scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme, and continuously executing the step S8;
s8, according to the preset personnel authority of the system, fault or defect information is pushed to related personnel or an upper-level dispatching integrated system.
According to the method, the intelligent recorder master station is subjected to intelligent analysis and management, when the power grid is abnormal or fails, the workload of a dispatcher is reduced, a scheme is automatically generated by the master station, scientific decisions are timely and accurately made, and the accident handling efficiency is improved.
On the basis of the above technical solution, preferably, step S2 specifically includes the following sub-steps:
s2-1, connecting the wave recorders, obtaining a standard fixed value list of each wave recorder, comparing the standard fixed value list with a standing book of the wave recorders, giving a short message alarm when inconsistent is found, reminding operation and maintenance personnel of checking in time, ensuring accurate standing book information, and continuing to execute the step S2-2;
s2-2, loading corresponding protocol rules in a protocol rule base according to the standing account information of the target recorder to establish connection; when the protocols are not matched, attempting to carry out self-adaption by using other types of protocol rules in the protocol rule base, generating protocol pairing alarm in the running log, and continuously executing the step S2-3;
s2-3, if the matched recorder is disconnected due to network reasons, reconnecting is initiated once every preset second time of the recorder, 3 times of continuous reconnection fails, the reconnection interval time is adjusted to be preset third time, and the preset third time is larger than the preset second time.
According to the method, the short message alarm is carried out when the standard fixed value list of the recorder is inconsistent with the recorder standing account, the adaptation is carried out by trying other types of protocol rules when the protocol rule connection of the target recorder is not matched, and the protocol pairing alarm is generated in the operation log, so that errors are prevented from occurring in the connection establishment stage.
On the basis of the above technical solution, preferably, step S5 specifically includes the following sub-steps:
s5-1, analyzing and processing operation and maintenance data of the intelligent recorder, and evaluating reliability of the intelligent recorder; continuing to execute the step S5-2;
s5-2, extracting a primary equipment model and a connection relation thereof, a secondary equipment model, a secondary equipment association relation, a secondary optical fiber loop and a secondary virtual loop model in an SMCD intelligent operation and maintenance management model file or an SVG graph, comparing the primary equipment model, the secondary equipment association relation, the secondary optical fiber loop and the secondary virtual loop model with the last-called model file, marking equipment or links with state changes, and performing visual display in a user interface; continuing to execute the step S5-3;
s5-3, evaluating the health degree of the intelligent substation according to the device alarm classification in the intelligent operation and maintenance file, and generating an intelligent operation and maintenance report after the evaluation is completed, wherein the report content comprises evaluation scores and deduction item details; continuing to execute the step S5-4;
s5-4, judging and positioning the power grid faults according to the protection action information and the wave recording file, and generating a fault diagnosis report, wherein the report content comprises the name, the type, the phase of a fault line, three cyclic electric parameters before and after the fault, protection action condition evaluation and fault point distance measurement information.
According to the method, the operation and maintenance file of the intelligent recorder is analyzed, the equipment or the link with the state change is visually displayed in the user interface, and finally, a report is generated according to the evaluation and analysis of the operation and maintenance file, so that the intelligent and transparent management of the operation and maintenance state of the intelligent recorder is realized.
On the basis of the above technical solution, preferably, the step S5-1 specifically includes the following sub-steps:
s5-1-1, intelligent operation and maintenance data in the intelligent recorder are extracted, and whether the data which are called from the intelligent recorder contain protection action information, a wave recording file, a visual model and an intelligent operation and maintenance file is checked; if the data is missing, the missing data independently initiates a calling instruction once; if the file is still missing, the new file is not generated in the type, and the analysis flow is abandoned;
s5-1-2, analyzing the intelligent operation and maintenance file, checking whether the intelligent operation and maintenance file contains station device alarm information, and presetting the station device alarm information grade as follows: important, general, informed, none; if not, the alarm information grade of the station device is none, and the step S5-1-3 is continuously executed; if the information is included, processing is carried out according to the alarm information grade of the station device, when the alarm information grade of the station device is important or common, an operation and maintenance event log is generated, A, B sections of waveform morphological characteristics of the wave recording file analog quantity at the alarm time are extracted, and the waveform morphological characteristics are incorporated into an operation and maintenance knowledge base; when the alarm information level of the station device is informing, generating an operation and maintenance event log; meanwhile, an operation and maintenance knowledge base is operated, defects of the device are analyzed, an operation and maintenance scheme is guided, and self-learning and self-upgrading of the operation and maintenance knowledge base are carried out in the operation process; continuing to execute the step S5-1-3;
S5-1-3, evaluating the reliability of the intelligent recorder, and setting the evaluation level to be unreliable, defective, abnormal and reliable according to the alarm information level of the station end device; when the evaluation level is unreliable, the data thereof is not available; when the evaluation grade is defect, the related data of the defect item is not available; when the evaluation level is abnormal or reliable, its data is available.
The invention extracts the operation and maintenance data of the intelligent recorder through the method, analyzes the operation and maintenance file, simultaneously operates the operation and maintenance knowledge base, completes self-learning and self-upgrading of the operation and maintenance knowledge base, evaluates the reliability of the intelligent recorder and enhances the processing function of the operation and maintenance data of the intelligent recorder.
On the basis of the above technical solution, preferably, step S5-3 specifically includes:
the health evaluation method adopts deduction, takes the minimum element which can be monitored by the SMCD intelligent operation and maintenance management model file as a unit, sets a threshold value and a score for key parameters of each type of element, and deducts the corresponding score when the measured value exceeds the threshold value;
the element health degree is 100 points of full score minus the sum of all parameter deduction points, and weight is set according to the element importance degree;
the device health is a weighted average of all element health scores;
And the intelligent substation health degree is the minimum value among all the equipment health degree scores.
