CN1136630A - Ceiling method by using decorative coiled material with assembled parts and structure - Google Patents
Ceiling method by using decorative coiled material with assembled parts and structure Download PDFInfo
- Publication number
- CN1136630A CN1136630A CN 96101742 CN96101742A CN1136630A CN 1136630 A CN1136630 A CN 1136630A CN 96101742 CN96101742 CN 96101742 CN 96101742 A CN96101742 A CN 96101742A CN 1136630 A CN1136630 A CN 1136630A
- Authority
- CN
- China
- Prior art keywords
- plane materiel
- ceiling
- assembly
- coiled material
- band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The ceiling method by using decorative coiled material and its structure are characterized by that one side of facing material criss-cross is connected to some longitudinal and lateral tension reinforcing bands and assembling components, and made into ceiling, then the ceiling can be fixed to the vertical walls by means of some tension springs. Said invention has no need of keel and plywood, and can save material, reduce cost, so that it can be extensively used for hanging ceiling in door.
Description
A kind of ceiling method and structure that the decorative coiled material of assembly is arranged relates to civilian construction furred ceiling field.
Current, it generally is to decorate rough ground (or lightgage steel joist) earlier to be fixed on indoor top on request that civilian construction are decorated furred ceiling, and then the sheet material that furred ceiling is used is installed on the keel (referring to " furred ceiling, the light partition ", the general building standard design 1988 of ALFISOL IN CENTRAL).Above-mentioned ceiling method exists following shortcoming: 1. for ceiling suspension and guarantee that plate is straight indeformable, need through walls, burrow, the primary and secondary keel are installed, its complex structure is installed trouble, needs use a lot of man-hours; 2, material usage is very big, decorates the cost height of furred ceiling.
The object of the present invention is to provide and a kind ofly keel need be installed, a kind of ceiling method and structure that the decorative coiled material of assembly is arranged simple in structure without veneer, easy for installation, as to save material.
The objective of the invention is to realize by following mode.Design principle of the present invention is: around the thin skin plane materiel and the spring between the stalk, framework all strain the back and produce tension force, holding the band that looses by each pulling force passes on the plane materiel, make the balanced stretching of whole plane materiel, remain flat surface, simultaneously, because each spring tension interacts plane materiel is sling, thereby finishes furred ceiling.
Technical scheme of the present invention is: the one side at the thin skin plane materiel connects some directly in length and breadth, and bearing and distributing strengthening belt of horizontal tensile force and assembly are made becomes ceiling; Directly, willfully loading onto the termination folder that there is connecting hole at two ends on the strong band on the ceiling, in connecting hole, load onto the extension structure again, dress tension spring on the hook, the other end of spring is fixed on the holder of stalk, then, tighten up and adjust each pulling force again and brush lightly spring, make whole ceiling be in outside extended state, at last, place, every plane materiel exchange slit mends with short covering plane materiel band.
The structure of making of the ceiling method of the decorative coiled material that assembly is arranged, it is characterized in that when making the small size furred ceiling, plane materiel with the thin skin making, simultaneously add with some cross-shaped straight, bearing and distributing strengthening belt of horizontal tensile force at it, be connected with the termination folder at the two ends of each reinforcing band, there is connecting hole at the two ends of termination folder, and are connected with hook, the hook be fixed on stalk on holder between be connected by tension spring, hanging hole is arranged on the holder; The termination of per two adjacent plane materiel junctions clamps its horizontal load that is connected and connects tie rod, and there is short covering plane materiel band at the place, slit of junction.
The structure of making of the ceiling method of the decorative coiled material that assembly is arranged, it is characterized in that when making the large tracts of land furred ceiling, connect tie rod with some cross-shaped straight, horizontal loads and form some little frames, hang the plane materiel that draws a thin skin to make in each little frame, the two ends that connect tie rod at each load are connected with the termination folder, one end is connected with stalk, and the other end links to each other with stalk by tension spring; There is short covering plane materiel band in the slit of per two adjacent plane materiel junctions.
The ceiling method and the structure of the decorative coiled material of assembly are arranged, it is characterized in that: install some pulling force additional in the one side of plane materiel (1) and hold diffusing piece (16) and assembly (17), also plane materiel (1) can be made plane materiel pulling block (23) and pulling force and hold diffusing limit (18).Hold at pulling force and to be equipped with on the diffusing piece (16) that tensile elongation limits circle (19) and tension strength limits breach (20), pulling force holds diffusing limit (18) and goes up the disconnected bar (21) of uniform limited power.
The used thin skin plane materiel (1) of the present invention can be thin metal aluminum sheet, can be plastic skin, paper, the cloth of handling through fire prevention.
Accompanying drawing 1 is the plane structure schematic diagram of small size furred ceiling of the present invention.
1 plane materiel, 2 straight reinforcing bands, 3 strong bands willfully, 4 terminations folder, 5 connecting holes, 6 hooks, 7 stalks, 8 holders, 9 hold-down screws, 10 tension springs, 11 hanging holes, 12 horizontal loads connect tie rods, 13 short covering plane materiel bands.
Accompanying drawing 2 is the plane structure schematic diagram of large tracts of land furred ceiling of the present invention;
Accompanying drawing 3 is a special-shaped roof construction schematic diagram of the present invention.
14 straight loads connect tie rods, 15 terminations folder, and 16 pulling force hold diffusing piece, 17 assemblies, 18 pulling force hold diffusing limit, and 19 tensile elongations limit circle, and 20 tension strengths limit breach, the 21 limit power bar that break, 22 is perpendicular excellent, 23,24 plane materiel pulling blocks, 25 plane materiel extension springs, 26 extension spring seats.
The invention will be further described below in conjunction with embodiment and accompanying drawing.
Embodiment 1
With reference to accompanying drawing, the plane materiel (1) that the thin skin metallic aluminium is made is welded with some in length and breadth in its one side and is the straight reinforcing band (2) of "+" word cross-like and strong band (3) willfully, and making becomes ceiling; Straight on ceiling, strong band (2) willfully, the termination folder (4) that there is connecting hole (5) at two ends is housed (3), in the termination folder (4) hook (6) is housed, on hook (6), load onto tension spring (10), on stalk (7) around the underfloor, respective distance by each termination distribution, load onto holder (8), and it is fixing on the wall with hold-down screw (9), as the hard point of hanging hand-pulled noodles material (1), the other end with all tension springs (10) is connected on the hanging hole (11) of holder (8) again, there is the horizontal load of its connection of dress to connect tie rod (12) on the termination folder (4) of the junction of per two adjacent plane materiels (1), then, tighten up and adjust each tension spring (10) again, make whole ceiling be in the balanced straightened condition that outwards stretches; At last, every plane materiel hands over the place, slit of drawing to mend with short covering plane materiel band (13).
Embodiment 2
With reference to accompanying drawing, install some pulling force additional in the one side of the decoration plane material made from thin aluminum top or the plastic skin of handling through fire prevention, cloth, paper etc. (1) and hold diffusing piece (16), perhaps the plane materiel periphery is made and had at interval uniformly that pulling force holds diffusing piece (16).During furred ceiling, reaching straight reinforcing band (2) willfully, strong band (3) pierces in the assembly (17) and plane materiel pulling block (23) of plane materiel (1), form an integral body, reinforcing band one end is hung in the heart holder (8), behind the other end tension spring of series connection (10), be suspended on the hold-down screw (9) on the wall, tension spring (10) tightened up make reinforcing band straight, and then each the plane materiel extension spring (25) on the plane materiel (1) is suspended on the extension spring seat (26) on the wall, tighten up that each plane materiel extension spring (25) makes it straight on the plane materiel.
Pulling force on plane materiel (1) holds diffusing limit (18) and goes up segmentation the disconnected bar (21) of several limit power and the tensile elongation circle (19) of limiting the quantity of is housed, when tension strength reaches predetermined value, tension strength limits breach (20) and disconnects, and the tensile elongation circle (19) of limiting the quantity of becomes straight line, plane materiel (1) is limited the quantity of stretch.
Can adopt perpendicular rod (22) by horizontal load tie rod (12) when needs hang when drawing special-shaped top or multi-level planar top, straight load tie rod (14), tension spring (10) and holder (8) can be formed the multilayer planar top, and the perpendicular excellent angle of change can be formed special-shaped top.
Claims (7)
1. ceiling method that the decorative coiled material of assembly is arranged is characterized in that: the one side of plane materiel (1) connect in length and breadth some straight, bearing and distributing strengthening belt of horizontal tensile force (2), (3) are made into ceiling; Directly, willfully loading onto the termination folder (4) that there is connecting hole (5) at two ends on the strong band on the ceiling, in connecting hole (5), load onto hook (6), on hook (6), load onto tension spring (10), the other end of tension spring (10) is fixed on the holder (8) of stalk (7), tighten up and adjust each tension spring (10) again, whole ceiling is pulled outwardly is stretched into straightened condition; At last, place, the slit of the handing-over of every plane materiel (1) mends with short covering plane materiel band (13).
2. the structure that the ceiling method of the decorative coiled material that assembly arranged according to claim 1 is made, it is characterized in that: during the small size furred ceiling, plane materiel (1) with the thin skin making, simultaneously add with some cross-shaped straight, bearing and distributing strengthening belt of horizontal tensile force (2), (3) at it, termination folder (4) is arranged at the two ends of each reinforcing band, there is connecting hole (5) at its two ends, be connected with hook (6), be connected by tension spring (10) between the holder (8) on hook (6) and the fixing stalk (7), hanging hole (11) is arranged on the holder (8); Have on the termination folder (4) of per two adjacent plane materiels (1) junction its horizontal load that links to each other is connected tie rod (12), there is short covering plane materiel band (13) in the slit of junction.
3. the structure that the ceiling method of the decorative coiled material that assembly arranged according to claim 1 is made, it is characterized in that: during the large tracts of land furred ceiling, connect tie rod (14) with some cross-shaped straight loads and be connected the some little frames of tie rod (12) composition with horizontal load, hang the plane materiel (1) that draws a thin skin to make in each little frame, the two ends that connect tie rod (12), (14) at each load are connected with termination folder (15), one end is connected with stalk (7), and the other end links to each other with stalk (7) by tension spring (10); There is short covering plane materiel band (13) in the slit of per two adjacent plane materiels (1) junction.
4. ceiling method and the structure that the decorative coiled material of assembly is arranged according to claim 1, it is characterized in that: in the one side of plane materiel (1) some pulling force are installed and hold diffusing piece (16) and assembly (17), also plane materiel (1) can be made pulling force and hold diffusing limit (18).
5. the structure that the ceiling method of the decorative coiled material that assembly arranged according to claim 1 is made, it is characterized in that: hold at pulling force tensile elongation qualification circle (19) and tension strength qualification breach (20) are housed on the diffusing piece (16), pulling force holds diffusing limit (18) and goes up the disconnected bar (21) of uniform limited power.
6. according to claim 1,2,3 described ceiling method and the structures that the decorative coiled material of assembly is arranged, it is characterized in that: plane materiel (1) can be thin metal aluminum sheet, also can be plastic skin, cloth, the paper of handling through fire prevention.
7. ceiling method and the structure that the decorative coiled material of assembly is arranged according to claim 1 is characterized in that: the assembly on the plane materiel (17) can add attached, also can be done by plane materiel self.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96101742 CN1136630A (en) | 1996-02-01 | 1996-02-01 | Ceiling method by using decorative coiled material with assembled parts and structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96101742 CN1136630A (en) | 1996-02-01 | 1996-02-01 | Ceiling method by using decorative coiled material with assembled parts and structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1136630A true CN1136630A (en) | 1996-11-27 |
Family
ID=5117242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96101742 Pending CN1136630A (en) | 1996-02-01 | 1996-02-01 | Ceiling method by using decorative coiled material with assembled parts and structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1136630A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102936935A (en) * | 2012-12-08 | 2013-02-20 | 姬志刚 | Invisible supporting structure of gypsum board ceiling |
-
1996
- 1996-02-01 CN CN 96101742 patent/CN1136630A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102936935A (en) * | 2012-12-08 | 2013-02-20 | 姬志刚 | Invisible supporting structure of gypsum board ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS62228573A (en) | Building structure | |
CN110747997A (en) | Construction method of large-curvature cable membrane structure with cable membrane synergistic effect | |
CN211421803U (en) | Ride non-standard hanging flower basket support of wall formula and hang mechanism | |
CN110725410A (en) | Cable membrane structure with large curvature and synergistic effect of cable membrane | |
CN1136630A (en) | Ceiling method by using decorative coiled material with assembled parts and structure | |
CN212078415U (en) | Deformable card formula keel and curved surface furred ceiling mounting structure | |
CN1121132A (en) | Construction method and structure of hung and drawn ceiling with ribbed sheets as surface material | |
CN212670973U (en) | Building light steel grid suspended ceiling | |
CN213174189U (en) | Building structure house capable of being quickly disassembled and assembled | |
CN113756513A (en) | Fabricated ceiling veneer and mounting method | |
CN210288852U (en) | Hanging piece vertical curtain ceiling structure | |
CN209603344U (en) | A kind of building glass curtain wall installing structure | |
CN216713779U (en) | Hanging basket with supporting system installed without falling to ground | |
CN218508878U (en) | Clear water concrete link plate system of decorating | |
CN211040806U (en) | L ED street lamp for municipal works | |
CN217683569U (en) | Light-duty piece prevents weighing down support | |
CN218264798U (en) | A aluminium honeycomb panel fast-assembling device for wall fast-assembling | |
CN218933537U (en) | Curtain wall combined by multi-specification unit curtain walls | |
CN216075884U (en) | Assembled furred ceiling veneer | |
CN220705109U (en) | Horizontal net pulling construction platform | |
CN218406638U (en) | Protective net | |
CN213664353U (en) | Camping rack | |
CN214498111U (en) | Large-scale decoration frame for architectural design roof | |
CN207776221U (en) | Plug-in cylinder hanging piece suspended ceiling | |
CN210685126U (en) | Exhibition hall cloth exhibition position furred ceiling suspended structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C01 | Deemed withdrawal of patent application (patent law 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |