Prior art keywords
module
planning
target
node
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111195107.2A
Other languages
Chinese (zh)
Inventor
杨培桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chenfeng Planning Shenzhen Co ltd
Original Assignee
Chenfeng Planning Shenzhen Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chenfeng Planning Shenzhen Co ltd filed Critical Chenfeng Planning Shenzhen Co ltd
Priority to CN202111195107.2A priority Critical patent/CN113642940A/en
Publication of CN113642940A publication Critical patent/CN113642940A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling

Abstract

The invention relates to the technical field of enterprise planning, in particular to an enterprise planning intelligent management platform based on tracking survey, which comprises: the control terminal is a main control terminal of the planned intelligent management platform, and all the receiving and sending instructions are sent by the main control terminal; the planning target receiving module is used for receiving a planning target instruction sent by the control terminal and extracting a planning target acquisition purpose; the planning target analysis module is used for analyzing and planning the node target task; the target task allocation module is used for allocating the node target tasks analyzed in the planning target analysis module; the emergency plan generating module is used for generating an emergency candidate plan for the planned target task and providing operation guarantee for the planned target task; the invention provides a planned emergency plan in the planning process, avoids the situation that the overall planning cannot be promoted due to delayed dragging of a certain link in the planning process, and completes the planning target as far as possible in advance through allocation.

Description

Enterprise planning intelligent management platform based on tracking survey
Technical Field
The invention relates to the technical field of enterprise planning, in particular to an enterprise planning intelligent management platform based on tracking survey.
Background
The business plan is relative to the market plan, strictly speaking it is subordinate to the market plan, and they are interrelated and complementary. The system and the method belong to the overall marketing thought and mode of the enterprise, and the marketing plan and the enterprise plan made on the premise are the advertising behaviors with integrity and continuity, and the enterprise plan can keep stable marketing amount of the enterprise only by following the idea of the overall marketing plan.
However, in the prior art, enterprise planning is mostly processed in a manual planning mode, which not only consumes a lot of labor, but also causes understanding deviation in the transmission of upper and lower level instructions, and cannot be well controlled, so that benefits brought by planning, tracking and surveying are not in direct proportion to actual payment.
Disclosure of Invention
Solves the technical problem
Aiming at the defects in the prior art, the invention provides an enterprise planning intelligent management platform based on tracking investigation, and solves the problems that most enterprise plans in the prior art are processed in a manual planning mode, the mode consumes a large amount of labor force, and meanwhile, the upper-level and lower-level instruction transmission is easy to have understanding deviation and cannot be well controlled, so that the benefit brought by planning and tracking investigation is not in direct proportion to the actual payment.
Technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme:
an enterprise planning intelligent management platform based on tracking survey comprises:
the control terminal is a main control terminal of the planned intelligent management platform, and all the receiving and sending instructions are sent by the main control terminal;
the planning target receiving module is used for receiving a planning target instruction sent by the control terminal and extracting a planning target acquisition purpose;
the planning target analysis module is used for analyzing and planning the node target task;
the target task allocation module is used for allocating the node target tasks analyzed in the planning target analysis module;
the emergency plan generating module is used for generating an emergency candidate plan for the planned target task and providing operation guarantee for the planned target task;
the monitoring module is used for monitoring the completion progress of the node target task;
the reporting module is used for reporting the node task completion progress, the total planned target task progress and the planned target completion result;
the triggering unit is used for triggering the system program to operate again, and triggering the target task allocation module to execute again by taking the report module evaluation result as the triggering basis;
and the modification module is used for modifying the emergency plan generation module in real time and adaptively modifying the emergency plan generation module by taking the data acquisition result as a modification condition.
Furthermore, the planning target analysis module comprises an attribute judgment module, and the attribute judgment module is used for judging the difficulty degree of the node target task and providing the node target task for the target task distribution module to refer to so as to reasonably distribute the node planning target task.
Still further, the monitoring module includes:
the monitoring configuration unit is used for configuring and planning the task progress monitoring distribution;
and the planning module is used for planning the mobilization of the monitoring distribution, and the mobilization opinion is provided by the modification module after modification for planning the node task distribution condition.
Further, the trigger unit trigger condition is set as "node planning target task is not completed", "node planning target completion is advanced".
Furthermore, the reporting module comprises a progress acquisition module, the progress acquisition module is used for actively acquiring the node planning target completion progress, the node planning target completion condition is actively reported to the reporting module, and the reporting module compares the node planning target completion condition with the progress acquisition module by taking active reporting as a reference.
Furthermore, the progress acquisition module generates acquired data information through a wireless network and shares the acquired data information to the modification module, and the modification module receives the acquired data information sent by the self-reporting module and immediately triggers the operation.
Furthermore, the monitoring configuration unit and the planning module are controlled by the same monitoring module, and respectively include:
the monitoring state updating module is used for updating the monitoring state and ensuring no delay in the output of the monitoring state data;
the progress analysis module is used for analyzing and planning the progress analysis of the task target of the node and providing a report data acquisition basis for the report module;
the evaluation module is used for evaluating the progress analysis content of the node task target in the progress analysis module, reducing the error of outgoing data and reducing the doping amount of useless data;
the progress allocation module is used for allocating the progress of the strategy node task target, homogenizing the task target progress adaptation synchronization and avoiding the generation of the laggard strategy node task target;
and the assistant intervention module is used for rearranging the monitoring distribution and planning the task allocation of the nodes according to the system trigger operation.
Furthermore, the progress allocation module and the assistance intervention module complete information full coverage sharing through a wireless network, and the progress allocation module operates in linkage to assist the intervention module to enter a waiting state.
Further, the emergency plan triggering probability is as follows:
{(a1/b)/(a1-a2)/b}·%=X%
where a1 sets the number for the plan node;
a2 is the plan node completed number;
b is the time for finishing planning the number of the nodes in the corresponding time;
and X is the triggering probability of the emergency plan.
Furthermore, the emergency plan change content generated by the emergency plan generation module is reported to the control terminal to complete interactive awareness.
Advantageous effects
Compared with the known public technology, the technical scheme provided by the invention has the following beneficial effects:
1. the invention provides an online management control platform for enterprise planning, which has good distribution function, clear tracking and surveying targets and certain allocation function, ensures the synchronous proceeding of various planning implementation targets and leads the planning targets to be more smoothly developed and ended through allocation.
2. The invention provides a planned emergency plan in the planning process, avoids the situation that the overall planning cannot be promoted due to delayed dragging of a certain link in the planning process, and completes the planning target as far as possible in advance through allocation.
Drawings
In order to more clearly illustrate the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It is obvious that the drawings in the following description are only some embodiments of the invention, and that for a person skilled in the art, other drawings can be derived from them without inventive effort.
FIG. 1 is a schematic structural diagram of an enterprise planning intelligent management platform based on tracking investigation;
FIG. 2 is a schematic diagram of a monitoring configuration unit according to the present invention;
FIG. 3 is a diagram illustrating an exemplary scenario for planning the operation of the management platform according to the present invention;
FIG. 4 is a diagram illustrating exemplary trigger points for trigger requests of the assisted intervention module according to the present invention;
FIG. 5 is a schematic diagram illustrating an exemplary trigger point triggered by the intervention module;
the reference numerals in the drawings denote: 1. a control terminal; 2. planning a target receiving module; 3. a planning target analysis module; 31. an attribute determination module; 4. a target task allocation module; 5. an emergency plan generating module; 6. a monitoring module; 610. a monitoring configuration unit; 620. a planning module; 7. a reporting module; 71. a progress acquisition module; 8. a trigger unit; 9. a modification module; 611. a monitoring state updating module; 612. a progress analysis module; 613. an evaluation module; 621. a schedule allocation module; 622. an intervention module.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings. It is to be understood that the embodiments described are only a few embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The present invention will be further described with reference to the following examples.
Example 1
The enterprise planning intelligent management platform based on tracking investigation of the embodiment, as shown in fig. 1, includes: the control terminal 1 is a main control end for planning the intelligent management platform, and all the receiving and sending instructions are sent by the main control end;
the planning target receiving module 2 is used for receiving a planning target instruction sent by the control terminal 1 and extracting a planning target acquisition purpose;
the planning target analysis module 3 is used for analyzing and planning the node target task;
the target task allocation module 4 is used for allocating the node target tasks analyzed by the planning target analysis module 3;
the emergency plan generating module 5 is used for generating an emergency candidate plan for the planned target task and providing operation guarantee for the planned target task;
the monitoring module 6 is used for monitoring the completion progress of the node target task;
the reporting module 7 is used for reporting the node task completion progress, the planned target task total progress and the planned target completion result;
the triggering unit 8 is used for triggering the system program to operate again, and triggering the target task distribution module 4 to execute again by taking the evaluation result of the reporting module 7 as the triggering basis;
and the modification module 9 is used for modifying the emergency plan generation module 5 in real time and carrying out adaptive modification on the emergency plan generation module 5 by taking the data acquisition result as a modification condition.
As shown in fig. 1, the planned target analysis module 3 includes an attribute determination module 31, where the attribute determination module 31 is configured to determine the difficulty level of a node target task, and provide the node target task for the target task allocation module 4 to refer to, and reasonably allocate the node planned target task.
When the embodiment is used, when the control terminal 1 sends a target instruction, the planned target receiving module 2 is responsible for receiving and sending the target instruction to the planned target analysis module 3, the planned target analysis module 3 obtains a judgment content after the auxiliary judgment according to the attribute judgment module 31, distributes the planned target node through the target task distribution module 4, and meanwhile, the emergency plan generation module 5 synchronously and correspondingly generates an emergency plan;
the planning node synchronously monitors the node tasks in real time by the monitoring module 6 in the process of planning the node, after the planning total task is completed, the obtained data is reported by the reporting module 7, in the node report, if the node task is out of order in progress, the triggering unit 8 triggers the target task distribution module 4 to operate again, and the modification module 9 is started together with the triggering unit 8 to modify the emergency plan generation module 5.
Example 2
As shown in fig. 2, the monitoring module 6 includes:
a monitoring configuration unit 610, configured to configure a planned task progress monitoring distribution;
and the planning module 620 is configured to plan mobilization of the monitoring distribution, where the mobilization opinion is provided by the modification module 9 after modification to plan the node task allocation situation.
As shown in fig. 2, the monitoring configuration unit 610 and the planning module 620 are controlled by the monitoring module 6, and respectively include:
a monitoring state updating module 611, configured to update the monitoring state and ensure that there is no delay in outputting the monitoring state data;
the progress analysis module 612 is used for analyzing and planning the progress analysis of the task target of the node and providing a report data acquisition basis for the report module 7;
the evaluation module 613 is used for evaluating the progress analysis content of the node task target planned in the progress analysis module 612, reducing the error of outgoing data and reducing the doping amount of useless data;
the progress allocation module 621 is used for allocating progress of the planned node task target, and evenly adapting and synchronizing the progress of the task target to avoid generating a backward planned node task target;
an assistance intervention module 622, operating in accordance with system triggers, is used to rearrange the monitoring distribution and plan node task deployment.
As shown in fig. 2, the scheduling module 621 and the assisting intervention module 622 complete information full coverage sharing via the wireless network, and the scheduling module 621 operates to link the assisting intervention module 622 to enter a waiting state.
In the operation process of this embodiment, the monitoring configuration unit 610 and the planning module 620 operate in a coordinated manner, and configuration is completed through the monitoring state updating module 611, the progress analysis module 612 and the progress analysis module 612 in the monitoring configuration unit 610, so that stability of task feedback data of the planning node in the monitoring process is maintained;
the schedule allocating module 621 and the assisting intervention module 622 in the planning module 620 serve as active modules for coordination configuration, so as to provide remedial braking for the enterprise planning management platform and coordinate tasks of each planning node to cooperate with each other.
Example 3
As shown in fig. 4 and 5, the trigger unit 8 sets the trigger conditions to "node planning target task is not completed", "node planning target completion advanced".
This configuration is used as an active trigger basis for the assisted intervention module 622 to effectively coordinate and plan the compatibility of the node tasks.
As shown in fig. 1, the reporting module 7 includes a progress acquisition module 71, and the progress acquisition module 71 is configured to actively acquire a node plan target completion progress, where the node plan target completion condition is actively reported to the reporting module 7, and the reporting module 7 compares the node plan target completion condition with the progress acquisition module 71 by taking active reporting as a reference.
Through the arrangement of the progress acquisition module 71, an effective comparison basis is provided for the reporting module 7, which is helpful for improving the accuracy of the reported data of the reporting module 7.
As shown in fig. 1, the progress acquisition module 71 generates the acquired data information through the wireless network and shares the acquired data information to the modification module 9, and the modification module 9 receives the acquired data information sent by the report module 7 and immediately triggers the operation.
By setting the condition of linkage processing between the progress acquisition module 71 and the modification module 9, timely modification data is provided for the emergency plan generation module 5 by the modification module 9, and the real-time state matching of the planned target sent by the emergency pre-sensing pre-control terminal 1 generated in the emergency plan generation module 5 is ensured.
As shown in fig. 1, the emergency plan triggering probability is as follows:
{(a1/b)/(a1-a2)/b}·%=X%
where a1 sets the number for the plan node;
a2 is the plan node completed number;
b is the time for finishing planning the number of the nodes in the corresponding time;
and X is the triggering probability of the emergency plan.
As shown in fig. 1, the emergency plan change content generated by the emergency plan generation module 5 is reported to the control terminal 1 to complete interactive awareness.
Through the arrangement, the information interoperability of the platform system can be effectively improved, so that the control terminal (1) is assisted to make correct judgment and send out a latest planning instruction.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the corresponding technical solutions.

Claims (10)

1. Enterprise planning intelligent management platform based on tracking survey, which is characterized by comprising:
the control terminal (1) is a main control end for planning the intelligent management platform, and all the receiving and sending instructions are sent by the main control end;
the planning target receiving module (2) is used for receiving a planning target instruction sent by the control terminal (1) and extracting a planning target acquisition purpose;
the planning target analysis module (3) is used for analyzing and planning the node target task;
the target task allocation module (4) is used for allocating the node target tasks analyzed by the planning target analysis module (3);
the emergency plan generating module (5) is used for generating an emergency candidate plan for the planned target task and providing operation guarantee for the planned target task;
the monitoring module (6) is used for monitoring the completion progress of the node target task;
the reporting module (7) is used for reporting the node task completion progress, the planned target task total progress and the planned target completion result;
the triggering unit (8) is used for triggering the system program to operate again, and triggering the target task distribution module (4) to execute again by taking the evaluation result of the reporting module (7) as the triggering basis;
and the modification module (9) is used for modifying the emergency plan generation module (5) in real time and carrying out adaptive modification on the emergency plan generation module (5) by taking the data acquisition result as a modification condition.
2. The enterprise planning intelligent management platform based on tracking investigation according to claim 1, wherein the planning target analysis module (3) comprises an attribute determination module (31), and the attribute determination module (31) is configured to determine difficulty of node target tasks, and provide the difficulty for the target task allocation module (4) to refer to and reasonably allocate the node planning target tasks.
3. An enterprise curation intelligence management platform based on follow-up investigations according to claim 1, characterised in that said monitoring module (6) comprises:
the monitoring configuration unit (610) is used for configuring planning task progress monitoring distribution;
and the planning module (620) is used for planning the mobilization of the monitoring distribution, and the mobilization opinion is provided by the modification module (9) after modification for planning the node task distribution condition.
4. The enterprise planning intelligence management platform based on follow-up survey according to claim 1, wherein the trigger unit (8) triggers conditions that node planning target task is not completed and node planning target completion is advanced.
5. The enterprise planning intelligent management platform based on tracking survey according to claim 1, wherein the reporting module (7) comprises a progress acquisition module (71), the progress acquisition module (71) is used for actively acquiring a node planning target completion progress, the node planning target completion condition is actively reported to the reporting module (7), and the reporting module (7) compares the node planning target completion condition with the progress acquisition module (71) by taking active reporting of the node planning target completion condition as a reference.
6. The enterprise planning intelligent management platform based on tracking investigation of claim 5, wherein the progress acquisition module (71) generates the acquired data information to be shared to the modification module (9) through a wireless network, and the modification module (9) triggers operation immediately after receiving the acquired data information sent by the reporting module (7).
7. An enterprise planning intelligent management platform based on follow-up survey according to claim 3, wherein the monitoring configuration unit (610) and the planning module (620) are controlled by the same-genus monitoring module (6), and respectively comprise:
the monitoring state updating module (611) is used for updating the monitoring state and ensuring no delay in the output of the monitoring state data;
the progress analysis module (612) is used for analyzing and planning the progress analysis of the task target of the node and providing a report data acquisition basis for the report module (7);
the evaluation module (613) is used for evaluating the progress analysis content of the node task target planned in the progress analysis module (612), reducing the error of outgoing data and reducing the doping amount of useless data;
the progress allocation module (621) is used for allocating the progress of the strategy node task target, and evenly adapting and synchronizing the progress of the task target to avoid generating the laggard strategy node task target;
and the assistant intervention module (622) is operated according to system trigger and is used for rearranging the monitoring distribution and planning the task allocation of the nodes.
8. The intelligent management platform for enterprise planning based on follow-up survey according to claim 7, wherein the scheduling module (621) and the assisting intervention module (622) complete information full-coverage sharing via a wireless network, and the scheduling module (621) operates to link the assisting intervention module (622) to enter a waiting state.
9. The track survey based enterprise curation intelligence management platform of claim 1, wherein the emergency plan trigger probabilities are as follows:
{(a1/b)/(a1-a2)/b}·%=X%
where a1 sets the number for the plan node;
a2 is the plan node completed number;
b is the time for finishing planning the number of the nodes in the corresponding time;
and X is the triggering probability of the emergency plan.
10. The enterprise planning intelligent management platform based on follow-up survey according to claim 1, wherein the emergency plan change content generated by the emergency plan generation module (5) is reported to the control terminal (1) to complete interactive awareness.
CN202111195107.2A 2021-10-14 2021-10-14 Enterprise planning intelligent management platform based on tracking survey Pending CN113642940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111195107.2A CN113642940A (en) 2021-10-14 2021-10-14 Enterprise planning intelligent management platform based on tracking survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111195107.2A CN113642940A (en) 2021-10-14 2021-10-14 Enterprise planning intelligent management platform based on tracking survey

Publications (1)

Publication Number Publication Date
CN113642940A true CN113642940A (en) 2021-11-12

Family

ID=78426734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111195107.2A Pending CN113642940A (en) 2021-10-14 2021-10-14 Enterprise planning intelligent management platform based on tracking survey

Country Status (1)

Country Link
CN (1) CN113642940A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040138942A1 (en) * 2002-09-30 2004-07-15 Pearson George Duncan Node-level modification during execution of an enterprise planning model
CN109784781A (en) * 2019-03-04 2019-05-21 中铁隧道局集团有限公司 A kind of project management system served as theme with project progress, method and storage medium
CN111626531A (en) * 2019-02-28 2020-09-04 贵阳海信网络科技有限公司 Risk control method, device, system and storage medium
US20200334777A1 (en) * 2018-11-21 2020-10-22 Beijing Yutian Technology Co. Ltd Intelligent emergency decision support system for emergency communication
CN112561472A (en) * 2020-12-11 2021-03-26 易筑网络科技(苏州)有限公司 Enterprise design project management system based on cooperative office platform
CN113469579A (en) * 2021-07-30 2021-10-01 苏州清研精准汽车科技有限公司 Production and assembly project progress quality control system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040138942A1 (en) * 2002-09-30 2004-07-15 Pearson George Duncan Node-level modification during execution of an enterprise planning model
US20200334777A1 (en) * 2018-11-21 2020-10-22 Beijing Yutian Technology Co. Ltd Intelligent emergency decision support system for emergency communication
CN111626531A (en) * 2019-02-28 2020-09-04 贵阳海信网络科技有限公司 Risk control method, device, system and storage medium
CN109784781A (en) * 2019-03-04 2019-05-21 中铁隧道局集团有限公司 A kind of project management system served as theme with project progress, method and storage medium
CN112561472A (en) * 2020-12-11 2021-03-26 易筑网络科技(苏州)有限公司 Enterprise design project management system based on cooperative office platform
CN113469579A (en) * 2021-07-30 2021-10-01 苏州清研精准汽车科技有限公司 Production and assembly project progress quality control system

Similar Documents

Publication Publication Date Title
CN111885136B (en) Edge computing gateway cluster operation method and system based on edge cloud cooperation
CN114500521A (en) Computing power scheduling method, device, scheduling equipment, system and storage medium
CN112148484B (en) Coupling degree-based micro-service online distribution method and system
CN110794800A (en) Monitoring system for wisdom mill information management
DE112021006595T5 (en) USER CONTEXT MIGRATION BASED ON A COMPUTATION DIAGRAM IN AN ARTIFICIAL INTELLIGENCE APPLICATION EXECUTING IN AN EDGE COMPUTING ENVIRONMENT
CN103248512A (en) Method and system for generating topological structure of application layer in communication network
CN106453541A (en) Data synchronization method, server and data synchronization system
Sorkhoh et al. Optimizing information freshness for MEC-enabled cooperative autonomous driving
CN111199359A (en) Multi-agent task allocation method under network resource constraint
CN110768914A (en) Decentralized Internet of things gateway system based on semantic scene instance migration
US20240097976A1 (en) Change deployment system
CN115840631A (en) RAFT-based high-availability distributed task scheduling method and equipment
CN106452899B (en) A kind of distributed data digging system and method
CN104809551A (en) Cross-system workflow cooperation method based on mobile agent client side
Zhang et al. Dynamic DNN decomposition for lossless synergistic inference
CN111401991A (en) Data information distribution method and device, storage medium and computer equipment
CN114817190A (en) Log synchronization method, device, system, equipment and storage medium
CN112351106B (en) Service grid platform containing event grid and communication method thereof
CN115480882A (en) Distributed edge cloud resource scheduling method and system
CN113642940A (en) Enterprise planning intelligent management platform based on tracking survey
CN111614741A (en) Multi-robot communication method and device based on ROS system
CN115037769B (en) SOA-based air traffic control automation system and realization method thereof
WO2022161081A1 (en) Training method, apparatus and system for integrated learning model, and related device
CN105429795A (en) Alarm monitoring system and method
CN114610798A (en) Resource allocation management method, system, device, storage medium and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211112