According to the method, a reasonable health degree evaluation method is set, the health degree of the intelligent substation can be accurately evaluated, evaluation scores, deduction item details and the like are recorded in the intelligent operation and maintenance report, and the intelligent operation and maintenance report is analyzed conveniently to obtain specific information of faults or defects of the intelligent substation.
On the basis of the above technical solution, preferably, step S6 specifically includes the following sub-steps:
s6-1, extracting A, B sections of waveform morphological characteristics of the newly-called recording file analog quantity in a conventional recorder to form characteristic quantities; continuing to execute the step S6-2;
s6-2, comparing the characteristic quantity with historical data in the operation and maintenance knowledge base, searching whether operation and maintenance event data with the same characteristic exist, and determining that the type of operation and maintenance event is contained if the similarity exceeds 90%, obtaining a comparison result and generating an operation and maintenance event log; continuing to execute the step S6-3;
s6-3, evaluating the reliability of the conventional recorder, and setting the evaluation level to be unreliable, defective, abnormal and reliable by comparing the alarm information level of the station device; when the evaluation level is unreliable, the data thereof is not available; when the evaluation grade is defect, the related data of the defect item is not available; when the evaluation level is abnormal or reliable, the data thereof is available; continuing to execute the step S6-4;
S6-4, judging and positioning the power grid faults according to the wave recording file, and generating a fault diagnosis report, wherein the report content comprises the information of the name, the type and the phase of a fault line, the electrical parameters of three cycles before and after the fault, fault point ranging and the like; continuing to execute the step S6-5;
s6-5, analyzing possible defects of the conventional recorder by combining the comparison result and generating a recorder defect report, wherein the report content comprises information such as the standing account information, the defect element, the type, the alarm classification, the operation and maintenance scheme and the like of the target recorder.
The method extracts the operation and maintenance data of the conventional recorder, analyzes the operation and maintenance file, evaluates the reliability of the conventional recorder, performs classified operation and maintenance analysis and management on the conventional recorder and the intelligent recorder, and enhances the management pertinence.
On the basis of the above technical solution, preferably, step S7 specifically includes the following sub-steps:
s7-1, analyzing and processing fault diagnosis reports, intelligent operation and maintenance reports and recorder defect reports, comparing the same type of faults or defect conditions with the same equipment history faults or defect conditions as the key parameters, and continuously executing the step S7-2;
s7-2, analyzing and processing according to the order of processing fault diagnosis reports, processing intelligent operation and maintenance reports next-level priority and finally processing fault reports of the recorder, and generating an accident processing scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme.
According to the method, fault diagnosis reports, intelligent operation and maintenance reports and recorder defect reports are analyzed and processed, an accident handling scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme are generated, a reliable scheme is provided for a dispatcher to solve faults or defects, and the workload of the dispatcher is reduced.
The invention also discloses an intelligent recorder master station management system based on the transparent system architecture, which comprises: the system comprises a communication service unit, a system intranet switch, a data processing unit, a model management unit, an operation and maintenance management unit, a fault diagnosis unit, an information pushing unit, an isolation device, a comprehensive decision unit and a scheduling integrated system interface unit;
the system is connected with the power dispatching data network switch through the communication service unit and is connected with the power comprehensive data network switch through the information pushing unit; the system intranet switch realizes the internal connection of each unit of the system, wherein the communication service unit is connected with the data processing unit, the model management unit, the operation and maintenance management unit and the fault diagnosis unit through the system intranet switch, the model management unit, the operation and maintenance management unit and the fault diagnosis unit are connected with the comprehensive decision unit, the comprehensive decision unit is connected with the scheduling integrated system interface unit and the isolation device, and the isolation device is connected with the information pushing unit;
System intranet switch: the system is used for realizing the internal connection of each unit of the system;
communication service unit: the intelligent recorder is used for carrying out communication connection and data retrieval with an intelligent recorder or a conventional recorder at a transformer substation end through a power dispatching data network;
a data processing unit: standardized processing for protecting action information, wave recording files, visual model files, intelligent operation and maintenance files and network message data;
model management unit: the method is used for graphical processing, display and variable monitoring of a transformer substation end visual model;
operation and maintenance management unit: the method is used for statistics and analysis of intelligent operation and maintenance files, and an operation and maintenance scheme is formulated when the transformer substation terminal equipment has defects;
a fault diagnosis unit: the system is used for analyzing the protection action information and the wave recording data and diagnosing and positioning faults when the data contain fault data;
and the comprehensive decision unit: the analysis results are comprehensively analyzed and checked by the comprehensive model management unit, the operation and maintenance management unit and the fault diagnosis unit, and the model change, the power grid fault and the equipment defect information contained in the analysis results are alarmed and displayed to form a processing plan;
scheduling integrated system interface unit: the system alarm information and the original data are converted and pushed according to the requirements of the upper-level dispatching integrated system, and unified model, account and fixed value information including but not limited to are acquired from the upper-level dispatching integrated system;
Isolation device: the system is used for realizing the safety isolation of the electric power network safety II area service and the electric power network safety III area service of the system;
information pushing unit: the system is used for pushing the alarm information and the original data of the system to the corresponding user side of the power network safety III region through the power comprehensive data network.
In a third aspect of the present invention, an electronic device is disclosed, the device comprising: at least one processor, at least one memory, a communication interface, and a bus; the processor, the memory and the communication interface complete communication with each other through the bus; the memory stores a transparent architecture-based intelligent recorder master station management method program executable by the processor, and the transparent architecture-based intelligent recorder master station management method program is configured to implement the transparent architecture-based intelligent recorder master station management method according to the first aspect of the present invention.
In a fourth aspect of the present invention, a computer readable storage medium is disclosed, where a transparent architecture-based intelligent recorder master station management method program is stored on the storage medium, where the transparent architecture-based intelligent recorder master station management method program is implemented when being executed, where the transparent architecture-based intelligent recorder master station management method according to the first aspect of the present invention is implemented.
Compared with the prior art, the intelligent recorder master station management method and system based on the transparent system architecture have the following beneficial effects:
(1) According to the data base of the intelligent recorder, the operation state visualization, fault depth perception and control scheme support are carried out on the power grid, so that the operation state of a master station of the intelligent recorder is transparent, and a dispatcher can timely and comprehensively perceive the power grid fault.
(2) The intelligent recorder master station processes complex message data and a transmission process thereof, only the power grid state reflected by the last message is displayed to a dispatcher after being processed, and the intelligent processing process can timely make accurate analysis and decision when the power grid fails or has defects, so that the situation that the power failure time becomes long due to low accident processing efficiency and even secondary accidents of equipment damage due to decision errors are avoided.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a flow chart of a method for managing an intelligent recorder master station based on a transparent system architecture.
FIG. 2 is a block diagram of an intelligent recorder master station management system based on a transparent architecture according to the present invention.
Fig. 3 is a diagram of a health evaluation method of an intelligent substation.
FIG. 4 is a diagram showing the whole structure of an intelligent recorder master station management system based on a transparent system architecture.
Detailed Description
The following description of the embodiments of the present invention will clearly and fully describe the technical aspects of the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present invention without making any inventive effort, are intended to fall within the scope of the present invention.
The invention provides an intelligent recorder master station integrated system based on a transparent system architecture. Aiming at the defects of the traditional wave recording master station in the aspects of transparent information, transparent data, transparent calculation, transparent operation and the like, according to the technical characteristics of the new-generation intelligent wave recorder, the application of a scheduling end of the new-generation four-in-one intelligent wave recorder with the intelligent power grid scheduling requirement is realized; through the design of a 'transparent' framework, the compatibility problem of the intelligent recorder and a conventional recorder is solved, and one-stop management is realized; the depth perception of the running state of the transformer substation equipment is enhanced; the comprehensive decision support and the visual operation support of the modulator are enhanced; the intelligent and conventional transformer substation indifferent fault all-weather monitoring, newly-added type data application, power grid fault diagnosis, intelligent equipment operation and information multi-channel pushing are realized, and the intelligent regulation and control level is improved. Examples
The invention relates to an intelligent recorder master station management method based on a transparent system architecture, wherein the working flow is shown in figure 1, and the processing steps are as follows:
the method comprises the steps that firstly, an intelligent recorder master station management system based on a transparent system architecture is deployed in a power dispatching control center at any level, and the system is connected with an intelligent recorder in an intelligent transformer substation and a conventional recorder in a conventional transformer substation through a power dispatching data network; and the system is connected with an office system and a short message platform through an electric comprehensive data network. And pre-establishing a recorder standing book and a recorder model protocol rule base of a power grid where the system is located, and performing deep learning according to historical operation and maintenance data to form an operation and maintenance knowledge base. The recorder model protocol rule base is an autonomous structure and comprises IEC103, IEC61850 and private protocols used by the domestic main stream recorder model, and is used for realizing transparent access of conventional and intelligent multi-type recorders. Turning to the second step.
The second step, establish connection with the recorder, is accomplished by the communication service unit, establish the connection mode as follows:
1) An OCS operation control system interface in the scheduling integrated system interface unit is connected with a relay protection constant value management module thereof, a standard constant value list of each recorder is obtained and compared with the standing account of the recorder, and when inconsistent is found, a short message alarm is carried out, so that operation and maintenance personnel are reminded to check in time, and the accuracy of the standing account information is ensured;
2) And according to the standing account information of the target recorder, the communication module loads corresponding protocol rules in the protocol rule base to establish connection. When the protocols are not matched, attempting to adapt by using other types of protocol rules in the protocol library, and generating protocol pairing alarms in the operation log;
3) And (3) disconnecting the successfully paired recorder due to network reasons, initiating reconnection once every preset second time, continuously reconnecting for 3 times, adjusting the reconnection interval time to preset third time which is larger than the preset second time, setting the preset second time to 10 minutes, and setting the preset third time to 1 hour. Turning to the third step.
And thirdly, calling recorder data, which is completed by the communication service unit. The master station active calling mode is adopted, a first time is preset at each interval of the communication service unit to call a data list of the recorder, a second time is preset to be 5 minutes, the new list is compared with the last list, a new entry is found to be the new data generated by the recorder, and a calling instruction of the new data is initiated to the recorder. Turning to the fourth step.
And step four, judging whether the connected recorder is an intelligent recorder or not, and finishing the connection by the communication service unit. Judging whether the recorder is an intelligent recorder according to whether the recorder model is the intelligent recorder model and whether the protocol type connected in the second step is IEC61850, wherein only two points are satisfied simultaneously to judge the recorder as the intelligent recorder, otherwise, the recorder is a conventional recorder, and the follow-up data processing flows of the two are different; if the intelligent recorder is adopted, turning to the fifth step; in the case of a conventional recorder, go to the sixth step.
Fifthly, processing the data of the intelligent recorder, wherein the flow is as follows:
1) And extracting intelligent operation and maintenance data, which is completed by a data processing unit. And checking whether the called data of the intelligent recorder contains protection action information, a recording file, a visual model and an intelligent operation and maintenance file. If the data is missing, the communication service unit singly initiates a call instruction by the missing data. If the file is still missing, the new file is not generated in the type, and the analysis flow is abandoned next.
2) And the intelligent operation and maintenance analysis is completed by an operation and maintenance management unit. And analyzing the extracted intelligent operation and maintenance file, and judging whether the intelligent operation and maintenance file contains station end device alarm information. If not, carrying out the next step; if the method comprises the steps of selecting a processing flow according to the alarm classification condition (important, general and informing), generating an operation and maintenance event log when the alarm classification condition is important or general, extracting A, B sections of waveform morphological characteristics of the alarm time wave recording file analog quantity, and incorporating the waveform morphological characteristics into an operation and maintenance knowledge base; when the alarm classification condition is a notification, generating an operation and maintenance event log; and then the next step is carried out.
3) And running the operation and maintenance knowledge base, which is completed by the operation and maintenance management unit. And the self-learning and self-upgrading are completed in the running process, and the method is used for device defect analysis and operation and maintenance scheme guidance.
4) The reliability evaluation of the recorder is completed by the operation and maintenance management unit. The reliability of the recorder is evaluated, and the alarm classification conditions (important, general, informing and none) in comparison are evaluated as (unreliable, defect, abnormal and reliable). When the evaluation level is unreliable, the data thereof is not available; when the evaluation grade is defect, the related data of the defect item is not available; when the evaluation level is abnormal or reliable, its data is available.
5) Model data extraction and model visualization are completed by a model management unit. And extracting a primary equipment model and a connection relation, a secondary equipment model, a secondary equipment association relation, a secondary optical fiber loop, a secondary virtual loop and other models in the SMCD intelligent operation and maintenance management model file or the SVG graph, comparing the models with the last called model file, marking equipment or links with state changes, and visually displaying in a user interface.
6) And generating an intelligent substation health assessment and intelligent operation and maintenance report, which is completed by an operation and maintenance management unit. And evaluating the health degree of the intelligent substation according to the device alarm classification in the intelligent operation and maintenance file, wherein the evaluation method is shown in figure 3. And after the evaluation is completed, an intelligent operation and maintenance report is generated, and the report content comprises evaluation scores and deduction item details. The health evaluation method adopts deduction, takes the minimum element which can be monitored by the SMCD intelligent operation and maintenance management model file as a unit, sets a threshold value and a score for key parameters of each type of element, and deducts the corresponding score when the measured value exceeds the threshold value; the element health degree is 100 points of full score minus the sum of all parameter deduction points, and weight is set according to the element importance degree; the device health is a weighted average of all element health scores; and the intelligent substation health degree is the minimum value among all the equipment health degree scores.
7) And generating a power grid fault analysis and fault diagnosis report, which is completed by a fault diagnosis unit. And judging and positioning the power grid faults according to the protection action information and the wave recording file, and generating a fault diagnosis report, wherein the report content comprises the information of the name, the type, the phase, the electrical parameters of three cycles before and after the faults, the protection action condition evaluation, the fault point ranging and the like. Turning to the seventh step.
Sixth, processing the data of the conventional recorder, wherein the flow is as follows:
1) The wave recording data is mined and completed by the data processing unit. Extracting A, B sections of waveform morphological characteristics of the newly-called wave-recording file analog quantity to form characteristic quantities.
2) And comparing the operation and maintenance knowledge base according to the characteristic quantity, and completing the operation and maintenance knowledge base by an operation and maintenance management unit. And comparing the extracted characteristic quantity with historical data in an operation and maintenance knowledge base, searching whether operation and maintenance event data with the same characteristic exist, and identifying the operation and maintenance event as including the type if the similarity exceeds 90%, so as to generate a comparison result and an operation and maintenance event log.
3) The evaluation of the recorder reliability is completed by the operation and maintenance management unit. The reliability of the recorder is evaluated, and the alarm classification conditions (important, general, informing and none) in comparison are evaluated as (unreliable, defect, abnormal and reliable). When the evaluation level is unreliable, the data thereof is not available; when the evaluation grade is defect, the related data of the defect item is not available; when the evaluation level is abnormal or reliable, its data is available.
4) And generating a power grid fault analysis and fault diagnosis report, which is completed by a fault diagnosis unit. And judging and positioning the power grid faults according to the wave recording file, and generating a fault diagnosis report, wherein the report content comprises the information of fault line names, types, phases, three frequency electric parameters before and after the faults, fault point ranging and the like. Because the conventional recorder collects incomplete protection action information, the step does not have the protection action condition evaluation function.
5) And generating recorder defect analysis and recorder defect report. And (3) analyzing possible defects of the recorder and generating a recorder defect report according to the comparison result, wherein the report content comprises information such as the standing account information, the defect element, the type, the alarm classification, the operation and maintenance scheme and the like of the target recorder. Turning to the seventh step.
And seventhly, generating a comprehensive decision report according to the comprehensive decision knowledge base, and completing the comprehensive decision report by a comprehensive decision unit. And analyzing and processing fault diagnosis reports, intelligent operation and maintenance reports and recorder defect reports according to comparison results of corresponding modules of the comprehensive decision knowledge base, and comparing the same type of faults or defect conditions and the same equipment history faults or defect conditions with key parameters. And according to the order of processing fault diagnosis reports preferentially, processing intelligent operation and maintenance reports next-level preferentially and finally processing fault reports of the recorder, generating an accident processing scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme. Turning to the eighth step.
And eighth step, checking personnel authority and pushing information, which is completed by an information pushing unit or a dispatching integrated system interface unit. And according to the preset personnel authority of the system, fault or defect information is pushed to related personnel or an upper-level dispatching integrated system.
The system of the invention operates for 24 hours and simultaneously manages the intelligent recorder and the conventional recorder. The dispatching terminal is applied to the functions of intelligent substation such as power grid fault diagnosis, substation visual model, intelligent equipment operation and maintenance and the like, and the functions of conventional substation such as power grid fault diagnosis, fault perception of a recorder and the like. The system completes the release of fault information and wave recording data through an office system in the electric comprehensive data network, and completes the fault short message pushing through a short message platform.
The system of the invention automatically retrieves the latest data of the intelligent recorder or the conventional recorder in the transformer substation.
The master station system is in communication connection with an intelligent recorder management unit in the intelligent substation and performs data transmission, see fig. 4: and acquiring SV and GOOSE messages of equipment such as a merging unit, an intelligent terminal, a protection device and the like in the intelligent substation process layer network through an intelligent recorder acquisition unit. The SV network message is formed by converting PT/CT electrical quantity of a primary system of the transformer substation acquired by a merging unit, and the GOOSE message is formed by converting state quantity of a breaker acquired by an intelligent terminal and control signal quantity of a receiving protection device. And generating a protection action information report and a recording file in a COMTRADE format by an intelligent recorder acquisition unit, and recording a network message. MMS network messages of the intelligent recorder acquisition unit, the protection device and other devices are acquired in the intelligent substation station control layer network through the intelligent recorder management unit, and PTP messages of the time synchronization device are acquired. The MMS network message is generated by each device and contains the running state information of the MMS network message. The PTP message is generated by a time synchronization device and comprises time service information and time quality information. The visualization model can be generated by the intelligent recorder management unit.
The master station system is in communication connection and data transmission with a conventional recorder management unit in a conventional transformer substation, see fig. 4: PT/CT electric quantity, breaker state quantity and protection action information of a primary system of a transformer substation are acquired through a cable loop of a conventional recorder acquisition unit, a recorder file is generated by the conventional recorder acquisition unit, and COMTRADE format conversion of the recorder file is completed by a conventional recorder management unit.
The invention realizes the information transparency of the intelligent recorder master station: (1) a recorder protocol rule base is established in the communication service unit, and almost covers IEC103, IEC61850 and private protocols used by the main stream recorder model in China, so that transparent access of conventional and intelligent multi-type recorders is realized; (2) the communication protocol module incorporates a protocol adaptation mechanism to load protocols from a rule base as needed. Therefore, the access of the recorder does not need a debugging person to manually assign a specific communication service unit provided with a specific communication protocol module, only the standing book of the recorder is required to be established, the smoothness of the network and the port of the recorder is ensured, and the system can automatically allocate a proper communication service unit for the recorder, so that the transparent allocation of a communication interface is realized; (3) the model information of the recorder is automatically updated from the OCS system, the regulation configuration is adjusted, and even if the model is unknown or wrong, the recorder can be automatically adjusted through a self-adaptive mechanism, so that the transparency maintenance has stronger adaptability to the model alternation of the later-stage recorder.
The invention realizes data transparentization: (1) the data processing unit is added with the variety of data analysis aiming at the new generation intelligent recorder, and is fully compatible with all station-side services of the intelligent recorder, so that data transparency management is realized; (2) the graphic processing of the visual model of the intelligent recorder is added in the model management unit, so that the complex and difficult message data of the intelligent transformer substation can be intuitively and transparently displayed to a user.
The invention realizes the calculation transparency, and (1) the number of the communication protocol modules in the communication service unit is not matched with the number of the protocol types by 1:1, but is matched according to the daily task amount of the system. According to the calculation of a 1000-set management recorder, 40 communication protocol modules (5 of which are cold standby and are manually configured during starting) are required to be configured in the past, and only 20 communication protocol modules (10 of which are hot standby and are automatically started and loaded according to the task amount) are required to be configured at present, so that the transparent management of system resources is realized; (2) in the data processing unit, processing is started to finish the recorder data, the recorder alarm grading evaluation value in the intelligent operation and maintenance data is preferentially extracted, and if the evaluation grade is unreliable and defective, the group of data is abandoned, so that invalid data is avoided to consume system resources; (3) in the operation and maintenance management unit, the comprehensive decision unit and other businesses with larger calculation amount, the processing flow and the task priority are selected according to the alarm classification condition, so that the thread congestion caused by unordered queuing of tasks and large-scale data processing is avoided.
The invention realizes the operation transparentization: (1) in the model management unit, the primary and secondary devices and the association relation model thereof are visually displayed; monitoring the state change of the model in real time, and carrying out dynamic marking or alarming to transparently reflect the running state of the power grid; (2) in the operation and maintenance management unit, the operation state and the alarm condition of the equipment are monitored, a multi-level scoring mechanism from the element health degree of the equipment to the health degree of the intelligent substation is established, and the working condition of the substation equipment is reflected in a deep transparent mode.
In conclusion, the invention generally realizes the transparent operation and management of core services such as panoramic sensing, accident handling comprehensive decision and the like from the whole system architecture to the power grid and equipment of the intelligent recorder master station, and realizes transparent panoramic view.
The invention also discloses an intelligent recorder master station management system based on the transparent system architecture, the system structure is shown in figure 2, and the system comprises: the system comprises a communication service unit, a system intranet switch, a data processing unit, a model management unit, an operation and maintenance management unit, a fault diagnosis unit, an information pushing unit, an isolation device, a comprehensive decision unit and a scheduling integrated system interface unit;
the system is connected with the power dispatching data network switch through the communication service unit and is connected with the power comprehensive data network switch through the information pushing unit; the system intranet switch realizes the internal connection of each unit of the system, wherein the communication service unit is connected with the data processing unit, the model management unit, the operation and maintenance management unit and the fault diagnosis unit through the system intranet switch, the model management unit, the operation and maintenance management unit and the fault diagnosis unit are connected with the comprehensive decision unit, the comprehensive decision unit is connected with the scheduling integrated system interface unit and the isolation device, and the isolation device is connected with the information pushing unit;
System intranet switch: the system is used for realizing the internal connection of each unit of the system;
communication service unit: the intelligent recorder is used for carrying out communication connection and data retrieval with an intelligent recorder or a conventional recorder at a transformer substation end through a power dispatching data network;
a data processing unit: standardized processing for protecting action information, wave recording files, visual model files, intelligent operation and maintenance files and network message data;
model management unit: the method is used for graphical processing, display and variable monitoring of a transformer substation end visual model;
operation and maintenance management unit: the method is used for statistics and analysis of intelligent operation and maintenance files, and an operation and maintenance scheme is formulated when the transformer substation terminal equipment has defects;
a fault diagnosis unit: the system is used for analyzing the protection action information and the wave recording data and diagnosing and positioning faults when the data contain fault data;
and the comprehensive decision unit: the analysis results are comprehensively analyzed and checked by the comprehensive model management unit, the operation and maintenance management unit and the fault diagnosis unit, and the model change, the power grid fault and the equipment defect information contained in the analysis results are alarmed and displayed to form a processing plan;
scheduling integrated system interface unit: the system alarm information and the original data are converted and pushed according to the requirements of the upper-level dispatching integrated system, and unified model, account and fixed value information including but not limited to are acquired from the upper-level dispatching integrated system;
Isolation device: the system is used for realizing the safety isolation of the electric power network safety II area service and the electric power network safety III area service of the system;
information pushing unit: the system is used for pushing the alarm information and the original data of the system to the corresponding user side of the power network safety III region through the power comprehensive data network.
The invention also discloses an electronic device, which comprises: at least one processor, at least one memory, a communication interface, and a bus; the processor, the memory and the communication interface complete communication with each other through the bus; the memory stores a transparent architecture-based intelligent recorder master station management method program executable by the processor, and the transparent architecture-based intelligent recorder master station management method program is configured to implement the transparent architecture-based intelligent recorder master station management method.
The invention also discloses a computer readable storage medium, the storage medium stores an intelligent recorder master station management method program based on a transparent system architecture, and the intelligent recorder master station management method based on the transparent system architecture is realized when the intelligent recorder master station management method program based on the transparent system architecture is executed.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the invention.

Claims (9)

1. The intelligent recorder master station management method based on the transparent system architecture is characterized by comprising the following steps of:
s1, a recorder ledger and a recorder model protocol rule base of a power grid are established in advance, an operation and maintenance knowledge base is formed through deep learning according to historical operation and maintenance data, and the step S2 is continuously executed;
s2, the intelligent recorder master station establishes connection with the recorder through the protocol rule base, and the step S3 is continuously executed;
s3, the intelligent recorder master station actively calls a data list of the recorder at preset first time intervals, and the step S4 is continuously executed;
s4, the intelligent recorder master station judges whether the recorder is an intelligent recorder, and when the recorder is the intelligent recorder, the step S5 is continuously executed; when the recorder is a conventional recorder, continuing to execute the step S6;
s5, carrying out operation and maintenance analysis processing on the data which are called from the intelligent recorder, generating a fault diagnosis report and an intelligent operation and maintenance report, and continuously executing the step S7;
S6, carrying out operation and maintenance analysis processing on the data which are called from the conventional recorder, generating a fault diagnosis report and a recorder defect report, and continuously executing the step S7;
s7, carrying out comprehensive decision analysis processing on the fault diagnosis report, the intelligent operation and maintenance report and the recorder defect report to generate an accident handling scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme, and continuously executing the step S8;
s8, according to the preset personnel authority of the system, fault or defect information is pushed to related personnel or an upper-level dispatching integrated system.
2. The method for master station management of an intelligent recorder based on a transparent architecture as claimed in claim 1, wherein said step S2 specifically comprises the following sub-steps:
s2-1, connecting the wave recorders, acquiring a standard fixed value list of each wave recorder, comparing the standard fixed value list with the standing book of the wave recorder, and carrying out a short message alarm when inconsistent is found, reminding operation and maintenance personnel to check in time, ensuring accurate standing book information, and continuing to execute the step S2-2;
s2-2, loading corresponding protocol rules in the protocol rule library according to the standing account information of the target recorder to establish connection; when the protocols are not matched, attempting to carry out self-adaption by using other types of protocol rules in the protocol rule base, generating protocol pairing alarm in the running log, and continuously executing the step S2-3;
S2-3, if the matched recorder is disconnected due to network reasons, reconnecting is initiated once every preset second time of the recorder, 3 times of continuous reconnection fails, the reconnection interval time is adjusted to be preset third time, and the preset third time is larger than the preset second time.
3. The method for master station management of an intelligent recorder based on a transparent architecture as claimed in claim 1, wherein said step S5 comprises the following steps:
s5-1, analyzing and processing the operation and maintenance data of the intelligent recorder, and evaluating the reliability of the intelligent recorder; continuing to execute the step S5-2; the step S5-1 specifically comprises the following steps:
s5-1-1, extracting intelligent operation and maintenance data in the intelligent recorder, and checking whether the data which are extracted from the intelligent recorder contain protection action information, a recording file, a visual model and an intelligent operation and maintenance file; if the data is missing, the missing data independently initiates a calling instruction once; if the file is still missing, the new file is not generated in the type, and the analysis flow is abandoned;
s5-1-2, analyzing the intelligent operation and maintenance file, checking whether the intelligent operation and maintenance file contains station device alarm information, and presetting the station device alarm information grade as follows: important, general, informed, none; if not, the alarm information grade of the station device is none, and the step S5-1-3 is continuously executed; if the information is included, processing is carried out according to the alarm information grade of the station end device, when the alarm information grade of the station end device is important or common, an operation and maintenance event log is generated, A, B sections of waveform morphological characteristics of the wave recording file analog quantity at the alarm moment are extracted, and the waveform morphological characteristics are included in the operation and maintenance knowledge base; when the alarm information level of the station device is informing, generating an operation and maintenance event log; simultaneously operating the operation and maintenance knowledge base, analyzing device defects, guiding an operation and maintenance scheme, and performing self-learning and self-upgrading of the operation and maintenance knowledge base in the operation process; continuing to execute the step S5-1-3;
S5-1-3, evaluating the reliability of the intelligent recorder, and setting the evaluation level as unreliable, defective, abnormal and reliable by comparing the alarm information level of the station device; when the evaluation level is unreliable, the data thereof is not available; when the evaluation grade is defect, the related data of the defect item is not available; when the evaluation level is abnormal or reliable, the data thereof is available;
s5-2, extracting a primary equipment model and a connection relation thereof, a secondary equipment model, a secondary equipment association relation, a secondary optical fiber loop and a secondary virtual loop model in an SMCD intelligent operation and maintenance management model file or an SVG graph, comparing the primary equipment model, the secondary equipment association relation, the secondary optical fiber loop and the secondary virtual loop model with the last-called model file, marking equipment or links with state changes, and performing visual display in a user interface; continuing to execute the step S5-3;
s5-3, evaluating the health degree of the intelligent substation according to the device alarm grades in the intelligent operation and maintenance file, and generating an intelligent operation and maintenance report after the evaluation is completed, wherein the report content comprises evaluation scores and deduction item details; continuing to execute the step S5-4;
s5-4, judging and positioning the power grid faults according to the protection action information and the wave recording file, and generating a fault diagnosis report, wherein the report content comprises the name, the type, the phase of a fault line, three cyclic electric parameters before and after the fault, protection action condition evaluation and fault point distance measurement information.
4. The method for master station management of an intelligent recorder based on a transparent architecture as claimed in claim 3, wherein said step S5-3 specifically comprises:
the health evaluation method adopts deduction, takes the minimum element which can be monitored by the SMCD intelligent operation and maintenance management model file as a unit, sets a threshold value and a score for key parameters of each type of element, and deducts the corresponding score when the measured value exceeds the threshold value;
the element health degree is 100 points of full score minus the sum of all parameter deduction points, and weight is set according to the element importance degree;
the device health is a weighted average of all element health scores;
and the intelligent substation health degree is the minimum value among all the equipment health degree scores.
5. The method for master station management of an intelligent recorder based on a transparent architecture as claimed in claim 3, wherein said step S6 specifically comprises the following sub-steps:
s6-1, extracting A, B sections of waveform morphological characteristics of the analog quantity of the new-called recording file in the conventional recorder to form characteristic quantities; continuing to execute the step S6-2;
s6-2, comparing the characteristic quantity with historical data in the operation and maintenance knowledge base, searching whether operation and maintenance event data with the same characteristic exist, and judging that the type of operation and maintenance event is contained if the similarity exceeds 90%, so as to obtain a comparison result and generate an operation and maintenance event log; continuing to execute the step S6-3;
S6-3, evaluating the reliability of the conventional recorder, and setting the evaluation level as unreliable, defective, abnormal and reliable by comparing the alarm information level of the station device; when the evaluation level is unreliable, the data thereof is not available; when the evaluation grade is defect, the related data of the defect item is not available; when the evaluation level is abnormal or reliable, the data thereof is available; continuing to execute the step S6-4;
s6-4, judging and positioning the power grid faults according to the wave recording file, and generating a fault diagnosis report, wherein the report content comprises the information of the name, the type and the phase of a fault line, the electrical parameters of three cycles before and after the fault, fault point ranging and the like; continuing to execute the step S6-5;
s6-5, analyzing the possible defects of the conventional recorder by combining the comparison result, and generating a recorder defect report, wherein the report content comprises information such as the standing account information, the defect element, the type, the alarm classification, the operation and maintenance scheme and the like of the target recorder.
6. The method for master station management of an intelligent recorder based on a transparent architecture as claimed in claim 1, wherein said step S7 specifically comprises the following sub-steps:
s7-1, analyzing and processing fault diagnosis reports, intelligent operation and maintenance reports and recorder defect reports, comparing the same type of faults or defect conditions with the same equipment history faults or defect conditions as the key parameters, and continuously executing the step S7-2;
S7-2, analyzing and processing according to the order of processing fault diagnosis reports, processing intelligent operation and maintenance reports next-level priority and finally processing fault reports of the recorder, and generating an accident processing scheme, a transformer substation intelligent operation and maintenance scheme and a recorder intelligent operation and maintenance scheme.
7. An intelligent recorder master station working system based on a transparent system architecture, which is characterized by comprising: the system comprises a communication service unit, a system intranet switch, a data processing unit, a model management unit, an operation and maintenance management unit, a fault diagnosis unit, an information pushing unit, an isolation device, a comprehensive decision unit and a scheduling integrated system interface unit;
the system is connected with the power dispatching data network switch through the communication service unit and is connected with the power comprehensive data network switch through the information pushing unit; the system intranet switch realizes the internal connection of each unit of the system, wherein the communication service unit is connected with the data processing unit, the model management unit, the operation and maintenance management unit and the fault diagnosis unit through the system intranet switch, the model management unit, the operation and maintenance management unit and the fault diagnosis unit are connected with the comprehensive decision unit, the comprehensive decision unit is connected with the scheduling integrated system interface unit and the isolation device, and the isolation device is connected with the information pushing unit;
System intranet switch: the system is used for realizing the internal connection of each unit of the system;
communication service unit: the intelligent recorder is used for carrying out communication connection and data retrieval with an intelligent recorder or a conventional recorder at a transformer substation end through a power dispatching data network;
a data processing unit: standardized processing for protecting action information, wave recording files, visual model files, intelligent operation and maintenance files and network message data;
model management unit: the method is used for graphical processing, display and variable monitoring of a transformer substation end visual model;
operation and maintenance management unit: the method is used for statistics and analysis of intelligent operation and maintenance files, and an operation and maintenance scheme is formulated when the transformer substation terminal equipment has defects;
a fault diagnosis unit: the system is used for analyzing the protection action information and the wave recording data and diagnosing and positioning faults when the data contain fault data;
and the comprehensive decision unit: the analysis results are comprehensively analyzed and checked by the comprehensive model management unit, the operation and maintenance management unit and the fault diagnosis unit, and the model change, the power grid fault and the equipment defect information contained in the analysis results are alarmed and displayed to form a processing plan;
scheduling integrated system interface unit: the system alarm information and the original data are converted and pushed according to the requirements of the upper-level dispatching integrated system, and unified model, account and fixed value information including but not limited to are acquired from the upper-level dispatching integrated system;
Isolation device: the system is used for realizing the safety isolation of the electric power network safety II area service and the electric power network safety III area service of the system;
information pushing unit: the system is used for pushing the alarm information and the original data of the system to the corresponding user side of the power network safety III region through the power comprehensive data network.
8. An electronic device comprising at least one processor, at least one memory, a communication interface, and a bus; the processor, the memory and the communication interface complete communication with each other through the bus; the memory stores a transparent architecture-based intelligent recorder master station management method program executable by the processor, and a transparent architecture-based intelligent recorder master station operating program is configured to implement a transparent architecture-based intelligent recorder master station management method according to any one of claims 1 to 6.
9. A computer readable storage medium, wherein a transparent architecture-based intelligent recorder master station management method program is stored on the storage medium, and the transparent architecture-based intelligent recorder master station management method program is executed to realize the transparent architecture-based intelligent recorder master station management method according to any one of claims 1 to 6.
CN202110911070.2A 2021-08-10 2021-08-10 Intelligent recorder master station management method and system based on transparent system architecture Active CN113726007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110911070.2A CN113726007B (en) 2021-08-10 2021-08-10 Intelligent recorder master station management method and system based on transparent system architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110911070.2A CN113726007B (en) 2021-08-10 2021-08-10 Intelligent recorder master station management method and system based on transparent system architecture

Publications (2)

Publication Number Publication Date
CN113726007A CN113726007A (en) 2021-11-30
CN113726007B true CN113726007B (en) 2024-01-30

Family

ID=78675317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110911070.2A Active CN113726007B (en) 2021-08-10 2021-08-10 Intelligent recorder master station management method and system based on transparent system architecture

Country Status (1)

Country Link
CN (1) CN113726007B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114184865A (en) * 2021-12-07 2022-03-15 武汉中元华电电力设备有限公司 Intelligent oscillograph testing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102175934A (en) * 2011-01-13 2011-09-07 上海自动化仪表股份有限公司 Data collection method of wave recording module
CN103501047A (en) * 2013-10-09 2014-01-08 云南电力调度控制中心 Intelligent fault wave recording main station information management system
CN103840554A (en) * 2014-03-04 2014-06-04 国电南京自动化股份有限公司 Distributed type fault recording and network analyzing system of intelligent substation
CN108494098A (en) * 2018-05-30 2018-09-04 保定天威保变电气股份有限公司 A kind of failure wave-recording method and device on the spot used for intelligent electric network
CN112564278A (en) * 2020-11-26 2021-03-26 广西电网有限责任公司防城港供电局 Relay protection fault information sorting and electronic reporting system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102175934A (en) * 2011-01-13 2011-09-07 上海自动化仪表股份有限公司 Data collection method of wave recording module
CN103501047A (en) * 2013-10-09 2014-01-08 云南电力调度控制中心 Intelligent fault wave recording main station information management system
CN103840554A (en) * 2014-03-04 2014-06-04 国电南京自动化股份有限公司 Distributed type fault recording and network analyzing system of intelligent substation
CN108494098A (en) * 2018-05-30 2018-09-04 保定天威保变电气股份有限公司 A kind of failure wave-recording method and device on the spot used for intelligent electric network
CN112564278A (en) * 2020-11-26 2021-03-26 广西电网有限责任公司防城港供电局 Relay protection fault information sorting and electronic reporting system and method

Also Published As

Publication number Publication date
CN113726007A (en) 2021-11-30

Similar Documents

Publication Publication Date Title
CN110020967B (en) Information processing method and device for intelligent alarm of power grid dispatching end transformer substation
CN104020754B (en) Method for enabling state monitoring information of transformer station primary main equipment to access to regulation and control system
CN109713793B (en) Power supply online state evaluation system and method for transformer substation
CN104753178A (en) Power grid fault handling system
CN107798395A (en) A kind of power grid accident signal automatic diagnosis method and system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN111400295A (en) Power distribution network power failure event analysis method and device and storage medium
CN111667143A (en) Method for realizing fusion of real-time monitoring data and service management data in power grid dispatching
CN113726007B (en) Intelligent recorder master station management method and system based on transparent system architecture
CN116522746A (en) Power distribution hosting method for high-energy-consumption enterprises
CN115293370A (en) Digital integrated operation and maintenance management system of distributed photovoltaic power station
CN115965266A (en) Intelligent analysis system based on big data
CN108596450B (en) Power grid risk early warning method and system
CN113346622A (en) Power grid operation risk intelligent warning system based on big data analysis
CN209948789U (en) Power distribution monitoring system
CN109818335B (en) Protection system abnormal event diagnosis system and method based on fault tree analysis
CN114692787B (en) Multi-source data-based three-winding main transformer event analysis processing method and system
CN116468243A (en) Power grid trend early warning method based on monitoring operation data
Zhang et al. Distributed Architecture of Power Grid Asset Management and Future Research Directions
CN111917187B (en) Intelligent substation cloud monitored control system
CN114265837A (en) Station-side interactive data feature extraction method
CN114157038A (en) Intelligent and safe all-dimensional early warning and control system for power distribution network
CN113129160A (en) Electric power communication network inspection method based on equipment state perception and intellectualization
CN113140096B (en) Method, device, equipment and storage medium for monitoring and judging station loss of voltage
Lu et al. Research on substation intelligent monitoring scheme under big data environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant