CN113606017A CN202110740326.8A CN202110740326A CN113606017A CN 113606017 A CN113606017 A CN 113606017A CN 202110740326 A CN202110740326 A CN 202110740326A CN 113606017 A CN113606017 A CN 113606017A
Authority
CN
China
Prior art keywords
urea
relay
liquid level
signal
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110740326.8A
Other languages
Chinese (zh)
Inventor
黄二静
董雯雯
侯卓磊
邱楚然
李夏宇
王苏东
耿睿
侯璐
江云鹤
刘洲
张宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Science and Technology Branch of XCMG
Original Assignee
Science and Technology Branch of XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Science and Technology Branch of XCMG filed Critical Science and Technology Branch of XCMG
Priority to CN202110740326.8A priority Critical patent/CN113606017A/en
Publication of CN113606017A publication Critical patent/CN113606017A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N3/00Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust
    • F01N3/08Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous
    • F01N3/10Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous by thermal or catalytic conversion of noxious components of exhaust
    • F01N3/18Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous by thermal or catalytic conversion of noxious components of exhaust characterised by methods of operation; Control
    • F01N3/20Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous by thermal or catalytic conversion of noxious components of exhaust characterised by methods of operation; Control specially adapted for catalytic conversion ; Methods of operation or control of catalytic converters
    • F01N3/2006Periodically heating or cooling catalytic reactors, e.g. at cold starting or overheating
    • F01N3/2013Periodically heating or cooling catalytic reactors, e.g. at cold starting or overheating using electric or magnetic heating means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N3/00Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust
    • F01N3/08Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous
    • F01N3/10Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous by thermal or catalytic conversion of noxious components of exhaust
    • F01N3/18Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous by thermal or catalytic conversion of noxious components of exhaust characterised by methods of operation; Control
    • F01N3/20Exhaust or silencing apparatus having means for purifying, rendering innocuous, or otherwise treating exhaust for rendering innocuous by thermal or catalytic conversion of noxious components of exhaust characterised by methods of operation; Control specially adapted for catalytic conversion ; Methods of operation or control of catalytic converters
    • F01N3/2066Selective catalytic reduction [SCR]
    • F01N3/208Control of selective catalytic reduction [SCR], e.g. dosing of reducing agent
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N2590/00Exhaust or silencing apparatus adapted to particular use, e.g. for military applications, airplanes, submarines
    • F01N2590/08Exhaust or silencing apparatus adapted to particular use, e.g. for military applications, airplanes, submarines for heavy duty applications, e.g. trucks, buses, tractors, locomotives
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N2610/00Adding substances to exhaust gases
    • F01N2610/02Adding substances to exhaust gases the substance being ammonia or urea
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N2610/00Adding substances to exhaust gases
    • F01N2610/14Arrangements for the supply of substances, e.g. conduits
    • F01N2610/1473Overflow or return means for the substances, e.g. conduits or valves for the return path
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N2610/00Adding substances to exhaust gases
    • F01N2610/14Arrangements for the supply of substances, e.g. conduits
    • F01N2610/1486Means to prevent the substance from freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N2900/00Details of electrical control or of the monitoring of the exhaust gas treating apparatus
    • F01N2900/06Parameters used for exhaust control or diagnosing
    • F01N2900/18Parameters used for exhaust control or diagnosing said parameters being related to the system for adding a substance into the exhaust
    • F01N2900/1806Properties of reducing agent or dosing system
    • F01N2900/1811Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N2900/00Details of electrical control or of the monitoring of the exhaust gas treating apparatus
    • F01N2900/06Parameters used for exhaust control or diagnosing
    • F01N2900/18Parameters used for exhaust control or diagnosing said parameters being related to the system for adding a substance into the exhaust
    • F01N2900/1806Properties of reducing agent or dosing system
    • F01N2900/1814Tank level

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Exhaust Gas After Treatment (AREA)

Abstract

The invention discloses a delayed power-off control device which comprises a controller, a first relay and a second relay, wherein a urea liquid level sensor and a urea temperature sensor are arranged in a urea box of a loader; the controller receives the on-off state signals of the whole loader and the output signals of the urea temperature sensor and the urea liquid level sensor, and controls the power on and power off of the first relay coil and the second relay coil according to the signals transmitted by the urea temperature sensor and the urea liquid level sensor. The invention also discloses a control method of the delayed power-off control device. The invention discloses a loader and a delayed power-off control device and a control method thereof, which can solve the technical problem that an engine cannot be started in a normal production mode due to blockage of a urea pipe and a nozzle of the loader caused by power-off of a whole vehicle.

Description

Loader and delayed power-off control device and control method thereof
Technical Field
The invention relates to a delayed power-off control device and a delayed power-off control method for a loader, and belongs to the technical field of engineering vehicle control.
Background
Along with the rapid development of social economy and the general improvement of the living standard of people, the requirement of the whole society on environmental protection is higher and higher, and the requirement on the tail gas emission standard of engineering vehicles is higher and higher, so that the national IV and European V emission standards of the engineering vehicles are in line with each other. The urea is used as a raw material necessary for the post-treatment system of national IV and European V emission standards of engineering vehicles, and the normal and stable delivery of the urea to the post-treatment system of the engineering vehicles is particularly important. Because the engineering vehicle does not have the direct power failure of time delay after the operation is accomplished, urea case heating solenoid valve can close immediately, back flow heating device stop heating, and the urea of remaining in urea case nozzle department can crystallize, blocks up urea nozzle and pipeline, and urea just can't carry whole car aftertreatment system again when leading to reuse, can lead to whole car aftertreatment system inoperative finally, and the unable normal use of whole car.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a loader, a delayed power-off control device and a control method thereof, which can solve the technical problem that an engine cannot be normally started due to blockage of a urea pipe and a nozzle of the loader caused by power-off of the whole vehicle.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows:
a time-delay power-off control device of a loader comprises a controller, a first relay and a second relay, wherein a urea liquid level sensor and a urea temperature sensor are arranged in a urea box of the loader; the controller receives the on-off state signal of the whole loader and the output signals of the urea temperature sensor and the urea liquid level sensor, the controller controls the power on and power off of the first relay and the second relay coil according to the signals transmitted by the urea temperature sensor and the urea liquid level sensor, the contact of the first relay is connected to the power supply loop of the urea box return pipe heating device, and the contact of the second relay is connected to the power supply loop of the urea heating electromagnetic valve.
The controller is connected with an indicator light.
And a safety box is connected between the second relay and the heating device of the urea box return pipe.
The urea box heating electromagnetic valve is a switch valve.
The whole vehicle switch is a normally open contact switch.
The first relay contact connected to the power supply loop of the urea box backflow pipe heating device and the second relay contact connected to the power supply loop of the urea heating electromagnetic valve are normally open contacts respectively.
The power supply supplies power for the first relay, the second relay and the controller.
A loader comprises the loader delayed power-off control device.
A control method of a delayed power-off control device of a loader is characterized by comprising the following steps: the method comprises the following steps:
receiving a low level signal sent when a switch of a whole vehicle is switched off;
analyzing and processing the low level signal, and determining that a delayed power-off device needs to be started when the whole vehicle is powered off;
outputting two high-level signals to a first relay and a second relay respectively, controlling coils of the first relay and the second relay to be electrified, closing normally open contacts of the first relay and the second relay, and supplying power to a backflow pipe heating device and a urea heating electromagnetic valve by a power supply;
and step four, controlling the opening and closing of a heating device of a return pipe of the urea box and a heating electromagnetic valve of the urea box according to the received signals of the urea temperature sensor and the urea liquid level sensor.
Step four, the process of controlling the urea box heating electromagnetic valve by the controller is as follows:
step a, receiving an analog quantity liquid level signal detected by a urea liquid level sensor;
step b, filtering the analog quantity liquid level signal to remove interference signals;
step c, converting the analog quantity liquid level signal into a hexadecimal digital signal by A/D conversion;
d, sampling and analyzing the converted digital signals, carrying out numerical processing, then carrying out numerical authenticity verification, and removing unstable digital signals to obtain stable and accurate digital signals;
e, digitally arranging the acquired stable and accurate digital signals to obtain a discrete liquid level curve;
and f, comparing and analyzing the liquid level value on the discrete liquid level curve with a preset value, controlling the coil of the first relay to be powered off when the liquid level value is smaller than the preset value, and otherwise controlling the coil of the first relay to be powered on.
Step four, the process of controlling the heating device of the return pipe of the urea box by the controller is as follows:
step a, receiving an analog quantity temperature signal detected by a urea temperature sensor;
step b, filtering the analog quantity temperature signal to remove an interference signal;
step c, converting the analog quantity temperature signal into a hexadecimal digital signal by A/D conversion;
d, sampling and analyzing the converted digital signals, carrying out numerical processing, then carrying out numerical authenticity verification, and removing unstable digital signals to obtain stable and accurate digital signals;
e, digitally arranging the acquired stable and accurate digital signals to obtain a discrete temperature curve;
and f, comparing and analyzing the temperature value on the discrete temperature curve with a preset value, controlling the coil of the second relay to be powered on when the temperature value is smaller than the preset value, and otherwise controlling the coil of the second relay to be powered off.
The invention has the beneficial effects that:
1. the controller is connected with a switch of the whole vehicle, the controller is connected with a coil control end of a first relay and a urea liquid level sensor, the controller is connected with a coil control end of a second relay and a urea temperature sensor, and only when the controller detects that no power supply signal is input through the switch, the controller controls the urea heating electromagnetic valve to be opened and the urea return pipe heating device to heat; therefore, after the power supply is powered off, the urea in the pipeline completely flows back into the urea box, and the blockage of the urea pipeline is prevented.
2. The invention adopts the urea temperature sensor to monitor the temperature of the urea in the urea box, transmits the urea temperature signal to the controller, and processes the signal through the controller, thereby achieving the effect of real-time control of the controller on the heating device of the return pipe of the urea box.
3. The urea level sensor monitors the urea liquid level in the urea box, the urea liquid level signal is transmitted to the controller, the signal is processed by the controller, and when the urea liquid level is lower than the low level of the set range, the controller controls the reflux pipe heating device to stop heating, so that the effect of stopping the interlocking control is achieved.
4. A fuse box is additionally arranged between the relay contact end and the backflow pipe heating device, so that overload of the control circuit caused by transitional heating of the backflow pipe heating device is avoided, and the whole heating system is protected.
5. The control method for controlling the urea box heating electromagnetic valve and the urea box return pipe heating device by the controller has the advantages of larger data acquisition amount, better filtering effect, faster and more accurate data processing.
Drawings
Fig. 1 is a schematic view of a frame connection structure of a delayed power-off control device of a loader according to the present invention.
The reference numbers in the figures are as follows: 1-a controller; 2-a first relay; 3-a second relay; 4-an indicator light; 5-a power supply; 6-fuse box; 7-a reflux pipe heating device; 8-urea heating electromagnetic valve; 9-urea temperature sensor; 10-a switch of the whole vehicle and 11-a urea liquid level sensor.
Detailed Description
The present invention is further described with reference to the accompanying drawings, and the following examples are only for clearly illustrating the technical solutions of the present invention, and should not be taken as limiting the scope of the present invention.
As shown in figure 1, the invention discloses a delayed power-off control device of a loader, which comprises a controller 1, a first relay 2, a second relay 3, an indicator lamp 4, a power supply 5, a fuse box 6, a return pipe heating device 7, a urea heating electromagnetic valve 8, a urea temperature sensor 9, a whole vehicle switch 10 and a urea liquid level sensor 11. The urea box heating electromagnetic valve 8 is a switch valve, and the whole vehicle switch 10 is a normally open contact switch. The controller 1 is connected with an indicator lamp 4, and the indicator lamp 4 is turned off after the switch 10 of the whole vehicle is turned off for a certain time. The controller 1 is connected with a whole vehicle switch 10, and the power supply for a certain time is continuously output after the power supply is cut off by the controller through logic control. A urea liquid level sensor 11 and a urea temperature sensor 9 are arranged in a urea box of the loader, the urea box is connected with a return pipe and a heating pipeline, a urea heating electromagnetic valve 8 is arranged on the heating pipeline, and a urea box return pipe heating device 7 is arranged on the return pipe; controller 1 receives loader whole car switch 10 status signal to and urea temperature sensor 9 and urea level sensor 11's output signal, controller 1 is according to the signal of urea temperature sensor 9 and urea level sensor 11 transmission, the first relay 2 of control and the 3 coils of second relay get the electricity and lose the electricity, the contact of first relay 2 is connected on the power supply circuit of urea case back flow heating device 7, the contact of second relay 3 is connected on the power supply circuit of urea heating solenoid valve 8. The power supply 5 supplies power to the first relay 2, the second relay 3, and the controller 1. The contact of the first relay 2 connected to the power supply loop of the urea box return pipe heating device 7 and the contact of the second relay 3 connected to the power supply loop of the urea heating electromagnetic valve 8 are normally open contacts respectively.
A safety box 6 is connected between the second relay 3 and the urea box return pipe heating device 7, so that overload caused by introduction of control circuit due to transition heating of the return pipe heating device 7 is avoided, and the whole heating system is protected. Urea level sensor 11 gathers urea case liquid level signal and feeds back to controller 1, and urea temperature sensor 9 gathers urea case urea temperature and feeds back to controller 1. In order to facilitate installation and later maintenance, all hardware are installed through threads; the input and output of the signal are transmitted by the wire.
The invention also discloses a loader, which comprises the loader delayed power-off control device.
The invention also discloses a control method of the delayed power-off control device of the loader, which comprises the following steps:
firstly, a controller 1 receives a low level signal sent when a vehicle switch 10 is switched off;
step two, the controller 1 analyzes and processes the low level signal to confirm that the power failure of the whole vehicle needs to start the delayed power failure device;
step three, the controller 1 outputs two high level signals to the first relay 2 and the second relay 3 respectively, and controls coils of the first relay 2 and the second relay 3 to be electrified, so that normally open contacts of the first relay 2 and the second relay 3 are closed, and the power supply 5 supplies power to the backflow pipe heating device 7 and the urea heating electromagnetic valve 8;
and step four, the controller 1 controls the opening and closing of the urea box return pipe heating device 7 and the urea box heating electromagnetic valve 8 according to the received signals of the urea temperature sensor 9 and the urea liquid level sensor 11 respectively.
In the fourth step, the process of controlling the urea box heating electromagnetic valve 8 by the controller 1 is as follows:
step a, receiving an analog quantity liquid level signal detected by a urea liquid level sensor 11;
step b, filtering the analog quantity liquid level signal to remove interference signals;
step c, converting the analog quantity liquid level signal into a hexadecimal digital signal by A/D conversion;
d, sampling and analyzing the converted digital signals, carrying out numerical processing, then carrying out numerical authenticity verification, and removing unstable digital signals to obtain stable and accurate digital signals;
e, digitally arranging the acquired stable and accurate digital signals to obtain a discrete liquid level curve;
and f, comparing and analyzing the liquid level value on the discrete liquid level curve with a preset value, controlling the coil of the first relay 2 to be powered off when the liquid level value is smaller than the preset value, and otherwise controlling the coil of the first relay 2 to be powered on.
Wherein, the process that the controller 1 controls the urea box return pipe heating device 7 in the fourth step is as follows:
step a, receiving an analog quantity temperature signal detected by a urea temperature sensor 9;
step b, filtering the analog quantity temperature signal to remove an interference signal;
step c, converting the analog quantity temperature signal into a hexadecimal digital signal by A/D conversion;
d, sampling and analyzing the converted digital signals, carrying out numerical processing, then carrying out numerical authenticity verification, and removing unstable digital signals to obtain stable and accurate digital signals;
e, digitally arranging the acquired stable and accurate digital signals to obtain a discrete temperature curve;
and f, comparing and analyzing the temperature value on the discrete temperature curve with a preset value, controlling the coil of the second relay 3 to be powered on when the temperature value is smaller than the preset value, and otherwise controlling the coil of the second relay 3 to be powered off.
The above description is only of the preferred embodiments of the present invention, and it should be noted that: it will be apparent to those skilled in the art that various modifications and adaptations can be made without departing from the principles of the invention and these are intended to be within the scope of the invention.

Claims (10)

1. A time delay outage controlling means which characterized in that: the device comprises a controller (1), a first relay (2) and a second relay (3), wherein a urea liquid level sensor (11) and a urea temperature sensor (9) are arranged in a urea box of the loader, the urea box is connected with a return pipe and a heating pipeline, a urea heating electromagnetic valve (8) is arranged on the heating pipeline, and a urea box return pipe heating device (7) is arranged on the return pipe; controller (1) receives loader whole car switch (10) state signal, and the output signal of urea temperature sensor (9) and urea level sensor (11), controller (1) basis the signal of urea temperature sensor (9) and urea level sensor (11) transmission, control first relay (2) and second relay (3) coil gain of electricity and lose the electricity, the contact of first relay (2) is connected on the power supply circuit of urea case back flow heating device (7), the contact of second relay (3) is connected on the power supply circuit of urea heating solenoid valve (8).
2. The delayed power-off control device as claimed in claim 1, wherein: the controller (1) is connected with an indicator lamp (4).
3. The delayed power-off control device as claimed in claim 1, wherein: and a safety box (6) is connected between the second relay (3) and the urea box return pipe heating device (7).
4. The delayed power-off control device as claimed in claim 1, wherein: the urea box heating electromagnetic valve (8) is a switch valve.
5. The delayed power-off control device as claimed in claim 1, wherein: the whole vehicle switch (10) is a normally open contact type switch; the first relay (2) contact connected to the power supply circuit of the urea box return pipe heating device (7) and the second relay (3) contact connected to the power supply circuit of the urea heating electromagnetic valve (8) are normally open contacts respectively.
6. The delayed power-off control device as claimed in claim 1, wherein: the power supply (5) is used for supplying power to the first relay (2), the second relay (3) and the controller (1).
7. A loader characterized in that: comprising the delayed power down control device of any of claims 1 to 9.
8. A control method of the delayed power-off control device as claimed in any one of claims 1 to 6, characterized in that: the method comprises the following steps:
s01, receiving a low level signal sent when the vehicle switch (10) is switched off;
s02, analyzing and processing the low level signal, and determining that the delayed power-off device needs to be started when the whole vehicle is powered off;
s03, two high-level signals are output to the first relay (2) and the second relay (3) respectively, coils of the first relay (2) and the second relay (3) are controlled to be electrified, normally open contacts of the first relay (2) and the second relay (3) are closed, and a power supply (5) supplies power to the return pipe heating device (7) and the urea heating electromagnetic valve (8);
and S04, controlling the opening and closing of the urea box return pipe heating device (7) and the urea box heating electromagnetic valve (8) according to the received signals of the urea temperature sensor (9) and the urea liquid level sensor (11).
9. The control method of the delayed power-off control device according to claim 8, wherein: the process that the controller (1) controls the urea box heating electromagnetic valve (8) in S04 is as follows:
step a, receiving an analog quantity liquid level signal detected by a urea liquid level sensor (11);
step b, filtering the analog quantity liquid level signal to remove interference signals;
step c, converting the analog quantity liquid level signal into a hexadecimal digital signal by A/D conversion;
d, sampling and analyzing the converted digital signals, carrying out numerical processing, then carrying out numerical authenticity verification, and removing unstable digital signals to obtain stable and accurate digital signals;
e, digitally arranging the acquired stable and accurate digital signals to obtain a discrete liquid level curve;
and f, comparing and analyzing the liquid level value on the discrete liquid level curve with a preset value, controlling the coil of the first relay (2) to be powered off when the liquid level value is smaller than the preset value, and otherwise controlling the coil of the first relay (2) to be powered on.
10. The control method of the delayed power-off control device according to claim 8, wherein: s04 the process that the controller (1) controls the urea box return pipe heating device (7) is as follows:
step a, receiving an analog quantity temperature signal detected by a urea temperature sensor (9);
step b, filtering the analog quantity temperature signal to remove an interference signal;
step c, converting the analog quantity temperature signal into a hexadecimal digital signal by A/D conversion;
d, sampling and analyzing the converted digital signals, carrying out numerical processing, then carrying out numerical authenticity verification, and removing unstable digital signals to obtain stable and accurate digital signals;
e, digitally arranging the acquired stable and accurate digital signals to obtain a discrete temperature curve;
and f, comparing and analyzing the temperature value on the discrete temperature curve with a preset value, controlling the coil of the second relay (3) to be powered on when the temperature value is smaller than the preset value, and otherwise controlling the coil of the second relay (3) to be powered off.
CN202110740326.8A 2021-06-30 2021-06-30 Loader and delayed power-off control device and control method thereof Pending CN113606017A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110740326.8A CN113606017A (en) 2021-06-30 2021-06-30 Loader and delayed power-off control device and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110740326.8A CN113606017A (en) 2021-06-30 2021-06-30 Loader and delayed power-off control device and control method thereof

Publications (1)

Publication Number Publication Date
CN113606017A true CN113606017A (en) 2021-11-05

Family

ID=78337050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110740326.8A Pending CN113606017A (en) 2021-06-30 2021-06-30 Loader and delayed power-off control device and control method thereof

Country Status (1)

Country Link
CN (1) CN113606017A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008152105A1 (en) * 2007-06-12 2008-12-18 Continental Automotive Gmbh Urea dosing system for an internal combustion engine and a method and a device for dosing urea using the urea dosing system
CN101975101A (en) * 2010-10-20 2011-02-16 中国第一汽车集团公司 SCR urea system for non-deflation emptying pipeline of pneumatic single-urea box
US20130186073A1 (en) * 2010-05-25 2013-07-25 Takao Onodera Recovery control system
CN203532016U (en) * 2013-11-04 2014-04-09 中国重汽集团济南动力有限公司 Urea spray feeding device with heater
CN205013104U (en) * 2015-09-25 2016-02-03 中国重汽集团济南动力有限公司 Heavy -duty car SCR urea pipe heating device that unfreezes
CN105888789A (en) * 2016-06-12 2016-08-24 中国重汽集团济南动力有限公司 Power supply system of heavy-duty car SCR system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008152105A1 (en) * 2007-06-12 2008-12-18 Continental Automotive Gmbh Urea dosing system for an internal combustion engine and a method and a device for dosing urea using the urea dosing system
US20130186073A1 (en) * 2010-05-25 2013-07-25 Takao Onodera Recovery control system
CN101975101A (en) * 2010-10-20 2011-02-16 中国第一汽车集团公司 SCR urea system for non-deflation emptying pipeline of pneumatic single-urea box
CN203532016U (en) * 2013-11-04 2014-04-09 中国重汽集团济南动力有限公司 Urea spray feeding device with heater
CN205013104U (en) * 2015-09-25 2016-02-03 中国重汽集团济南动力有限公司 Heavy -duty car SCR urea pipe heating device that unfreezes
CN105888789A (en) * 2016-06-12 2016-08-24 中国重汽集团济南动力有限公司 Power supply system of heavy-duty car SCR system

Similar Documents

Publication Publication Date Title
US20010030468A1 (en) Method and apparatus utilized for priority sequencing
CN106364426A (en) Automobile starting and stopping protective system and method
CN110936854A (en) Hydrogenation control system and method for hydrogen fuel cell vehicle
CN109435711A (en) A kind of new-energy automobile low tension battery preventing electric loss system and method
DE102012216539A1 (en) DARK CURRENT SHUT-OFF SYSTEM AND METHOD FOR A VEHICLE DISTRIBUTION BOX
CN103573449B (en) The controlling method of common rail pressure-limit valve
CN211731319U (en) Power supply control system and vehicle
CN114161931A (en) New energy vehicle type storage battery electricity supplementing control method
CN104691451A (en) Method and system for reducing static power consumption of automobile body controller
CN112558593A (en) Intelligent control circuit and control method for mechanical power-off switch of passenger car
CN113606017A (en) Loader and delayed power-off control device and control method thereof
US20220325564A1 (en) Single-door Control Circuit for Train
CN112849220B (en) Urban rail vehicle storage battery feed prevention control method and system
CN113733912A (en) Intelligent electricity supplementing method for new energy electric vehicle storage battery
CN209320757U (en) A kind of low-power consumption monitoring system and vehicle
CN201444574U (en) Automatic power off device for preventing over discharge of automobile storage battery
CN116344864A (en) Vehicle-mounted hydrogen supply system with high hydrogen utilization rate and hydrogen fuel cell
CN113771783A (en) Control system and method for reducing vehicle quiescent current
CN111880465B (en) General assembly workshop repair area exhaust fan control management system and method
CN109130860B (en) Multisource monitored control system and power module
CN209823506U (en) Automatic switching device for 10KV dual-power automatic bus transfer
CN221507352U (en) Vehicle door control circuit and rail train
CN212743723U (en) Electric door control device with intermediate stop function
CN201400099Y (en) Coach emergent-stall power-down safety device
CN217902285U (en) Power-off control circuit and energy vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211105

RJ01 Rejection of invention patent application after publication