Internet-oriented comprehensive energy modeling method, device and system Download PDF

Info

Publication number
CN113642166B
CN113642166B CN202110889892.5A CN202110889892A CN113642166B CN 113642166 B CN113642166 B CN 113642166B CN 202110889892 A CN202110889892 A CN 202110889892A CN 113642166 B CN113642166 B CN 113642166B
Authority
CN
China
Prior art keywords
power grid
energy
comprehensive energy
modeling
internet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110889892.5A
Other languages
Chinese (zh)
Other versions
CN113642166A (en
Inventor
彭泽武
谢瀚阳
温柏坚
冯歆尧
江疆
邵彦宁
伍江瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202110889892.5A priority Critical patent/CN113642166B/en
Publication of CN113642166A publication Critical patent/CN113642166A/en
Application granted granted Critical
Publication of CN113642166B publication Critical patent/CN113642166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/04Power grid distribution networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Signal Processing (AREA)
  • Computing Systems (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Remote Sensing (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Evolutionary Computation (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an Internet-oriented comprehensive energy modeling method, device and system. The method is suitable for the GIS client and comprises the following steps: after authentication and authentication of an intranet user succeed, an icon of the grid equipment is imported, grid modeling is conducted on the intranet by combining with the connection relation of the grid equipment, a grid model is obtained, and grid data are stored in a grid database; after the authentication of the internet user is successful, the icon of the energy equipment is imported, and after the authentication of the internet network is successful, the network data in the network database is imported into the comprehensive energy database; and carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing energy data in a comprehensive energy database. The invention can realize the fusion of the intranet power grid data and the Internet energy data on the premise of ensuring the safety of the power grid data, and is convenient for a user to acquire the complete data of the comprehensive energy to carry out integral analysis and multi-energy coordination.

