CN113543288A - Power control method and power control device - Google Patents
Power control method and power control device Download PDFInfo
- Publication number
- CN113543288A CN113543288A CN202010316153.2A CN202010316153A CN113543288A CN 113543288 A CN113543288 A CN 113543288A CN 202010316153 A CN202010316153 A CN 202010316153A CN 113543288 A CN113543288 A CN 113543288A
- Authority
- CN
- China
- Prior art keywords
- target
- power
- sub
- communication unit
- frequency band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 71
- 238000004891 communication Methods 0.000 claims abstract description 248
- 230000005540 biological transmission Effects 0.000 claims abstract description 125
- 230000005684 electric field Effects 0.000 claims abstract description 88
- 238000004088 simulation Methods 0.000 claims abstract description 43
- 230000009467 reduction Effects 0.000 claims abstract description 27
- 238000012545 processing Methods 0.000 claims description 33
- 238000004590 computer program Methods 0.000 claims description 8
- 230000005670 electromagnetic radiation Effects 0.000 description 13
- 230000008569 process Effects 0.000 description 6
- 238000005259 measurement Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 4
- 230000015654 memory Effects 0.000 description 4
- 238000012549 training Methods 0.000 description 4
- 238000013528 artificial neural network Methods 0.000 description 3
- 238000013508 migration Methods 0.000 description 3
- 230000005012 migration Effects 0.000 description 3
- 238000011946 reduction process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000005672 electromagnetic field Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000005855 radiation Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 208000037855 acute anterior uveitis Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0203—Power saving arrangements in the radio access network or backbone network of wireless communication networks
- H04W52/0206—Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B17/00—Monitoring; Testing
- H04B17/30—Monitoring; Testing of propagation channels
- H04B17/309—Measuring or estimating channel quality parameters
- H04B17/318—Received signal strength
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/06—Testing, supervising or monitoring using simulated traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
A power control method includes: acquiring a first electric field strength value, wherein the first electric field strength value is an electric field strength value measured at a measuring point when a plurality of communication units of a station configure preset data transmission power; when the first electric field strength value is larger than or equal to the preset electric field strength value, performing power reduction simulation on the data transmission power of the plurality of communication units in the target time period, and calculating a second electric field strength value according to the reduced data transmission power; when the second electric field strength value is smaller than the preset electric field strength value, outputting a command; and performing power-down operation within the target time period according to the command. The method can automatically adjust the power of each communication unit in the site, thereby effectively utilizing the power of the communication units. The application also provides a power control device capable of realizing the power control method.
Description
Technical Field
The present application relates to the field of communications technologies, and in particular, to a power control method and a power control apparatus.
Background
With the development of wireless communication technology, a station can deploy a plurality of communication devices with different communication systems to provide a plurality of wireless network services. The intensity of the electromagnetic radiation generated by such a station risks exceeding the electromagnetic radiation standards. With the deployment of 5G devices, how to control the electromagnetic radiation of a station within the electromagnetic radiation standard becomes a concern.
One current method of controlling the intensity of electromagnetic radiation is generally as follows: the method comprises the steps of calculating the current electromagnetic radiation intensity of a station according to the working power of non-5G equipment of the station, calculating the allowable working power of the 5G equipment according to the difference value between the electromagnetic radiation standard and the current electromagnetic radiation intensity, and carrying out power control on the 5G equipment according to the allowable working power.
As the service on the non-5G device migrates to the 5G device, the operating power of the non-5G device may be reduced, which may cause the problem that the operating power allocated to the non-5G device is too high and the operating power allocated to the 5G device is too low, i.e. the power allocation is not reasonable, so that the above method for controlling the electromagnetic radiation intensity is difficult to be applied to the 5G application scenario.
Disclosure of Invention
In view of the above, the present application provides a power control method and a power control apparatus, which can automatically adjust the power of each communication unit in a site, thereby more effectively utilizing the power of the communication unit.
A first aspect provides a power control method in which a first electric field strength value is acquired; when the first electric field strength value is larger than or equal to the preset electric field strength value, performing power reduction simulation on the data transmission power of the plurality of communication units in the target time period, and calculating a second electric field strength value according to the reduced data transmission power; outputting a command when the second electric field strength value is smaller than the preset electric field strength; and performing power-down operation within the target time period according to the command.
The plurality of communication units comprise communication units of different communication systems. Each communication unit is configured with an independent preset data transmission power. The data transmission power refers to an average power of transmission service data in a time period, and a duration of the time period may be set according to an actual situation, which is not limited in the present application. The electric field strength is also referred to as the electromagnetic radiation strength. The first electric field strength value is an electric field strength value measured at the station at the measurement point when the plurality of communication units of the station configure a preset data transmission power. The second electric field strength value is an electric field strength value measured at the measurement point to the station when the plurality of communication units of the station are configured in accordance with the reduced data transmission power.
By doing so, in the case that the data transmission power of the station is too large, the data transmission power of the plurality of communication units in the target time period is subjected to power reduction simulation, and the data transmission power of the station may be an arithmetic sum or a weighted sum of the data transmission powers of all the communication units. If the electric field intensity of the station does not exceed the preset electric field intensity under the simulation condition, the communication unit can transmit data according to the reduced data transmission power in the target time period after the configuration according to the reduced data transmission power. Therefore, the power of each communication unit can be automatically adjusted, and the electric field intensity of the station does not exceed the preset electric field intensity, so that the electromagnetic radiation intensity is ensured within a safety range.
In another possible implementation manner, the load amount of each communication unit in a target period is predicted according to the historical load amount of the communication unit; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target time interval is inversely related to the priority of the communication unit; and performing power reduction simulation on the data transmission power of each communication unit in the target time period according to the priority order from high to low. Specifically, the time before the target time interval may be divided into a plurality of time intervals, the duration of each time interval is equal to the duration of the target time interval, the unit of the target time interval may be, but is not limited to, minutes or hours, and the time interval may be set according to the actual situation, which is not limited in this application. And then training a prediction model according to the historical load amount of each time interval, and predicting the load amount of the target time interval by using the prediction model. The training method may be, but is not limited to, a gradient descent algorithm, a neural network algorithm. The priority of each communication unit is determined according to the load of each communication unit, namely, the lower the load, the higher the priority of the communication unit, and the higher the priority of the communication unit. The power reduction simulation is preferentially carried out on the communication units with low load capacity, so that the communication units with high load capacity can use more power, the power of the communication units is distributed according to the load capacity, and the power of each communication unit is fully utilized. Moreover, the method has little or no influence on the service transmission of the site, so that the user experience is not obviously influenced or even influenced. The order of performing the power down simulation on the plurality of communication units is not limited to the order from high to low, and may be the order from low to high, a random order, or another order, and the present application is not limited thereto.
In another possible implementation, the power-down simulating the data transmission power of each communication unit in the target period comprises: under the condition that the communication unit is provided with a plurality of working frequency bands and each working frequency band comprises a plurality of sub-frequency bands, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in a target time period is predicted according to the historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; and when the target frequency sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target frequency sub-band in the target time period.
The prediction of the load of each sub-band in the target working band within the target time period according to the historical load of the sub-band may be based on a prediction model. The training method of the prediction model can be, but is not limited to, a gradient descent algorithm and a neural network algorithm. By the implementation, the load of the target frequency sub-band with the minimum load can be transferred to other frequency sub-bands for transmission, and then the target frequency sub-band is turned off, so that power reduction simulation is realized. This can have little to no impact on the traffic transmission of the communication unit. It should be noted that, besides the sub-band with the minimum load, one or more other sub-bands with smaller load may be selected to be turned off.
In another possible implementation manner, before the target frequency sub-band is turned off by the artificial carrier in the target time period, the power control method further includes: carrying out simulation carrier wave shutoff on the target sub-frequency band in a target time period; acquiring a service quality index of a target working frequency band; when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the turn-off condition; and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target frequency sub-band does not meet the turn-off condition. In this way, the sub-bands which can be switched off and the sub-bands which cannot be switched off in each communication unit can be identified through simulation, so that the service quality can be guaranteed when the power is reduced.
In another possible implementation, the power-down simulating the data transmission power of each communication unit in the target period comprises: under the condition that a communication unit is configured with a plurality of beams for data transmission, one beam is sequentially selected from the plurality of beams as a target beam, and the data transmission power of the target beam in a target time period is reduced from a preset first power to a second power; acquiring a service quality index of a target beam; and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time interval according to the second power. Wherein the power control of the beams may be independent of each other. This can reduce the power of one or more beams and can guarantee the quality of service of the service.
In another possible implementation, the power-down simulating the data transmission power of each communication unit in the target period comprises: reducing the average power of a power amplifier of the communication unit in a target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power. This can reduce the power of the power amplifier of the communication unit and can guarantee the quality of service of the business.
In another possible implementation, the power-down simulating the data transmission power of each communication unit in the target period comprises: under the condition that a communication unit is configured with a plurality of working frequency bands, each working frequency band comprises a plurality of sub-frequency bands, and the communication unit is configured with a plurality of beams, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in a target time period is predicted according to the historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; when the target sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target sub-band in a target time period; sequentially selecting one beam from the plurality of beams as a target beam, and reducing the data transmission power of the target beam in a target time period from a preset first power to a second power; acquiring a service quality index of a target beam; when the service quality index of the target wave beam meets the preset service quality requirement, configuring the data transmission power of the target wave beam in the target time interval according to a second power; reducing the average power of a power amplifier of the communication unit in a target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power. By the implementation, the influence of carrier turn-off simulation on the service quality is minimum, the influence of beam power on the service quality is reduced for the second time, and the influence of power reduction simulation on the power amplifier of the communication unit on the service quality is maximum. By implementing the above sequence, the impact of the power reduction process on the service quality can be minimized.
A second aspect provides a power control apparatus comprising:
the processing unit is used for acquiring a first electric field strength value, wherein the first electric field strength value is an electric field strength value measured at the station at the measuring point when the plurality of communication units of the station configure preset data transmission power;
the processing unit is used for performing power reduction simulation on the data transmission power of the plurality of communication units in the target time period when the second electric field strength value is greater than or equal to the preset electric field strength value, and the plurality of communication units comprise communication units of different communication systems; calculating a second electric field strength value of the measuring point according to the reduced data transmission power; outputting a command when the second electric field strength value is smaller than the preset electric field strength;
a communication unit for performing a power down operation within a target period according to the command.
In a possible implementation manner, the processing unit is specifically configured to predict a load amount of each communication unit in a target period according to a historical load amount of the communication unit; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target time interval is inversely related to the priority of the communication unit; and performing power reduction simulation on the data transmission power of each communication unit in the target time period according to the priority order from high to low.
In another possible implementation manner, the processing unit is specifically configured to, when the communication unit is configured with a plurality of working frequency bands, and each working frequency band includes a plurality of sub-frequency bands, sequentially select one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict a load capacity of each sub-frequency band in the target working frequency band in a target time period according to a historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all the service load of the target sub-band in the target time period to other sub-bands; and when the target frequency sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target frequency sub-band in the target time period. The target frequency sub-band and the other frequency sub-bands belong to the same working frequency band.
In another possible implementation manner, the processing unit is further configured to perform simulated carrier shutdown on the target frequency sub-band at the target time period before performing simulated carrier shutdown on the target frequency sub-band at the target time period; acquiring a service quality index of a target working frequency band; when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the turn-off condition; and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target frequency sub-band does not meet the turn-off condition.
In another possible implementation manner, the processing unit is specifically configured to, in a case that the communication unit is configured with a plurality of beams for data transmission, sequentially select one beam from the plurality of beams as a target beam, and reduce data transmission power of the target beam in a target time period from a preset first power to a second power; acquiring a service quality index of a target beam; and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time interval according to the second power.
In another possible implementation manner, the processing unit is specifically configured to reduce an average power of a power amplifier of the communication unit in a target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
In another possible implementation manner, the processing unit is specifically configured to, when the communication unit is configured with a plurality of working frequency bands, each working frequency band includes a plurality of sub-frequency bands, and the communication unit is configured with a plurality of beams, sequentially select one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict a load capacity of each sub-frequency band in the target working frequency band in a target time period according to a historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; when the target sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target sub-band in a target time period; sequentially selecting one beam from the plurality of beams as a target beam, and reducing the data transmission power of the target beam in a target time period from a preset first power to a second power; acquiring a service quality index of a target beam; when the service quality index of the target wave beam meets the preset service quality requirement, configuring the data transmission power of the target wave beam in the target time interval according to a second power; reducing the average power of a power amplifier of the communication unit in a target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
For specific implementation steps of the second aspect and various possible implementation manners of the second aspect performed by the constituent modules of the apparatus provided in the second aspect of the present application, and beneficial effects brought by each implementation manner, reference may be made to descriptions in the first aspect and various possible implementation manners of the first aspect, and details are not repeated here.
A third aspect provides a computer-readable storage medium having a computer program stored therein, which when run on a computer causes the computer to perform the power control method of the first aspect or any one of the possible implementations of the first aspect.
A fourth aspect provides a computer program which, when run on a computer, causes the computer to perform the power control method of the first aspect or any one of the possible implementations of the first aspect.
A fifth aspect provides a chip system comprising a processor for enabling a station to implement the functions referred to in the above aspects, e.g. to transmit or process data and/or information referred to in the above power control method. In one possible design, the system-on-chip further includes a memory for storing program instructions and data necessary for the site. The chip system may be formed by a chip, or may include a chip and other discrete devices.
Drawings
FIG. 1 is a schematic diagram of a site of the present application;
FIG. 2 is a flow chart of a power control method of the present application;
fig. 3 is a schematic structural diagram of a power control apparatus according to the present application.
Detailed Description
The power control method of the present application can be applied to a station of a wireless communication system. A station may comprise a processing unit and a communication unit. The processing unit and the communication unit are connected by wire or wirelessly. When the station includes a plurality of communication units, the plurality of communication units may include communication units of different communication systems, such as a Remote Radio Unit (RRU) of a 2G network, an RRU of a 3G network, an RRU of a 4G network, or an Active Antenna Unit (AAU) of a 5G network. The number of the processing units may be one or more, and the number of the communication units of each communication system may be one or more. It will be appreciated that each communication unit may also include an antenna unit, which may include one or more antennas.
Referring to fig. 1, a station may include a processing unit 10, a communication unit 20, and a communication unit 30. The processing unit 10 may be a computing device or a processor within a computing device. The communication unit 20 may be an RRU of a 4G network and the communication unit 30 may be an AAU of a 5G network.
Hereinafter, the data transmission power of the communication unit 20 is denoted as P1The data transmission power of the communication unit 30 is denoted as P2The data transmission power may be an antenna transmission power.
Alternatively, the power density S of the communication unit 20 is calculated according to a first formula1。
The first formula is: s1=P1×G1/4πR1 2;
Wherein G is1In dBi, is the power gain of the communication unit 20. R1To measure the distance of a point to the antenna of the communication unit 20.
Optionally, the power density S of the communication unit 30 is calculated according to a second formula2。
The second formula is: s2=P2×G2/4πR2 2
Wherein G is2In dBi, is the power gain of the communication unit 30. R2To measure the distance of a point to the antenna of the communication unit 30. The antenna of communication unit 20 and the antenna of communication unit 30 may be deployed on a single tower or in close proximity, where R is1And R2Similar or equal.
Optionally, the power density S' of the station is calculated according to a third formula.
The third formula is: s ═ S1+S2。
Optionally, the power density S and the electric field strength E satisfy a fourth formula:
the fourth formula is: e ═ S2/377。
According to the formula, the electric field strength value of each communication unit can be calculated after the distance from the measuring point to the antenna, the power gain and the antenna transmitting power are obtained. The maximum allowed power of the station can also be calculated according to the above formula and electromagnetic radiation standard, and the power of each communication unit is allocated on the basis of the maximum allowed power.
The current power distribution method has the problems that the power distribution is unreasonable and the power of each communication device is difficult to be fully utilized. The application discloses a power control method, which can automatically adjust the power of each communication unit in a station, thereby more effectively utilizing the power of the communication units. Referring to fig. 2, an embodiment of a power control method according to the present application includes:
In this embodiment, the first electric field strength value is an electric field strength value measured at the measurement point when the plurality of communication units of the station configure the preset data transmission power. The plurality of communication units include communication units of different communication systems. For example, the station may include one or more RRUs of a 2G network, one or more RRUs of a 3G network, one or more RRUs of a 4G network, and one or more AAUs of a 5G network, and may further include a communication unit after 5G.
Each communication unit is configured with an independent preset data transmission power. For example, the preset data transmission power of the RRU of the 4G network is different from the preset data transmission power of the AAU of the 5G network. The data transmission power refers to an average power of transmission service data in a time period, and a duration of the time period may be set according to an actual situation, which is not limited in the present application.
When the first electric field strength value is greater than or equal to the preset electric field strength, the fact that the electric field strength value of the station is greater than the electromagnetic field radiation standard is indicated, and the fact that the data transmission power of the station is too high is also indicated, and the data transmission power of the communication unit needs to be reduced. And when the first electric field strength value is smaller than the preset electric field strength, the electric field strength value of the station is smaller than the electromagnetic field radiation standard.
The data transmission power of the station may be an arithmetic sum of the data transmission powers of all the communication units, or the data transmission power of the station may be a weighted sum of the data transmission powers of all the communication units. The weight of the data transmission power of each communication unit may be set according to actual conditions, and the present application is not limited thereto.
The second electric field strength value is an electric field strength value measured at the measurement point to the station when the plurality of communication units of the station are configured in accordance with the reduced data transmission power.
Optionally, after the data transmission power of the plurality of communication units is reduced, the electric field strength value of each communication unit is calculated according to the reduced data transmission power of each communication unit, and then the second electric field strength value is calculated according to the electric field strength value of each communication unit. Alternatively, after the data transmission power of the plurality of communication units is reduced, the data transmission power of the station is calculated according to the reduced data transmission power of each communication unit, and then the second electric field strength value is calculated according to the data transmission power of the station.
And step 204, outputting a command when the second electric field strength value is less than or equal to the preset electric field strength.
The command may be a man-machine language (MML) command. And when the second electric field strength value is larger than the preset electric field strength value, the electric field strength of the station is over high, and power reduction simulation cannot be performed according to the current data transmission power. Specifically, the data transmission power may be further reduced until the electric field intensity value calculated according to the reduced data transmission power is less than or equal to the preset electric field intensity, and the command may be output.
And step 205, executing power-down operation within the target time period according to the command.
The communication unit performs a power-down operation for a target period according to the command, and performs data transmission at the reduced data transmission power. The commands are used to make the power-down operation consistent with the power-down simulation process.
In this embodiment, when the data transmission power of the station is too large, the power reduction simulation is performed on the data transmission power of the plurality of communication units in the target time period. If the electric field intensity of the station does not exceed the preset electric field intensity under the simulation condition, the data transmission can be ensured to be carried out according to the reduced data transmission power in the target time period after the configuration is carried out according to the reduced data transmission power. Therefore, the power of each communication unit can be automatically adjusted, and the electric field intensity of the station does not exceed the preset electric field intensity, so that the electromagnetic radiation intensity is ensured within a safety range.
In an alternative embodiment, the power-down simulating the data transmission power of the plurality of communication units for the target period comprises:
predicting the load of each communication unit in a target period according to the historical load of the communication unit; determining the priority of each communication unit according to the prediction result; and performing power reduction simulation on the data transmission power of each communication unit in the target time period according to the priority order from high to low.
In this embodiment, the time before the target time interval may be divided into a plurality of time intervals, and then a prediction model may be trained according to the historical load amount of each time interval, and the load amount of the target time interval may be predicted using the prediction model. The duration of each time interval is equal to the duration of the target time interval, the unit of the target time interval may be minutes and hours, and the setting may be specifically performed according to the actual situation, which is not limited in the present application. The training method can be a gradient descent algorithm, a neural network algorithm and the like.
The prediction result of each communication unit in the target period is inversely related to the priority of the communication unit, i.e. the lower the load, the higher the priority of the communication unit, and the higher the load, the lower the priority of the communication unit. The power reduction simulation is preferentially carried out on the communication units with low load capacity, so that the communication units with high load capacity can use more power, the power of the communication units is distributed according to the load capacity, and the power of each communication unit is fully utilized. Moreover, the method has little or no influence on the service transmission of the site, so that the user experience is not obviously influenced or even influenced.
The order of performing the power down simulation on the plurality of communication units is not limited to be from high to low, and may be from low to high or random, and the present application is not limited thereto.
In the embodiment of the present application, the power reduction simulation of the data transmission power of each communication unit in the target time period can be implemented by various methods:
the first method is carrier shutdown, and the following embodiments can be specifically referred to:
in an optional embodiment, under the condition that the communication unit is configured with a plurality of working frequency bands and each working frequency band comprises a plurality of sub-frequency bands, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in a target time period is predicted according to the historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all the service load of the target sub-band in the target time period to other sub-bands; and when the target frequency sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target frequency sub-band in the target time period.
The sub-bands are also referred to as sub-carriers. The target frequency sub-band and the other frequency sub-bands belong to the same working frequency band. In the process of migrating the service load of the target sub-band, a load threshold may be set for each sub-band, and when the load of the sub-band is lower than the load threshold, the service load may be migrated to the sub-band. And when the load of the sub-frequency band reaches or exceeds the load threshold value, stopping migrating the service load to the sub-frequency band.
Optionally, the migration sub-bands may be set in order of load from low to high, and the migration sub-bands are sub-bands to which the traffic load is migrated. For example, an operating band includes 5 sub-bands, and the 5 sub-bands are f1, f2, f3, f4, and f 5. The load amounts of the sub-bands are respectively D1, D2, D3, D4 and D5, and D1< D2< D3< D4< D5. According to the method of the embodiment, f1 can be determined as the target sub-band, and the traffic load of f1 is migrated to other sub-bands, wherein the migration order is f2, f3, f4 and f 5. The traffic load of the previous sub-band needs to be brought to or past the load threshold before the traffic is migrated to the next sub-band. If the entire traffic load is migrated to f2 and the amount of load of f2 does not exceed the load threshold, then f1 does not migrate the traffic load to f3, f4, f 5. If the traffic load needs to be migrated to f3, the traffic load is migrated to f2 first, so that the load amount of f2 reaches or exceeds the load threshold.
In this way, the data transmission power of the communication unit can be reduced for each operating band by traffic load shifting and sub-band switching off, thereby enabling a small or no impact on the traffic transmission of the communication unit.
In another optional embodiment, before the target sub-band is turned off by the artificial carrier in the target period, the power control method further includes: carrying out simulation carrier wave shutoff on the target sub-frequency band in a target time period; acquiring a service quality index of a target working frequency band; when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the turn-off condition; and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target frequency sub-band does not meet the turn-off condition.
The quality of service indicator may include one or more of throughput, transmission delay, and packet loss rate. When the service quality index includes throughput, transmission delay and packet loss rate, it is required to simultaneously satisfy a plurality of conditions that the throughput is greater than or equal to the preset throughput, the transmission delay is less than or equal to the preset delay or the packet loss rate is less than or equal to the preset packet loss rate, and the like, that the service quality index of the target working frequency band satisfies the preset service quality requirement is indicated, otherwise, the service quality index of the target working frequency band does not satisfy the preset service quality requirement.
In this embodiment, the sub-bands that can be turned off and the sub-bands that cannot be turned off in each communication unit can be identified through simulation, so that the service quality can be guaranteed when the power is reduced.
The second method is beam power control, which can be specifically referred to the following embodiments:
in another optional embodiment, in a case that the communication unit is configured with a plurality of beams for data transmission, one beam is sequentially selected from the plurality of beams as a target beam, and the data transmission power of the target beam in a target time period is reduced from a preset first power to a second power; acquiring a service quality index of a target beam; and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time interval according to the second power.
Wherein the second power is less than the first power. The specific values of the first power and the second power can be set according to actual conditions, and the application is not limited.
In this embodiment, the data transmission power of one beam can be reduced separately, thereby achieving fine-grained power control. By reducing the power of one or more beams, the electric field strength of the station can be made to meet the safety standard and the service quality of the service can be guaranteed.
For the third method to reduce the power of the power amplifier, refer to the following embodiments:
in another alternative embodiment, the average power of the power amplifier of the communication unit in the target period is reduced from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
Wherein the fourth power is less than the third power. The specific values of the third power and the fourth power can be set according to actual conditions, and the application is not limited.
In this embodiment, the power of the power amplifier of the communication unit may be reduced, so as to implement coarse-grained power control, which may enable the electric field strength of the station to meet the safety standard and may ensure the quality of service.
In addition, the power reduction simulation of the data transmission power of each communication unit in the target time period can also be performed according to two or three of the power reduction simulation methods in sequence. For example, for a 3G communications unit, the first method may be performed first and then the third method; alternatively, the third method is performed first and then the first method is performed. For a 4G communication unit or a 5G communication unit, the first method may be performed first, and then the second method may be performed; or, the first method is executed first and then the third method is executed; alternatively, the first method is performed first, then the second method is performed, and then the third method is performed.
It should be noted that the execution order of the plurality of power-down simulation methods is not limited to the above example, and may be executed in other orders, and the present application is not limited thereto.
For the process of performing the power down simulation according to the sequence of the first method, the second method, and the third method, the following is described in detail with an embodiment:
in an alternative embodiment, the power-down simulating the data transmission power of each communication unit for the target time period comprises:
under the condition that a communication unit is configured with a plurality of working frequency bands, each working frequency band comprises a plurality of sub-frequency bands, and the communication unit is configured with a plurality of beams, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in a target time period is predicted according to the historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; when the target sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target sub-band in a target time period;
sequentially selecting one beam from the plurality of beams as a target beam, and reducing the data transmission power of the target beam in a target time period from a preset first power to a second power; acquiring a service quality index of a target beam; when the service quality index of the target wave beam meets the preset service quality requirement, configuring the data transmission power of the target wave beam in the target time interval according to a second power;
reducing the average power of a power amplifier of the communication unit in a target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
In this embodiment, for each working frequency band, after the service load of the sub-band with the lowest load capacity is migrated to another sub-band, the sub-band with the lowest load capacity is subjected to carrier turn-off simulation. And after the sub-frequency band with the lowest load capacity in part or all of the working frequency bands is switched off, performing power reduction simulation on the data transmission power of part or all of the beams, and then performing power reduction simulation on the power amplifier of the communication unit. This enables the quality of service of the communication device transmission service to be guaranteed while power is reduced.
It should be noted that, although the qos indicators of all operating bands of the communication unit satisfy the preset qos requirement, the qos of the service may be affected during the power reduction process. The influence of carrier turn-off simulation on the service quality is minimum, the influence of beam power on the service quality is reduced for the second time, and the influence of power reduction simulation on the service quality is maximum by a power amplifier of a communication unit. By implementing the above sequence, the impact of the power reduction process on the service quality can be minimized.
The present application provides a power control apparatus, which can implement the power control method in the embodiment or the alternative embodiment shown in fig. 2. Referring to fig. 3, a power control apparatus 300 includes:
a processing unit 301, configured to obtain a first electric field strength value, where the first electric field strength value is an electric field strength value measured at a measurement point when a plurality of communication units of a station configure preset data transmission power;
the processing unit 301 is further configured to perform power reduction simulation on the data transmission power of the plurality of communication units in the target time period when the second electric field strength value is greater than or equal to the preset electric field strength, where the plurality of communication units include communication units of different communication systems; calculating a second electric field strength value according to the reduced data transmission power; outputting a command when the second electric field strength value is smaller than the preset electric field strength;
a communication unit 302 for performing a power down operation within a target period according to the command.
In an optional embodiment, the processing unit 301 is specifically configured to predict a load amount of each communication unit in a target period according to a historical load amount of the communication unit; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target time interval is inversely related to the priority of the communication unit; and performing power reduction simulation on the data transmission power of each communication unit in the target time period according to the priority order from high to low.
In another optional embodiment, the processing unit 301 is specifically configured to, when the communication unit is configured with a plurality of working frequency bands, and each working frequency band includes a plurality of sub-frequency bands, sequentially select one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict a load capacity of each sub-frequency band in the target working frequency band in a target time period according to a historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; and when the target frequency sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target frequency sub-band in the target time period.
In another optional embodiment, the processing unit 301 is further configured to perform carrier off simulation on the target frequency sub-band in the target time period before performing carrier off simulation on the target frequency sub-band in the target time period; acquiring a service quality index of a target working frequency band; when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the turn-off condition; and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target frequency sub-band does not meet the turn-off condition.
In another optional embodiment, the processing unit 301 is specifically configured to, in a case that the communication unit is configured with a plurality of beams for data transmission, sequentially select one beam from the plurality of beams as a target beam, and reduce the data transmission power of the target beam in a target time period from a preset first power to a second power; acquiring a service quality index of a target beam; and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time interval according to the second power.
In another alternative embodiment, the processing unit 301 is specifically configured to reduce the average power of the power amplifier of the communication unit in the target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
In another optional embodiment, the processing unit 301 is specifically configured to, when the communication unit is configured with a plurality of working frequency bands, each working frequency band includes a plurality of sub-frequency bands, and the communication unit is configured with a plurality of beams, sequentially select one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict a load capacity of each sub-frequency band in the target working frequency band in a target time period according to a historical load capacity of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; when the target sub-band meets the turn-off condition, carrying out simulated carrier turn-off on the target sub-band in a target time period; sequentially selecting one beam from the plurality of beams as a target beam, and reducing the data transmission power of the target beam in a target time period from a preset first power to a second power; acquiring a service quality index of a target beam; when the service quality index of the target wave beam meets the preset service quality requirement, configuring the data transmission power of the target wave beam in the target time interval according to a second power; reducing the average power of a power amplifier of the communication unit in a target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of a communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
It should be noted that, because the contents of information interaction, execution process, and the like between the modules/units of the apparatus are based on the same concept as the method embodiment of the present application, the technical effect brought by the contents is the same as the method embodiment of the present application, and specific contents may refer to the description in the foregoing method embodiment of the present application, and are not described herein again.
The present application provides a computer-readable storage medium having a computer program stored therein, which when run on a computer causes the computer to perform the power control method in the embodiment or the alternative embodiment shown in fig. 2.
The present application also provides a computer program product comprising instructions which, when run on a computer, cause the computer to perform the power control method as described in the foregoing embodiment or alternative embodiments of fig. 2.
The power control device in this application may specifically be a chip in a site, and the chip includes: a processing unit and a storage unit. The processing unit may be a processor. The processing unit may execute the computer executable instructions stored by the memory unit to cause the station to perform the power control method in the embodiment shown in fig. 2. Optionally, the storage unit is a storage unit in the chip, such as a register, a cache, and the like, and the storage unit may also be a storage unit located outside the chip in the site, such as a read-only memory (ROM) or another type of static storage device that can store static information and instructions, a Random Access Memory (RAM), and the like. The processor referred to in any above may be a general purpose central processing unit, a microprocessor, an Application Specific Integrated Circuit (ASIC), or one or more integrated circuits for controlling the execution of the programs of the method of the first aspect.
It should be noted that the above-described embodiments of the apparatus are merely illustrative, where the units described as separate parts may or may not be physically separate, and the parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. In addition, in the drawings of the embodiments of the apparatus provided in the present application, the connection relationship between the modules indicates that there is a communication connection therebetween, and may be implemented as one or more communication buses or signal lines.
Through the above description of the embodiments, those skilled in the art will clearly understand that the present application can be implemented by software plus necessary general-purpose hardware, and certainly can also be implemented by special-purpose hardware including special-purpose integrated circuits, special-purpose CPUs, special-purpose memories, special-purpose components and the like. Generally, functions performed by computer programs can be easily implemented by corresponding hardware, and specific hardware structures for implementing the same functions may be various, such as analog circuits, digital circuits, or dedicated circuits. However, for the present application, the implementation of a software program is more preferable. Based on such understanding, the technical solutions of the present application may be substantially embodied in the form of a software product, which is stored in a readable storage medium, such as a floppy disk, a usb disk, a removable hard disk, a ROM, a RAM, a magnetic disk, or an optical disk of a computer, and includes several instructions for enabling a computer device (which may be a personal computer, a server, or a network device) to execute the methods described in the embodiments of the present application.
In the above embodiments, the implementation may be wholly or partially realized by software, hardware, firmware, or any combination thereof. When implemented in software, may be implemented in whole or in part in the form of a computer program product.
The computer program product includes one or more computer instructions. When loaded and executed on a computer, cause the processes or functions described in accordance with the embodiments of the application to occur, in whole or in part. The computer may be a general purpose computer, a special purpose computer, a network of computers, or other programmable device. The computer instructions may be stored in a computer readable storage medium or transmitted from one computer readable storage medium to another, for example, from one website, computer, server, or data center to another website, computer, server, or data center via wire (e.g., coaxial cable, fiber optic, Digital Subscriber Line (DSL), or wireless (e.g., infrared, wireless, microwave, etc.), the computer readable storage medium may be any available medium that a computer can store or a data storage device including one or more available media integrated servers, data centers, etc., the available media may be magnetic media (e.g., floppy disks, hard disks, tapes), optical media (e.g., DVDs), or semiconductor media (e.g., solid state disks, SSD)), etc.
The above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications or substitutions do not depart from the spirit and scope of the present disclosure as defined by the appended claims.
Claims (15)
1. A method of power control, comprising:
acquiring a first electric field strength value, wherein the first electric field strength value is an electric field strength value measured at a measuring point when a plurality of communication units of a station configure preset data transmission power;
when the first electric field strength value is larger than or equal to a preset electric field strength value, performing power reduction simulation on data transmission power of the plurality of communication units in a target time period, wherein the plurality of communication units comprise communication units of different communication systems;
calculating a second electric field strength value according to the reduced data transmission power;
outputting a command when the second electric field strength value is smaller than a preset electric field strength;
and executing power reduction operation within the target time period according to the command.
2. The method of claim 1, wherein the power-down simulating the data transmission power of the plurality of communication units for the target time period comprises:
predicting the load of each communication unit in the target time period according to the historical load of the communication unit; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target time interval is inversely related to the priority of the communication unit;
and performing power reduction simulation on the data transmission power of each communication unit in the target time period according to the priority order from high to low.
3. The method of claim 2, wherein the power-down simulating the data transmission power of each of the communication units during the target time period comprises:
under the condition that the communication unit is configured with a plurality of working frequency bands and each working frequency band comprises a plurality of sub-frequency bands, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load capacity of the sub-frequency band;
taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band;
transferring all the service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band;
and when the target sub-band meets a turn-off condition, carrying out simulated carrier turn-off on the target sub-band in the target time period.
4. The method of claim 3, wherein before the target time period turns off the dummy carrier for the target sub-band, the method further comprises:
carrying out simulation carrier wave shutoff on the target sub-frequency band in the target time period;
acquiring a service quality index of the target working frequency band;
when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the turn-off condition;
and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target frequency sub-band does not meet the turn-off condition.
5. The method of claim 2, wherein the power-down simulating the data transmission power of each of the communication units during the target time period comprises:
under the condition that the communication unit is configured with a plurality of beams for data transmission, one beam is sequentially selected from the plurality of beams as a target beam, and the data transmission power of the target beam in the target time period is reduced from a preset first power to a second power;
obtaining a service quality index of the target wave beam;
and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time interval according to the second power.
6. The method of claim 2, wherein the power-down simulating the data transmission power of each of the communication units during the target time period comprises:
reducing the average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power;
acquiring service quality indexes of all working frequency bands of the communication unit;
and when the service quality indexes of all working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
7. The method of claim 2, wherein the power-down simulating the data transmission power of each of the communication units during the target time period comprises:
under the condition that the communication unit is configured with a plurality of working frequency bands, each working frequency band comprises a plurality of sub-frequency bands, and the communication unit is configured with a plurality of beams, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load capacity of the sub-frequency band;
taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band;
transferring all the service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band;
when the target sub-band meets a turn-off condition, carrying out simulated carrier turn-off on the target sub-band in the target time period;
sequentially selecting one beam from a plurality of beams as a target beam, and reducing the data transmission power of the target beam in the target time period from a preset first power to a second power;
obtaining a service quality index of the target wave beam;
when the service quality index of the target wave beam meets the preset service quality requirement, configuring the data transmission power of the target wave beam in the target time interval according to the second power;
reducing the average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power;
acquiring service quality indexes of all working frequency bands of the communication unit;
and when the service quality indexes of all working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
8. A power control apparatus, comprising:
the processing unit is used for acquiring a first electric field strength value, wherein the first electric field strength value is an electric field strength value measured at a measuring point when a plurality of communication units of a station configure preset data transmission power;
the processing unit is further configured to perform power reduction simulation on the data transmission power of the plurality of communication units in a target time period when the first electric field strength value is greater than or equal to a preset electric field strength value, where the plurality of communication units include communication units of different communication systems; calculating a second electric field strength value according to the reduced data transmission power; outputting a command when the second electric field strength value is smaller than a preset electric field strength;
a communication unit for performing a power down operation within the target time period according to the command.
9. The apparatus of claim 8,
the processing unit is specifically configured to predict a load of each communication unit in the target time period according to a historical load of the communication unit; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target time interval is inversely related to the priority of the communication unit; and performing power reduction simulation on the data transmission power of each communication unit in the target time period according to the priority order from high to low.
10. The apparatus of claim 9,
the processing unit is specifically configured to select one working frequency band from the multiple working frequency bands as a target working frequency band under the condition that the communication unit is configured with multiple working frequency bands and each working frequency band includes multiple sub-frequency bands, and predict a load of each sub-frequency band in the target working frequency band in the target time period according to a historical load of the sub-frequency band; taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band; transferring all service loads of a target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band; and when the target sub-band meets a turn-off condition, carrying out simulated carrier turn-off on the target sub-band in the target time period.
11. The apparatus of claim 10,
the processing unit is further configured to perform simulated carrier shutdown on the target sub-band at the target time period before performing simulated carrier shutdown on the target sub-band at the target time period; acquiring a service quality index of the target working frequency band; when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the turn-off condition; and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target frequency sub-band does not meet the turn-off condition.
12. The apparatus of claim 9,
the processing unit is specifically configured to, when the communication unit is configured with a plurality of beams for data transmission, select one beam from the plurality of beams as a target beam, and reduce data transmission power of the target beam in the target period from a preset first power to a second power; obtaining a service quality index of the target wave beam; and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time interval according to the second power.
13. The apparatus of claim 9,
the processing unit is specifically configured to reduce an average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of the communication unit; and when the service quality indexes of all working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
14. The apparatus of claim 9,
the processing unit is specifically configured to, when the communication unit is configured with a plurality of working frequency bands, each working frequency band includes a plurality of sub-frequency bands, and the communication unit is configured with a plurality of beams, sequentially select one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict a load amount of each sub-frequency band in the target working frequency band in the target time period according to a historical load amount of the sub-frequency band;
taking the predicted sub-frequency band with the minimum load capacity as a target sub-frequency band;
transferring all the service loads of the target sub-band in the target time period to other sub-bands, wherein the target sub-band and the other sub-bands belong to the same working frequency band;
when the target sub-band meets a turn-off condition, carrying out simulated carrier turn-off on the target sub-band in the target time period;
sequentially selecting one beam from a plurality of beams as a target beam, and reducing the data transmission power of the target beam in the target time period from a preset first power to a second power;
obtaining a service quality index of the target wave beam;
when the service quality index of the target wave beam meets the preset service quality requirement, configuring the data transmission power of the target wave beam in the target time interval according to the second power;
reducing the average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power;
acquiring service quality indexes of all working frequency bands of the communication unit;
and when the service quality indexes of all working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power.
15. A computer-readable storage medium, in which a computer program is stored, which, when run on a computer, causes the computer to perform the power control method of any one of claims 1 to 7.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010316153.2A CN113543288B (en) | 2020-04-21 | 2020-04-21 | Power control method and power control device |
PCT/CN2021/087177 WO2021213226A1 (en) | 2020-04-21 | 2021-04-14 | Power control method and power control apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010316153.2A CN113543288B (en) | 2020-04-21 | 2020-04-21 | Power control method and power control device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113543288A true CN113543288A (en) | 2021-10-22 |
CN113543288B CN113543288B (en) | 2024-10-11 |
Family
ID=78123795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010316153.2A Active CN113543288B (en) | 2020-04-21 | 2020-04-21 | Power control method and power control device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN113543288B (en) |
WO (1) | WO2021213226A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070201405A1 (en) * | 2006-02-27 | 2007-08-30 | Santhanam Arvind V | Power control in communication systems |
CN102196542A (en) * | 2011-05-27 | 2011-09-21 | 上海华为技术有限公司 | Power control method, equipment and system |
CN103354643A (en) * | 2013-06-26 | 2013-10-16 | 上海华为技术有限公司 | Method and apparatus for realizing dual-mode network energy-efficiency joint simulation |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101998601B (en) * | 2010-12-15 | 2013-11-20 | 迈普通信技术股份有限公司 | Dynamic power control method capable of reducing wireless local area network (WLAN) interference and system thereof |
KR101941510B1 (en) * | 2012-06-13 | 2019-01-23 | 삼성전자주식회사 | Method for saving power consumption and an electronic device thereof |
CN105493545B (en) * | 2013-04-26 | 2019-08-27 | 华为技术有限公司 | Network energy efficiency emulation and appraisal procedure, device |
CN103841568B (en) * | 2013-12-10 | 2017-05-17 | 大唐移动通信设备有限公司 | Wireless network planning method and device |
CN109728828B (en) * | 2017-10-31 | 2021-08-20 | 华为技术有限公司 | Method for separating signals and signal processing device |
CN110493826B (en) * | 2019-08-28 | 2022-04-12 | 重庆邮电大学 | Heterogeneous cloud wireless access network resource allocation method based on deep reinforcement learning |
-
2020
- 2020-04-21 CN CN202010316153.2A patent/CN113543288B/en active Active
-
2021
- 2021-04-14 WO PCT/CN2021/087177 patent/WO2021213226A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070201405A1 (en) * | 2006-02-27 | 2007-08-30 | Santhanam Arvind V | Power control in communication systems |
CN102196542A (en) * | 2011-05-27 | 2011-09-21 | 上海华为技术有限公司 | Power control method, equipment and system |
CN103354643A (en) * | 2013-06-26 | 2013-10-16 | 上海华为技术有限公司 | Method and apparatus for realizing dual-mode network energy-efficiency joint simulation |
Also Published As
Publication number | Publication date |
---|---|
CN113543288B (en) | 2024-10-11 |
WO2021213226A1 (en) | 2021-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10477426B1 (en) | Identifying a cell site as a target for utilizing 5th generation (5G) network technologies and upgrading the cell site to implement the 5G network technologies | |
CN113268341B (en) | Distribution method, device, equipment and storage medium of power grid edge calculation task | |
US9763138B2 (en) | Load balancing apparatus and method for wireless communications system, and base station | |
US9942892B2 (en) | Self-optimizing mobile satellite systems | |
CN112868265A (en) | Network resource management method, management device, electronic device and storage medium | |
US20200137678A1 (en) | Slice management device and slice management method | |
KR20090080723A (en) | Apparatus and method for plannig wireless network | |
CN114786268A (en) | Data transmission bandwidth adjusting method and device, electronic equipment and storage medium | |
CN112752327A (en) | Power regulation method and access network equipment | |
CN114885376A (en) | Frame structure configuration method, device and storage medium | |
CN113260034B (en) | Uplink channel transmission power distribution method and device, terminal and storage medium | |
CN106465356A (en) | Method and apparatus for allocating time-frequency resource | |
RU2651577C1 (en) | Wireless communication device, wireless communication method and wireless communication system | |
CN102076004B (en) | Measuring method and device | |
CN113543288B (en) | Power control method and power control device | |
CN111343719B (en) | LTE physical resource block allocation method, device and storage medium | |
CN110832894B (en) | Carrier power control method, apparatus, storage medium, and computer program product | |
EP4418778A1 (en) | Self-adaptive adjustment method and apparatus for downlink control channel resource, and storage medium | |
CN114389952B (en) | Multi-layer network-oriented mobile communication network capacity configuration method and device | |
GB2574102A (en) | Optimised network deployment | |
JP7287247B2 (en) | MODELING METHOD, MODELING PROGRAM AND INFORMATION PROCESSING DEVICE | |
CN109756981B (en) | Battlefield wireless spectrum resource allocation method and system based on auction mechanism | |
US11405281B2 (en) | Dynamic network adaptation | |
JP6735322B2 (en) | Communication device, control device, communication method, and communication program | |
KR101549309B1 (en) | Power-optimized vertical handover scheme for heterogeneous wireless networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |