- CN113642194A CN113642194A CN202111021980.XA CN202111021980A CN113642194A CN 113642194 A CN113642194 A CN 113642194A CN 202111021980 A CN202111021980 A CN 202111021980A CN 113642194 A CN113642194 A CN 113642194A
- Authority
- CN
- China
- Prior art keywords
- power
- wind
- data
- generating set
- wind generating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 42
- 238000004364 calculation method Methods 0.000 title claims abstract description 32
- 238000004140 cleaning Methods 0.000 claims description 10
- 230000005684 electric field Effects 0.000 claims description 9
- 238000010248 power generation Methods 0.000 description 9
- 238000006243 chemical reaction Methods 0.000 description 3
- 238000013507 mapping Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/06—Wind turbines or wind farms
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/06—Power analysis or power optimisation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111021980.XA CN113642194B (zh) | 2021-09-01 | 2021-09-01 | 风力发电机组可调上限计算方法及有功功率调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111021980.XA CN113642194B (zh) | 2021-09-01 | 2021-09-01 | 风力发电机组可调上限计算方法及有功功率调度方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113642194A true CN113642194A (zh) | 2021-11-12 |
CN113642194B CN113642194B (zh) | 2024-02-02 |
Family
ID=78424863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111021980.XA Active CN113642194B (zh) | 2021-09-01 | 2021-09-01 | 风力发电机组可调上限计算方法及有功功率调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113642194B (zh) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011095519A2 (en) * | 2010-02-05 | 2011-08-11 | Vestas Wind Systems A/S | Method of operating a wind power plant |
CN102969722A (zh) * | 2012-11-12 | 2013-03-13 | 南京中德保护控制系统有限公司 | 风电场无功电压控制方法 |
WO2014173081A1 (zh) * | 2013-04-27 | 2014-10-30 | 国家电网公司 | 一种风电场集群无功电压优化控制方法 |
US20160025070A1 (en) * | 2014-07-28 | 2016-01-28 | State Grid Corporation Of China | Method for calculating theoretical power of a wind farm based on extrapolation of anemometer tower data |
CN105914796A (zh) * | 2016-05-30 | 2016-08-31 | 都城绿色能源有限公司 | 一种风力发电场有功功率控制方法 |
CN108923473A (zh) * | 2018-09-14 | 2018-11-30 | 国电联合动力技术有限公司 | 一种基于智能穿越技术的柔塔风电场能量调度方法及系统 |
CN109118057A (zh) * | 2018-07-20 | 2019-01-01 | 西安西热电站信息技术有限公司 | 一种基于实时功率曲线的风电机组出力评价方法 |
CN109412210A (zh) * | 2018-10-25 | 2019-03-01 | 中国船舶重工集团海装风电股份有限公司 | 一种风电机组有功功率精细化调节方法 |
CN109958574A (zh) * | 2017-12-22 | 2019-07-02 | 北京金风科创风电设备有限公司 | 用于风力发电机组的降载控制方法和装置 |
CN110783952A (zh) * | 2019-10-30 | 2020-02-11 | 中国华能集团有限公司 | 一种风电场能量管理系统及方法 |
CN111146806A (zh) * | 2020-01-03 | 2020-05-12 | 国电联合动力技术有限公司 | 风电场有功可用出力动态计算优化方法及能量管理平台 |
CN111342459A (zh) * | 2020-03-26 | 2020-06-26 | 南京南瑞继保电气有限公司 | 一种电力需量决策分析系统及方法 |
CN111835041A (zh) * | 2020-08-12 | 2020-10-27 | 山西粤电能源有限公司 | 一种风电场的有功功率控制方法 |
-
2021
- 2021-09-01 CN CN202111021980.XA patent/CN113642194B/zh active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011095519A2 (en) * | 2010-02-05 | 2011-08-11 | Vestas Wind Systems A/S | Method of operating a wind power plant |
US20130035798A1 (en) * | 2010-02-05 | 2013-02-07 | Yu Zhou | Method of operating a wind power plant |
CN102969722A (zh) * | 2012-11-12 | 2013-03-13 | 南京中德保护控制系统有限公司 | 风电场无功电压控制方法 |
WO2014173081A1 (zh) * | 2013-04-27 | 2014-10-30 | 国家电网公司 | 一种风电场集群无功电压优化控制方法 |
US20160025070A1 (en) * | 2014-07-28 | 2016-01-28 | State Grid Corporation Of China | Method for calculating theoretical power of a wind farm based on extrapolation of anemometer tower data |
CN105914796A (zh) * | 2016-05-30 | 2016-08-31 | 都城绿色能源有限公司 | 一种风力发电场有功功率控制方法 |
CN109958574A (zh) * | 2017-12-22 | 2019-07-02 | 北京金风科创风电设备有限公司 | 用于风力发电机组的降载控制方法和装置 |
CN109118057A (zh) * | 2018-07-20 | 2019-01-01 | 西安西热电站信息技术有限公司 | 一种基于实时功率曲线的风电机组出力评价方法 |
CN108923473A (zh) * | 2018-09-14 | 2018-11-30 | 国电联合动力技术有限公司 | 一种基于智能穿越技术的柔塔风电场能量调度方法及系统 |
CN109412210A (zh) * | 2018-10-25 | 2019-03-01 | 中国船舶重工集团海装风电股份有限公司 | 一种风电机组有功功率精细化调节方法 |
CN110783952A (zh) * | 2019-10-30 | 2020-02-11 | 中国华能集团有限公司 | 一种风电场能量管理系统及方法 |
CN111146806A (zh) * | 2020-01-03 | 2020-05-12 | 国电联合动力技术有限公司 | 风电场有功可用出力动态计算优化方法及能量管理平台 |
CN111342459A (zh) * | 2020-03-26 | 2020-06-26 | 南京南瑞继保电气有限公司 | 一种电力需量决策分析系统及方法 |
CN111835041A (zh) * | 2020-08-12 | 2020-10-27 | 山西粤电能源有限公司 | 一种风电场的有功功率控制方法 |
Non-Patent Citations (2)
Title |
---|
赵洪山;刘兴杰;李聪;: "基于机组动态风速信息的风电场有功控制策略", 电力科学与工程, no. 01, pages 9 - 15 * |
黄哲: "基于历史运行数据的风电场理论输出功率计算方法分析", 内蒙古电力技术, vol. 34, no. 6, pages 1 - 6 * |
Also Published As
Publication number | Publication date |
---|---|
CN113642194B (zh) | 2024-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107944757A (zh) | 电力互联系统可再生能源消纳能力评估分析方法 | |
CN104362673A (zh) | 基于调峰裕度的风电并网协调调度优化方法 | |
CN110445136A (zh) | 一种基于功率预测的新能源场站无功电压控制方法和平台 | |
CN108493995B (zh) | 计及风机调频应对直流闭锁后低频的紧急控制系统及方法 | |
CN105914796A (zh) | 一种风力发电场有功功率控制方法 | |
CN109802413B (zh) | 一种主动支撑电网频率响应控制方法及系统 | |
CN111667136A (zh) | 一种区域电力市场的出清方法、装置及存储介质 | |
CN104362680A (zh) | 以有功损耗最小为目标的风电场有功功率自动分配方法 | |
CN110783927B (zh) | 多时间尺度交直流配电网调度方法及装置 | |
CN113300354A (zh) | 电网运行效能最优的源网荷储有功协调控制方法及装置 | |
CN110365019B (zh) | 一种多端直流配电网变流器容量配置方法及系统 | |
CN108374747A (zh) | 一种调配新能源发电系统的抽水蓄能控制方法 | |
CN111784100A (zh) | 一种基于机器学习的月度计划方式生成方法 | |
CN113394795B (zh) | 一种内陆山地风电一次调频能力在线主动评估方法、系统 | |
CN110752598A (zh) | 多点分布式储能系统灵活性评价方法和装置 | |
CN104794576B (zh) | 一种风电场内机组有功分配协调方法 | |
CN104253443B (zh) | 一种虚拟小水电群有功快速调节方法 | |
US11262713B2 (en) | Method for calculating control parameters of heating supply power of heating network | |
CN109004641A (zh) | 一种基于能源优化调度的微网源网荷协调控制方法 | |
CN108448655A (zh) | 一种无源电网广域发电控制方法及系统 | |
CN113642194B (zh) | 风力发电机组可调上限计算方法及有功功率调度方法 | |
CN112202202A (zh) | 一种多层递阶结构下的风电场群协调控制方法 | |
CN110910024B (zh) | 一种源网荷储协同方法及系统 | |
CN211744058U (zh) | 一种能量管理平台 | |
CN110443509A (zh) | 一种评估各类灵活性资源对电力系统灵活性贡献度的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No. 30 Jinyu Avenue, Economic Development Park, Yubei District, Chongqing, 400000 Applicant after: China Shipbuilding Haizhuang Wind Power Co.,Ltd. Address before: 401122 No. 30 Jinyu Avenue, Jingkaiyuan, North New District of Chongqing Applicant before: CSIC HAIZHUANG WINDPOWER Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240809 Address after: No. 361 Shangchuan Road, Pudong New Area, Shanghai, 201209 Patentee after: China Shipping Polytron Technologies Inc. Country or region after: China Address before: No. 30 Jinyu Avenue, Economic Development Park, Yubei District, Chongqing, 400000 Patentee before: China Shipbuilding Haizhuang Wind Power Co.,Ltd. Country or region before: China |