Prior art keywords
data
value
time
fields
relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110943565.3A
Other languages
Chinese (zh)
Other versions
CN113657626A (en
Inventor
邱泽坚
胡润锋
陈凤超
黄达区
张冠洲
韩湛元
张锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202110943565.3A priority Critical patent/CN113657626B/en
Publication of CN113657626A publication Critical patent/CN113657626A/en
Application granted granted Critical
Publication of CN113657626B publication Critical patent/CN113657626B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a distribution network power outage overhaul data checking method, a device, electronic equipment and a storage medium, wherein the method comprises the steps of obtaining a distribution network power outage overhaul data table, wherein each piece of data of the data table comprises a plurality of fields with the numerical value type of time; judging the numerical value size relation of associated fields, wherein the associated fields are fields with time sequence relation; if the size relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the association field has a problem; and recording the piece of data and the corresponding problem in a new table. The distribution network power failure overhaul data checking method, the distribution network power failure overhaul data checking device, the electronic equipment and the storage medium can automatically acquire data, judge whether the data has problems in batches and record the problem data in batches, and remarkably improve the data checking efficiency and solve the misjudgment problem caused by manual checking.

Description

Distribution network power outage overhaul data checking method and device, electronic equipment and storage medium
Technical Field
The invention belongs to the technical field of distribution networks, and particularly relates to a distribution network power outage overhaul data checking method, a distribution network power outage overhaul data checking device, electronic equipment and a storage medium.
Background
When analyzing and counting the power failure overhaul data, the distribution network dispatcher needs to screen out the data with problems and process and count the data with problems. Through the OMS ERP (enterprise management information system) of the distribution network, a corresponding data table can be derived according to the numerical value of a field (such as overhaul category). When checking data, the data in the data table needs to be manually judged one by one to judge whether the problem of non-standardization exists. The data with the nonstandard problem needs to record the data in the newly built worksheet as the problem record, and if a piece of data has a plurality of nonstandard problems, a plurality of problem records need to be recorded in the newly built worksheet. Because the data volume is huge, the data is judged by one in a manual mode, so that the data checking efficiency is low, and the problem of misjudgment is easy to occur.
Disclosure of Invention
The invention aims to provide a distribution network power failure overhaul data checking method, a distribution network power failure overhaul data checking device, electronic equipment and a storage medium, so that data checking efficiency is improved, and the problem of misjudgment caused by manual checking is solved.
To achieve the purpose, the invention adopts the following technical scheme:
in a first aspect, a method for checking power outage overhaul data of a distribution network is provided, including:
acquiring a data table for power outage overhaul of a distribution network, wherein each piece of data of the data table comprises a plurality of fields with the numerical value type of time;
Judging the numerical value size relation of associated fields, wherein the associated fields are fields with time sequence relation; if the size relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the association field has a problem;
and recording the piece of data and the corresponding problem in a new table.
Optionally, the fields of the plurality of value types being time of day include: the power outage start time, the approval work end time, the power outage operation start time, the power outage operation end time, the power restoration operation start time, the line permission time, the line termination time, the post-delay work end time, the station permission time and the station termination time are approved.
Optionally, the judging and associating the numerical value magnitude relation of the fields, wherein the associating fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the approved blackout start time is greater than the value of the blackout operation start time, the piece of data has an early blackout problem.
Optionally, the judging and associating the numerical value magnitude relation of the fields, wherein the associating fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the power outage operation ending time is larger than the value of the line permission time, or if the value of the power outage operation ending time is larger than the value of the station permission time, the data has the problem of early permission.
Optionally, the judging and associating the numerical value magnitude relation of the fields, wherein the associating fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the complex power operation starting time is smaller than the value of the line ending time or the value of the complex power operation starting time is smaller than the value of the station ending time, the data has the problem of early power transmission.
Optionally, the judging and associating the numerical value magnitude relation of the fields, wherein the associating fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
if the value of the line permitted time is greater than or equal to the value of the line termination time, or the value of the station permitted time is greater than or equal to the value of the station termination time, the data has the problem of early termination.
Optionally, the judging and associating the numerical value magnitude relation of the fields, wherein the associating fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the working ending time after the delay is not null, the value of the working ending time after the delay is smaller than the value of the line ending time or the value of the working ending time after the delay is smaller than the value of the station ending time, and then the delay error problem exists in the data.
In a second aspect, a power outage overhaul data checking device for a distribution network is provided, including:
The acquisition module is used for acquiring a data table for power outage overhaul of the distribution network, wherein each piece of data of the data table comprises a plurality of fields with the numerical value type of time;
The judging module is used for judging the numerical value magnitude relation of the associated fields, wherein the associated fields are fields with time sequence relation; if the size relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the association field has a problem;
and the recording module is used for recording the data and the corresponding problems in a new table.
In a third aspect, an electronic device is provided, comprising:
A memory for storing a computer program;
and the processor is used for realizing the steps of the distribution network power failure overhaul data checking method when executing the computer program.
In a fourth aspect, a computer readable storage medium is provided, on which a computer program is stored, which when executed by a processor implements the steps of a distribution network outage overhaul data checking method as described above.
Compared with the prior art, the embodiment of the invention has the following beneficial effects:
According to the method, the device, the electronic equipment and the storage medium for checking the distribution network power outage overhaul data, the distribution network power outage overhaul data table can be automatically acquired, and then whether the data has problems or not is judged according to the numerical value size relation (the relation of the actually filled data table reaction) of the associated fields and the time sequence relation (the relation existing in logic) of the associated fields, and the data with the problems and the problems corresponding to the data are recorded in the new table. The method, the device, the electronic equipment and the storage medium for checking the distribution network power outage overhaul data can automatically acquire the data, judge whether the data has problems in batches and record the problem data in batches, and remarkably improve the data checking efficiency and solve the misjudgment problem caused by manual checking.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
The structures, proportions, sizes, etc. shown in the present specification are shown only for the purposes of illustration and description, and are not intended to limit the scope of the invention, which is defined by the claims, so that any structural modifications, changes in proportions, or adjustments of sizes, which do not affect the efficacy or the achievement of the present invention, should fall within the scope of the invention.
Fig. 1 is a flowchart of a method for checking power outage overhaul data of a distribution network according to an embodiment of the present invention;
fig. 2 is a block diagram of a power outage overhaul data checking device for a distribution network according to an embodiment of the present invention.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is apparent that the embodiments described below are only some embodiments of the present invention, not all embodiments of the present invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Please refer to fig. 1.
The embodiment provides a distribution network power failure overhaul data checking method, which can automatically acquire data, judge whether the data has problems in batches and record the problem data in batches, remarkably improve the data checking efficiency and solve the misjudgment problem caused by manual checking, and specifically comprises the following steps:
s101, acquiring a data table for power outage overhaul of a distribution network, wherein each piece of data of the data table comprises a plurality of fields with the numerical value type of time;
S102, judging the numerical value size relation of associated fields, wherein the associated fields are fields with time sequence relation; if the magnitude relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the associated field has a problem;
S103, recording the piece of data and the corresponding problem in a new table.
In step S101, a data table may be derived from the distribution network OMS ERP (enterprise management information system). The data table is generally composed of one piece of data. And a piece of data typically has a plurality of fields. The fields are classified according to their numeric type, and may have a time of day field, a numeric field, a text field, and so forth.
For example, the time field may have a field for approving a blackout start time, approving a work end time, a blackout operation start time, a blackout operation end time, a double-power operation start time, a line permission time, a line termination time, a post-delay work end time, a station permission time, and a station termination time.
For example, the text field may have an overhaul category field, with numerical options for the overhaul category: scheduled maintenance, fault maintenance, emergency maintenance, and other maintenance.
Therefore, when the data table is exported, the data to be analyzed and checked may be selected by screening according to the inspection type.
For any piece of data in the exported data table, whether the values of the fields are in compliance or not can be judged through time sequence, so that whether the piece of data has a problem or not is judged. Specifically, a time field has a time sequence relationship among some fields, and the relationship accords with logic and natural rules. However, since the data contents of the derived data table are imported during the power outage maintenance, there is a possibility that the logic is not satisfied.
Specifically, in step S102, the magnitude relation of the values of the associated fields is determined, where the associated fields are fields having a time sequence relation with each other; if the magnitude relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the associated field has a problem.
As a specific application scenario of step 102, if the value of the approved power outage start time is greater than the value of the power outage operation start time, the corresponding piece of data has an early power outage problem.
As a specific application scenario of step 102, if the value of the end time of the outage operation is greater than the value of the line allowable time (if the value of the line allowable time is empty, the judgment is ignored), or if the value of the end time of the outage operation is greater than the value of the station allowable time (if the value of the station allowable time is empty, the judgment is ignored), the corresponding piece of data has an early permission problem.
As a specific application scenario of step 102, if the value of the complex power operation start time is smaller than the value of the line termination time (if the value of the line termination time is null, the judgment is ignored), or if the value of the complex power operation start time is smaller than the value of the station termination time (if the value of the station termination time is null, the judgment is ignored), the corresponding piece of data has the early power transmission problem.
As a specific application scenario of step 102, if the value of the line allowable time is greater than or equal to the value of the line termination time (if the value of the line termination time is null, the judgment is ignored), or if the value of the station allowable time is greater than or equal to the value of the station termination time (if the value of the station termination time is null, the judgment is ignored), the corresponding piece of data has an early termination problem.
As a specific application scenario of step 102, if the value of the working end time after the delay is not null, the value of the working end time after the delay is smaller than the value of the line end time (if the value of the line end time is null, the judgment is omitted), or the value of the working end time after the delay is smaller than the value of the station end time (if the value of the station end time is null, the judgment is omitted), the corresponding piece of data has a delay error problem.
If the value of the working end time after the delay is null, the value of the approval working end time is smaller than the value of the line end time or the value of the approval working end time is smaller than the value of the station end time, and the corresponding piece of data does not have the delay.
In step S103, the piece of data having the problem and the corresponding problem thereof are recorded in a new table (new data table).
The method for checking the power outage overhaul data of the distribution network provided by the embodiment uses the RPA technology to replace the traditional manual mode, and performs program design according to manual working steps and operation scenes so as to achieve the same working effect as the manual mode, and uses the program to replace the manual mode to work, so that the working efficiency is improved. The accuracy of the data can be improved in a program mode, the accuracy is embodied in that the program judges the condition of each piece of data on the data table, so that the data to be recorded is generated, and the inaccuracy of the data caused by partial omission due to a manual screening mode is avoided.
Please refer to fig. 2.
In another embodiment of the present application, a power outage overhaul data checking device for a distribution network is provided, which may be used to implement the steps of the power outage overhaul data checking method for a distribution network provided in the foregoing embodiment, and specifically includes:
The acquisition module 101 is configured to acquire a data table for power outage maintenance of the distribution network, where each piece of data of the data table includes a plurality of fields with a value type of time;
The judging module 102 is configured to judge a value magnitude relation of associated fields, where the associated fields are fields having a time sequence relation with each other; if the magnitude relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the associated field has a problem;
a recording module 103, configured to record the piece of data and the corresponding problem in a new table.
Further, the present embodiment also provides an electronic device, including:
A memory for storing a computer program;
and the processor is used for realizing the steps of the distribution network power failure overhaul data checking method when executing the computer program.
Further, the embodiment also provides a computer readable storage medium, and a computer program is stored on the computer readable storage medium, and when the computer program is executed by a processor, the steps of the distribution network power outage overhaul data checking method are realized.
Since the specific steps and principles of the method for checking the outage overhaul data of the distribution network have been specifically described in the previous embodiment, the details are not repeated here.
According to the distribution network power outage overhaul data checking device, the electronic equipment and the storage medium, the distribution network power outage overhaul data table can be automatically obtained, and then whether the data has problems or not is judged according to the numerical value size relation (the relation of the actually filled data table reaction) of the associated fields and the time sequence relation (the relation existing logically) of the associated fields, and the data with the problems and the problems corresponding to the data are recorded in the new table. The data checking process can remarkably improve the data checking efficiency and solve the misjudgment problem caused by manual checking.
The above embodiments are only for illustrating the technical solution of the present invention, and not for limiting the same; although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (4)

1. The power failure overhaul data checking method for the distribution network is characterized by comprising the following steps of:
acquiring a data table for power outage overhaul of a distribution network, wherein each piece of data of the data table comprises a plurality of fields with the numerical value type of time;
Judging the numerical value size relation of associated fields, wherein the associated fields are fields with time sequence relation; if the size relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the association field has a problem;
Recording the data and the corresponding problems in a new table;
The fields of the plurality of value types being time of day include: approving the power outage starting time, approving the work ending time, starting the power outage operation, ending the power outage operation, starting the power restoration operation, allowing the line to be in time, ending the line, ending the work after delay, allowing the station to be in time and ending the station;
The value size relation of the associated fields is judged, and the associated fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the approved power outage starting time is larger than the value of the power outage operation starting time, the piece of data has the problem of early power outage;
The value size relation of the associated fields is judged, and the associated fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the power outage operation ending time is larger than the value of the line permission time, or if the value of the power outage operation ending time is larger than the value of the station permission time, the data has an early permission problem;
The value size relation of the associated fields is judged, and the associated fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
if the value of the complex power operation starting time is smaller than the value of the line ending time or the value of the complex power operation starting time is smaller than the value of the station ending time, the data has the problem of early power transmission;
The value size relation of the associated fields is judged, and the associated fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
if the value of the line permission time is greater than or equal to the value of the line termination time or the value of the station permission time is greater than or equal to the value of the station termination time, the data has the early termination problem;
The value size relation of the associated fields is judged, and the associated fields are fields with time sequence relation; if the size relationship is opposite to the time sequence relationship, the piece of data corresponding to the numerical value of the association field has a problem, including:
If the value of the working ending time after the delay is not null, the value of the working ending time after the delay is smaller than the value of the line ending time or the value of the working ending time after the delay is smaller than the value of the station ending time, and then the delay error problem exists in the data.
2. The distribution network power outage overhaul data checking device is characterized by being used for realizing the distribution network power outage overhaul data checking method according to claim 1, and comprises the following steps:
The acquisition module is used for acquiring a data table for power outage overhaul of the distribution network, wherein each piece of data of the data table comprises a plurality of fields with the numerical value type of time;
The judging module is used for judging the numerical value magnitude relation of the associated fields, wherein the associated fields are fields with time sequence relation; if the size relation is opposite to the time sequence relation, the piece of data corresponding to the numerical value of the association field has a problem;
and the recording module is used for recording the data and the corresponding problems in a new table.
3. An electronic device, comprising:
A memory for storing a computer program;
a processor, configured to implement the steps of the distribution network outage overhaul data checking method according to claim 1 when executing the computer program.
4. The computer-readable storage medium, wherein the computer-readable storage medium has a computer program stored thereon, the computer program when executed by a processor implementing the steps of the distribution network outage overhaul data checking method of claim.
CN202110943565.3A 2021-08-17 2021-08-17 Distribution network power outage overhaul data checking method and device, electronic equipment and storage medium Active CN113657626B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110943565.3A CN113657626B (en) 2021-08-17 2021-08-17 Distribution network power outage overhaul data checking method and device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110943565.3A CN113657626B (en) 2021-08-17 2021-08-17 Distribution network power outage overhaul data checking method and device, electronic equipment and storage medium

Publications (2)

Publication Number Publication Date
CN113657626A CN113657626A (en) 2021-11-16
CN113657626B true CN113657626B (en) 2024-06-25

Family

ID=78480059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110943565.3A Active CN113657626B (en) 2021-08-17 2021-08-17 Distribution network power outage overhaul data checking method and device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN113657626B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105678646A (en) * 2016-03-24 2016-06-15 国网辽宁省电力有限公司电力科学研究院 Production management system distribution network equipment machine account intelligent inspection system
CN111221956A (en) * 2019-12-26 2020-06-02 国网宁夏电力有限公司中卫供电公司 PMS distribution network equipment data quality checking method for power management system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110135601A (en) * 2019-05-17 2019-08-16 广东电网有限责任公司 A kind of system and method that distribution scheduling interruption maintenance is permitted indirectly
CN111861156A (en) * 2020-07-03 2020-10-30 广东电网有限责任公司 Power distribution network scheduling operation safety management and control system and method
CN113077144B (en) * 2021-03-31 2022-12-23 广东电网有限责任公司佛山供电局 Intelligent statistical method and device for number of users affected by distribution network fault
CN112883051A (en) * 2021-04-12 2021-06-01 广东电网有限责任公司佛山供电局 Intelligent extraction method and system for field data of distribution network power conversion field
CN113205431A (en) * 2021-07-07 2021-08-03 广东电网有限责任公司佛山供电局 Multi-source account data abnormity monitoring system and method for distribution network line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105678646A (en) * 2016-03-24 2016-06-15 国网辽宁省电力有限公司电力科学研究院 Production management system distribution network equipment machine account intelligent inspection system
CN111221956A (en) * 2019-12-26 2020-06-02 国网宁夏电力有限公司中卫供电公司 PMS distribution network equipment data quality checking method for power management system

Also Published As

Publication number Publication date
CN113657626A (en) 2021-11-16

Similar Documents

Publication Publication Date Title
CN107908672B (en) Application report realization method, device and storage medium based on Hadoop platform
CN113595761B (en) Micro-service component optimization method and medium of power system information communication integrated scheduling platform
US10354343B2 (en) Automated process control hardware engineering using schema-represented requirements
CN108304522A (en) Comparison method, device and the terminal device of difference between a kind of database
CN112162980A (en) Data quality control method and system, storage medium and electronic equipment
CN110837496A (en) Data quality management method and system based on dynamic sql
CN103761595A (en) Business process monitoring method and apparatus in ERP system
CN111984495A (en) Big data monitoring method and device and storage medium
CN113656174A (en) Resource allocation method, system, computer device and storage medium
CN115146000A (en) Database data synchronization method and device, electronic equipment and storage medium
CN113657626B (en) Distribution network power outage overhaul data checking method and device, electronic equipment and storage medium
CN113641567A (en) Database inspection method and device, electronic equipment and storage medium
CN111277425B (en) Centralized data transmission management device
CN115016902B (en) Industrial flow digital management system and method
CN111258907A (en) Automobile instrument testing method, device and equipment
CN115034927A (en) Data processing method and device, electronic equipment and storage medium
CN108983714B (en) Method and device for monitoring state of unit of million-kilowatt nuclear power station and terminal equipment
CN113376564A (en) Smart electric meter metering correction method and device based on data analysis and terminal
CN113220757A (en) Real-time warehouse automatic ETL method, system, equipment and computer storage medium
CN111401022A (en) Management standard template rapid generation system and method
CN112448840A (en) Communication data quality monitoring method, device, server and storage medium
CN112101847A (en) Intelligent management method and device for nuclear power station warehouse, computer equipment and storage medium
CN114334194B (en) High-temperature gas cooled reactor helium gas leakage early warning method, device, equipment and storage medium
CN111061632B (en) Automated test method and test system for report data
CN110399349B (en) Method and device for converting MIB (management information base) matching documents

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant