CN113596881A - Base station side PHR optimization method, storage medium, electronic device and base station - Google Patents

Base station side PHR optimization method, storage medium, electronic device and base station Download PDF

Info

Publication number
CN113596881A
CN113596881A CN202110875405.XA CN202110875405A CN113596881A CN 113596881 A CN113596881 A CN 113596881A CN 202110875405 A CN202110875405 A CN 202110875405A CN 113596881 A CN113596881 A CN 113596881A
Authority
CN
China
Prior art keywords
current
phr
adjustment
limited state
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110875405.XA
Other languages
Chinese (zh)
Inventor
周璐璐
杨今明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Baopu Communication Technology Co ltd
Raisecom Technology Co Ltd
Original Assignee
Xi'an Baopu Communication Technology Co ltd
Raisecom Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Baopu Communication Technology Co ltd, Raisecom Technology Co Ltd filed Critical Xi'an Baopu Communication Technology Co ltd
Priority to CN202110875405.XA priority Critical patent/CN113596881A/en
Publication of CN113596881A publication Critical patent/CN113596881A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/36TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
    • H04W52/365Power headroom reporting
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/08Access point devices

Abstract

The embodiment of the application discloses a PHR optimization method, a storage medium, an electronic device and a base station at a base station side. The method comprises the following steps: after obtaining the current power headroom report value PHR of the user equipment UE, the following steps are cyclically executed until the obtained current PHR of the UE is greater than or equal to a preset first preset value, including: step A1, judging whether the current PHR of the UE is smaller than the first preset value; step A2, if the current PHR is smaller than the first preset value, judging whether the current block error rate BLER is larger than or equal to a preset block error rate threshold value; step A3, if the current BLER is larger than or equal to the threshold value of the block error rate, determining the adjustment strategy of the Resource Block (RB) of the UE; step A4, according to the adjustment strategy, the RB of the UE is reallocated, and the step A1 is continuously executed.

Description

Base station side PHR optimization method, storage medium, electronic device and base station
Technical Field
The embodiment of the present application relates to the field of communications technologies, and in particular, to a method for optimizing a Power Headroom Report (PHR), a storage medium, an electronic device, and a base station.
Background
In an LTE (long term evolution) network, a PH (Power Headroom) represents a difference between a maximum transmission (Allowed maxrranspower) Power Allowed by a UE (User Equipment) and a currently estimated PUSCH (Physical Uplink Shared Channel) transmission Power, and can be simply expressed by a formula as: UE AllowedMaxTransPower-PuschPower. It indicates how much transmission power the UE can use in addition to the transmission power used for the current PUSCH transmission. The unit of PH is dB, the range is [ -23dB, +40dB ], and if negative, it means that the base station has scheduled the UE with a data transmission rate higher than it can support at the available transmit power at that time.
Since the power headroom report value in the process of reporting the power headroom to the network side by the UE is transmitted by the control unit of the UE MAC layer, the MAC control unit related to this process is also referred to as a PHR control unit.
The 3GPP protocol defines 64 PH levels, each PH level value is used as a PHR, and corresponds to an actual measurement quality value dB, as shown in table 1, a mapping relationship between the PHR and the PH is shown, for example, if the PH value that the UE needs to report is-22 dB, then it is only necessary to fill a value 1 in the PHR control unit of the MAC PDU.
Reporting value (Reported value) Measuring quality value (Measured quality value) (dB)
POWER_HEADROOM_0 -23≤PH<-22
POWER_HEADROOM_1 -22≤PH<-21
POWER_HEADROOM_2 -21≤PH<-20
POWER_HEADROOM_3 -20≤PH<-19
POWER_HEADROOM_4 -19≤PH<-18
POWER_HEADROOM_5 -18≤PH<-17
POWER_HEADROOM_22 -1≤PH<0
POWER_HEADROOM_58 35≤PH<36
POWER_HEADROOM_59 36≤PH<37
POWER_HEADROOM_60 37≤PH<38
POWER_HEADROOM_61 38≤PH<39
POWER_HEADROOM_62 39≤PH<40
POWER_HEADROOM_63 PH≥40
TABLE 1
The PH is defined because it can serve as a reference for the base station to allocate an uplink RB (Resource Block). In the prior art, if the PH value reported by the UE is negative, it indicates that the current PUSCH transmission power has exceeded the maximum transmission power allowed by the UE, and the RB allocated to the UE is usually directly reduced in the next scheduling, and typically, the base station raises the PH by reducing the allocated RB; if the PH value is positive, the RBs subsequently allocated to the UE may also continue to increase, and the specific RB scheduling manners are determined by different manufacturers, which is not described herein. However, when the PH value is negative, if RB allocation to the UE is reduced, uplink rate reduction of the UE is inevitably caused, and although the reduction of the uplink rate can basically meet user service requirements in a scenario where the requirement of the user for uplink traffic is not high (for example, a normal operator scenario), user perception is not obvious, the requirement of the user cannot be met in a scenario where the uplink traffic needs to be stably maintained in a higher range (for example, a private network environment where uplink video service needs to be returned).
Disclosure of Invention
In order to solve any one of the above technical problems, an embodiment of the present application provides a base station side PHR optimization method, a storage medium, an electronic apparatus, and a base station.
In order to achieve the purpose of the embodiment of the present application, an embodiment of the present application provides a base station side PHR optimization method, including:
after obtaining the current power headroom report value PHR of the user equipment UE, the following steps are cyclically executed until the obtained current PHR of the UE is greater than or equal to a preset first preset value, including:
step A1, judging whether the current PHR of the user equipment UE is smaller than the first preset value;
step A2, if the current PHR is smaller than the first preset value, judging whether the current block error rate BLER is larger than or equal to a preset block error rate threshold value;
step A3, if the current BLER (block error rate) is greater than or equal to the block error rate threshold, determining an adjustment strategy of the Resource Block (RB) of the UE;
step A4, according to the adjustment strategy, the RB of the UE is reallocated, and the step A1 is continuously executed.
A storage medium having a computer program stored therein, wherein the computer program is arranged to perform the method as described above when executed.
An electronic device comprising a memory having a computer program stored therein and a processor arranged to execute the computer program to perform the method as described above.
A base station, characterized in that it comprises an electronic device as claimed in the preceding claims.
One of the above technical solutions has the following advantages or beneficial effects:
and when the obtained PHR is lower than a first preset value and the current BLER is greater than or equal to a block error rate threshold value, determining an adjustment strategy of the RB, and distributing the RB according to the adjustment strategy so as to ensure the stable uplink flow required by the user.
Additional features and advantages of the embodiments of the application will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the embodiments of the application. The objectives and other advantages of the embodiments of the application may be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
The accompanying drawings are included to provide a further understanding of the embodiments of the present application and are incorporated in and constitute a part of this specification, illustrate embodiments of the present application and together with the examples of the embodiments of the present application do not constitute a limitation of the embodiments of the present application.
Fig. 1 is a flowchart of a base station side PHR optimization method according to an embodiment of the present application;
fig. 2 is a flowchart of a base station side PHR optimization method according to an embodiment of the present application;
fig. 3 is a flowchart of a base station side PHR optimization method according to a second embodiment of the present application.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application more apparent, the embodiments of the present application will be described in detail below with reference to the accompanying drawings. It should be noted that, in the embodiments of the present application, features in the embodiments and the examples may be arbitrarily combined with each other without conflict.
Fig. 1 is a flowchart of a base station side PHR optimization method according to an embodiment of the present disclosure. As shown in fig. 1, the method includes:
after obtaining the current PHR of the UE, the following steps are executed in a loop until the obtained current PHR of the UE is greater than or equal to a preset first preset value, including:
step A1, judging whether the current PHR of the UE is smaller than the first preset value;
step A2, if the current PHR is smaller than the first preset value, judging whether the current BLER is larger than or equal to a preset block error rate threshold value;
step A3, if the current BLER is larger than or equal to the threshold value of the block error rate, determining the adjustment strategy of the Resource Block (RB) of the UE;
step A4, according to the adjustment strategy, the RB of the UE is reallocated, and the step A1 is continuously executed.
And when the current PHR is judged to be smaller than the first preset value but the current BLER is smaller than the threshold value of the block error rate, the RB of the UE is not reallocated.
According to the method provided by the embodiment of the application, when the obtained PHR is lower than the first preset value and the current BLER is greater than or equal to the block error rate threshold value, the adjustment strategy of the RB is determined, and the RB is distributed according to the adjustment strategy, otherwise, the RB is not distributed and adjusted, so that the stable uplink flow required by a user is ensured.
The method provided by the embodiments of the present application is explained as follows:
in an exemplary embodiment, the determining an adjustment strategy of resource blocks RB of the UE includes:
determining the limited state of the current PHR of the UE to obtain the current limited state, wherein the current limited state comprises a PHR entering a quasi-limited state and a PHR entering an initial limited state;
determining an adjustment strategy corresponding to the current limited state;
the regulation strategy corresponding to the PHR entering the quasi-limited state is a high-order regulation strategy, the regulation strategy corresponding to the PHR entering the initially-limited state is a low-order regulation strategy, and the regulation speed of the high-order regulation strategy is higher than that of the low-order regulation strategy.
The limited severity of the current PHR of the UE is determined, so that a proper adjustment strategy is determined according to the limited severity, wherein the more severe the limited state of the PHR is, the faster the adjustment speed of the corresponding adjustment strategy is, and the required stable uplink flow is provided for the user as soon as possible.
In an exemplary embodiment, determining the limited state of the current PHR of the UE, and obtaining the current limited state includes:
judging whether the current PHR is smaller than a preset second preset value, wherein the second preset value is smaller than the first preset value;
and if the current PHR is smaller than the second preset value, determining that the current limited state is that the PHR enters a quasi-limited state, and otherwise, determining that the current limited state is that the PHR enters an initial limited state.
By setting the second preset value, which is smaller than the first preset value, the comparison result can be divided into three cases, namely, the comparison result is smaller than the second preset value, and the comparison result is larger than the second preset value, the comparison result is larger than the first preset value, and the comparison result is larger than the first preset value. The first 2 cases correspond to the PHR entering the quasi-restricted state and the PHR entering the initial restricted state respectively; wherein the last case does not make an adjustment of the RB.
In an exemplary embodiment, the determining the limited state of the current PHR of the UE to obtain the current limited state includes:
acquiring a current SIGNAL-to-NOISE RATIO (SNR) of an uplink channel;
judging whether the current signal-to-noise ratio is larger than a preset signal-to-noise ratio threshold value or not;
and if the current signal-to-noise ratio is smaller than the signal-to-noise ratio threshold value, determining that the current limited state is a PHR entering a quasi-limited state.
By judging the current uplink SNR, when the current SNR is smaller than the current SNR threshold value, the current limited state is directly determined to be a PHR entering a quasi-limited state, the called adjustment strategy is rapidly determined to be a high-order adjustment strategy, and rapid adjustment is entered, so that an uplink line obtains faster adjustment response when the PHR is low and the SNR is low.
In one exemplary embodiment, the method further comprises:
if the current SNR is larger than or equal to the SNR threshold value, judging whether the current PHR is smaller than a preset second preset value, wherein the second preset value is smaller than the first preset value;
and if the current PHR is smaller than the second preset value, determining that the current limited state is that the PHR enters a quasi-limited state, and otherwise, determining that the current limited state is that the PHR enters an initial limited state.
When the current SNR is greater than or equal to the SNR threshold, by setting a second preset value, which is smaller than the first preset value, and with the help of the second preset value, the comparison result can be divided into three cases, which are respectively smaller than the second preset value, larger than the second preset value, smaller than the first preset value, and larger than the first preset value. The first 2 cases correspond to the PHR entering the quasi-restricted state and the PHR entering the initial restricted state respectively; wherein the last case does not make an adjustment of the RB.
In an exemplary embodiment, the second preset value is determined according to a zero PH percentage allowed by the UE.
In an exemplary embodiment, the second preset value is 18.
In one exemplary embodiment, the first preset value is 22.
By adopting the above method to set the threshold value, the limited state of the PHR can be accurately determined, and a basis is provided for selecting a proper adjustment strategy.
In one exemplary embodiment, the method further comprises:
when the current PHR is larger than or equal to the first preset value, updating the current adjustment times i of all adjustment strategies to initial values;
after the RB of the UE is redistributed, the numerical value of the current adjusting times i corresponding to the adjusting strategy currently used by the UE is recorded and added with 1, the numerical value of the current adjusting times i of the unused adjusting strategy is set as an initial value, and the step A1 is continuously executed.
In an exemplary embodiment, the reallocating the RBs of the UE according to the adjustment policy includes:
determining the adjustment proportion of the corresponding RB for the adjustment times i corresponding to the currently used adjustment strategy;
determining the total number of RBs required to be reduced by the UE according to the adjustment proportion and the total number of the RBs currently requested by the UE;
when the adjustment times i are the same, the adjustment proportion corresponding to the high-order adjustment strategy is larger than that in the low-order adjustment strategy.
By determining the adjustment proportion corresponding to the current adjustment times i, the RB can be gradually adjusted, so that smooth execution of adjustment operation is realized.
In an exemplary embodiment, the adjusted ratio of RB is obtained by:
(i-1)*step+A;
wherein i is the current adjustment times, step is the adjustment step length, and A is the initial adjustment proportion value.
The values of the adjustment step length and the initial adjustment ratio can be defined as required.
The determination of the adjustment proportion of each adjustment operation is completed based on the calculation expression, and the implementation mode is simple and convenient.
In order to solve the above problem, an embodiment of the present application provides a method for PHR optimization, where when an obtained PHR value is lower than a first preset value and a current block error rate is greater than or equal to a preset block error rate threshold value, an adjustment mode of an RB is determined according to a recorded current PHR, and the RB is allocated, otherwise, the RB is not allocated and adjusted, so as to ensure a stable uplink flow rate required by a user.
The first embodiment is as follows:
referring to fig. 2, a PHR optimization method proposed in this embodiment is applied to a base station, where the base station starts a BLER (block error rate) monitoring period according to a preset policy, and records a BLER obtained in the monitoring period as a current BLER when one monitoring period is ended, where the preset policy may be a starting policy in the prior art, for example, when a certain UE is determined to be accessed, the base station starts a first BLER monitoring period for the UE, and an initial value of the current BLER at this time is set to 0. And performing the following steps:
step 100: acquiring a PHR reported by UE, and recording the acquired PHR as a current PHR;
in this step, the MAC layer of the base station demodulates and obtains a Reported value (Reported value) from the PHR control unit Reported by the UE, where the obtained Reported value may reflect the current power headroom of the UE;
step 101: judging whether the reported value of the current PHR is smaller than a first preset value, if so, executing the step 102, and if not, executing the step 106;
in this step, the first preset value may be preferably: 22; according to the mapping relationship between the PH and the PHR, when the PHR value is 22, the power headroom PH value corresponding to the UE is: -1 dB; indicating that the current PUSCH transmission power has exceeded the maximum transmission power allowed by the UE, (it is stated herein that PUSCH is a calculated value, not the actual transmission power of the UE, and thus PH may be a negative value) may need to be reduced to the RB allocated for the UE;
step 102: judging whether the current BLER is smaller than a preset block error rate threshold value, if not, executing a step 103, otherwise, executing a step 106;
in this step, for the current BLER, the block error rate threshold is preferably 10%; in LTE, the target BLER of the data Channel is 10%, the UE reports a measured CQI (Channel Quality Indication) value to the base station, where the specification of LTE defines a CQI selection criterion, that is, a decoding error rate (BLER) of the PDSCH is less than 10% of a used CQI value, and the base station can determine, according to the CQI value reported by the UE, a Modulation and Coding Scheme (MCS) used for current scheduling, where the block error rate index of LTE is 10% under a HARQ (Hybrid Automatic Repeat Request) retransmission-free condition; of course, in other embodiments, for the current BLER, the block error rate threshold may also be set to other values according to an actual situation, for example, set to 8% in a situation where the required accuracy is higher, where no further limitation is made on other selection manners of the block error rate threshold of the current BLER value, and the selection may be performed by a person having ordinary skill in the art according to an actual scenario.
Step 103: judging whether the current PHR is smaller than a second preset value or not, and executing the step 104 according to a judgment result;
in this step, a second preset value is set for indicating that the PH value of the current UE has seriously affected the user experience, where the second preset value is smaller than the first preset value and is determined according to the percentage of the zero power headroom set by the UE, and typically, if the current resource allocation already exceeds approximately 50% of the zero power headroom of the UE (10 × lg2 — 3dB) from the power perspective, the user experience will be seriously affected, the second preset value may be set as: 18;
step 104: determining and recording the current RB adjustment mode according to the current PHR, and performing reallocation;
specifically, if the current PHR is smaller than the second preset value, it indicates that the PHR enters the quasi-restricted state, and execute step 104-1: RB reallocation is carried out according to a PHR quasi-limited state adjustment mode, namely: the RB is quickly reduced by presetting a high-order initial adjustment threshold and step length; recording the current RB adjusting mode;
if the current PHR is greater than or equal to the second preset value and smaller than the first preset value, indicating that the PHR enters an initial limited state, executing step 104-2: RB reallocation is carried out according to a PHR quasi-limited state adjustment mode, namely: the RB is slowly reduced by the initial adjustment threshold and the step length of a preset low order; recording the current RB adjusting mode;
wherein, the initial adjustment threshold and step size of the low order and the initial adjustment threshold and step size of the high order are the modes that can be realized by those skilled in the art in the prior art, and only for the UE whose PHR is in the quasi-limited state, the power margin enters the serious insufficient state, and the adjustment speed for the RB thereof needs to be faster, so as to avoid discomfort of user experience.
Typically, the initial adjustment threshold and the step size of the preset low order may be set as: the initial adjustment threshold is 10%, the adjustment step is 5%, and RB allocation is gradually reduced according to the adjustment strategy of (i-1) × step + the initial threshold. Wherein i is the current adjustment times; for example, when the current adjustment number i is 1, this RB adjustment is the first adjustment, and the RB to be reduced and allocated at this time is: the UE actually reports BSR allocation RB 10% currently, and when the current adjustment time i is 2, it indicates that this RB adjustment is the second adjustment, and the RB allocation is reduced at this time as follows: the UE currently actually reports BSR allocation RB 15% … ….
The initial adjustment threshold and step size of the high order may be set as: the initial adjustment threshold is 20%, the adjustment step is 10%, and RB allocation is rapidly reduced according to an adjustment strategy of (i-1) × step + the initial threshold; wherein, i is the current adjustment number, for example, when the current adjustment number i is equal to 1, it indicates that the RB adjustment is the first adjustment, and the RB to be reduced and allocated at this time is: the UE actually reports 20% of BSR allocated RB, when the current adjustment time i is 2, it indicates that this RB is adjusted to the second adjustment, and the RB allocated to this time is reduced as follows: UE currently actually reports BSR allocation RB 30% … …
Step 105: updating the current adjustment frequency i of the current RB adjustment mode to i +1, and updating the current adjustment frequency i of another RB adjustment mode to 1; then returning to execute the step 100;
in this step, if the updated RB adjustment mode adjustment number i is 2, it indicates that the first RB adjustment has been performed in the current adjustment mode; if the updated adjusting times i are more than 2, the RB continuous adjustment under the current adjusting mode is performed currently, namely the RB is adjusted, but the set requirement is still not met, and the adjusting mode is not changed in the current adjustment;
step 106: the RB allocation is not adjusted, the current adjustment number i of each RB adjustment mode is updated to 1, and then the process returns to step 100.
The PHR optimization method proposed in this embodiment has the following significant advantages:
(1) when the base station judges that the current PHR is smaller than the first preset value but the current BLER is smaller than the preset block error rate threshold value, the base station still allocates the RB according to the resource actually required by the user and does not immediately adjust the RB, so that stable uplink flow is provided for the user, the service requirement of the user is met, and unnecessary RB adjustment is avoided under the condition that the PH is too low due to overhigh network access power of the UE;
(2) when the base station judges that the current PHR is smaller than the first preset value and the current BLER is larger than or equal to the block error rate threshold value, the base station determines the adjustment mode of the RB according to the current PHR, and adjusts the RB, so that the PH value can be quickly adjusted to meet the service requirement, and the situation that the PH value is adjusted too fast when not smaller than a second preset value which indicates that the user experience is seriously influenced can be avoided, and the user rate is reduced too fast.
Example two:
referring to fig. 3, in a second embodiment, based on the first embodiment, further optimization is performed, and another method for optimizing a PHR is provided, where the method is applied to a base station, the base station starts a BLER (block error rate) monitoring period according to a preset policy, and when a monitoring period is finished, records the BLER obtained in the monitoring period as a current BLER, where the preset policy may be a starting policy in the prior art, for example, when a certain UE is determined to be accessed, the base station starts a first BLER monitoring period for the UE, and an initial value of the current BLER at this time is set to 0. And performing the following steps:
step 200: acquiring a PHR reported by UE, and recording the acquired PHR as a current PHR;
in this step, the MAC layer of the base station demodulates and obtains a Reported value (Reported value) from the PHR control unit Reported by the UE, where the obtained Reported value may reflect the current power headroom of the UE;
step 201: judging whether the current PHR is smaller than a first preset value, if so, executing step 102, and if not, executing step 207;
in this step, the first preset value may be preferably: 22; according to the mapping relationship between the PH and the PHR, when the PHR value is 22, the power headroom PH value corresponding to the UE is: -1 dB; indicating that the current PUSCH transmission power has exceeded the maximum transmission power allowed by the UE, (it is stated herein that PUSCH is a calculated value, not the actual transmission power of the UE, and thus PH may be a negative value) may need to be reduced to the RB allocated for the UE;
step 202: judging whether the current BLER is smaller than a preset block error rate threshold value, if not, executing a step 203, otherwise, executing a step 207;
in this step, for the current BLER, the block error rate threshold is preferably 10%; in LTE, the target BLER of the data Channel is 10%, the UE reports a measured CQI (Channel Quality Indication) value to the base station, where the specification of LTE defines a CQI selection criterion, that is, a decoding error rate (BLER) of the PDSCH is less than 10% of a used CQI value, and the base station can determine, according to the CQI value reported by the UE, a Modulation and Coding Scheme (MCS) used for current scheduling, where the block error rate index of LTE is 10% under a HARQ (Hybrid Automatic Repeat Request) retransmission-free condition; of course, in other embodiments, for the current BLER, the block error rate threshold may also be set to other values according to an actual situation, for example, set to 8% in a situation where the required accuracy is higher, where no further limitation is made on other selection manners of the block error rate threshold of the current BLER value, and the selection may be performed by a person having ordinary skill in the art according to an actual scenario.
Step 203: judging whether the current uplink SNR (SIGNAL to NOISE RATIO) is smaller than the current SNR threshold value, if so, indicating that the RB needs to be adjusted urgently so as not to influence the user perception, and thus directly executing the step 205-1; if not, go to step 204;
in this step, the current uplink SNR can be obtained by a person of ordinary skill in the art according to the prior art, typically by physical layer measurement, which is not described herein again; the current SNR threshold is a value determined according to the MCS used in the current scheduling, and is not a unique determined value, and a mapping relationship between the PUSCH SNR and the MCS is usually stored on the base station side, as shown in table 2 below, which typically indicates that the physical layer corresponding to the MCS can correctly demodulate the SNR threshold; whereby the current SNR threshold value can be known from the current MCS;
MCS Index Modulation OrderQ'm PUSCH SNR
0 2 0
1 2 1
2 2 2
3 2 3
4 2 4
5 2 5
6 2 6
7 2 7
8 2 8
9 2 9
10 2 10
11 4 10
12 4 11
13 4 12
14 4 13
15 4 14
16 4 15
17 4 16
18 4 17
19 4 18
20 4 19
21 6 19
22 6 20
23 6 21
24 6 22
25 6 23
26 6 24
27 6 25
28 6 26
TABLE 2
Step 204: judging whether the current PHR is smaller than a second preset value or not, and executing the step 205 according to the judgment result;
in this step, a second preset value is set for indicating that the PH value of the current UE has seriously affected the user experience, where the second preset value is smaller than the first preset value and is determined according to the percentage of the zero power headroom set by the UE, and typically, if the current resource allocation already exceeds approximately 50% of the zero power headroom of the UE (10 × lg2 — 3dB) from the power perspective, the user experience will be seriously affected, the second preset value may be set as: 18;
step 205: determining and recording the current RB adjustment mode according to the current PHR, and performing reallocation;
specifically, if the current PHR is smaller than the second preset value, it indicates that the PHR enters the quasi-restricted state, and step 205-1 is executed: RB reallocation is carried out according to a PHR quasi-limited state adjustment mode, namely: the RB is quickly reduced by presetting a high-order initial adjustment threshold and step length; recording the current RB adjusting mode;
if the current PHR is greater than the second preset value and smaller than the first preset value, it indicates that the PHR enters the initial limited state, execute step 205-2: RB reallocation is carried out according to a PHR quasi-limited state adjustment mode, namely: the RB is slowly reduced by the initial adjustment threshold and the step length of a preset low order; recording the current RB adjusting mode;
wherein, the initial adjustment threshold and step size of the low order and the initial adjustment threshold and step size of the high order are the modes that can be realized by those skilled in the art in the prior art, and only for the UE whose PHR is in the quasi-limited state, the power margin enters the serious insufficient state, and the adjustment speed for the RB thereof needs to be faster, so as to avoid discomfort of user experience.
Typically, the initial adjustment threshold and the step size of the preset low order may be set as: the initial adjustment threshold is 10%, the adjustment step is 5%, and RB allocation is gradually reduced according to the adjustment strategy of (i-1) × step + the initial threshold. Wherein i is the current adjustment times; for example, when the current adjustment number i is 1, this RB adjustment is the first adjustment, and the RB to be reduced and allocated at this time is: the UE actually reports BSR allocation RB 10% currently, and when the current adjustment time i is 2, it indicates that this RB adjustment is the second adjustment, and the RB allocation is reduced at this time as follows: the UE currently actually reports BSR allocation RB 15% … ….
The initial adjustment threshold and step size of the high order may be set as: the initial adjustment threshold is 20%, the adjustment step is 10%, and RB allocation is rapidly reduced according to an adjustment strategy of (i-1) × step + the initial threshold; wherein, i is the current adjustment number, for example, when the current adjustment number i is equal to 1, it indicates that the RB adjustment is the first adjustment, and the RB to be reduced and allocated at this time is: the UE actually reports 20% of BSR allocated RB, when the current adjustment time i is 2, it indicates that this RB is adjusted to the second adjustment, and the RB allocated to this time is reduced as follows: UE currently actually reports BSR allocation RB 30% … …
Step 206: updating the current adjustment frequency i of the current RB adjustment mode to i +1, and updating the current adjustment frequency i of another RB adjustment mode to 1; then returning to execute the step 200;
in this step, if the updated RB adjustment mode adjustment number i is 2, it indicates that the first RB adjustment has been performed in the current adjustment mode; if the updated adjusting times i are more than 2, the RB continuous adjustment under the current adjusting mode is performed currently, namely the RB is adjusted, but the set requirement is still not met, and the adjusting mode is not changed in the current adjustment;
step 206: the RB allocation is not adjusted, and the current adjusting times i of each RB adjusting mode are updated to be 1; and then returns to perform step 200.
Compared with the first embodiment, in the second embodiment, when the RB needs to be adjusted according to the current PHR value and the BLER value, the judgment on the current uplink SNR is further introduced, so that when the current SNR is smaller than the current SNR threshold, the current SNR directly enters the fast adjustment, and whether the current PHR is larger than the second preset value is no longer judged, so that the uplink can obtain a faster adjustment response when the PHR is low and the SNR is low.
An embodiment of the present application provides a storage medium, in which a computer program is stored, wherein the computer program is configured to perform the method described in any one of the above when the computer program runs.
An embodiment of the application provides an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor is configured to execute the computer program to perform the method described in any one of the above.
An embodiment of the present application provides a base station, including the electronic apparatus described above. The electronic device may be provided in the base station as a separate module or integrated on a module having a processing function in the base station.
It will be understood by those of ordinary skill in the art that all or some of the steps of the methods, systems, functional modules/units in the devices disclosed above may be implemented as software, firmware, hardware, and suitable combinations thereof. In a hardware implementation, the division between functional modules/units mentioned in the above description does not necessarily correspond to the division of physical components; for example, one physical component may have multiple functions, or one function or step may be performed by several physical components in cooperation. Some or all of the components may be implemented as software executed by a processor, such as a digital signal processor or microprocessor, or as hardware, or as an integrated circuit, such as an application specific integrated circuit. Such software may be distributed on computer readable media, which may include computer storage media (or non-transitory media) and communication media (or transitory media). The term computer storage media includes volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer readable instructions, data structures, program modules or other data, as is well known to those of ordinary skill in the art. Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, Digital Versatile Disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to store the desired information and which can accessed by a computer. In addition, communication media typically embodies computer readable instructions, data structures, program modules or other data in a modulated data signal such as a carrier wave or other transport mechanism and includes any information delivery media as known to those skilled in the art.

Claims (15)

1. A PHR optimization method at a base station side is characterized by comprising the following steps:
after obtaining the current power headroom report value PHR of the user equipment UE, the following steps are cyclically executed until the obtained current PHR of the UE is greater than or equal to a preset first preset value, including:
step A1, judging whether the current PHR of the UE is smaller than the first preset value;
step A2, if the current PHR is smaller than the first preset value, judging whether the current block error rate BLER is larger than or equal to a preset block error rate threshold value;
step A3, if the current BLER is larger than or equal to the threshold value of the block error rate, determining the adjustment strategy of the Resource Block (RB) of the UE;
step A4, according to the adjustment strategy, the RB of the UE is reallocated, and the step A1 is continuously executed.
2. The method of claim 1, wherein the determining an adjustment strategy for Resource Blocks (RBs) of the UE comprises:
determining the limited state of the current PHR of the UE to obtain the current limited state, wherein the current limited state comprises a PHR entering a quasi-limited state and a PHR entering an initial limited state;
determining an adjustment strategy corresponding to the current limited state;
the regulation strategy corresponding to the PHR entering the quasi-limited state is a high-order regulation strategy, the regulation strategy corresponding to the PHR entering the initially-limited state is a low-order regulation strategy, and the regulation speed of the high-order regulation strategy is higher than that of the low-order regulation strategy.
3. The method of claim 2, wherein determining the limited state of the current PHR of the UE and obtaining the current limited state comprises:
judging whether the current PHR is smaller than a preset second preset value, wherein the second preset value is smaller than the first preset value;
and if the current PHR is smaller than the second preset value, determining that the current limited state is that the PHR enters a quasi-limited state, and otherwise, determining that the current limited state is that the PHR enters an initial limited state.
4. The method of claim 2, wherein the determining the limited state of the current PHR of the UE, resulting in a current limited state, comprises:
acquiring a current signal-to-noise ratio of an uplink channel;
judging whether the current signal-to-noise ratio is larger than a preset signal-to-noise ratio threshold value or not;
and if the current signal-to-noise ratio is smaller than the signal-to-noise ratio threshold value, determining that the current limited state is a PHR entering a quasi-limited state.
5. The method of claim 4, further comprising:
if the current signal-to-noise ratio is larger than or equal to the signal-to-noise ratio threshold value, judging whether the current PHR is smaller than a preset second preset value, wherein the second preset value is smaller than the first preset value;
and if the current PHR is smaller than the second preset value, determining that the current limited state is that the PHR enters a quasi-limited state, and otherwise, determining that the current limited state is that the PHR enters an initial limited state.
6. The method of claim 3 or 5, wherein the second predetermined value is determined according to a percentage of zero power headroom allowed by the UE.
7. The method of claim 6, wherein the second preset value is 18.
8. The method of claim 1, wherein the first preset value is 22.
9. The method of claim 1, further comprising:
when the current PHR is larger than or equal to the first preset value, updating the current adjustment times i of all adjustment strategies to initial values;
after the RB of the UE is redistributed, the numerical value of the current adjusting times i corresponding to the adjusting strategy currently used by the UE is recorded and added with 1, the numerical value of the current adjusting times i of the unused adjusting strategy is set as an initial value, and the step A1 is continuously executed.
10. The method of claim 9, wherein the reallocating the RBs of the UE according to the adjustment policy comprises:
determining the adjustment proportion of the corresponding RB for the adjustment times i corresponding to the currently used adjustment strategy;
determining the total number of RBs required to be reduced by the UE according to the adjustment proportion and the total number of the RBs currently requested by the UE;
when the adjustment times i are the same, the adjustment proportion corresponding to the high-order adjustment strategy is larger than that in the low-order adjustment strategy.
11. The method of claim 10, wherein the adjusted ratio of RBs is obtained by:
(i-1)*step+A;
wherein i is the current adjustment times, step is the adjustment step length, and A is the initial adjustment proportion value.
12. The method of claim 1, further comprising:
and when the current PHR is judged to be smaller than the first preset value but the current BLER is smaller than the threshold value of the block error rate, not reallocating the RB of the UE.
13. A storage medium, in which a computer program is stored, wherein the computer program is arranged to perform the method of any of claims 1 to 12 when executed.
14. An electronic device comprising a memory and a processor, wherein the memory has stored therein a computer program, and wherein the processor is arranged to execute the computer program to perform the method of any of claims 1 to 12.
15. A base station, characterized in that it comprises an electronic device according to claim 14.
CN202110875405.XA 2021-07-30 2021-07-30 Base station side PHR optimization method, storage medium, electronic device and base station Pending CN113596881A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110875405.XA CN113596881A (en) 2021-07-30 2021-07-30 Base station side PHR optimization method, storage medium, electronic device and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110875405.XA CN113596881A (en) 2021-07-30 2021-07-30 Base station side PHR optimization method, storage medium, electronic device and base station

Publications (1)

Publication Number Publication Date
CN113596881A true CN113596881A (en) 2021-11-02

Family

ID=78253051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110875405.XA Pending CN113596881A (en) 2021-07-30 2021-07-30 Base station side PHR optimization method, storage medium, electronic device and base station

Country Status (1)

Country Link
CN (1) CN113596881A (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100104969A (en) * 2009-03-20 2010-09-29 강원대학교산학협력단 Method for apparatus for scheduling frequency domain packet
CN101854665A (en) * 2009-04-03 2010-10-06 大唐移动通信设备有限公司 Method, device and system for controlling load of LTE system
WO2011047606A1 (en) * 2009-10-20 2011-04-28 华为技术有限公司 Method and device for adaptive retransmission of high speed uplink packet access
CN102647796A (en) * 2011-02-21 2012-08-22 中兴通讯股份有限公司 Method and device for upstream resource allocation
CN102714864A (en) * 2010-01-12 2012-10-03 高通股份有限公司 Bundled frequency division multiplexing structure in wireless communications
WO2015032082A1 (en) * 2013-09-09 2015-03-12 华为技术有限公司 Method and apparatus for adaptively adjusting downlink initial block error rate target value
CN104735763A (en) * 2013-12-18 2015-06-24 联芯科技有限公司 SIR (Signal to Interference Ratio) adjusting method in external loop power control and terminal equipment
CN105188147A (en) * 2015-09-18 2015-12-23 哈尔滨工业大学深圳研究生院 LTE-A system full duplex resource allocation method based on power control
US20170353930A1 (en) * 2014-12-22 2017-12-07 Nokia Solutions And Networks Oy Controlling Transmission
US10470073B1 (en) * 2018-12-06 2019-11-05 Sprint Spectrum L.P. Use of block error rate as basis to control configuration of MU-MIMO service
CN111010739A (en) * 2019-12-20 2020-04-14 大连市共进科技有限公司 Physical resource block configuration method and device, 5G base station and readable storage medium
CN111245534A (en) * 2018-11-29 2020-06-05 普天信息技术有限公司 Uplink resource scheduling method and device
CN111294815A (en) * 2018-12-06 2020-06-16 中国移动通信集团陕西有限公司 Method and device for determining uplink limitation
CN112153677A (en) * 2020-09-08 2020-12-29 北京长焜科技有限公司 Uplink AMC optimization method for small telephone traffic scene
KR20210066174A (en) * 2019-11-28 2021-06-07 주식회사 유캐스트 Apparatus and Method for Assigning Modulation and Coding Scheme and Resource Block for LTE Uplink
CN112930701A (en) * 2018-10-31 2021-06-08 高通股份有限公司 Maintaining long term evolution traffic in power limited dual connectivity scenarios

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100104969A (en) * 2009-03-20 2010-09-29 강원대학교산학협력단 Method for apparatus for scheduling frequency domain packet
CN101854665A (en) * 2009-04-03 2010-10-06 大唐移动通信设备有限公司 Method, device and system for controlling load of LTE system
WO2011047606A1 (en) * 2009-10-20 2011-04-28 华为技术有限公司 Method and device for adaptive retransmission of high speed uplink packet access
CN102714864A (en) * 2010-01-12 2012-10-03 高通股份有限公司 Bundled frequency division multiplexing structure in wireless communications
CN102647796A (en) * 2011-02-21 2012-08-22 中兴通讯股份有限公司 Method and device for upstream resource allocation
WO2015032082A1 (en) * 2013-09-09 2015-03-12 华为技术有限公司 Method and apparatus for adaptively adjusting downlink initial block error rate target value
CN104735763A (en) * 2013-12-18 2015-06-24 联芯科技有限公司 SIR (Signal to Interference Ratio) adjusting method in external loop power control and terminal equipment
US20170353930A1 (en) * 2014-12-22 2017-12-07 Nokia Solutions And Networks Oy Controlling Transmission
CN105188147A (en) * 2015-09-18 2015-12-23 哈尔滨工业大学深圳研究生院 LTE-A system full duplex resource allocation method based on power control
CN112930701A (en) * 2018-10-31 2021-06-08 高通股份有限公司 Maintaining long term evolution traffic in power limited dual connectivity scenarios
CN111245534A (en) * 2018-11-29 2020-06-05 普天信息技术有限公司 Uplink resource scheduling method and device
US10470073B1 (en) * 2018-12-06 2019-11-05 Sprint Spectrum L.P. Use of block error rate as basis to control configuration of MU-MIMO service
CN111294815A (en) * 2018-12-06 2020-06-16 中国移动通信集团陕西有限公司 Method and device for determining uplink limitation
KR20210066174A (en) * 2019-11-28 2021-06-07 주식회사 유캐스트 Apparatus and Method for Assigning Modulation and Coding Scheme and Resource Block for LTE Uplink
CN111010739A (en) * 2019-12-20 2020-04-14 大连市共进科技有限公司 Physical resource block configuration method and device, 5G base station and readable storage medium
CN112153677A (en) * 2020-09-08 2020-12-29 北京长焜科技有限公司 Uplink AMC optimization method for small telephone traffic scene

Similar Documents

Publication Publication Date Title
JP5663660B2 (en) Uplink power control method and system
KR101902579B1 (en) Apparatus and method for uplink power control for a wireless transmitter/receiver unit utilizing multiple carriers
JP5878643B2 (en) Uplink power control method and apparatus
JP5129348B2 (en) Assigning transmit power to multiple carriers assigned to a wireless communication device
RU2395168C2 (en) Noise control in wireless communication system
RU2486708C2 (en) Channel adaptation method, base station and terminal in lte system
US8040804B2 (en) Method of flow control for IUB-interface, apparatus and base station
JP5692902B2 (en) Uplink interference control and apparatus for wireless mobile communication system
US20120176998A1 (en) Method for Dynamically Controlling an Uplink Transmission Power of a User Equipment
US20150351051A1 (en) Method and apparatus for reporting maximum transmission power in wireless communication
EP2945451A1 (en) Interference reduction in a communication network by scheduling and link adaptation
EP1708536A2 (en) Method of managing radio resources and node B apparatus implementing the same
US20170289921A1 (en) Method and apparatus for controlling uplink transmission power
EP2606687A1 (en) Method and apparatus for power headroom reporting during multi-carrier operation
CN108605296A (en) A kind of method and terminal of terminal power adjustment
US8107425B2 (en) Radio quality based channel resource management
CN104812079A (en) PDCCH (physical downlink control channel) resource distribution method and device
EP1976143B1 (en) Radio base station apparatus, resource allocation method and resource allocation program
WO2012159298A1 (en) Method and apparatus for implementing uplink data transmission
CN113596881A (en) Base station side PHR optimization method, storage medium, electronic device and base station
CN113596902A (en) Base station side PHR optimization method, storage medium, electronic device and base station
CN109392072B (en) Power headroom calculation method
KR101248944B1 (en) Method and Apparatus for downlink power control in wireless communication system
KR101154991B1 (en) Method of re-transmitting channel quality information and supporting thereof in mobile communication system
KR100752567B1 (en) Initial downlink transmit power adjustment for non-real-time services using dedicated or shared channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination