CN113605698A - High-throwing self-compacting micro-expansion concrete-filled steel tube construction process - Google Patents

High-throwing self-compacting micro-expansion concrete-filled steel tube construction process Download PDF

Info

Publication number
CN113605698A
CN113605698A CN202110515877.4A CN202110515877A CN113605698A CN 113605698 A CN113605698 A CN 113605698A CN 202110515877 A CN202110515877 A CN 202110515877A CN 113605698 A CN113605698 A CN 113605698A
Authority
CN
China
Prior art keywords
concrete
steel column
expansion
construction
vibration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110515877.4A
Other languages
Chinese (zh)
Inventor
顾金戈
徐佳能
范晓晋
胡锐
刘春辉
陈�胜
廖榆
倪汝贤
孙靖宜
卞越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huashi Enterprises Co Ltd
Original Assignee
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huashi Enterprises Co Ltd filed Critical China Huashi Enterprises Co Ltd
Priority to CN202110515877.4A priority Critical patent/CN113605698A/en
Publication of CN113605698A publication Critical patent/CN113605698A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/025Structures with concrete columns
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Emergency Management (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to the technical field of building construction, and discloses a high-throw self-compaction micro-expansion steel column concrete construction process which comprises three process modules, namely material blending, sample testing and construction operation; the process module material blending comprises the steps of material selection, proportioning design, test verification and the like; the process module sample test comprises the steps of steel column manufacturing, primary pouring, secondary pouring, maintenance test and the like; the construction operation of the process module comprises the steps of steel column improvement, pump concrete distribution, auxiliary vibration, cleaning and maintenance and the like. The construction method can effectively solve the construction difficulty of the steel pipe concrete, can avoid the quality defects of cavities, honeycombs and the like caused by the incapability of vibrating or insufficient vibration, greatly reduce the construction noise, can construct a plurality of layers of steel pipe columns at one time, accelerate the construction speed, ensure and improve the construction quality, has good economic and social benefits, and has great popularization value and wide application prospect.

Description

High-throwing self-compacting micro-expansion concrete-filled steel tube construction process
Technical Field
The invention relates to the technical field of building construction, in particular to a high-throw self-compaction micro-expansion concrete filled steel tube construction process.
Background
With the rapid development of building technology, the steel tube concrete is widely popularized and applied in high-rise buildings and large-span structural engineering. The Steel pipe Concrete structure (CFST) is a composite structure formed by filling Concrete in a Steel pipe, and can more effectively exert the respective advantages of two materials, namely Steel and Concrete, and overcome the defect that the Steel pipe structure is easy to bend. Compared with a steel structure, the CFST can save a large amount of steel, and has better fire resistance; compared with a concrete structure, the CFST can obtain larger building space, reduce the dead weight and the cement consumption, improve the anti-seismic performance and the like. The steel pipe concrete can utilize the synergistic bearing effect of two materials of the steel pipe and the concrete in the stress process, so that the steel pipe concrete has the characteristics of high bearing capacity, good plasticity and toughness, good fire resistance and earthquake resistance, good economic benefit and the like.
However, in the steel pipe concrete engineering, the concrete pouring amount is large, the pumping height is large, and the concrete is wrapped by the peripheral steel pipe, so that the pouring construction difficulty is quite large. The high-throwing self-compacting concrete has the characteristics of no segregation and no bleeding due to high fluidity, can automatically level and compact without vibration or auxiliary vibration, achieves the purpose of compacting the concrete by utilizing the kinetic energy generated when the concrete falls from a high position, can effectively solve the construction difficulty of the steel pipe concrete, can avoid the quality defects of cavities, honeycombs and the like caused by the incapability of vibration or insufficient vibration, greatly reduces the construction noise, accelerates the construction speed, ensures and improves the construction quality, and is one of the development directions of the steel pipe concrete construction methods.
However, the key technology of the steel pipe concrete composite material is to tightly combine the core concrete and the steel pipe wall, to obtain a reliable composite effect, to solve the problem of cooperativity of expansion and contraction and strength development, the continuous and stable expansion of the concrete in a closed state, the design and controllability of the expansion stress of the concrete-steel pipe wall, the preparation of the expanded concrete and the construction technology thereof.
Therefore, in the technical field of building construction, a technology capable of overcoming the respective technical difficulties and the combination of the high-throwing self-compacting concrete, the micro-expansive concrete and the steel column concrete is urgently needed, and the technology can be applied to the high-throwing self-compacting micro-expansive steel pipe concrete construction technology of high-rise buildings.
Disclosure of Invention
The invention overcomes the defects of the prior art, provides the technical barriers which can overcome the respective technical difficulties of high-throwing self-compacting concrete, micro-expansive concrete and steel column concrete and the combination of the three, and can be applied to the high-throwing self-compacting micro-expansive steel pipe concrete construction process of high-rise buildings.
The invention is realized by the following technical scheme:
the high-throwing self-compacting micro-expansion steel pipe concrete construction process comprises three process modules, namely material preparation, sample test and construction operation;
the process module I comprises the following steps of: A. material selection, B proportioning design and C test verification;
the sample test comprises the following steps: D. manufacturing a steel column, E, primary pouring, F, secondary pouring and G, maintaining and testing;
the construction operation comprises the following steps: H. steel column improvement, J pump concrete distribution, K auxiliary vibration, M cleaning and maintenance.
Further, in the step a, the material selection includes the following materials:
a1. cement: 42.5R ordinary Portland cement with the 28D compressive strength of 52MPa and qualified stability;
a2. fly ash: the grade I fly ash with the water requirement ratio of 92 percent and the screen residue of a 0.045mm sieve of 10.3 percent;
a3. silica fume: silica fume with the silica content of 94 percent and the activity index of 114 percent;
a4. swelling agent: the specific surface area is 255m2WG-CMA as three-expansion-source expansion agent with 0.025% of limited expansion rate in water of/kg and 7D;
a5. fine aggregate: medium sand with fineness modulus of 2.7 and stone powder content of 6 percent;
a6. coarse aggregate: 5-20 continuous gradation and 2.67g/cm apparent density3Crushed stone with the crushing index of 7 percent;
a7. pumping agent: the pumping agent special for the high-throwing self-compacting concrete has the solid content of 15.10 percent, the water reducing rate of 31 percent and the compressive strength of 199 percent.
Further, in the step B, in the proportioning design, the mass parts of the materials are as follows: 488.2-547.8 parts of cement, 29.7-36.3 parts of fly ash, 29.7-36.3 parts of silica fume, 32.4-39.6 parts of expanding agent, 733.5-896.5 parts of fine aggregate, 831.6-1016.4 parts of coarse aggregate and 15.12-18.48 parts of pumping aid.
Further, in the step c, test verification, the tested items include c1. development, c2. slump, c3.T500 development time, c4. rewinding time, c5. mixture segregation rate and c6.U type box height difference test.
Step D, in the manufacturing of the steel column, the specification of the steel column is 1200mm multiplied by 1600mm multiplied by 8000mm, and the wall thickness is 30 mm; step E, performing primary pouring in a pouring mode of four meters at the lower part of the steel column by adopting an automobile pump and a non-vibration mode; and F, performing secondary pouring by adopting an automobile pump and micro-vibration mode aiming at a pouring mode of four meters above the steel column.
Further, step G, in the maintenance test, covering the top opening surface, initially setting, napping and watering, detecting the blank sound and carrying out ultrasonic detection by D7, detecting the blank sound and carrying out ultrasonic detection by D28, cutting at a fixed point by D135, sampling and actually measuring.
And step H, in the steel column improvement, the inner side wall of the steel column is additionally provided with a stud, and/or the horizontal partition plate is additionally provided with an air hole.
Further, in the step j, the pump concrete distribution comprises the following steps:
j1. testing the expansion degree and the slump degree before pumping;
j2. laying out
Figure RE-RE-GDA0003258605730000031
The high-pressure pump pipe of (1);
j3. four meters of non-vibration high-pressure pump pipes at the lower part of the steel column are uniformly distributed.
And further, in the step K, in the auxiliary vibration, for the colleagues that four meters of the upper part of the steel column are distributed on the pump concrete, a vibration rod is inserted into the concrete of the lower layer for auxiliary vibration by 5-10cm, vibration points are uniformly arranged according to a quincunx shape, the vibration rod moves point by point, the vibration rod is inserted quickly and pulled slowly, the vibration time of each point is 5-10 seconds, the vibration rod does not obviously descend until the surface of the concrete is flush, and no air bubble appears.
Further, in the step M, cleaning and maintaining, the method comprises the following steps:
m1. pouring and distributing materials until the distance between the top of the concrete and the opening at the top of the steel column is 600mm, stopping pouring, taking out concrete slurry with the thickness of 100mm at the upper part, and scratching the top by using a tool;
and m2, pouring clear water with the thickness of 200mm on the top of the concrete after initial setting for maintenance, and additionally arranging a cover at the opening at the top of the steel column.
And m3, before the upper section of steel column is installed, taking out the residual clear water on the top of the concrete, wiping the top of the concrete, and removing the concrete grout adhered to the wall of the pipe.
Compared with the prior art, the invention has the following advantages and beneficial effects:
1. the steel tube concrete can more effectively exert the respective advantages of steel and concrete, and overcomes the defect that a steel tube structure is easy to bend.
2. It can save a great deal of steel, has better fire resistance, can obtain larger building space, reduces dead weight and cement consumption, and improves earthquake resistance.
3. The steel pipe concrete does not need a template and a formwork system, can save a large amount of wood, and has good environmental protection significance.
4. The high-throwing self-compacting concrete achieves the purpose of compacting the concrete by utilizing the kinetic energy generated when the concrete falls from a high position, can effectively solve the construction difficulty of the concrete filled steel tube, can avoid the quality defects of cavities, honeycombs and the like caused by incapability of vibrating or insufficient vibration, and greatly reduces the construction noise.
5. The construction method can be used for one-step construction of a multilayer steel pipe column, quickens the construction speed, ensures and improves the construction quality, has good economic and social benefits, and has great popularization value and wide application prospect.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
FIG. 1 is a schematic structural view of a test steel column of the present invention;
FIG. 2 is a schematic view of a steel column sampling site according to the present invention;
FIG. 3 is a schematic view of the sampling point location at A of the present invention;
FIG. 4 is a schematic view of the sampling point location at B of the present invention;
FIG. 5 is a schematic view of the sampling point location at C of the present invention;
FIG. 6 is a schematic view of the sampling point location at D of the present invention;
FIG. 7 is a schematic view of the sampling point location at E of the present invention;
FIG. 8 is a schematic view of the sampling point location at F according to the present invention;
FIG. 9 is a schematic view of the sampling point location at G of the present invention;
FIG. 10 is a schematic view of the sampling point location at H according to the present invention;
FIG. 11 is a schematic view of the sampling point location at I of the present invention;
FIG. 12 is a schematic view of the sampling point location at J according to the present invention;
FIG. 13 is a schematic view of the sampling point location at K according to the present invention;
FIG. 14 is a schematic view of the sampling point location at L of the present invention;
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to examples and accompanying drawings, and the exemplary embodiments and descriptions thereof are only used for explaining the present invention and are not meant to limit the present invention.
The high-throwing self-compacting micro-expansion steel column concrete construction process comprises three process modules, namely material blending, sample testing and construction operation.
The process module I is used for blending materials and comprises the following steps: A. material selection, B proportioning design and C test verification;
step A, material selection, which comprises the following materials:
a1. cement: 42.5R ordinary Portland cement with the 28D compressive strength of 52MPa and qualified stability;
a2. fly ash: the grade I fly ash with the water requirement ratio of 92 percent and the screen residue of a 0.045mm sieve of 10.3 percent;
a3. silica fume: silica fume with the silica content of 94 percent and the activity index of 114 percent;
a4. swelling agent: the specific surface area is 255m2WG-CMA as three-expansion-source expansion agent with 0.025% of limited expansion rate in water of/kg and 7D;
a5. fine aggregate: medium sand with fineness modulus of 2.7 and stone powder content of 6 percent;
a6. coarse aggregate: 5-20 continuous gradation and 2.67g/cm apparent density3Crushed stone with the crushing index of 7 percent;
a7. pumping agent: the pumping agent special for the high-throwing self-compacting concrete has the solid content of 15.10 percent, the water reducing rate of 31 percent and the compressive strength of 199 percent.
And B, in the proportioning design, the mass parts of the materials are as follows: 488.2-547.8 parts of cement, 29.7-36.3 parts of fly ash, 29.7-36.3 parts of silica fume, 32.4-39.6 parts of expanding agent, 733.5-896.5 parts of fine aggregate, 831.6-1016.4 parts of coarse aggregate and 15.12-18.48 parts of pumping aid.
Step C, in test verification, the tested items comprise c1. expansion degree, c2. slump, c3.T500 expansion time, c4. cylinder-reversing time, c5. mixture segregation rate and c6. U-shaped box height difference test.
TABLE 1 Material ratio (kg/m)3)
Numbering Cement Fly ash Silica fume Expanding agent Fine aggregate Coarse aggregate Additive agent
1 498 33 33 36 815 924 16.8
2 463 32 32 34 837 948 15.7
3 496 34 34 36 776 956 16.8
4 496 34 34 36 848 884 16.8
5 496 34 34 36 815 924 15.0
The specific components of five examples of the material proportioning test are shown in the table (table 1), and the test results of the tests of the five examples are shown in the table (table 2).
TABLE 2 test results
Figure RE-RE-GDA0003258605730000071
As can be seen from tables 1 and 2, when the concrete cementing material mixing amount is different, as shown in the numbers 1 and 2, the concrete compressive strength is greatly influenced, so that a reasonable cementing material dosage needs to be selected, and the dosage of the cementing material is determined to be 600 kg/m 3; when the sand rate of the concrete is different, as shown in the number 1, the number 3 and the number 4, the flowing performance of the concrete is greatly influenced, when the sand rate is too small, the phenomena of exposed aggregate and poor wrapping performance are easy to occur, and when the sand rate is too low, the phenomena of reduced concrete strength, poor segregation and poor clearance permeability are caused, so that a reasonable sand rate is necessary to be selected; when the mixing amount of the concrete admixture is different, the workability, particularly the fluidity of the concrete is greatly influenced, and as shown in the No. 5, the self-compacting concrete has poor fluidity, serious slump loss with time and poor clearance permeability, so that a reasonable mixing amount of the admixture is selected.
The sample test comprises the following steps: D. manufacturing a steel column, E, primary pouring, F, secondary pouring and G, maintaining and testing;
step D, in the manufacturing of the steel column, the specification of the steel column is 1200mm multiplied by 1600mm multiplied by 8000mm, and the wall thickness is 30 mm; step E, performing primary pouring in a pouring mode of four meters at the lower part of the steel column by adopting an automobile pump and a non-vibration mode;
and F, performing secondary pouring by adopting an automobile pump and micro-vibration mode aiming at a pouring mode of four meters above the steel column.
And G, in the maintenance test, covering the open surface at the top, initially setting, napping and irrigating, performing D7 knocking detection on the blank sound and performing ultrasonic detection, performing D28 knocking detection on the blank sound and performing ultrasonic detection, and performing D135 fixed-point cutting, sampling and actual measurement.
The construction operation comprises the following steps: H. steel column improvement, J pump concrete distribution, K auxiliary vibration, M cleaning and maintenance.
And H, in the steel column improvement, the inner side wall of the steel column is additionally provided with a stud, and/or the horizontal partition plate is additionally provided with an air hole.
Step J, in the pump concrete distribution, the method comprises the following steps: j1. testing the expansion degree and the slump degree before pumping; j2. laying out
Figure RE-RE-GDA0003258605730000081
The high-pressure pump pipe of (1); j3. four meters of non-vibration high-pressure pump pipes at the lower part of the steel column are uniformly distributed.
And step K, in auxiliary vibration, aiming at the same time that four meters of the upper part of the steel column are distributed on the concrete of the pump, inserting a vibration rod into the concrete of the lower layer for 5-10cm for auxiliary vibration, uniformly arranging vibration points according to a quincunx shape, moving point by point, quickly inserting and slowly pulling, wherein the vibration time of each point is 5-10 seconds, the concrete does not obviously descend until the surface of the concrete is flush, and no air bubble appears.
Step M, in the cleaning and maintenance, the method comprises the following sub-steps: m1. pouring and distributing materials until the distance between the top of the concrete and the opening at the top of the steel column is 600mm, stopping pouring, taking out concrete slurry with the thickness of 100mm at the upper part, and scratching the top by using a tool; m2, pouring clear water with the thickness of 200mm on the top of the concrete for curing after initial setting, and arranging a cover on the opening at the top of the steel column. m3, before the steel column is mounted, the residual clear water on the top of the concrete is contained, the top of the concrete is wiped dry, and the concrete grout adhered to the wall of the pipe is removed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
It will be understood that the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in an orientation or positional relationship indicated in the drawings for convenience in describing the invention, and do not indicate or imply that the components or mechanisms so referred to must be in a particular orientation, constructed and operated in a particular orientation, and thus are not to be considered as limiting the invention.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are merely preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. The high-throwing self-compacting micro-expansion steel column concrete construction process is characterized by comprising three process modules, namely material preparation, sample test and construction operation, wherein the three process modules comprise a first process module, a second process module, a third process module and a third process module;
the process module I comprises the following steps of: A. material selection, B proportioning design and C test verification;
the sample test comprises the following steps: D. manufacturing a steel column, E, primary pouring, F, secondary pouring and G, maintaining and testing;
the construction operation comprises the following steps: H. steel column improvement, J pump concrete distribution, K auxiliary vibration, M cleaning and maintenance.
2. The construction process for the concrete of the high-throw self-compacting micro-expansion steel column according to claim 1, wherein the material selection in the step A comprises the following materials:
a1. cement: 42.5R ordinary Portland cement with the 28D compressive strength of 52MPa and qualified stability;
a2. fly ash: the grade I fly ash with the water requirement ratio of 92 percent and the screen residue of a 0.045mm sieve of 10.3 percent;
a3. silica fume: silica fume with the silica content of 94 percent and the activity index of 114 percent;
a4. swelling agent: the specific surface area is 255m2WG-CMA as three-expansion-source expansion agent with 0.025% of limited expansion rate in water of/kg and 7D;
a5. fine aggregate: medium sand with fineness modulus of 2.7 and stone powder content of 6 percent;
a6. coarse aggregate: 5-20 continuous gradation and 2.67g/cm apparent density3Crushed stone with the crushing index of 7 percent;
a7. pumping agent: the pumping agent special for the high-throwing self-compacting concrete has the solid content of 15.10 percent, the water reducing rate of 31 percent and the compressive strength of 199 percent.
3. The high-throwing self-compacting micro-expansion steel column concrete construction process according to claim 2, wherein in the step B, the material parts by mass are as follows: 488.2-547.8 parts of cement, 29.7-36.3 parts of fly ash, 29.7-36.3 parts of silica fume, 32.4-39.6 parts of expanding agent, 733.5-896.5 parts of fine aggregate, 831.6-1016.4 parts of coarse aggregate and 15.12-18.48 parts of pumping aid.
4. The construction process of high-throw self-compacting micro-expansion steel column concrete as claimed in claim 3, wherein in the step C, test verification, the tested items comprise c1. expansion, c2. slump, c3.T500 development time, c4. cylinder-falling time, c5. mixture segregation rate and c6.U box height difference test.
5. The construction process for the concrete of the high-throw self-compacting micro-expansion steel column as claimed in claim 1, wherein in the step D, the steel column is made into a specification of 1200mm × 1600mm × 8000mm, and the wall thickness is 30 mm; step E, performing primary pouring in a pouring mode of four meters at the lower part of the steel column by adopting an automobile pump and a non-vibration mode; and F, performing secondary pouring by adopting an automobile pump and micro-vibration mode aiming at a pouring mode of four meters above the steel column.
6. The construction process for the high-throw self-compacting micro-expansion steel column concrete according to claim 5, wherein in the step G, maintenance test comprises top open surface covering, initial setting, napping and watering, D7 knocking, detecting and ultrasonically detecting, D28 knocking, detecting and ultrasonically detecting, D135 fixed-point cutting, sampling and actual measurement.
7. The construction process for high-throw self-compacting micro-expansion steel column concrete according to claim 1, wherein the step H. steel column improvement comprises additionally arranging studs on the inner side wall of the steel column and/or additionally arranging air holes on the horizontal partition plate.
8. The construction process for the high-throw self-compacting micro-expansion steel column concrete according to claim 7, wherein the step J of pump concrete distribution comprises the following steps:
j1. testing the expansion degree and the slump degree before pumping;
j2. laying out
Figure FDA0003062048130000021
The high-pressure pump pipe of (1);
j3. four meters of non-vibration high-pressure pump pipes at the lower part of the steel column are uniformly distributed.
9. The construction process for the high-throw self-compacting micro-expansion steel column concrete according to claim 8, characterized in that in the step K, in the auxiliary vibration, for the colleagues that the concrete is distributed on the pump four meters above the steel column, a vibration rod is inserted into the concrete on the lower layer for 5-10cm for auxiliary vibration, vibration points are uniformly arranged according to a quincunx shape, the vibration points move point by point, are rapidly inserted and slowly pulled, and each vibration time lasts for 5-10 seconds, so that the concrete does not obviously descend until the surface of the concrete is flush, and no air bubbles appear.
10. The construction process for the high-throw self-compacting micro-expansion steel column concrete according to claim 9, wherein the step M of cleaning and maintaining comprises the following steps:
m1. pouring and distributing materials until the distance between the top of the concrete and the opening at the top of the steel column is 600mm, stopping pouring, taking out concrete slurry with the thickness of 100mm at the upper part, and scratching the top by using a tool;
and m2, pouring clear water with the thickness of 200mm on the top of the concrete after initial setting for maintenance, and additionally arranging a cover at the opening at the top of the steel column.
And m3, before the upper section of steel column is installed, taking out the residual clear water on the top of the concrete, wiping the top of the concrete, and removing the concrete grout adhered to the wall of the pipe.
CN202110515877.4A 2021-05-12 2021-05-12 High-throwing self-compacting micro-expansion concrete-filled steel tube construction process Pending CN113605698A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110515877.4A CN113605698A (en) 2021-05-12 2021-05-12 High-throwing self-compacting micro-expansion concrete-filled steel tube construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110515877.4A CN113605698A (en) 2021-05-12 2021-05-12 High-throwing self-compacting micro-expansion concrete-filled steel tube construction process

Publications (1)

Publication Number Publication Date
CN113605698A true CN113605698A (en) 2021-11-05

Family

ID=78336431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110515877.4A Pending CN113605698A (en) 2021-05-12 2021-05-12 High-throwing self-compacting micro-expansion concrete-filled steel tube construction process

Country Status (1)

Country Link
CN (1) CN113605698A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280628A (en) * 2008-05-23 2008-10-08 中建五局第三建设有限公司 Special fine sand high-strength high-performance concrete ultra-high pumping construction method
US20140053499A1 (en) * 2012-08-21 2014-02-27 Yeong Ho Cho Concrete Pole and Manufacturing Method Therefor
CN104278841A (en) * 2013-07-09 2015-01-14 宏润建设集团股份有限公司 Method for pouring concrete in steel pipe column
CN106437033A (en) * 2016-11-08 2017-02-22 浙江大学建筑设计研究院有限公司 Embedded column footing of steel tube concrete column
CN111691554A (en) * 2019-03-15 2020-09-22 中建五洲工程装备有限公司 Underground box type concrete pouring steel column deviation conversion structure and manufacturing method thereof
CN211622622U (en) * 2019-10-10 2020-10-02 中建三局第三建设工程有限责任公司 High-strength high-throwing self-compacting concrete pouring structure of super-large section steel pipe concrete column
CN111763050A (en) * 2020-07-14 2020-10-13 四川华西绿舍建材有限公司 High-strength high-throwing self-compacting micro-expansion concrete and preparation method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280628A (en) * 2008-05-23 2008-10-08 中建五局第三建设有限公司 Special fine sand high-strength high-performance concrete ultra-high pumping construction method
US20140053499A1 (en) * 2012-08-21 2014-02-27 Yeong Ho Cho Concrete Pole and Manufacturing Method Therefor
CN104278841A (en) * 2013-07-09 2015-01-14 宏润建设集团股份有限公司 Method for pouring concrete in steel pipe column
CN106437033A (en) * 2016-11-08 2017-02-22 浙江大学建筑设计研究院有限公司 Embedded column footing of steel tube concrete column
CN111691554A (en) * 2019-03-15 2020-09-22 中建五洲工程装备有限公司 Underground box type concrete pouring steel column deviation conversion structure and manufacturing method thereof
CN211622622U (en) * 2019-10-10 2020-10-02 中建三局第三建设工程有限责任公司 High-strength high-throwing self-compacting concrete pouring structure of super-large section steel pipe concrete column
CN111763050A (en) * 2020-07-14 2020-10-13 四川华西绿舍建材有限公司 High-strength high-throwing self-compacting micro-expansion concrete and preparation method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中华人民共和国住房和城乡建设部: "《混凝土泵送施工技术规程》", 13 July 2011, 中国建筑工业出版社 *
张志明等: "多腔体多边形钢管柱高抛自密实混凝土施工技术", 《建筑技术》 *

Similar Documents

Publication Publication Date Title
Gho et al. Flexural behaviour of high-strength rectangular concrete-filled steel hollow sections
Elchalakani et al. Experimental tests and design of rubberised concrete-filled double skin circular tubular short columns
CN109809775A (en) A kind of self-compaction self-waterproof concrete
CN101858114A (en) Construction method for cast-in-place integral light-weight partition wall
CN103088964A (en) Steel tube foam concrete combined upright column and construction method thereof
Saheed et al. Structural behavior of out-of-plane loaded precast lightweight EPS-foam concrete C-shaped slabs
Amran et al. An ultra-lightweight cellular concrete for geotechnical applications–A review
Sepasdar Experimental investigation on the out-of-plane behaviour of concrete masonry infilled RC frames
Wu et al. Internal curing effect on strength of recycled concrete and its enhancement in concrete-filled thin-wall steel tube
Alwash et al. Experimental investigation on behavior of SCC filled steel tubular stub columns strengthened with CFRP
CN113605698A (en) High-throwing self-compacting micro-expansion concrete-filled steel tube construction process
Zade et al. Current Status and Future Challenges of Autoclaved Aerated Concrete Masonry
Ikponmwosa et al. A review and investigations of some properties of foamed aerated concrete
Othman et al. Ultimate shear strength ofreinforced high strength concrete corbelssubjected to vertical load
CN101220713A (en) No-leakage structure of steel reinforced concrete pool and well, and leakage preventing method
Li et al. Construction technology of precast pier foundation filled with demolished concrete lumps
Puspitasari et al. EXPERIMENTAL STUDY OF FLEXURAL CAPACITY STRENGTH IN-PLANE LOAD ON WALL PANELS USING AUTOCLAVED AERATED CONCRETE BLOCK AND BAMBOO REINFORCEMENT
Shiso In-plane structural response of single-storey unreinforced walls constructed using alternative masonry units
Kin et al. Strength Properties of Expanded Polystyrene Concrete and Cold Formed Steel Wall Frame Composite
Dhavale et al. Cellular Light Weight Concrete using Glass Fiber
Ávila Cruces Mechanical, structural and seismic behavior of rammed Earth constructions
CN216634843U (en) Prefabricated constructional column exocoel mould
Jooste Flexural behaviour of unreinforced alternative masonry walls
Hamad et al. Comparative Study on the Strengthening of Cellular Lightweight Concrete Block (CLC) Masonry
AU2014101579A4 (en) Lightweight Building Member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211105