CN113665763A - Datum line construction method for straight main board in ship construction - Google Patents

Datum line construction method for straight main board in ship construction Download PDF

Info

Publication number
CN113665763A
CN113665763A CN202111127380.1A CN202111127380A CN113665763A CN 113665763 A CN113665763 A CN 113665763A CN 202111127380 A CN202111127380 A CN 202111127380A CN 113665763 A CN113665763 A CN 113665763A
Authority
CN
China
Prior art keywords
main board
point
reference line
main plate
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111127380.1A
Other languages
Chinese (zh)
Inventor
冯敏超
孙建志
徐占勇
曹岭
蒋林勇
王镇浩
王洁
何经先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN202111127380.1A priority Critical patent/CN113665763A/en
Publication of CN113665763A publication Critical patent/CN113665763A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/40Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
    • B63B73/43Welding, e.g. laser welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/50Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by forming methods, e.g. manufacturing of curved blocks

Abstract

The invention discloses a datum line construction method of a straight main board in ship construction, which comprises the steps of welding the main board in a segmented construction stage, drawing a first insulation datum line by taking the margin-free edge of the main board as a reference, wherein the distance between the first insulation datum line and the margin-free edge of the main board is a preset value, determining a first point and a second point on the first insulation datum line, the distance between the first point and the first end of the main board is the preset value, the distance between the first point and the second point is b, making an arc on the main board by taking the first point as a circle center and a as a radius, making an arc by taking the second point as a circle center and c as a radius, and intersecting the two arcs at the third point, wherein a2+b2=c2A second absolute reference line is scribed on the main board through the first and third points, the second absolute reference line extending from the third end of the main board to the fourth end of the main board, the first absolute reference line is translated by L1 to scribe a first auxiliary reference lineAnd drawing a second auxiliary reference line by translating the second reference line L.

Description

Datum line construction method for straight main board in ship construction
Technical Field
The invention relates to a datum line construction method of a straight main plate in ship construction.
Background
In the existing ship construction, the reference marking of a straight main plate affects the precision of the assembly, the segmentation and the block related to the straight main plate, wherein the marking of a reference line on the main plate is particularly important, and in the segmentation construction, the block construction and the outfitting stage, the reference line on the main plate is used as a reference for installing other components of a ship body and is also used as a reference for carrying, so that a main plate marking method capable of ensuring the ship body construction precision is needed.
Disclosure of Invention
The invention provides a datum line construction method of a straight main plate in ship construction, which is beneficial to ensuring the construction precision of a ship body.
The invention solves the technical problems through the following technical scheme:
a datum line construction method of a straight main plate in ship construction comprises the following steps:
s10, welding a main board in a sectional construction stage;
s20, drawing a first insulation reference line by taking the margin-free edge of the main board as a reference, wherein the distance between the first insulation reference line and the margin-free edge of the main board is a preset value, and the first insulation reference line extends from the first end of the main board to the second end of the main board;
s30, determining a first point and a second point on the first absolute reference line, wherein the distance between the first point and the first end of the main board is the preset value, and the distance between the first point and the second point is b;
s40, making an arc on the main board by taking the first point as the center of a circle and a as the radius, making an arc by taking the second point as the center of a circle and c as the radius, and intersecting the two arcs at the third point, wherein a2+b2=c2
S50, drawing a second absolute reference line on the main board, wherein the second absolute reference line passes through the first point and the third point, and the second absolute reference line extends from the third end of the main board to the fourth end of the main board;
and S60, drawing a first auxiliary reference line by the first absolute reference line translation L1, and drawing a second auxiliary reference line by the second reference line translation L, wherein L and L1 are respectively added with a dispersion extension amount on the basis of corresponding theoretical values.
Preferably, the following steps are further included before step S10:
s09, processing a plurality of cell boards according to the size determined in the design stage;
step S10 specifically includes:
and splicing and welding and fixing the unit plates to form the main plate.
Preferably, step S20 is specifically:
and making a ground sample line intersection point on the main board, wherein the distance between the ground sample line intersection point and the margin-free edge of the main board is the preset value, drawing the first insulation reference line parallel to the margin-free edge of the main board by using a bevel protractor, and extending the first insulation reference line from the first end of the main board to the second end of the main board.
Preferably, the b value in step S30 is L1.
Preferably, the value of a in step S40 is L.
Preferably, the following steps are further included between step S40 and step S50:
s41, checking the actual distance between the first point and the second point, if the actual distance is equal to the value a, executing the step S50, otherwise returning to the step S40.
Preferably, the main plate generates welding shrinkage when welding the exterior member, and the discrete extension amount of L1 includes a component of the welding shrinkage value of the main plate in the direction of the first insulation reference line in step S60.
Preferably, the main plate generates welding shrinkage when welding the external member, and the discrete extension amount of L includes a component of the welding shrinkage value of the main plate in the direction of the second absolute reference line in step S60.
Preferably, the main board is any one of a deck, an inner bottom board, an outer bottom board and an outer board of a side section of the ship body, and the preset value is any one of 100mm, 150mm and 200 mm.
Preferably, the margin-free edge of the main plate in the sections and blocks other than the bow section is at an end near the bow in the ship length direction, and the margin-free edge of the main plate is at an upper end of the main plate in the ship height direction.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.
The positive progress effects of the invention are as follows:
the invention provides a straight main board marking method which can ensure the precision of an absolute datum line, an auxiliary datum line and a main board and is beneficial to improving the building precision of a ship body.
Drawings
Fig. 1 is a schematic view of a main board after being tailor welded according to an embodiment of the present invention.
Fig. 2 is a main board after a first insulation reference line is scribed in an embodiment of the invention.
Fig. 3 is a main board after determining a first point and a second point according to an embodiment of the present invention.
Fig. 4 is a schematic diagram of a motherboard according to an embodiment of the invention.
Fig. 5 is a main board after a first auxiliary reference line and a second auxiliary reference line are scribed according to still another embodiment of the invention.
Description of reference numerals:
unit board 1
Main board 2
First end 21
Second end 22
Third end 23
Fourth end 24
First absolute reference line 31
Second absolute reference line 32
The first auxiliary reference line 33
The second auxiliary reference line 34
First point 4
Second point 5
Third point 6
Detailed Description
The present invention is further illustrated by the following examples, but is not limited thereby in the scope of the examples described below.
Please refer to fig. 1-5 for understanding. The embodiment of the invention provides a datum line construction method of a straight main board 2 in ship construction, which is applied to the ship construction, and the datum line construction method of the main board 2 comprises the following steps:
s09, processing a plurality of cell boards 1 according to the size determined in the design stage;
s10, as shown in figure 1, welding the main board 2 in the stage of sectional construction; that is, when building a section of a ship, the unit panels 1 are joined together and welded to form the main panel 2. The main board 2 is any one of a deck, an inner bottom board, an outer bottom board and an outer board of a side section of a ship body.
S20, as shown in fig. 2, the first insulation reference line 31 is drawn based on the margin-free edge of the main board 2, the margin-free edge of the main board 2 in the block and the block other than the bow block is at the end near the bow, and the margin-free edge of the main board 2 is at the upper end of the main board 2 in the direction of the ship height; in a specific operation, two ground sample lines are marked on the main board 2, and a ground sample line intersection point is formed, and the distance from the ground sample line intersection point to the margin-free edge of the main board 2 is a preset value, and the preset value is any one of 100mm, 150mm and 200 mm. The open angle ruler is used for drawing a first insulation reference line 31 parallel to the margin-free edge of the main board 2, the distance between the first insulation reference line 31 and the margin-free edge of the main board 2 is a preset value, and the first insulation reference line 31 extends from the first end 21 of the main board 2 to the second end 22 of the main board 2. Wherein, the intersection point of the ground sample lines can be arranged on the edge of the first end 21 of the main board 2, which is convenient for operation;
s30, as shown in fig. 3, determining a first point 4 and a second point 5 on the first absolute reference line 31, where the distance from the first point 4 to the first end 21 of the motherboard 2 is a preset value, and the distance from the first point 4 to the second point 5 is b; in this embodiment, the value b is L1, and in other embodiments, the value b may be any value as long as the second point 5 is on the motherboard 2.
S40, as shown in fig. 4, making an arc on the motherboard 2 with the first point 4 as the center, a as the radius, making an arc with the second point 5 as the center, c as the radius, and the two arcs intersecting at the third point 6, wherein a2+b2=c2(ii) a In this embodiment, the value a is L, and in other embodiments, the value a may be other values.
And S41, checking the actual distance between the first point 4 and the second point 5, executing the step S50 if the actual distance is equal to the value a, and returning to the step S40 if the actual distance is not equal to the value a.
S50, a second absolute reference line 32 is drawn on the main board 2 at the first point 4 and the third point 6, the second absolute reference line 32 extending from the third end 23 of the main board 2 to the fourth end 24 of the main board 2.
S60, as shown in fig. 5, the first reference line 31 is translated by L1 to define the first auxiliary reference line 33, and the second reference line translation L defines the second auxiliary reference line 34, wherein L and L1 each have a dispersion elongation added to the corresponding theoretical value. Welding shrinkage is generated when the main plate 2 is welded with an external component, the external component is a component which is generated in the hull manufacturing process and has a welding relation with the main plate 2, the external component is installed on the main plate 2 in at least one stage of a segmental construction stage, a total segmental construction section and an outfitting stage of a ship, the welding shrinkage generated by welding the main plate 2 and the external component is considered in advance, allowance flows out in advance, and the welding shrinkage value is obtained by calculating the existing welding shrinkage specification; in this step, the dispersion elongation of L1 includes a component of the welding shrinkage value of the main board 2 in the direction of the first absolute reference line 31, and the dispersion elongation of L includes a component of the welding shrinkage value of the main board 2 in the direction of the second absolute reference line 32.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that this is by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.

Claims (10)

1. A datum line construction method of a straight main plate in ship construction is characterized by comprising the following steps:
s10, welding a main board in a sectional construction stage;
s20, drawing a first insulation reference line by taking the margin-free edge of the main board as a reference, wherein the distance between the first insulation reference line and the margin-free edge of the main board is a preset value, and the first insulation reference line extends from the first end of the main board to the second end of the main board;
s30, determining a first point and a second point on the first absolute reference line, wherein the distance between the first point and the first end of the main board is the preset value, and the distance between the first point and the second point is b;
s40, making an arc on the main board by taking the first point as the center of a circle and a as the radius, making an arc by taking the second point as the center of a circle and c as the radius, and intersecting the two arcs at the third point, wherein a2+b2=c2
S50, drawing a second absolute reference line on the main board, wherein the second absolute reference line passes through the first point and the third point, and the second absolute reference line extends from the third end of the main board to the fourth end of the main board;
and S60, drawing a first auxiliary reference line by the first absolute reference line translation L1, and drawing a second auxiliary reference line by the second reference line translation L, wherein L and L1 are respectively added with a dispersion extension amount on the basis of corresponding theoretical values.
2. The datum line construction method of a straight main plate in ship construction according to claim 1, further comprising the steps of, before step S10:
s09, processing a plurality of cell boards according to the size determined in the design stage;
step S10 specifically includes:
and splicing and welding and fixing the unit plates to form the main plate.
3. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein the step S20 is embodied as:
and making a ground sample line intersection point on the main board, wherein the distance between the ground sample line intersection point and the margin-free edge of the main board is the preset value, drawing the first insulation reference line parallel to the margin-free edge of the main board by using a bevel protractor, and extending the first insulation reference line from the first end of the main board to the second end of the main board.
4. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein the value of b in the step S30 is L1.
5. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein the value of a in step S40 is L.
6. The datum line construction method of a straight main plate in ship construction according to claim 1, further comprising the steps between the step S40 and the step S50 of:
s41, checking the actual distance between the first point and the second point, if the actual distance is equal to the value a, executing the step S50, otherwise returning to the step S40.
7. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein the main plate generates welding shrinkage when welding exterior members, and the dispersed elongation of the L1 includes a component of the welding shrinkage value of the main plate in the direction of the first absolute datum line in step S60.
8. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein welding shrinkage occurs when the main plate is welded to the exterior member, and the discrete elongation of L includes a component of the welding shrinkage value of the main plate in a direction of the second absolute datum line in step S60.
9. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein the main plate is any one of a deck, an inner bottom plate, an outer bottom plate, and an outer plate of a side section of a ship body, and the preset value is any one of 100mm, 150mm, and 200 mm.
10. The datum line construction method of a straight main plate in ship construction according to claim 1, wherein the no-margin side of the main plate in the block other than the block of the bow and its segment is at one end near the bow in the ship length direction, and the no-margin side of the main plate is at the upper end of the main plate in the ship height direction.
CN202111127380.1A 2021-09-18 2021-09-18 Datum line construction method for straight main board in ship construction Pending CN113665763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111127380.1A CN113665763A (en) 2021-09-18 2021-09-18 Datum line construction method for straight main board in ship construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111127380.1A CN113665763A (en) 2021-09-18 2021-09-18 Datum line construction method for straight main board in ship construction

Publications (1)

Publication Number Publication Date
CN113665763A true CN113665763A (en) 2021-11-19

Family

ID=78550110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111127380.1A Pending CN113665763A (en) 2021-09-18 2021-09-18 Datum line construction method for straight main board in ship construction

Country Status (1)

Country Link
CN (1) CN113665763A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013071668A1 (en) * 2011-11-15 2013-05-23 江苏大学 Large-size floating state manufacturing method for marine engineering equipment
CN109591957A (en) * 2018-11-22 2019-04-09 广州文冲船厂有限责任公司 A kind of method of body section jigsaw scribing line
CN111776164A (en) * 2020-05-22 2020-10-16 沪东中华造船(集团)有限公司 High-precision rapid positioning method for side outer plate body
CN112373648A (en) * 2020-11-23 2021-02-19 上海外高桥造船有限公司 Method for constructing cruise ship
CN112977751A (en) * 2021-03-26 2021-06-18 广州文冲船厂有限责任公司 Jointed board marking method
CN113277031A (en) * 2021-06-15 2021-08-20 江南造船(集团)有限责任公司 Rapid building method for lower water tank section of ship
CN113401309A (en) * 2021-07-20 2021-09-17 青岛北海船舶重工有限责任公司 Segmented construction method for bottom side cabin of bulk cargo ship

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013071668A1 (en) * 2011-11-15 2013-05-23 江苏大学 Large-size floating state manufacturing method for marine engineering equipment
CN109591957A (en) * 2018-11-22 2019-04-09 广州文冲船厂有限责任公司 A kind of method of body section jigsaw scribing line
CN111776164A (en) * 2020-05-22 2020-10-16 沪东中华造船(集团)有限公司 High-precision rapid positioning method for side outer plate body
CN112373648A (en) * 2020-11-23 2021-02-19 上海外高桥造船有限公司 Method for constructing cruise ship
CN112977751A (en) * 2021-03-26 2021-06-18 广州文冲船厂有限责任公司 Jointed board marking method
CN113277031A (en) * 2021-06-15 2021-08-20 江南造船(集团)有限责任公司 Rapid building method for lower water tank section of ship
CN113401309A (en) * 2021-07-20 2021-09-17 青岛北海船舶重工有限责任公司 Segmented construction method for bottom side cabin of bulk cargo ship

Similar Documents

Publication Publication Date Title
CN109094723B (en) Anchor chain cylinder and anchor platform manufacturing and mounting method
CN104743059B (en) A kind of more block pre-modified methods of hull annular
CN104527922B (en) Accurate positioning method of anchor bolt hole of marine main engine
CN103711066B (en) Novel steel box girder top plate unit structure and preparation method
CN110877694B (en) Shipboard subsection belt bending angle position and trough-type bulkhead subsection butt joint assembly method
CN105015703A (en) Ship bottom segment assembly technology
CN105383642A (en) Vertical guide rail mounting and welding method
WO2018214335A1 (en) Quick erection method of vessel segments
CN113665763A (en) Datum line construction method for straight main board in ship construction
CN106314700B (en) Ocean platform, connection bracket and its design method
EP3868979B1 (en) Method for tensioning prefabricated component employing centroid tracking and seam width control
CN110789678A (en) Method for butt joint assembly of bottom sections of chemical ship
CN115195968A (en) Installation method for aligning hinge at end of folding hatch cover and strengthening opposite sides of oil cylinder base
CN111139808B (en) Method for carrying cantilever beam of self-elevating drilling platform
CN110704940B (en) Method for processing position deviation of aircraft engine mounting intersection point and engine thrust pin
US7840929B2 (en) Method for automatically modifying frame of circuit diagram
CN113247759A (en) Small lifting hook mounted on profile
CN105499818A (en) Segmental manufacturing method for deck
CN112550603B (en) Two-phase stainless steel longitudinal bulkhead sectional manufacturing process
CN113909823B (en) Method for machining upright column flange of quayside container crane
CN110681924B (en) Manufacturing process for end part of flat-bulb steel
CN112528409B (en) Ship non-complementary board creating method, system, storage medium and equipment
CN219433946U (en) Node measuring template
CN104100048B (en) Bar reinforcement positioning device in the hole of plate hole connector
CN216130168U (en) Split type slope cushion cap foundation template for bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211119