CN113622690B - Construction method of exterior wall decoration building - Google Patents

Construction method of exterior wall decoration building Download PDF

Info

Publication number
CN113622690B
CN113622690B CN202110953060.5A CN202110953060A CN113622690B CN 113622690 B CN113622690 B CN 113622690B CN 202110953060 A CN202110953060 A CN 202110953060A CN 113622690 B CN113622690 B CN 113622690B
Authority
CN
China
Prior art keywords
wall
building construction
decoration building
wall decoration
exterior wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110953060.5A
Other languages
Chinese (zh)
Other versions
CN113622690A (en
Inventor
刘庆祝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhongyuanxi Construction Co Ltd
Original Assignee
Guangdong Zhongyuanxi Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhongyuanxi Construction Co ltd filed Critical Guangdong Zhongyuanxi Construction Co ltd
Priority to CN202110953060.5A priority Critical patent/CN113622690B/en
Publication of CN113622690A publication Critical patent/CN113622690A/en
Application granted granted Critical
Publication of CN113622690B publication Critical patent/CN113622690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/16Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1877Leveling devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1894Lever-type lifters gripping the bottom edge of wall panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention relates to the technical field of exterior wall construction, in particular to an exterior wall decoration building construction method, which comprises the following steps: the method comprises the following steps: placing the large wall bricks on the outer wall decoration building construction device; step two: regularly and uniformly paving quantitative cement paste on the back of the wall brick; step three: after the installation position and the height of the wall brick are adjusted, the wall brick is pasted on the outer wall; step four; the wall brick adhered to the wall is fully pressed, so that the cement paste coated on the wall brick is flat and uniform, and the using amount of the cement paste is fixed.

Description

Construction method of exterior wall decoration building
Technical Field
The invention relates to the technical field of exterior wall construction, in particular to a construction method of an exterior wall decoration building.
Background
When the building exterior wall brick is laid, cement paste needs to be smeared on the back surface of a large wall brick to improve the adhesion degree of the wall brick and the wall surface, the stability of the wall brick after installation is improved, the wall brick has longer service life, but when the cement paste is smeared on the back surface of the wall brick, the smearing of the cement wall needs to be ensured to be smooth, the attractiveness of the wall brick stuck on the wall surface is ensured, the cement amount smeared on the wall brick needs to be controlled, the cement height smeared on each wall brick needs to be the same, a plurality of wall bricks are tidy and attractive, the cement waste can be caused when the cement amount smeared on the wall brick is too much, if the cement smearing is too little, the wall brick and the wall surface are not sufficiently connected, and a worker can not completely ensure that the cement paste smeared on the wall brick is smooth and uniform and can be used for a fixed amount.
Disclosure of Invention
The invention aims to provide a construction method for decorating an external wall to construct a building, which can ensure that cement paste coated on wall bricks is even and the further consumption is fixed.
The purpose of the invention is realized by the following technical scheme:
the construction method of the exterior wall decoration building comprises the following steps:
the method comprises the following steps: placing the large wall bricks on the outer wall decoration building construction device;
step two: paving a certain amount of cement paste on the back of the wall brick in order and uniformly;
step three: after the installation position and the height of the wall brick are adjusted, the wall brick is pasted on the outer wall;
step four; the wall bricks attached to the wall are fully pressed.
Building construction equipment is decorated to outer wall, the on-line screen storage device comprises a base, the rack, the workbin, the threaded rod, the track, the shower nozzle, a slide rail, the pull rod, the plectane is with put the thing platform, the even a plurality of racks of fixedly connected with in both ends of base, workbin fixed connection is in the upper end of base, it connects on the base to put thing platform fixed connection, the threaded rod rotates to be connected in the workbin, be equipped with a slope down conical plate in the workbin, the lower extreme of base rotates and is connected with two tracks, the lower extreme of workbin is equipped with a slide rail of fixedly connected with, the shower nozzle passes through pipe connection and feeds through the lower extreme at the workbin, shower nozzle sliding connection is on the slide rail, pull rod sliding connection is on the shower nozzle, plectane fixed connection is on the pull rod, the plectane rotates to be connected in the shower nozzle.
The building construction device is decorated to outer wall includes the support, a mold, the spout, the scraping wings, flange and clout box, and support sliding connection is on putting the thing platform, and mould fixed connection is on the support, and the mould is located puts thing bench side, is equipped with a rectangular groove and two circular recesses on the mould, and both ends all are equipped with the guard plate around the mould, and both ends all are equipped with the spout around the mould, and both ends all articulate about the mould has the clout box, and scraping wings sliding connection is between two spouts, and two flange difference fixed connection are both ends about the scraping wings.
The construction device for the outer wall decoration building comprises a moving frame, clamping seats, a sliding block, a supporting plate, a rotating wheel shaft, sliding rods, a clamping block, a limiting block and a fixing block, wherein the moving frame is installed on a base through a three-level hydraulic cylinder, the three-level hydraulic cylinder is fixedly connected to the base, the moving frame is fixedly connected to the three-level hydraulic cylinder, the two clamping seats are respectively and fixedly connected to the left end and the right end of the moving frame, the sliding block is installed on the moving frame through the hydraulic cylinder, one end of the hydraulic cylinder is rotatably connected to the sliding block, the other end of the hydraulic cylinder is rotatably connected to the moving frame, the sliding block is slidably connected to the supporting plate, the supporting plate is rotatably connected to the moving frame, the rotating wheel shaft is fixedly connected to the supporting plate, the rotating wheel shaft is rotatably connected to the moving frame, the left end and the right end of the rotating wheel shaft are respectively rotatably connected to the two sliding rods, the two sliding rods are respectively and slidably connected to the two clamping seats, and springs are respectively arranged between the two sliding rods and the two clamping seats, two fixture blocks are respectively sliding connection on two cassettes, all are equipped with spring II between two fixture blocks and two cassettes, and two fixture blocks carry out the restriction that removes in the horizontal direction to two slide bars respectively, and two stoppers are fixed connection respectively at both ends about the runner spindle, and two fixed blocks are fixed connection respectively on two slide bars.
Building construction equipment is decorated to outer wall includes sucking disc, push rod, link and pushes away the frame, and two sucking discs are fixed connection both ends about the backup pad respectively, and the even sliding connection of a plurality of push rods pushes away frame sliding connection in the backup pad, and the equal fixed connection of a plurality of push rods pushes away frame fixed connection on the link.
Drawings
The invention is described in further detail below with reference to the accompanying drawings and specific embodiments.
FIG. 1 is a flow chart of an exterior wall finishing building construction method of the present invention;
FIG. 2 is a schematic view of the placement frame for the exterior wall decoration construction device of the present invention;
FIG. 3 is a schematic view of a base of the exterior wall decoration building construction device of the present invention;
FIG. 4 is a schematic view of a bin of the exterior wall finishing construction device of the present invention;
FIG. 5 is a schematic view of a circular plate of the exterior wall decoration construction device of the present invention;
FIG. 6 is a schematic view of a mold for an exterior wall decoration construction device according to the present invention;
FIG. 7 is a schematic view of a surplus material box of the construction device for exterior wall decoration of the present invention;
FIG. 8 is a schematic view of a movable frame of the exterior wall decoration construction apparatus of the present invention;
FIG. 9 is a schematic view of a support plate of the exterior wall finishing construction device of the present invention;
FIG. 10 is a schematic view of a fastening seat of the construction device for exterior wall decoration of the present invention;
FIG. 11 is a schematic view of a rotary wheel of the exterior wall finishing construction device of the present invention;
FIG. 12 is a schematic view of a suction cup of the exterior wall finishing construction device of the present invention;
FIG. 13 is a schematic view of a push frame of the exterior wall finishing construction device of the present invention;
FIG. 14 is a general schematic view of an exterior wall finishing construction device according to the present invention;
fig. 15 is a general schematic view of an exterior wall finishing construction device of the present invention.
In the figure:
a base 1; a placing rack 11; a bin 12; a threaded rod 13; a crawler belt 14; a shower head 15; a slide rail 16; a pull rod 17; a circular plate 18; a placement table 19; a bracket 2; a mold 21; a chute 22; a pusher plate 23; a convex plate 24; a residue box 25; a moving frame 3; a card holder 31; a slider 32; a support plate 33; a rotating wheel 34; a slide lever 35; a latch 36; a stopper 37; a fixed block 38; a suction cup 41; a push rod 42; a connecting frame 43; and pushing the frame 44.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1;
the construction method of the exterior wall decoration building comprises the following steps:
the method comprises the following steps: placing the large wall bricks on the outer wall decoration building construction device;
step two: paving a certain amount of cement paste on the back of the wall brick in order and uniformly;
step three: after the installation position and the height of the wall brick are adjusted, the wall brick is pasted on the outer wall;
step four; fully pressing the wall bricks attached to the wall.
As shown in fig. 2-5;
the construction method of the exterior wall decoration building also uses an exterior wall decoration building construction device which comprises a base 1, a placing rack 11, a material box 12, a threaded rod 13 and a crawler 14, the spray head 15, the slide rail 16, the pull rod 17, the circular plate 18 and the object placing table 19, wherein a plurality of placing frames 11 are uniformly and fixedly connected to two ends of the base 1, the material box 12 is fixedly connected to the upper end of the base 1, the object placing table 19 is fixedly connected to the base 1, the threaded rod 13 is rotatably connected into the material box 12, a downward-gradient conical plate is arranged in the material box 12, the lower end of the base 1 is rotatably connected with two crawler belts 14, the lower end of the material box 12 is fixedly connected with the slide rail 16, the spray head 15 is connected to the lower end of the material box 12 through a pipeline, the spray head 15 is slidably connected to the slide rail 16, the pull rod 17 is rotatably connected to the spray head 15, the circular plate 18 is fixedly connected to the pull rod 17, and the circular plate 18 is rotatably connected to the spray head 15;
the threaded rod 13 is driven by external power, the external power selects a speed reducing motor, the speed reducing motor is fixedly connected to the material box 12, and the threaded rod 13 is fixedly connected to an output shaft of the speed reducing motor;
the device is provided with the plurality of placing frames 11, the wall bricks can be carried to be transported in the brick sticking process, workers do not need to carry the wall bricks independently at each time for use, manpower and material resources are saved, the workload of the workers is reduced, the working efficiency is improved, meanwhile, the plurality of placing frames 11 are independent, unnecessary loss caused by collision among the wall bricks in the transportation process of the plurality of wall bricks can be avoided, the device is also provided with the material box 12, cement paste raw materials can be transported through the material box 12, the cement paste can be conveniently used in real time, and the transportation process of the cement paste by the workers is avoided;
the wall brick is placed on the object placing table 19, so that slurry can be sprayed on the wall brick through the spray head 15, meanwhile, a worker can push and pull the pull rod 17 through pushing and pulling, the pull rod 17 moves to drive the spray head 15 to move, the slurry can be uniformly spread on the wall brick, the slurry on the wall brick can be conveniently leveled, meanwhile, the slurry flows into the spray head 15 through a pipeline and is easily blocked, and the slurry in the material box 12 can be fully extruded through the rotation of the threaded rod 13, so that the flowing stability of the slurry is ensured;
further, block up shower nozzle 15 through plectane 18, make thick liquids can't flow, it rotates to rotate pull rod 17 and drives plectane 18 and rotate, plectane 18 rotates the back and loses stopping to shower nozzle 15, make thick liquids can flow, the velocity of flow of the different thick liquids of plectane 18 turned angle is also different, the staff of being convenient for controls thick liquids flow, the fixed point that carries out a small amount of thick liquids in the place that lacks the material adds, the staff can control the position and the speed of unloading through the removal and the rotation of control pull rod 17, be convenient for operate.
As shown in fig. 6-7;
the exterior wall decoration building construction device further comprises a support 2, a mold 21, sliding grooves 22, a material pushing plate 23, convex plates 24 and a waste material box 25, wherein the support 2 is connected to the object placing table 19 in a sliding mode, the mold 21 is fixedly connected to the support 2, the mold 21 is located above the object placing table 19, a rectangular groove and two circular grooves are formed in the mold 21, protective plates are arranged at the front end and the rear end of the mold 21, the sliding grooves 22 are formed in the front end and the rear end of the mold 21, the waste material box 25 is hinged to the left end and the right end of the mold 21, the material pushing plate 23 is connected between the two sliding grooves 22 in a sliding mode, and the two convex plates 24 are fixedly connected to the left end and the right end of the material pushing plate 23 respectively;
the bracket 2 is driven by a hydraulic cylinder II, the hydraulic cylinder II is fixedly connected to the base 1, and the bracket 2 is fixedly connected to the hydraulic cylinder II;
the material pushing plate 23 is driven by a driving assembly in a combined mode, the driving assembly comprises a speed reducing motor II and a screw rod, the speed reducing motor II is fixedly connected to the die 21, the screw rod is fixedly connected to an output shaft of the speed reducing motor II, the screw rod is rotatably connected to the die 21, and the screw rod and the material pushing plate 23 are in threaded transmission;
the device can also control the amount and shape of the slurry laid on the wall bricks, the wall bricks are placed on the object placing table 19, the bracket 2 moves downwards to drive the mould 21 to move downwards, the mould 21 moves downwards to be attached on the wall bricks, at the moment, the slurry is sprayed on the mould 21, the slurry is leveled, so that the slurry can flow into the grooves on the mould 21, when all the grooves on the mould 21 are fully filled, the heights of the slurry on different wall bricks can be kept consistent, the wall bricks are neat and beautiful after being attached on the wall surface, all the grooves on the mould 21 are fully filled, the wall bricks and the wall surface can be fully connected when the wall bricks are fully coated without using a large amount of slurry, the slurry consumption is saved while the laying effect of the wall bricks is ensured, the redundant slurry can be pushed into the residual material boxes 25 at the left end and the right end, and before the next wall brick is coated with the slurry, the two residual material boxes 25 can be rotated to pour the slurry in the two residual material boxes 25 onto the wall brick, so that the residual materials are fully utilized, the waste of the residual materials can be avoided, and the economic expenditure can be reduced;
further, after the thick liquids spill on mould 21, can remove through scraping wings 23 and will spill the thick liquids on mould 21 and float, make all thick liquids can both fully flow into mould 21 upper groove, in order to avoid the bar inslot at both ends around mould 21 to be difficult to the feeding, through two flange 24, make the unnecessary thick liquids in mould 21 top can be removed to both ends along the inclined plane of flange 24 by the promotion in-process, make all grooves on mould 21 can both fully fill up the thick liquids.
As shown in fig. 8-11;
the construction device for the exterior wall decoration building further comprises a moving frame 3, clamping seats 31, a sliding block 32, a supporting plate 33, a rotating wheel shaft 34, sliding rods 35, clamping blocks 36, a limiting block 37 and a fixing block 38, wherein the moving frame 3 is installed on the base 1 through a three-stage hydraulic cylinder, the three-stage hydraulic cylinder is fixedly connected on the base 1, the moving frame 3 is fixedly connected on the three-stage hydraulic cylinder, the two clamping seats 31 are respectively and fixedly connected at the left end and the right end of the moving frame 3, the sliding block 32 is installed on the moving frame 3 through the hydraulic cylinder, one end of the hydraulic cylinder is rotatably connected on the sliding block 32, the other end of the hydraulic cylinder is rotatably connected on the moving frame 3, the sliding block 32 is slidably connected on the supporting plate 33, the supporting plate 33 is rotatably connected on the moving frame 3, the pushing rods are respectively arranged at the left end and the right end of the rotating wheel shaft 34, the rotating wheel shaft 34 is rotatably connected on the moving frame 3, the left end and the right end of the rotating wheel shaft 34 are respectively rotatably connected on the two sliding rods 35, the two sliding rods 35 are respectively connected to the two clamping seats 31 in a sliding manner, springs are arranged between the two sliding rods 35 and the two clamping seats 31, the two clamping blocks 36 are respectively connected to the two clamping seats 31 in a sliding manner, springs II are arranged between the two clamping blocks 36 and the two clamping seats 31, the two clamping blocks 36 respectively limit the movement of the two sliding rods 35 in the horizontal direction, the two limiting blocks 37 are respectively fixedly connected to the left end and the right end of the rotating wheel shaft 34, and the two fixing blocks 38 are respectively fixedly connected to the two sliding rods 35;
the device can also automatically lay wall bricks, when the large wall bricks are laid, a plurality of workers are required to carry and paste together, a large amount of manpower resources are wasted, meanwhile, when the large wall bricks are at a certain height, the large wall bricks are dangerous to work, firstly, the wall bricks coated with slurry are directly pushed onto the supporting plate 33 from the object placing table 19, the transportation process of the wall bricks is reduced, the wall bricks are prevented from being collided and damaged in the transportation process, and the lengths of the three-stage hydraulic cylinders are adjusted through different laying heights of the wall bricks, so that the height of the wall bricks on the supporting plate 33 is adjusted;
furthermore, after the height is determined, the support plate 33 can be driven to rotate through the extension of the hydraulic cylinder, the support plate 33 rotates to drive the wall brick to rotate, the wall brick is attached to the wall when rotating to the vertical surface, the wall brick is attached, the work efficiency is improved while time and labor are saved, the workload of workers is reduced, the workers can carry out operations with different heights, the workers are prevented from climbing to a high place with the wall brick, and the safety and the efficiency are higher;
further, in order to make the wall brick more smooth and firm in the laying process, the fixture blocks 36 limit the sliding rods 35 to move, the support plate 33 can drive the rotating wheel shaft 34 to rotate firstly, the push rods at the two ends of the rotating wheel shaft 34 can push the two fixture blocks 36 to move upwards, the support plate 33 keeps a vertical state after rotating for 90 degrees, at this time, the limit blocks 37 at the two ends of the rotating wheel shaft 34 are limited by the two fixing blocks 38 and cannot continue to rotate, the wall brick can be kept in a vertical state, the two push rods push the two fixture blocks 36 away from the two sliding rods 35 after the rotating wheel shaft 34 rotates for 90 degrees, at this time, the hydraulic cylinder continues to extend to enable the sliding blocks 32 to slide upwards, the support plate 33 cannot rotate and can also slide forwards, the wall brick is attached to the wall surface under the condition that the wall brick is kept vertical, the laying effect of the wall brick is improved, all the wall bricks are neat, attractive and high in stability.
As shown in fig. 12-13;
the outer wall decoration building construction device further comprises suckers 41, push rods 42, a connecting frame 43 and a push frame 44, wherein the two suckers 41 are respectively and fixedly connected to the left end and the right end of the supporting plate 33, the push rods 42 are uniformly and slidably connected to the supporting plate 33, the push frame 44 is slidably connected to the supporting plate 33, the push rods 42 are fixedly connected to the connecting frame 43, and the push frame 44 is fixedly connected to the connecting frame 43;
the connecting frame 43 is driven by a hydraulic cylinder III, the hydraulic cylinder III is fixedly connected to the supporting plate 33, and the connecting frame 43 is fixedly connected to the hydraulic cylinder III;
the wall brick needs to rotate along with the supporting plate 33, in order to avoid the situation that the wall brick slides or falls off in the process of rotating along with the supporting plate 33, so that unnecessary loss is caused due to damage of the wall brick, the stability of the wall brick rotating along with the supporting plate 33 is improved, two suckers 41 are arranged on the supporting plate 33, the wall brick is adsorbed through the two suckers 41, after the wall brick is installed, the two suckers 41 lose adsorption of the wall brick, sufficient protection can be improved on the wall brick, and the wall brick is prevented from being separated from the supporting plate 33 in the rotating process;
furthermore, in order to fully diffuse the cement slurry on the wall brick, so that the wall brick can be fully connected with the wall surface, and the stability of the laid wall brick is improved, after the wall brick is attached to the front surface, the connecting frame 43 moves to drive the push frame 44 to move, the push frame 44 moves to push and press the periphery of the wall brick, so that the slurry on the periphery of the wall brick can be fully diffused, no gap exists between the periphery of the wall brick and the wall surface, the wall brick and the wall surface are fully connected, the connecting frame 43 moves to drive the push rods 42 to move, the push rods 42 move to push and press the whole wall brick, so that the slurry in the wall brick is fully diffused and can be diffused to the part, which is not coated with the slurry, of the wall brick and the wall surface are connected, and the quality of the wall brick and the wall surface is improved;
further, all be equipped with the rubber sleeve on a plurality of push rods 42 and the frame 44 that pushes away, can avoid a plurality of push rods 42 and push away the frame 44 when bulldozing the wall brick, cause wearing and tearing or scrape the flower to the surface of wall brick, better protect the wall brick.

Claims (6)

1. The construction method of the exterior wall decoration building is characterized in that: the method comprises the following steps:
the method comprises the following steps: placing the large wall bricks on the outer wall decoration building construction device;
step two: paving a certain amount of cement paste on the back of the wall brick in order and uniformly;
step three: after the installation position and the height of the wall brick are adjusted, the wall brick is pasted on the outer wall;
step four; fully pressing the wall bricks attached to the wall;
the outer wall decoration building construction device comprises a base (1), wherein a plurality of placing frames (11) are uniformly fixed at two ends of the base (1), a material box (12) is fixed at the upper end of the base (1), and a placing table (19) is fixed on the base (1);
the threaded rod (13) rotates in the feed box (12), the lower end of the feed box (12) is provided with a slide rail (16), a spray head (15) slides in the slide rail (16), the spray head (15) rotates on a pull rod (17), the pull rod (17) slides on the slide rail (16), and the spray head (15) is connected with the feed box (12) through a pipeline and is communicated with the interior;
a circular plate (18) is fixed on the pull rod (17), and the circular plate (18) rotates in the spray head (15);
the outer wall decoration building construction device further comprises a support (2), the support (2) slides on the storage table (19), a mold (21) is fixed on the support (2), and the two ends of the mold (21) are hinged with residual material boxes (25).
2. The exterior wall decoration building construction method of claim 1, wherein: the die (21) is provided with two sliding grooves (22), a material pushing plate (23) slides between the two sliding grooves (22), and the material pushing plate (23) is provided with two convex plates (24).
3. The exterior wall finishing construction method of claim 2, wherein; the building construction device is decorated to outer wall still includes removes frame (3), removes frame (3) and passes through tertiary pneumatic cylinder to be fixed on base (1), removes to rotate on frame (3) and has backup pad (33).
4. The exterior wall decoration building construction method of claim 3, wherein: a sliding block (32) slides on the supporting plate (33), a hydraulic cylinder rotates on the sliding block (32), and the other end of the hydraulic cylinder rotates on the moving frame (3).
5. The exterior wall decoration building construction method of claim 4, wherein: the outer wall decoration building construction device further comprises push rods (42), a connecting frame (43) and push frames (44), the push rods (42) and the push frames (44) are fixed on the connecting frame (43), and the push rods (42) and the push frames (44) slide on the supporting plate (33).
6. The exterior wall decoration building construction method of claim 5, wherein: rubber sleeves are arranged on the push rods (42) and the push frames (44).
CN202110953060.5A 2021-08-19 2021-08-19 Construction method of exterior wall decoration building Active CN113622690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110953060.5A CN113622690B (en) 2021-08-19 2021-08-19 Construction method of exterior wall decoration building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110953060.5A CN113622690B (en) 2021-08-19 2021-08-19 Construction method of exterior wall decoration building

Publications (2)

Publication Number Publication Date
CN113622690A CN113622690A (en) 2021-11-09
CN113622690B true CN113622690B (en) 2022-09-02

Family

ID=78386606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110953060.5A Active CN113622690B (en) 2021-08-19 2021-08-19 Construction method of exterior wall decoration building

Country Status (1)

Country Link
CN (1) CN113622690B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035119A (en) * 2017-04-21 2017-08-11 钟建筑 A kind of construction is with vertical automatic Wall brick device
CN208039764U (en) * 2018-03-06 2018-11-02 江苏峰峦环境建设有限公司 A kind of vertical automatic Wall brick device of construction
CN111927065A (en) * 2020-08-15 2020-11-13 重庆万重山智能科技有限公司 Plastering module and full-automatic wall tiling robot thereof
CN113175182A (en) * 2021-04-30 2021-07-27 中国十七冶集团有限公司 Vertical type automatic wall tile pasting intelligent device for building construction and wall tile pasting method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035119A (en) * 2017-04-21 2017-08-11 钟建筑 A kind of construction is with vertical automatic Wall brick device
CN208039764U (en) * 2018-03-06 2018-11-02 江苏峰峦环境建设有限公司 A kind of vertical automatic Wall brick device of construction
CN111927065A (en) * 2020-08-15 2020-11-13 重庆万重山智能科技有限公司 Plastering module and full-automatic wall tiling robot thereof
CN113175182A (en) * 2021-04-30 2021-07-27 中国十七冶集团有限公司 Vertical type automatic wall tile pasting intelligent device for building construction and wall tile pasting method

Also Published As

Publication number Publication date
CN113622690A (en) 2021-11-09

Similar Documents

Publication Publication Date Title
AU2011201648A1 (en) Large Pallet Machine For Forming Molded Products
CN112046025B (en) Artificial stone thin plate material distribution system and artificial stone thin plate material distribution method
CN105108962B (en) Production line and production method for composite heat-insulation decorative board
CN106758708A (en) Automatic paving machine and tile work method
CN211366099U (en) Belt conveyor capable of automatically distributing materials
CN104325553A (en) Automatic production line for self-heat-insulating building block
CN111576799A (en) Method for automatically coating cement slurry layer on ceramic tile
CN113622690B (en) Construction method of exterior wall decoration building
CN109853911B (en) Ceramic tile plastering mechanism and ceramic tile plastering method
CN112878714B (en) Automatic brick laying machine for building engineering
CN110775646A (en) Floor tile is with spreading diaphragm equipment
CN207696735U (en) The automatic release agent spraying device of pipe pile forming die
CN109396383A (en) Motor rotor die-casting machine people's transfer matic
CN108788013B (en) Sand casting system with batching and sand mould finished product clearance function
CN201543557U (en) Curved pad printing device
CN111036509A (en) Powder spraying and distributing machine
CN114273167B (en) Automatic assembling equipment for street lamp shade glass
CN206154480U (en) Convertible concrete member make -up machine
CN213325473U (en) Ceramic wallboard production facility
CN208100723U (en) Movable type protects form integrated board molding machine
CN207484384U (en) A kind of snow-removing spreading machine
CN112459419B (en) Wall plastering machine for building construction
CN212041118U (en) Super clean and bright granite waxing device
CN212242313U (en) Feeder for powder compression molding equipment
CN217149789U (en) A rubble homogenization dispensing device for highway maintenance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220816

Address after: 2nd Floor, No. 10, Hengxi 8th Street, Shangpai New District, Guanglong Garden, Shuidong Street, Dianbai District, Maoming City, Guangdong Province, 525400

Applicant after: Guangdong Zhongyuanxi Construction Co., Ltd.

Address before: 150036 No. 1, Zhongshan Road, Xiangfang District, Harbin City, Heilongjiang Province

Applicant before: Liu Qingzhu

GR01 Patent grant
GR01 Patent grant