CN113565204B - Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method - Google Patents

Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method Download PDF

Info

Publication number
CN113565204B
CN113565204B CN202110941170.XA CN202110941170A CN113565204B CN 113565204 B CN113565204 B CN 113565204B CN 202110941170 A CN202110941170 A CN 202110941170A CN 113565204 B CN113565204 B CN 113565204B
Authority
CN
China
Prior art keywords
column
foundation
penetrating
prestressed
composite structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110941170.XA
Other languages
Chinese (zh)
Other versions
CN113565204A (en
Inventor
朱千琪
黄明
章祥余
张鹏
章泽亮
钱野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong No6 Construction Group Co ltd
Original Assignee
Jiangsu Nantong No6 Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No6 Construction Group Co ltd filed Critical Jiangsu Nantong No6 Construction Group Co ltd
Priority to CN202110941170.XA priority Critical patent/CN113565204B/en
Publication of CN113565204A publication Critical patent/CN113565204A/en
Application granted granted Critical
Publication of CN113565204B publication Critical patent/CN113565204B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/166Connectors or means for connecting parts for reinforcements the reinforcements running in different directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a composite structure column in-place reinforcement penetrating method earthquake-resistant node structure which comprises a prefabricated column, a cross-shaped steel column, a prestressed tendon penetrating hole, a beam main tendon penetrating hole and an unbonded prestressed tendon, wherein the cross-shaped steel column is arranged in the prefabricated column, and the upper end and the lower end of the cross-shaped steel column penetrate through the prefabricated column; the nodes at two ends of the cross-shaped steel column are respectively the upper end and the lower end of the node, the surfaces of the upper end and the lower end of the node are provided with a prestressed tendon through hole and a beam main tendon through hole, and the prestressed tendon through hole is positioned at one end of the cross-shaped steel column far away from the precast column; the lower end of the node is a composite structure column and foundation connecting node, and the upper end of the node is a composite structure column and structure beam connecting node; the unbonded prestressed tendons respectively cross tendon holes at the upper end and the lower end of the node, and a perforated steel bottom plate integrated with the cross steel column is arranged at the lower part of the cross steel column; the invention has reasonable structural design, strong node anti-seismic performance, high assembling and hoisting construction speed and construction period saving.

Description

Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method
Technical Field
The invention belongs to the technical field of assembly type buildings, and particularly relates to a composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and a construction method.
Background
The fabricated building is a building which is fabricated by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and accessories on the site in a reliable connection mode.
In recent years, the construction and development speed of the prefabricated buildings in China is high, and the emergence of relevant policies of governments and industries enables the prefabricated buildings in China to be widely developed all over the country in a short time, but aiming at the traditional rough type construction and construction distribution of the construction industry in China, the verification of the earthquake resistance of the prefabricated buildings still has a lot of uncertainty, the strength of the connecting node of the main stress component of the prefabricated building needs to be further enhanced, and the innovative design of the connecting node of the main structure becomes a major subject of the transformation and development of the current industry.
Disclosure of Invention
The invention aims to provide a composite structural column in-place reinforcement penetrating method earthquake-proof node structure, a construction method and a use method thereof, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention adopts the following technical scheme:
a composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure comprises a prefabricated column, a cross-shaped steel column, a prestressed reinforcement penetrating hole, a beam main reinforcement penetrating hole and unbonded prestressed reinforcements, wherein the cross-shaped steel column is arranged inside the prefabricated column, and the upper end and the lower end of the cross-shaped steel column penetrate through the prefabricated column; the joints at two ends of the cross-shaped steel column are respectively an upper joint end and a lower joint end, the surfaces of the upper joint end and the lower joint end are respectively provided with the tendon passing hole and the beam main tendon passing hole, and the tendon passing hole is positioned at one end, far away from the precast column, of the cross-shaped steel column; the lower end of the node is a composite structure column and foundation connecting node, and the upper end of the node is a composite structure column and structure beam connecting node; the unbonded prestressed tendons respectively cross the tendon penetrating holes at the upper end and the lower end of the node, and the lower part of the cross-shaped steel column is provided with a steel bottom plate with holes integrated with the cross-shaped steel column.
Preferably, the lower end of the node is connected with the foundation through a steel bolt to connect the perforated steel bottom plate at the bottom of the cross-shaped steel column.
A construction method for a composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure comprises the following steps:
the method comprises the following steps: pre-burying construction of steel bolts in the foundation; the steel bolts in the foundation are embedded into the foundation beam in a fixed mode, the steel bolts are in a group mode, each group of steel bolts is connected with the steel bolts with the holes at least 8, the foundation adopts a post-pouring method, the steel bolts in the foundation are embedded into a groove Liang Shizi in the construction process, a groove Liang Shizi is set to be a post-pouring section, the length of the cross groove in the longitudinal and transverse directions is not less than 750mm, the depth of the cross groove is not less than 1/2 of the height of the foundation beam, the diameter of the steel bolts in the foundation is not less than 20mm, the embedding depth of the steel bolts in the foundation beam in the early stage is not less than 200mm, and the exposed length of the steel bolts is not less than 150mm;
step two: hoisting the composite structural column, aligning and fixing the steel bolts; before the composite structure column is hoisted in place, rechecking the elevation of the top surface of the groove of the composite structure column and the site foundation Liang Shizi, and if the elevation has an error, adopting high-strength mortar to coat or pick and chisel; meanwhile, the protection is enhanced in the integral hoisting process of the composite structure column, after the composite structure column is hoisted in place, the bolts are symmetrically screwed without being screwed, then the hoisted composite structure column is temporarily supported and fixed, and the elevation and the verticality of each part of the composite structure column are rechecked;
step three: the joint of the lower foundation is crossed, penetrated and fixed by unbonded prestressed tendons; after the hoisting of the composite structural column is finished, in a post-cast section of a groove of the foundation Liang Shizi, a 'bar penetrating' process of the unbonded prestressed bars is performed in a crossed manner in longitudinal and transverse directions, and is fixed according to the design curve trend of the unbonded prestressed bars, the unbonded prestressed bars in all directions extend out of the end of the top surface of the foundation beam, the extending length is not less than 300mm, and the requirements of tensioning and anchoring the prestressed bars on the top surface of the foundation beam after the subsequent concrete pouring are met;
step four: the main reinforcement in the foundation beam is connected in a reinforcement penetrating way; after the unbonded prestressed tendon is penetrated, a 'tendon penetrating' process of the main tendon of the un-cast exposed part of the foundation is carried out in the post-cast section of the groove of the foundation Liang Shizi; the method comprises the following steps that (1) a reinforcement penetrating process of an additional steel bar is adopted for a main reinforcement of a foundation beam at a cross-shaped steel column, the diameter of the additional steel bar adopted for reinforcement penetrating at a reinforcement penetrating hole of an upper beam main reinforcement of the cross-shaped steel column is 1.5 times that of the main reinforcement of the foundation beam, and the extending length of two sides after the reinforcement penetrating is not less than 600mm;
step five: pouring and maintaining post-cast concrete at the joint of the foundation; checking the deviation of the composite structure column in position elevation, verticality, unbonded prestressed reinforcement penetrating and fixing position and the like again, and performing concrete pouring work of the connection node of the foundation part after the requirements are met;
step six: tensioning and anchoring the unbonded prestressed tendons at the foundation connection part; the crossed unbonded prestressed tendons adopt a construction process of 'top surface post-tensioning method of a foundation', and the crossed unbonded prestressed tendons are directly tensioned and anchored after being anchored on the top surface of the foundation, so that the construction process is simplified;
seventhly, mounting a support frame body of the superposed beam and hoisting the beam body; after the construction of the composite structural column at the foundation connection node is finished, the maintenance of the reinforced cast concrete is completed, the reinforced maintenance work is performed after the whole ground concrete pouring construction is completed according to the construction scheme, then the installation of the upper laminated beam support frame body and the hoisting work of the laminated beam body are performed, and the process inspection work of each process is well performed;
step eight: penetrating the main rib of the superposed beam and installing an anchoring plate; after the superposed beam is hoisted in place, checking the hoisting in-place deviation and adjusting, performing a 'bar penetrating' process of main bars of the superposed beam, when the bar penetrating of one end of the superposed beam is finished, arranging an anchoring plate at the end part of the reinforcing bar after the rib penetrating of the superposed beam is performed, and when the bar penetrating of the other end is difficult, performing bar penetrating connection at a beam-column connection node in the form of an additional reinforcing bar, and connecting the additional reinforcing bar and each main bar of the superposed beam in a post-pouring section of the beam-column connection by adopting a reinforcing bar sleeve grouting method;
step nine, the joint of the upper beam column is crossed and fixed by unbonded prestressed tendons; after the processes of the main reinforcement penetration of the laminated beam and the like are finished and are checked and accepted, the crossed reinforcement penetration and the fixing work of unbonded prestressed reinforcements at the upper beam-column joint are carried out, prestressed pore paths are arranged in the laminated beams at each position, reinforcement penetration holes are arranged at the top of the laminated beams at the other ends of the unbonded prestressed reinforcements, the reinforced reinforcements pass through the post-cast sections of beam-column joints and are perforated at the composite structural columns, and finally the reinforced reinforcements are penetrated from bottom to top through prestressed pore openings at the end parts of the laminated beams at the other ends, steel wires are adopted to assist the reinforcement penetration and are fixed according to the design curve trend of the unbonded prestressed reinforcements, the unbonded prestressed reinforcements at each position extend out of the top surface of the laminated beams, the extending length is not less than 300mm, and the requirements of tensioning and anchoring the prestressed reinforcements on the top surface of the laminated beams after the subsequent concrete pouring are met;
step ten: mounting a post-cast section template at the beam-column joint, and fixing and checking the position of a prestressed tendon; after all the reinforcement penetrating procedures are finished, mounting a post-cast section template at the beam-column joint, and fixing and checking the position of the prestressed reinforcement again;
step eleven: hoisting the laminated slab, and pouring concrete on the whole surface layer; after the procedures are completely finished, carrying out works such as hoisting of the laminated slab, pre-embedding of a steel square groove for prestressed reinforcement anchoring and relevant water and electricity pipelines, checking and accepting to be qualified, integrally checking the hoisting position of the laminated beam, setting of a post-cast section, penetrating reinforcing steel bars for fixing and the like, and pouring concrete on the cylindrical surface layer of the integral beam slab after checking and accepting relevant hidden projects;
step twelve: tensioning and anchoring the unbonded prestressed tendons at the beam-column connection part; after the concrete of the cylindrical surface layer of the integral beam slab is poured and maintained to meet the design requirements, the unbonded prestressed tendons are symmetrically tensioned and anchored at the prestressed tendon anchoring square grooves, and finally, the anchor square grooves are filled with fine aggregate concrete and sealed; when the prestressed tendons are tensioned and anchored on the superposed top surface of the superposed beam before the integral surface is poured, pouring concrete at the post-pouring section of the beam-column connecting node, maintaining to the designed strength, and then tensioning and anchoring the prestressed tendons;
step thirteen: hoisting the upper layer of composite structural column and grouting the sleeve; after all the work is finished, the first layer (or underground bottom layer) of the composite structure column-beam crossed unbonded prestressed connecting joint is constructed; the upper layer of composite structure column is relatively different from the lower layer construction, and is mainly characterized in that the upper layer of composite structure column is in butt-inserting connection with a cross-shaped steel column at the upper end of the composite structure column which is just constructed by adopting a bottom cross-shaped steel groove, and the bottom of the composite structure column to be hoisted is in alignment by adopting steel bars and connected by grouting through a steel bar sleeve, so that the hoisting quality requirements of the column body are doubly guaranteed;
fourteen steps: and repeating the seventh step to the twelfth step until all engineering hoisting is completed.
The invention has the technical effects and advantages that:
the technical scheme of 'composite structure column beam connection + cross opposite-insertion column body hoisting connection + reinforcement penetrating process + cross prestress node reinforcement' is adopted, the node anti-seismic performance can be improved, the assembling and hoisting construction speed is high, the construction period is shortened, a prefabricated column with a cross steel column is utilized, and unbonded prestress ribs on the surface of the cross steel column form a composite structure column, the composite structure column and a foundation beam, the composite structure column and a structure beam assembly type cross prestress node connection structure are adopted, and the strength of the integral assembly anti-seismic connection node is high.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
fig. 2 is a logical structure block diagram of the present embodiment.
In the figure: 1. prefabricating a column; 2. a cross-shaped section steel column; 3. the prestressed tendon penetrates through the tendon hole; 4. the main beam rib penetrates through the rib hole; 5. the prestressed tendons are not bonded.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to fig. 1 to 2 in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. The specific embodiments described herein are merely illustrative of the invention and do not delimit the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment is as follows:
as shown in fig. 1-2, the invention provides a composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure, which comprises a prefabricated column 1, a cross-shaped steel column 2, a prestressed reinforcement penetrating hole 3, a beam main reinforcement penetrating hole 4, an unbonded prestressed reinforcement 5, a connecting beam and other structures, wherein the cross-shaped steel column 2 is arranged in the prefabricated column 1; a prestressed tendon penetration hole 3 and a beam main tendon penetration hole 4 are formed in the upper end node and the lower end node of the cross-shaped steel column 2; the lower end of the node is a composite structure column and foundation connecting node, and the upper end of the node is a composite structure column and structure beam connecting node; the unbonded prestressed tendons 5 respectively cross and penetrate the prestressed tendon penetration holes 3 at the upper and lower connecting nodes, and the lower part of the cross-shaped steel column 2 is provided with a steel bottom plate with holes integrated with the cross-shaped steel column 2; the composite structure column and the foundation beam, and the composite structure column and the structure beam are connected in an assembly type crossed prestressed node connection structure, the strength of the integral assembly anti-seismic connection node is high, and the composite structure column and the foundation are connected at the lower connection node by adopting steel bolts at the steel bottom plate with holes at the bottom of the cross-shaped steel column 2.
A construction method for a composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure comprises the following steps:
the method comprises the steps of steel bolt pre-embedding construction in a foundation, composite structure column hoisting, steel bolt alignment, fixing, unbonded prestressed tendon 5 cross-penetrating in the lower part of a foundation joint, fixing, main tendon penetrating in a foundation beam connecting, post-cast concrete pouring at the position of the foundation joint, maintenance, unbonded prestressed tendon 5 tensioning in the lower part of the foundation joint, anchoring, composite beam support frame installation, beam hoisting, composite beam main tendon penetrating, and installation of an anchoring plate, unbonded prestressed tendon 5 cross-penetrating in the upper part of the beam column connecting, fixing, beam column connecting post-cast section template installation, fixed prestressed tendon position, checking, composite plate hoisting, integral surface layer concrete pouring, unbonded prestressed tendon 5 tensioning in the beam column connecting, anchoring, composite structure column hoisting in the upper layer, sleeve grouting, and repeating the seventh step to the twelfth step until all engineering hoisting is completed
The method comprises the following steps: and (5) pre-embedding construction of the steel bolts in the foundation. In order to ensure the strength of the connection node of the foundation part, the composite structural column is fixedly anchored in a foundation beam through a perforated steel bottom plate arranged on a cross-shaped steel column 2 on the lower portion of the composite structural column by using steel bolts, the steel bolts are in a group form, each group of steel bolts is connected with the perforated steel bottom plate by at least 8, the foundation adopts a post-pouring method, the steel bolts in the foundation are pre-buried in a groove Liang Shizi in the construction process, namely the groove Liang Shizi is set to be a post-pouring section, the length of the cross-shaped groove in the longitudinal and transverse directions is not less than 750mm, the depth of the cross-shaped groove is not less than 1/2 of the height of the foundation beam, the construction requirement of subsequent prestressed ribs is met, the diameter of the steel bolts in the foundation is not less than 20mm, the embedding depth of the early foundation beam in concrete pouring is not less than 200mm, the exposed length of the early foundation beam is not less than 150mm, and the pre-burying position does not influence the rib penetrating procedure of the subsequent unbonded prestressed ribs 5.
Step two: and (5) hoisting the composite structural column, and aligning and fixing the steel bolts. Before the composite structural column is hoisted in place, the design size of the composite structural column and the elevation of the top surface of the groove Liang Shizi of the site foundation are rechecked, and if large errors exist in the elevation, high-strength mortar is used for plastering or chiseling; meanwhile, as the cross-shaped steel columns 2 extend outwards from the upper part and the lower part of the composite structure column, the protection is enhanced in the integral hoisting process of the composite structure column, bolts are symmetrically screwed after the composite structure column is hoisted in place without being leaked, then the hoisted composite structure column is temporarily supported and fixed, and the elevation and the verticality of each part of the composite structure column are rechecked.
Step three: the lower base joint is crossed and fixed by unbonded prestressed tendons 5. After the hoisting of the composite structural column is finished, in a post-pouring section of a groove of the foundation Liang Shizi, a 'bar penetrating' process of the unbonded prestressed bars 5 is performed in a crossed mode in longitudinal and transverse directions, the unbonded prestressed bars 5 are fixed according to the trend of a design curve of the unbonded prestressed bars 5, the unbonded prestressed bars 5 in all the directions stretch out from the end head of the top surface of the foundation beam, the stretching length is not less than 300mm, and the requirements of tensioning and anchoring the unbonded prestressed bars on the top surface of the foundation beam after subsequent concrete pouring are met.
Step four: the main bar in the foundation beam is connected by penetrating bars. After the unbonded prestressed tendon 5 is penetrated, a 'tendon penetrating' process of the main tendon of the un-cast exposed part of the foundation is carried out in the post-cast section of the groove of the foundation Liang Shizi. For convenience of construction, the main reinforcement of the foundation beam can be penetrated in the position of the cross-shaped steel column 2 by adopting an additional reinforcement 'first penetrating and then anchoring' process, the diameter of the additional reinforcement which is penetrated in the position of the reinforcement penetrating hole 44 of the main reinforcement of the upper beam of the cross-shaped steel column 2 is 1.5 times of the diameter of the main reinforcement of the foundation beam, and the extending length of the two sides is not less than 600mm after the reinforcement penetrating.
Step five: and (5) pouring and maintaining post-cast concrete at the joint of the foundation. And checking the deviation of the composite structure column in position of hoisting elevation, verticality, unbonded prestressed reinforcement penetrating and fixing position and the like again, and performing concrete pouring work of the connection node of the foundation part after the requirements are met.
Step six: the joint of the foundation is tensioned and anchored without binding prestressed tendons 5. The crossed unbonded prestressed tendon 5 is constructed by adopting a 'foundation top surface post-tensioning method', and the construction procedures of related concrete pouring and the like are carried out subsequently on the upper part of the connection node part of the foundation to meet the anchor sealing process of the prestressed tendon, so that the crossed unbonded prestressed tendon 5 has no special requirements on the appearance quality after being anchored on the foundation top surface, and only needs to be directly tensioned and anchored, thereby simplifying the construction procedures.
Seventhly, mounting the support frame body of the superposed beam and hoisting the beam body. And after the construction of the composite structural column at the foundation connection node is finished, the maintenance of the reinforced post-cast concrete is completed, the reinforced maintenance work is performed after the whole ground concrete pouring construction is completed according to the construction scheme, the installation of the upper laminated beam supporting frame body and the hoisting work of the laminated beam body are performed after the standard maintenance requirements are met, and the process inspection work of each process is well performed.
Step eight: and (5) penetrating the main rib of the superposed beam, and installing an anchoring plate. After the superposed beam is hoisted in place, the hoisting in-place deviation is checked and adjusted, a 'bar penetrating' process of main bars of the superposed beam can be carried out firstly, when bar penetrating is finished at one end of the superposed beam, an anchoring plate is arranged at the end part of each reinforcing bar after the superposed beam penetrates the reinforcing bars, the reinforcing bars are arranged according to 100 percent of the number of the reinforcing bars, when the bars are difficult to penetrate at the other end of the superposed beam, bar penetrating connection can be carried out at beam column connection nodes in the same manner of additional reinforcing bars, the additional reinforcing bars and the main bars of the superposed beam are connected in a pouring section after the beam column connection nodes by a reinforcing bar sleeve grouting method, and the connection position of each connection reinforcing bar does not influence the stress requirement.
And step nine, the joint of the upper beam column is crossed and fixed by the unbonded prestressed tendons 5. After the processes of the main reinforcement penetration of the laminated beam and the like are finished and checked, the unbonded prestressed reinforcement 5 at the joint of the upper beam column is crossed and fixed, namely, a prestressed pore channel is arranged in each position of the laminated beam, a reinforcement penetration hole at the top of the laminated beam at the other end of the unbonded prestressed reinforcement 5 is penetrated, the post-cast section of the beam column node is penetrated, a hole is formed at the position of the composite structure column, and finally, the reinforcement penetration is carried out from bottom to top through a prestressed pore at the end part of the laminated beam at the other end, steel wires are adopted to assist the reinforcement penetration if necessary and are fixed according to the design curve trend of the unbonded prestressed reinforcement 5, the unbonded prestressed reinforcement 5 at each position extends out from the top end of the laminated beam, the extending length is not less than 300mm, and the requirements of tensioning and anchoring of the prestressed reinforcement on the top surface of the laminated beam after the subsequent concrete pouring are met.
Step ten: and (4) mounting a post-pouring section template at the beam-column joint, and fixing and checking the position of the prestressed tendon. And (4) after all the reinforcement penetrating processes are finished, mounting the post-cast section template at the beam-column joint, and fixing and checking the position of the prestressed reinforcement again.
Step eleven: and (5) hoisting the laminated slab and pouring concrete on the whole surface layer. Waiting that above-mentioned process is whole to be accomplished, works such as the pre-buried of superimposed sheet hoist and mount, prestressing tendons anchor steel square groove and relevant water and electricity pipeline to the acceptance is qualified, once again wholly check superimposed beam hoist and mount position, post-cast section setting, each reinforcing bar wear processes such as muscle fixed, satisfy the requirement, carry out relevant hidden project acceptance back, carry out the pouring work of integral beam slab cylinder layer concrete at last.
Step twelve: the beam-column joint is tensioned and anchored by the unbonded prestressed tendons 5. And (3) after the concrete of the cylindrical surface layer of the integral beam slab is poured and maintained to meet the design requirements, symmetrically performing tensioning and anchoring work of the unbonded prestressed tendons 5 at the anchoring square grooves of the prestressed tendons, and finally adopting fine aggregate concrete to fill and seal the anchoring square grooves. If the prestressed tendons adopt a scheme of firstly performing tensioning and anchoring on the superposed top surface of the superposed beam before integral surface casting, casting concrete at the post-cast section of the beam-column connecting node, maintaining to the designed strength, and then performing tensioning and anchoring work on the prestressed tendons.
Step thirteen: hoisting the upper layer of composite structural column and grouting the sleeve. And finishing all the work, namely finishing the construction of the first layer (or the underground bottom layer) of the crossed unbonded prestressed connecting joint of the composite structure column beam. The upper-layer composite structure column is different from the lower-layer construction relatively, and is mainly characterized in that the upper-layer composite structure column is connected with a cross-shaped steel column 2 at the upper end of the composite structure column just constructed through a bottom cross-shaped steel groove in a butt-inserting mode, the bottom of the composite structure column to be hoisted is connected through steel bar alignment and steel bar sleeve grouting, and hoisting quality requirements of the column body are met in a double-guarantee mode.
Fourteen steps: and repeating the seventh step to the twelfth step until all engineering hoisting is completed.
In conclusion, the construction method of the in-place bar penetrating method anti-seismic node structure of the composite structural column is reasonable in structural design, strong in node anti-seismic performance, high in assembling and hoisting construction speed and capable of saving the construction period.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (1)

1. A construction method for a composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure is characterized by comprising the following steps:
the method comprises the following steps: pre-embedding construction of steel bolts in the foundation; the steel bolts in the foundation are embedded into the foundation beam in a fixed mode, the steel bolts are in a group mode, each group of steel bolts is connected with the steel bolts with the holes at least 8, the foundation adopts a post-pouring method, the steel bolts in the foundation are embedded into a Liang Shizi groove in the construction process, a Liang Shizi groove is set to be a post-pouring section, the length of the cross groove in the longitudinal direction and the transverse direction is not less than 750mm, the depth of the cross groove is not less than 1/2 of the height of the foundation beam, the diameter of the steel bolts in the foundation is not less than 20mm, the embedding depth of the early foundation beam in concrete pouring is not less than 200mm, and the exposed length of the early foundation beam in concrete pouring is not less than 150mm;
step two: hoisting the composite structural column, aligning and fixing steel bolts; before the composite structure column is hoisted in place, rechecking the elevation of the top surface of the groove of the composite structure column and the site foundation Liang Shizi, and if the elevation has an error, adopting high-strength mortar to coat or pick and chisel; meanwhile, the protection is enhanced in the integral hoisting process of the composite structure column, bolts are symmetrically screwed after the composite structure column is hoisted in place without being leaked, then the hoisted composite structure column is temporarily supported and fixed, and the elevation and the verticality of each part of the hoisting of the composite structure column are rechecked;
step three: the lower base joint part is crossed, penetrated and fixed by unbonded prestressed tendons (5); after the hoisting of the composite structural column is finished, in a post-cast section of a groove of a foundation Liang Shizi, a 'bar penetrating' process of the unbonded prestressed bars (5) is performed in a crossed manner in the longitudinal and transverse directions, and is fixed according to the design curve trend of the unbonded prestressed bars (5), the unbonded prestressed bars (5) in each direction extend out of the end of the top surface of the foundation beam, the extending length is not less than 300mm, and the requirements of tensioning and anchoring the prestressed bars on the top surface of the foundation beam after subsequent concrete pouring are met;
step four: the main reinforcement in the foundation beam is connected in a reinforcement penetrating way; after the reinforcement penetrating of the unbonded prestressed reinforcement (5) is finished, a reinforcement penetrating procedure of main reinforcement of the un-poured exposed part of the foundation is carried out in a post-pouring section of the groove Liang Shizi of the foundation; the method comprises the following steps that (1) a foundation beam main rib penetrates through a rib at a cross-shaped steel column (2) by adopting an additional steel bar 'first penetration and then anchoring' process, the diameter of the additional steel bar adopted for penetrating through the rib at an upper beam main rib penetrating hole (4) of the cross-shaped steel column (2) is 1.5 times that of the foundation beam main rib, and the extending length of two sides is not less than 600mm after the rib is penetrated;
step five: pouring and maintaining post-cast concrete at the joint of the foundation; checking the hoisting in-place elevation and the verticality of the composite structural column and the deviation of the unbonded prestressed reinforcement penetrating and fixing positions again, and performing concrete pouring work on the connection nodes of the foundation part after the requirements are met;
step six: tensioning and anchoring the unbonded prestressed tendons (5) at the joints of the foundations; the crossed unbonded prestressed tendons (5) adopt a construction process of a foundation top surface post-tensioning method, and the crossed unbonded prestressed tendons (5) are directly tensioned and anchored after being anchored on the foundation top surface, so that the construction process is simplified;
seventhly, mounting a support frame body of the superposed beam and hoisting the beam body; after the construction of the composite structural column at the foundation connection node is finished, the maintenance of the reinforced cast concrete is completed, the reinforced maintenance work is performed after the whole ground concrete pouring construction is completed according to the construction scheme, then the installation of the upper laminated beam support frame body and the hoisting work of the laminated beam body are performed, and the process inspection work of each process is well performed;
step eight: penetrating the main rib of the superposed beam and installing an anchoring plate; after the superposed beam is hoisted in place, checking the hoisting in-place deviation and adjusting, performing a 'bar penetrating' process of main bars of the superposed beam, when the bar penetrating of one end of the superposed beam is finished, arranging an anchoring plate at the end part of the reinforcing bar after the rib penetrating of the superposed beam is performed, and when the bar penetrating of the other end is difficult, performing bar penetrating connection at a beam-column connection node in the form of an additional reinforcing bar, and connecting the additional reinforcing bar and each main bar of the superposed beam in a post-pouring section of the beam-column connection by adopting a reinforcing bar sleeve grouting method;
step nine, the joint of the upper beam column is crossed and fixed without the bonded prestressed tendons (5); after the process of penetrating the main reinforcements of the laminated beam is completed and is checked and accepted, the unbonded prestressed reinforcements (5) at the joints of the upper beam and the upper column are crossed and penetrated and fixed, prestressed pore passages are arranged in the laminated beams at all the positions, the reinforcing holes at the tops of the unbonded prestressed reinforcements (5) penetrate through the reinforcing holes at the tops of the laminated beams, the reinforcing holes pass through post-cast sections of beam and column joints and are perforated at the composite structural columns, and finally, the reinforcing holes at the end parts of the laminated beams at the other ends penetrate from bottom to top for construction, steel wires are adopted to assist in penetrating the reinforcements and are fixed according to the design curve trend of the unbonded prestressed reinforcements (5), the unbonded prestressed reinforcements (5) at all the positions extend out of the top surface of the laminated beam, the extension length is not less than 300mm, and the requirements of tensioning and anchoring of the prestressed reinforcements on the top surfaces of the laminated beams after subsequent concrete pouring are met;
step ten: mounting a post-cast section template at the beam-column joint, and fixing and checking the position of a prestressed tendon; after all the reinforcement penetrating procedures are finished, mounting a post-cast section template at the beam-column joint, and fixing and checking the position of the prestressed reinforcement again;
step eleven: hoisting the laminated slab, and pouring concrete on the whole surface layer; after the processes are completely finished, carrying out the pre-embedding work of the steel square groove for hoisting the laminated slab and anchoring the prestressed reinforcing steel and the related water and electricity pipelines, checking and accepting to be qualified, integrally checking the hoisting position of the laminated beam, setting the post-cast section and fixing each reinforcing steel bar through reinforcing steel bar, and pouring concrete on the cylindrical surface layer of the integral beam slab after the relevant hidden project is checked and accepted;
step twelve: tensioning and anchoring the unbonded prestressed tendons (5) at the beam-column connection part; after the concrete of the cylindrical surface layer of the integral beam slab is poured and maintained to meet the design requirements, the unbonded prestressed tendons (5) are symmetrically stretched and anchored at the prestressed tendon anchoring square grooves, and finally, the anchor square grooves are filled with fine aggregate concrete and anchored; when the prestressed tendons are firstly tensioned and anchored on the superposed top surface of the superposed beam before the integral surface layer is poured, firstly pouring concrete at the post-pouring section of the beam-column connecting node and curing to the designed strength, and then carrying out tensioning and anchoring work on the prestressed tendons;
step thirteen: hoisting the upper layer of composite structural column and grouting the sleeve; after all the work is finished, the first layer or the underground bottom layer of the composite structure column-beam crossed unbonded prestressed connecting joint is constructed; the upper layer of composite structure column is relatively different from the lower layer construction, and is mainly characterized in that the upper layer of composite structure column is in plug-in connection with a cross-shaped steel column (2) at the upper end of the composite structure column which is just constructed by adopting a bottom cross-shaped steel groove, and the bottom of the composite structure column to be hoisted is in alignment by adopting a steel bar and grouting by adopting a steel bar sleeve, so that the hoisting quality requirement of the column body is doubly guaranteed;
fourteen steps: and repeating the seventh step to the twelfth step until all engineering hoisting is completed.
CN202110941170.XA 2021-08-17 2021-08-17 Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method Active CN113565204B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110941170.XA CN113565204B (en) 2021-08-17 2021-08-17 Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110941170.XA CN113565204B (en) 2021-08-17 2021-08-17 Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method

Publications (2)

Publication Number Publication Date
CN113565204A CN113565204A (en) 2021-10-29
CN113565204B true CN113565204B (en) 2022-10-25

Family

ID=78171792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110941170.XA Active CN113565204B (en) 2021-08-17 2021-08-17 Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method

Country Status (1)

Country Link
CN (1) CN113565204B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302776A (en) * 2008-06-24 2008-11-12 沈阳建筑大学 Cellular combined steel and concrete column and reinforced concrete beam frame node
CN109057046A (en) * 2018-07-09 2018-12-21 常州市规划设计院 The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar
CN110439125B (en) * 2019-08-01 2021-02-02 中交一航局第一工程有限公司 Beam joint template process
CN110616807B (en) * 2019-09-04 2020-07-14 青岛理工大学 Folding type floor slab center pillar combined node and assembling method thereof
CN111335485B (en) * 2020-03-17 2021-06-15 钱野 Prefabricated section steel concrete intermediate column beam node prestressed tendon staggered tensioning anchoring structure for assembly building and construction method
CN112482567A (en) * 2020-11-20 2021-03-12 南通四建集团有限公司 Construction method and structure of four-direction unbonded prestressed crossed beam-column joint

Also Published As

Publication number Publication date
CN113565204A (en) 2021-10-29

Similar Documents

Publication Publication Date Title
CN106836479B (en) Assembled prestressed concrete frame structure
CN206707005U (en) A kind of prefabricated PC concrete frame structure
CN106759434A (en) A kind of groined type precast concrete king-post basis and its construction method
CN110670722A (en) Implementation method of beam-column connecting node of fabricated building
CN110805144B (en) Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN109914589B (en) Vertical connecting structure of prestressed reinforced concrete precast column and construction method thereof
CN113718753B (en) Anchor underground continuous wall foundation assembled type intermediate wall and construction method
CN114351855A (en) Assembled full-precast concrete frame structure system and construction method
CN111663682A (en) Assembly type wall body connecting structure based on ribbed box and construction method thereof
KR20070023274A (en) PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein
CN209874048U (en) Vertical connection structure of prestressed reinforced concrete prefabricated column
CN113565204B (en) Composite structure column in-place reinforcement penetrating method earthquake-resistant joint structure and construction method
CN216893134U (en) Prefabricated assembled reinforced concrete beam structure through hybrid connection of bolts and sleeves
CN115434425A (en) Lattice type steel reinforced concrete prefabricated beam column joint and method
CN216893135U (en) Assembled concrete connection structure through segmentation rebar connection
CN212295166U (en) Assembly type wall body connecting structure based on ribbed box
CN115928882A (en) Assembled composite structure hybrid connection node suitable for coastal region
CN115387378A (en) Semi-pillarless assembly type station based on simply supported superposed side walls and floorslabs and method thereof
CN212336411U (en) Assembled wall connection structure based on bolted connection
CN111335485B (en) Prefabricated section steel concrete intermediate column beam node prestressed tendon staggered tensioning anchoring structure for assembly building and construction method
CN114718186A (en) Steel reinforced concrete column-steel beam assembly type structure locally adopting ECC (error correction code) and assembly method
CN215166455U (en) Low, multi-layer fully prefabricated assembled concrete structure
CN218714108U (en) Prefabricated lattice type steel reinforced concrete combined shear wall
CN117231029B (en) Outer frame for reinforcing and reforming precast slab brick concrete structure and construction method thereof

Legal Events

Date Code Title Description