Description

Internet-oriented comprehensive energy modeling method, device and system
Technical Field
The invention relates to the technical field of energy management, in particular to an internet-oriented comprehensive energy modeling method, device and system.
Background
At present, energy equipment such as fuel gas, cooling and heating is mainly modeled on the Internet, but power grid equipment cannot be modeled on the Internet for safety reasons and can only be modeled on the Internet. Because the energy data on the Internet and the power grid data on the intranet are independently stored in different databases, data fusion cannot be realized on the Internet, and a user is difficult to acquire complete data of comprehensive energy to perform overall analysis and multi-energy coordination.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides the comprehensive energy modeling method, the device and the system for the Internet, which can realize fusion of the intranet power grid data and the Internet energy data on the premise of ensuring the safety of the power grid data, and are convenient for a user to acquire the complete data of the comprehensive energy to carry out integral analysis and multi-energy collaboration.
In order to solve the above technical problems, in a first aspect, an embodiment of the present invention provides an integrated energy modeling method for internet, which is applicable to a GIS client, and includes:
after authentication and authentication of an intranet user succeed, importing a graph of the grid equipment, carrying out grid modeling on the intranet by combining the connection relation of the grid equipment to obtain a grid model, and storing grid data in a grid database;
after the authentication of the internet user is successful, the icon of the energy equipment is imported, and after the authentication of the internet network is successful, the network data in the network database is imported into the comprehensive energy database;
and carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing energy data in the comprehensive energy database.
Further, after the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and the energy data is stored in the comprehensive energy database, the method further comprises:
and displaying the power grid data and the energy data in the comprehensive energy database, and/or transmitting the power grid data and the energy data in the comprehensive energy database to an external display system for display.
Further, after the authentication and authentication of the user in the intranet succeeds, the icon of the power grid equipment is imported, the connection relation of the power grid equipment is combined with the intranet to perform power grid modeling, a power grid model is obtained, and power grid data are stored in a power grid database, specifically:
after authentication and authentication of an intranet user succeed, importing the icon of the power grid equipment, and carrying out power grid modeling in the intranet according to the icon and the connection relation of the power grid equipment to obtain the power grid model;
performing power grid modeling rule verification on the power grid model according to pre-stored power grid modeling rules in a modeling rule base, and performing power grid graph model topology verification on the power grid model according to the icon and the connection relation of the power grid equipment;
and if the power grid model passes the power grid modeling rule verification and the power grid graph model topology verification, the power grid data are stored in the power grid database.
Further, after the power grid modeling rule verification is performed on the power grid model according to the pre-stored power grid modeling rules in the modeling rule base, before the power grid pattern topology verification is performed on the power grid model according to the icon and the connection relation of the power grid equipment, the method further comprises:
and performing electric network standing book supplement on the electric network model.
Further, after the authentication of the intranet user is successful, before the power grid data in the power grid database is imported into the comprehensive energy database, the method further comprises:
and configuring an intercommunication strategy of the intranet and the Internet.
Further, the configuration of the interworking policy of the intranet and the internet specifically includes:
setting a safety net gate to establish the mapping relation and authentication rule of the intranet and the Internet.
Further, the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and the energy data are stored in the comprehensive energy database, specifically:
performing comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain the comprehensive energy model;
performing comprehensive energy modeling rule verification on the comprehensive energy model according to a prestored comprehensive energy modeling rule in a modeling rule library, and performing comprehensive energy graph model topology verification on the comprehensive energy model according to the graph symbols and the connection relation of the power grid equipment and the graph symbols and the connection relation of the energy equipment;
and if the comprehensive energy model passes through the comprehensive energy modeling rule verification and the comprehensive energy graph model topology verification, the energy data is stored in the comprehensive energy database.
Further, after the comprehensive energy modeling rule verification is performed on the comprehensive energy model according to the pre-stored comprehensive energy modeling rule in the modeling rule base, before the comprehensive energy graph model topology verification is performed on the comprehensive energy model according to the graph and connection relation of the power grid device and the graph and connection relation of the energy device, the method further comprises:
and performing comprehensive energy ledger supplementation on the comprehensive energy model.
In a second aspect, an embodiment of the present invention provides an integrated energy modeling apparatus for the internet, which is applicable to a GIS client, including:
the power grid modeling module is used for importing the icon of the power grid equipment after the authentication and authentication of the user in the internal network are successful, carrying out power grid modeling on the internal network by combining the connection relation of the power grid equipment to obtain a power grid model, and storing power grid data in a power grid database;
the data importing module is used for importing the icon of the energy equipment after the authentication of the Internet user is successful, and importing the power grid data in the power grid database into the comprehensive energy database after the authentication of the internal and external network is successful;
and the fusion modeling module is used for carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing energy data in the comprehensive energy database.
In a third aspect, an embodiment of the present invention provides an internet-oriented integrated energy modeling system, including a GIS client, where the GIS client is configured to execute the internet-oriented integrated energy modeling method as described above.
The embodiment of the invention has the following beneficial effects:
after authentication and authentication of an internal network user are successful, an icon of the power grid equipment is imported, the connection relation of the power grid equipment is combined with the internal network to conduct power grid modeling to obtain a power grid model, power grid data are stored in a power grid database, after the authentication and authentication of the internet user are successful, the icon of the energy equipment is imported, after the authentication and authentication of the internal and external network are successful, the power grid data in the power grid database are imported into a comprehensive energy database, comprehensive energy modeling is conducted on the internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and the energy data are stored in the comprehensive energy database to complete fusion modeling of the power grid equipment and the energy equipment. Compared with the prior art, the embodiment of the invention carries out fusion modeling of the power grid equipment and the energy equipment based on the layered security authentication modes of intranet user authentication, internet user authentication and internal and external network authentication, can realize fusion of intranet power grid data and internet energy data on the premise of ensuring the safety of the power grid data, and is convenient for a user to acquire complete data of comprehensive energy to carry out integral analysis and multi-energy collaboration.
Drawings
FIG. 1 is a schematic flow chart of an Internet-oriented comprehensive energy modeling method in a first embodiment of the invention;
FIG. 2 is a data flow diagram of an Internet-oriented comprehensive energy modeling method in a first embodiment of the present invention;
FIG. 3 is a diagram of a multi-energy device in a first embodiment of the present invention;
FIG. 4 is a schematic diagram of an integrated energy modeling layout in a first embodiment of the present invention;
FIG. 5 is a schematic diagram of an in-station triple co-generation model for integrated energy modeling in a first embodiment of the present invention;
FIG. 6 is an interface diagram of a comprehensive energy device query in a first embodiment of the present invention;
FIG. 7 is an interface diagram of topology analysis of an integrated energy device in a first embodiment of the present invention;
FIG. 8 is an interface diagram of a WebGIS client in a first embodiment of the present invention;
FIG. 9 is an interface diagram of a WebGIS_API developer center in a first embodiment of the invention;
fig. 10 is a schematic structural diagram of an internet-oriented integrated energy modeling according to a second embodiment of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made more apparent and fully hereinafter with reference to the accompanying drawings, in which some, but not all embodiments of the invention are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that, the step numbers herein are only for convenience of explanation of the specific embodiments, and are not used as limiting the order of execution of the steps.
First embodiment:
as shown in fig. 1, a first embodiment provides an integrated energy modeling method for the internet, which is applicable to a GIS client, and includes steps S1 to S3:
s1, after authentication and authentication of an intranet user are successful, an icon of the grid equipment is imported, the intranet is subjected to grid modeling by combining with the connection relation of the grid equipment, a grid model is obtained, and grid data are stored in a grid database;
s2, after authentication of the internet user is successful, an icon of the energy equipment is imported, and after authentication of the internet network is successful, the network data in the network database is imported into the comprehensive energy database;
and S3, performing comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing energy data in a comprehensive energy database.
As an example, in step S1, the GIS client performs intranet user authentication on intranet login information input by a user, after detecting that the intranet user authentication is successful, allows the user to log in, and according to an operation instruction input by the user, imports an icon of the power grid device, performs power grid modeling on an intranet in combination with a connection relationship of the power grid device, obtains a power grid model, and stores power grid data in a power grid database.
In step S2, the GIS client performs internet user authentication on the internet login information input by the user, after detecting that the internet user authentication is successful, allows the user to log in, guides the icon of the energy device according to the operation instruction input by the user, performs internal-external network authentication on the internal network of the user, and after detecting that the internal-external network authentication is successful, allows the internal network to communicate with the internet, and guides the network data in the network database to the comprehensive energy database.
In step S3, the GIS client performs comprehensive energy modeling on the internet according to the icon and the connection relationship of the power grid device and the icon and the connection relationship of the energy device, to obtain a comprehensive energy model, and stores the energy data in a comprehensive energy database, thereby completing the fusion modeling of the power grid device and the energy device.
According to the method, fusion modeling of the power grid equipment and the energy equipment is carried out based on layered security authentication modes of intranet user authentication, internet user authentication and intranet network authentication, and the integration modeling of the intranet power grid data and the internet energy data can be achieved on the premise that the safety of the power grid data is guaranteed, and a user can conveniently obtain complete data of comprehensive energy to carry out overall analysis and multi-energy collaboration.
In a preferred embodiment, after the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, and the energy data is stored in the comprehensive energy database, the method further includes: and displaying the power grid data and the energy data in the comprehensive energy database, and/or transmitting the power grid data and the energy data in the comprehensive energy database to an external display system for display.
As an example, after the grid data and the energy data are stored in the integrated energy database in a fusion manner, the GIS client may directly display the grid data and the energy data in the integrated energy database, and/or provide a data interface to the outside through the WebGIS API, and display the data interface through the WebGIS client or other external display system.
In the embodiment, a mode of directly displaying data by the GIS client or displaying data by an external display system is adopted, so that a user can conveniently acquire complete data of comprehensive energy to perform integral analysis and multi-energy collaborative display.
In a preferred embodiment, after authentication and authentication of the user on the intranet succeeds, an icon of the power grid equipment is imported, power grid modeling is performed on the intranet by combining with a connection relation of the power grid equipment, a power grid model is obtained, and power grid data is stored in a power grid database, specifically: after authentication and authentication of an intranet user are successful, importing a picture symbol of the power grid equipment, and carrying out power grid modeling on the intranet according to the picture symbol and the connection relation of the power grid equipment to obtain a power grid model; carrying out power grid modeling rule verification on a power grid model according to pre-stored power grid modeling rules in a modeling rule base, and carrying out power grid graph model topology verification on the power grid model according to the icon and the connection relation of power grid equipment; and if the power grid model passes the power grid modeling rule verification and the power grid pattern topology verification, the power grid data is stored in a power grid database.
It should be noted that, the verification of the modeling rule of the power grid includes verifying the correctness of the modeling rule of the power grid model, that is, verifying whether the modeling rule of the power grid model accords with the pre-stored power grid modeling rule in the modeling rule base; the power grid pattern topology verification comprises verification of correctness of a corresponding relation between a pattern symbol of power grid equipment and the power grid equipment, namely verification of whether the pattern symbol of the power grid equipment corresponds to the power grid equipment or not, and verification of correctness of a connection relation of the power grid equipment, namely verification of whether the power grid equipment is communicated or not, whether the power grid equipment is isolated equipment or not, and the like.
As an example, the GIS client performs intranet user authentication on intranet login information input by a user, allows the user to log in after the intranet user authentication is detected to be successful, guides the icon of the power grid device according to an operation instruction input by the user, performs power grid modeling on the intranet according to the icon and a connection relation of the power grid device to obtain a power grid model, performs power grid modeling rule verification on the power grid model according to a pre-stored power grid modeling rule in a modeling rule base, performs power grid graph model topology verification on the power grid model according to the icon and the connection relation of the power grid device, and stores power grid data in a power grid database if the power grid model passes through the power grid modeling rule verification and the power grid graph model topology verification. And updating the pre-stored power grid modeling rules in the modeling rule base at fixed time.
According to the embodiment, the power grid data are stored in the power grid database after the power grid model passes through the power grid modeling rule verification and the power grid graph model topology verification, so that the accuracy of the power grid data is guaranteed.
In a preferred implementation manner of this embodiment, after the verifying the grid modeling rule of the grid model according to the pre-stored grid modeling rule in the modeling rule base, before the verifying the grid pattern topology of the grid model according to the icon and the connection relation of the grid device, the method further includes: and performing electric network account supplementing on the electric network model.
It should be noted that the grid standing book supplement includes supplementing and perfecting equipment parameters of the grid equipment.
According to the embodiment, the electric network account is supplemented to the electric network model, so that the integrity of electric network data is guaranteed.
In a preferred embodiment, after the authentication of the network of the internal and external networks is successful, before the power grid data in the power grid database is imported into the comprehensive energy database, the method further comprises: and configuring an intercommunication strategy of the intranet and the Internet.
In a preferred implementation manner of this embodiment, the configuration of the interworking policy between the intranet and the internet is specifically: setting a safety net gate to establish the mapping relation and authentication rule of the intranet and the Internet.
As an example, a mapping relationship between an intranet and the internet is established by setting a security gateway, an intercommunication strategy of an intranet private network corresponding to an integrated energy source external network of the power grid equipment is specified, the specified intranet private network setting is mapped to an integrated energy source modeling server corresponding to an external network, the configuration of the mapping relationship between the intranet and the external network is completed, the intranet private network accesses the external network and requires information such as a user, a password, authority, an IP network section and the like, and authentication rules of the intranet and the internet are established by setting the security gateway, so that authentication of the internal and the external networks is completed.
The embodiment establishes the mapping relation and authentication rule of the intranet and the Internet by setting the safety gatekeeper, thereby being beneficial to ensuring the safety isolation and data communication of the intranet and the Internet.
In a preferred embodiment, the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, and the energy data is stored in a comprehensive energy database, specifically: carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model; performing comprehensive energy modeling rule verification on the comprehensive energy model according to prestored comprehensive energy modeling rules in a modeling rule library, and performing comprehensive energy graph model topology verification on the comprehensive energy model according to the graph symbols and connection relations of the power grid equipment and the graph symbols and connection relations of the energy equipment; and if the comprehensive energy model passes the comprehensive energy modeling rule verification and the comprehensive energy graph model topology verification, the energy data is stored in the comprehensive energy database.
It should be noted that, the verification of the modeling rule of the comprehensive energy source includes verifying the correctness of the modeling rule of the comprehensive energy source model, that is, verifying whether the modeling rule of the comprehensive energy source model accords with the pre-stored modeling rule of the modeling rule base; the comprehensive energy pattern topology verification comprises verification of the correctness of the corresponding relation between the pattern symbols of the power grid equipment and the power grid equipment, the correctness of the corresponding relation between the pattern symbols of the energy equipment and the energy equipment, namely verification of whether the pattern symbols of the power grid equipment and the power grid equipment, the pattern symbols of the energy equipment and the energy equipment correspond to each other, and verification of the correctness of the connection relation between the power grid equipment and the energy equipment, namely verification of whether the power grid equipment is communicated with each other, whether the power grid equipment is isolated equipment, whether the energy equipment is communicated with each other, whether the energy equipment is isolated equipment and the like.
As an example, the GIS client performs comprehensive energy modeling on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, performs comprehensive energy modeling rule verification on the comprehensive energy model according to a pre-stored comprehensive energy modeling rule in a modeling rule base, performs comprehensive energy graph model topology verification on the comprehensive energy model according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device, and if the comprehensive energy model passes the comprehensive energy modeling rule verification and the comprehensive energy graph model topology verification, saves energy data in a comprehensive energy database to complete fusion modeling of the power grid device and the energy device, so as to realize fusion of the power grid data and the internet energy data. And the pre-stored comprehensive energy modeling rules in the modeling rule base are updated regularly.
According to the embodiment, the comprehensive energy model is verified through the comprehensive energy modeling rule and the comprehensive energy graph model topology, and then the energy data are stored in the comprehensive energy database and are fused with the power grid data, so that the accuracy of the energy data is guaranteed, and the power grid data and the energy data are effectively fused.
In a preferred implementation manner of this embodiment, after the verifying the comprehensive energy modeling rule according to the pre-stored comprehensive energy modeling rule in the modeling rule base, before the verifying the comprehensive energy graph topology according to the graph and the connection relation of the power grid device and the graph and the connection relation of the energy device, the method further includes: and (5) supplementing the comprehensive energy account of the comprehensive energy model.
The comprehensive energy ledger supplement comprises the supplement and improvement of equipment parameters of power grid equipment and energy equipment.
According to the embodiment, the comprehensive energy account is supplemented to the comprehensive energy model, so that the integrity of the power grid data and the energy data is guaranteed.
As shown in fig. 2, by way of example, the implementation flow of the integrated energy modeling method for internet according to the first embodiment is specifically as follows:
step 1: after authentication and authentication of an intranet user, modeling, grid modeling rule verification, grid account supplementing, grid pattern topology verification are performed on the intranet by the grid equipment, and after verification is successful, the grid data is stored, so that modeling of the intranet by the grid equipment is completed.
Step 2: after authentication and authentication of the Internet user, logging in a GIS client, and importing icons of energy equipment such as comprehensive equipment, fuel gas equipment, cooling and heating equipment, metering equipment, electric power equipment and the like into a GIS system according to modeling requirements. For example, the icon of the multi-energy device is shown in fig. 3.
Step 3: the internal and external network mapping setting is realized mainly through the mapping configuration of a safety gatekeeper, the intercommunication strategy of the corresponding comprehensive energy source external network of the internal network private network of the power grid equipment is appointed, the appointed internal network private network setting is mapped to the corresponding external network comprehensive energy source modeling server, and the internal and external network mapping strategy configuration is completed.
Step 4: the access from the intranet private network to the extranet is configured to require the user, the password, the authority and the IP network segment, and the authentication of the user authority is completed through the safety gatekeeper.
Step 5: after the internal and external network mapping configuration of the safety gatekeeper and the user authority authentication, the safety gatekeeper enters the corresponding external network, and the data of the internal network power grid equipment is imported into the comprehensive energy database, so that the purpose of integrating the internal network power grid data is achieved.
Step 6: the comprehensive energy modeling is carried out on the GIS client, the comprehensive energy modeling comprises the modeling outside and inside the station, the modeling outside mainly refers to the modeling of a pole tower, a line and pipeline equipment, the modeling operation is carried out on the line connection of the equipment outside the station, the modeling inside the station mainly refers to the modeling of the internal equipment of factory building equipment such as factory building equipment (such as a transformer substation and a power distribution room), the main line (bus) is generally built firstly, other equipment such as a switch and a transformer are connected on the bus, the equipment inside and outside the station is linked through the link points inside and outside the station, and the related equipment can comprise comprehensive equipment, gas equipment, cooling and heating equipment, metering equipment, electric power equipment and the like. For example, the comprehensive energy modeling is shown in figure 4 along the layout, the modeling belongs to the modeling of energy off-site, modeling display between off-site equipment and line connection lines, and the equipment such as charging piles, micro-grids, photovoltaics and the like can be completed by off-site modeling. The triple co-generation model in the comprehensive energy modeling station is shown in fig. 5, and mainly comprises a fusion model modeling of three energy sources of electric energy, heat energy and water energy, through the modeling model, it can be clearly known that water energy can be converted into heat energy through a heat exchanger, heat energy can be converted into electric energy through thermoelectric conversion, and the three energy source modeling conversion model of electric energy, heat energy and water energy is provided, and belongs to in-station modeling.
Step 7: and (3) verifying the comprehensive modeling rule of the modeled result, and prompting a modification method for the rule which does not accord with the modeling rule and displays errors, and re-modeling modification until the comprehensive modeling rule is verified.
Step 8: and (5) supplementing the comprehensive energy equipment account, verifying the comprehensive energy graph model topology, and warehousing data after verification is successful. For example, an interface diagram of the integrated energy device query is shown in fig. 6, and an interface diagram of the integrated energy device topology analysis is shown in fig. 7.
Step 9: after the modeling and warehousing are successful, the modeling client equipment data can be directly displayed on the GIS client, a data interface can be provided for the outside through the WebGIS_API, and the modeling client equipment data can be displayed on the WebGIS client, and can be fused and displayed after being called by other external display systems. For example, the interface diagram of the WebGIS client is shown in fig. 8, and the interface diagram of the webgis_api developer center is shown in fig. 9.
As shown in fig. 10, a second embodiment provides an integrated energy modeling apparatus for internet, which is applicable to GIS clients, and includes: the power grid modeling module 21 is used for importing the icon of the power grid equipment after the authentication and authentication of the user in the internal network are successful, carrying out power grid modeling on the internal network by combining the connection relation of the power grid equipment to obtain a power grid model, and storing power grid data in a power grid database; the data importing module 22 is configured to import the icon of the energy device after the authentication of the internet user is successful, and import the grid data in the grid database into the comprehensive energy database after the authentication of the internet network is successful; and the fusion modeling module 23 is used for performing comprehensive energy modeling on the internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing the energy data in a comprehensive energy database.
As an example, through the power grid modeling module 21, the gis client performs intranet user authentication on intranet login information input by a user, after detecting that the intranet user authentication is successful, allows the user to log in, and introduces an icon of the power grid device according to an operation instruction input by the user, performs power grid modeling on the intranet in combination with a connection relationship of the power grid device, obtains a power grid model, and stores power grid data in a power grid database.
Through the data importing module 22, the GIS client performs internet user authentication on internet login information input by a user, allows the user to log in after the internet user authentication is detected to be successful, imports an icon of the energy device according to an operation instruction input by the user, performs internal and external network authentication on internal and external login information of the user, allows the internal network to communicate with the internet after the internal and external network authentication is detected to be successful, and imports the network data in the network database to the comprehensive energy database.
Through the fusion modeling module 23, the GIS client performs comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and stores energy data in a comprehensive energy database to complete fusion modeling of the power grid equipment and the energy equipment.
According to the method, fusion modeling of the power grid equipment and the energy equipment is carried out based on layered security authentication modes of intranet user authentication, internet user authentication and intranet network authentication, and the integration modeling of the intranet power grid data and the internet energy data can be achieved on the premise that the safety of the power grid data is guaranteed, and a user can conveniently obtain complete data of comprehensive energy to carry out overall analysis and multi-energy collaboration.
In a preferred embodiment, after the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, and the energy data is stored in the comprehensive energy database, the method further includes: and displaying the power grid data and the energy data in the comprehensive energy database, and/or transmitting the power grid data and the energy data in the comprehensive energy database to an external display system for display.
As an example, after the grid data and the energy data are stored in the integrated energy database in a fusion manner, the GIS client may directly display the grid data and the energy data in the integrated energy database, and/or provide a data interface to the outside through the WebGIS API, and display the data interface through the WebGIS client or other external display system.
In the embodiment, a mode of directly displaying data by the GIS client or displaying data by an external display system is adopted, so that a user can conveniently acquire complete data of comprehensive energy to perform integral analysis and multi-energy collaborative display.
In a preferred embodiment, after authentication and authentication of the user on the intranet succeeds, an icon of the power grid equipment is imported, power grid modeling is performed on the intranet by combining with a connection relation of the power grid equipment, a power grid model is obtained, and power grid data is stored in a power grid database, specifically: after authentication and authentication of an intranet user are successful, importing a picture symbol of the power grid equipment, and carrying out power grid modeling on the intranet according to the picture symbol and the connection relation of the power grid equipment to obtain a power grid model; carrying out power grid modeling rule verification on a power grid model according to pre-stored power grid modeling rules in a modeling rule base, and carrying out power grid graph model topology verification on the power grid model according to the icon and the connection relation of power grid equipment; and if the power grid model passes the power grid modeling rule verification and the power grid pattern topology verification, the power grid data is stored in a power grid database.
It should be noted that, the verification of the modeling rule of the power grid includes verifying the correctness of the modeling rule of the power grid model, that is, verifying whether the modeling rule of the power grid model accords with the pre-stored power grid modeling rule in the modeling rule base; the power grid pattern topology verification comprises verification of correctness of a corresponding relation between a pattern symbol of power grid equipment and the power grid equipment, namely verification of whether the pattern symbol of the power grid equipment corresponds to the power grid equipment or not, and verification of correctness of a connection relation of the power grid equipment, namely verification of whether the power grid equipment is communicated or not, whether the power grid equipment is isolated equipment or not, and the like.
As an example, the GIS client performs intranet user authentication on intranet login information input by a user, allows the user to log in after the intranet user authentication is detected to be successful, guides the icon of the power grid device according to an operation instruction input by the user, performs power grid modeling on the intranet according to the icon and a connection relation of the power grid device to obtain a power grid model, performs power grid modeling rule verification on the power grid model according to a pre-stored power grid modeling rule in a modeling rule base, performs power grid graph model topology verification on the power grid model according to the icon and the connection relation of the power grid device, and stores power grid data in a power grid database if the power grid model passes through the power grid modeling rule verification and the power grid graph model topology verification. And updating the pre-stored power grid modeling rules in the modeling rule base at fixed time.
According to the embodiment, the power grid data are stored in the power grid database after the power grid model passes through the power grid modeling rule verification and the power grid graph model topology verification, so that the accuracy of the power grid data is guaranteed.
In a preferred implementation manner of this embodiment, after the verifying the grid modeling rule of the grid model according to the pre-stored grid modeling rule in the modeling rule base, before the verifying the grid pattern topology of the grid model according to the icon and the connection relation of the grid device, the method further includes: and performing electric network account supplementing on the electric network model.
It should be noted that the grid standing book supplement includes supplementing and perfecting equipment parameters of the grid equipment.
According to the embodiment, the electric network account is supplemented to the electric network model, so that the integrity of electric network data is guaranteed.
In a preferred embodiment, after the authentication of the network of the internal and external networks is successful, before the power grid data in the power grid database is imported into the comprehensive energy database, the method further comprises: and configuring an intercommunication strategy of the intranet and the Internet.
In a preferred implementation manner of this embodiment, the configuration of the interworking policy between the intranet and the internet is specifically: setting a safety net gate to establish the mapping relation and authentication rule of the intranet and the Internet.
As an example, a mapping relationship between an intranet and the internet is established by setting a security gateway, an intercommunication strategy of an intranet private network corresponding to an integrated energy source external network of the power grid equipment is specified, the specified intranet private network setting is mapped to an integrated energy source modeling server corresponding to an external network, the configuration of the mapping relationship between the intranet and the external network is completed, the intranet private network accesses the external network and requires information such as a user, a password, authority, an IP network section and the like, and authentication rules of the intranet and the internet are established by setting the security gateway, so that authentication of the internal and the external networks is completed.
The embodiment establishes the mapping relation and authentication rule of the intranet and the Internet by setting the safety gatekeeper, thereby being beneficial to ensuring the safety isolation and data communication of the intranet and the Internet.
In a preferred embodiment, the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, and the energy data is stored in a comprehensive energy database, specifically: carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model; performing comprehensive energy modeling rule verification on the comprehensive energy model according to prestored comprehensive energy modeling rules in a modeling rule library, and performing comprehensive energy graph model topology verification on the comprehensive energy model according to the graph symbols and connection relations of the power grid equipment and the graph symbols and connection relations of the energy equipment; and if the comprehensive energy model passes the comprehensive energy modeling rule verification and the comprehensive energy graph model topology verification, the energy data is stored in the comprehensive energy database.
It should be noted that, the verification of the modeling rule of the comprehensive energy source includes verifying the correctness of the modeling rule of the comprehensive energy source model, that is, verifying whether the modeling rule of the comprehensive energy source model accords with the pre-stored modeling rule of the modeling rule base; the comprehensive energy pattern topology verification comprises verification of the correctness of the corresponding relation between the pattern symbols of the power grid equipment and the power grid equipment, the correctness of the corresponding relation between the pattern symbols of the energy equipment and the energy equipment, namely verification of whether the pattern symbols of the power grid equipment and the power grid equipment, the pattern symbols of the energy equipment and the energy equipment correspond to each other, and verification of the correctness of the connection relation between the power grid equipment and the energy equipment, namely verification of whether the power grid equipment is communicated with each other, whether the power grid equipment is isolated equipment, whether the energy equipment is communicated with each other, whether the energy equipment is isolated equipment and the like.
As an example, the GIS client performs comprehensive energy modeling on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, performs comprehensive energy modeling rule verification on the comprehensive energy model according to a pre-stored comprehensive energy modeling rule in a modeling rule base, performs comprehensive energy graph model topology verification on the comprehensive energy model according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device, and if the comprehensive energy model passes the comprehensive energy modeling rule verification and the comprehensive energy graph model topology verification, saves energy data in a comprehensive energy database to complete fusion modeling of the power grid device and the energy device, so as to realize fusion of the power grid data and the internet energy data. And the pre-stored comprehensive energy modeling rules in the modeling rule base are updated regularly.
According to the embodiment, the comprehensive energy model is verified through the comprehensive energy modeling rule and the comprehensive energy graph model topology, and then the energy data are stored in the comprehensive energy database and are fused with the power grid data, so that the accuracy of the energy data is guaranteed, and the power grid data and the energy data are effectively fused.
In a preferred implementation manner of this embodiment, after the verifying the comprehensive energy modeling rule according to the pre-stored comprehensive energy modeling rule in the modeling rule base, before the verifying the comprehensive energy graph topology according to the graph and the connection relation of the power grid device and the graph and the connection relation of the energy device, the method further includes: and (5) supplementing the comprehensive energy account of the comprehensive energy model.
The comprehensive energy ledger supplement comprises the supplement and improvement of equipment parameters of power grid equipment and energy equipment.
According to the embodiment, the comprehensive energy account is supplemented to the comprehensive energy model, so that the integrity of the power grid data and the energy data is guaranteed.
The third embodiment provides an internet-oriented comprehensive energy modeling system, which comprises a GIS client, wherein the GIS client is used for executing the internet-oriented comprehensive energy modeling method according to the first embodiment, and can achieve the same beneficial effects as the internet-oriented comprehensive energy modeling method.
In summary, the embodiment of the invention has the following beneficial effects:
after authentication and authentication of an internal network user are successful, an icon of the power grid equipment is imported, the connection relation of the power grid equipment is combined with the internal network to conduct power grid modeling to obtain a power grid model, power grid data are stored in a power grid database, after the authentication and authentication of the internet user are successful, the icon of the energy equipment is imported, after the authentication and authentication of the internal and external network are successful, the power grid data in the power grid database are imported into a comprehensive energy database, comprehensive energy modeling is conducted on the internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and the energy data are stored in the comprehensive energy database to complete fusion modeling of the power grid equipment and the energy equipment. The embodiment of the invention carries out fusion modeling of the power grid equipment and the energy equipment based on the layered security authentication modes of the intranet user authentication, the internet user authentication and the intranet network authentication, can realize fusion of the intranet power grid data and the internet energy data on the premise of ensuring the safety of the power grid data, and is convenient for a user to acquire the complete data of the comprehensive energy to carry out integral analysis and multi-energy collaboration.
While the foregoing is directed to the preferred embodiments of the present invention, it will be appreciated by those skilled in the art that changes and modifications may be made without departing from the principles of the invention, such changes and modifications are also intended to be within the scope of the invention.
Those skilled in the art will appreciate that implementing all or part of the above-described embodiments may be accomplished by way of computer programs, which may be stored on a computer readable storage medium, which when executed may comprise the steps of the above-described embodiments. The storage medium may be a magnetic disk, an optical disk, a Read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), or the like.

Claims (8)

1. The comprehensive energy modeling method for the Internet is characterized by being suitable for a GIS client and comprising the following steps of:
after authentication and authentication of an intranet user succeed, importing a graph of the grid equipment, carrying out grid modeling on the intranet by combining the connection relation of the grid equipment to obtain a grid model, and storing grid data in a grid database;
after the authentication of the internet user is successful, the icon of the energy equipment is imported, and after the authentication of the internet network is successful, the network data in the network database is imported into the comprehensive energy database;
carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing energy data in the comprehensive energy database;
wherein, the authentication success of the network authentication of the internal and external networks comprises: after authentication and authentication of an intranet user are successful, before the power grid data in the power grid database is imported into the comprehensive energy database, an intercommunication strategy of the intranet and the Internet is configured;
the configuration of the intercommunication strategy of the intranet and the Internet is specifically as follows: setting up the security gate to establish the mapping relation and authentication rule of the intranet and the Internet so as to complete the authentication of the intranet and the Internet by setting up the security gate.
2. The internet-oriented comprehensive energy modeling method according to claim 1, wherein after the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, and the energy data is stored in the comprehensive energy database, further comprising:
and displaying the power grid data and the energy data in the comprehensive energy database, and/or transmitting the power grid data and the energy data in the comprehensive energy database to an external display system for display.
3. The internet-oriented comprehensive energy modeling method according to claim 1, wherein after authentication and authentication of the intranet user are successful, an icon of the grid equipment is imported, the intranet is modeled by combining with the connection relation of the grid equipment to obtain a grid model, and the grid data is stored in a grid database, specifically:
after authentication and authentication of an intranet user succeed, importing the icon of the power grid equipment, and carrying out power grid modeling in the intranet according to the icon and the connection relation of the power grid equipment to obtain the power grid model;
performing power grid modeling rule verification on the power grid model according to pre-stored power grid modeling rules in a modeling rule base, and performing power grid graph model topology verification on the power grid model according to the icon and the connection relation of the power grid equipment;
and if the power grid model passes the power grid modeling rule verification and the power grid graph model topology verification, the power grid data are stored in the power grid database.
4. The internet-oriented comprehensive energy modeling method according to claim 3, further comprising, after the verifying the grid modeling rule of the grid model according to the pre-stored grid modeling rule in the modeling rule base, before the verifying the grid pattern topology of the grid model according to the icon and the connection relation of the grid device:
and performing electric network standing book supplement on the electric network model.
5. The internet-oriented comprehensive energy modeling method according to claim 1, wherein the comprehensive energy modeling is performed on the internet according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device to obtain a comprehensive energy model, and the energy data is stored in the comprehensive energy database, specifically:
performing comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain the comprehensive energy model;
performing comprehensive energy modeling rule verification on the comprehensive energy model according to a prestored comprehensive energy modeling rule in a modeling rule library, and performing comprehensive energy graph model topology verification on the comprehensive energy model according to the graph symbols and the connection relation of the power grid equipment and the graph symbols and the connection relation of the energy equipment;
and if the comprehensive energy model passes through the comprehensive energy modeling rule verification and the comprehensive energy graph model topology verification, the energy data is stored in the comprehensive energy database.
6. The internet-oriented comprehensive energy modeling method according to claim 5, further comprising, after the comprehensive energy modeling rule verification of the comprehensive energy model according to a pre-stored comprehensive energy modeling rule in a modeling rule base, before the comprehensive energy pattern topology verification of the comprehensive energy model according to the icon and the connection relation of the power grid device and the icon and the connection relation of the energy device:
and performing comprehensive energy ledger supplementation on the comprehensive energy model.
7. An internet-oriented comprehensive energy modeling device, which is characterized in that the device is suitable for a GIS client and comprises:
the power grid modeling module is used for importing the icon of the power grid equipment after the authentication and authentication of the user in the internal network are successful, carrying out power grid modeling on the internal network by combining the connection relation of the power grid equipment to obtain a power grid model, and storing power grid data in a power grid database;
the data importing module is used for importing the icon of the energy equipment after the authentication of the Internet user is successful, and importing the power grid data in the power grid database into the comprehensive energy database after the authentication of the internal and external network is successful;
the fusion modeling module is used for carrying out comprehensive energy modeling on the Internet according to the icon and the connection relation of the power grid equipment and the icon and the connection relation of the energy equipment to obtain a comprehensive energy model, and storing energy data in the comprehensive energy database;
wherein, the authentication success of the network authentication of the internal and external networks comprises: after authentication and authentication of an intranet user are successful, before the power grid data in the power grid database is imported into the comprehensive energy database, an intercommunication strategy of the intranet and the Internet is configured;
the configuration of the intercommunication strategy of the intranet and the Internet is specifically as follows: setting up the security gate to establish the mapping relation and authentication rule of the intranet and the Internet so as to complete the authentication of the intranet and the Internet by setting up the security gate.
8. An internet-oriented integrated energy modeling system, comprising a GIS client for executing the internet-oriented integrated energy modeling method according to any one of claims 1 to 6.
CN202110889892.5A 2021-08-03 2021-08-03 Internet-oriented comprehensive energy modeling method, device and system Active CN113642166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110889892.5A CN113642166B (en) 2021-08-03 2021-08-03 Internet-oriented comprehensive energy modeling method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110889892.5A CN113642166B (en) 2021-08-03 2021-08-03 Internet-oriented comprehensive energy modeling method, device and system

Publications (2)

Publication Number Publication Date
CN113642166A CN113642166A (en) 2021-11-12
CN113642166B true CN113642166B (en) 2023-11-14

Family

ID=78419572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110889892.5A Active CN113642166B (en) 2021-08-03 2021-08-03 Internet-oriented comprehensive energy modeling method, device and system

Country Status (1)

Country Link
CN (1) CN113642166B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103188254A (en) * 2011-12-31 2013-07-03 北京市国路安信息技术有限公司 Network security protection method capable of giving consideration to both smoothness and safety of internal and external network information
CN207764802U (en) * 2017-12-06 2018-08-24 广西电网有限责任公司电力科学研究院 A kind of power distribution network synthesis data buffering system hardware platform
CN109272248A (en) * 2018-10-10 2019-01-25 上海方融科技有限责任公司 A kind of comprehensive energy integration e-CIM design methods based on metadata
CN110266037A (en) * 2019-05-24 2019-09-20 国网安徽省电力有限公司 Distributed new based on topological auto-polymerization observes modeling method and system entirely
CN110276155A (en) * 2019-06-28 2019-09-24 新奥数能科技有限公司 The artwork library method of integrated modeling and electronic equipment of comprehensive energy
CN110443483A (en) * 2019-07-26 2019-11-12 广东电网有限责任公司信息中心 The energy multipotency net that is extended using ECIM as skeleton and with can equipment modeling method
CN111191332A (en) * 2019-12-25 2020-05-22 中国南方电网有限责任公司 Stock data initialization system and method for dispatching master station transformer diagram module to GIS platform
CN112307629A (en) * 2020-11-02 2021-02-02 山东大学 Comprehensive energy multi-energy flow unified real-time simulation system and method based on Thermolib software package

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103188254A (en) * 2011-12-31 2013-07-03 北京市国路安信息技术有限公司 Network security protection method capable of giving consideration to both smoothness and safety of internal and external network information
CN207764802U (en) * 2017-12-06 2018-08-24 广西电网有限责任公司电力科学研究院 A kind of power distribution network synthesis data buffering system hardware platform
CN109272248A (en) * 2018-10-10 2019-01-25 上海方融科技有限责任公司 A kind of comprehensive energy integration e-CIM design methods based on metadata
CN110266037A (en) * 2019-05-24 2019-09-20 国网安徽省电力有限公司 Distributed new based on topological auto-polymerization observes modeling method and system entirely
CN110276155A (en) * 2019-06-28 2019-09-24 新奥数能科技有限公司 The artwork library method of integrated modeling and electronic equipment of comprehensive energy
CN110443483A (en) * 2019-07-26 2019-11-12 广东电网有限责任公司信息中心 The energy multipotency net that is extended using ECIM as skeleton and with can equipment modeling method
CN111191332A (en) * 2019-12-25 2020-05-22 中国南方电网有限责任公司 Stock data initialization system and method for dispatching master station transformer diagram module to GIS platform
CN112307629A (en) * 2020-11-02 2021-02-02 山东大学 Comprehensive energy multi-energy flow unified real-time simulation system and method based on Thermolib software package

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
企业互联网综合服务平台安全防护探讨;王钢;任桂田;李晓永;;科技创新导报(第08期);第130-131页 *
在线安全预警系统中的网络模型重建;蒋维勇;吴文传;张伯明;王刚;孙宏斌;;电力系统自动化(第21期);第5-9页 *
混合架构电网数据管控平台的统一认证研究;马凯;杨强;谢善益;彭明洋;宋亚男;;山东工业技术(第03期);第70-74页 *
电力―天然气网络耦合系统研究综述;杨自娟;高赐威;赵明;;电力系统自动化(第16期);第21-31页 *
考虑外网等值的江西电网模型拼接实现方法研究;邹根华;黄伟;姚诸香;谢忠华;;电力系统保护与控制(第13期);第94-97页 *
能源互联网关键技术及市场机制的研究与实践;陈建福;李建标;刘尧;;电力勘测设计(第S1期);第137-143页 *

Also Published As

Publication number Publication date
CN113642166A (en) 2021-11-12

Similar Documents

Publication Publication Date Title
CN104915750A (en) Intelligent operation ticket management method and system for achieving integration with an EMS and an OMS
Johnson et al. Evaluation of interoperable distributed energy resources to ieee 1547.1 using sunspec modbus, ieee 1815, and ieee 2030.5
CN115439249B (en) Method, device and system for realizing business service of cross-region block chain
CN103873462B (en) Based on the IED pattern of IEC62351 and the security configuration verification method of configuration file
CN107783809A (en) A kind of smart machine control panel remote rendering method
CN103795786A (en) Embedded concentrator system with web service function
CN107819611B (en) Client test method based on IEC61850 multi-server simulation
Hu et al. Recent advances on state estimation for power grids with unconventional measurements
Falk IEC 61850 demystified
CN114936062B (en) Method, device, equipment, system and storage medium for automatic debugging of equipment
Guo et al. Design and implementation of virtual laboratory for a microgrid with renewable energy sources
CN113642166B (en) Internet-oriented comprehensive energy modeling method, device and system
CN103841595B (en) A kind of base station information supervisory systems
Kemal et al. A real-time open access platform towards proof of concept for smart grid applications
Fu et al. Design of experiment platform for digital substation based on IEC 61850
WO2024125570A1 (en) Visual modeling method and apparatus, and internet of things platform
CN113518129B (en) Method and device for interconnection and sharing of electric power energy sources
Li et al. An Effective Node‐To‐Edge Interdependent Network and Vulnerability Analysis for Digital Coupled Power Grids
CN106301833A (en) A kind of transformer station schedule information method of testing
Le et al. CIM compliant multiplatform approach for cyber-physical energy system assessment
Jiang et al. Analysis on Network Information Security Protection Technology of Intelligent Terminal Power Monitoring System of Substation under the Support of Multimodal Multimedia Information
CN110659060A (en) In-place distributed FA configuration rapid configuration method and system
Xue et al. Teaching Information Management System Based on Blockchain Technology
Li et al. A novel energy trading platform for distribution network based on edge computing
Ma et al. Innovative Exploration of Standard Digital Transformation in the Power Field: A New Mode of Blockchain Cooperation on and off the Chain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant