CN113532104A - Preheater inner tube lacing film, lacing film and preheater inner tube - Google Patents

Preheater inner tube lacing film, lacing film and preheater inner tube Download PDF

Info

Publication number
CN113532104A
CN113532104A CN202110808003.8A CN202110808003A CN113532104A CN 113532104 A CN113532104 A CN 113532104A CN 202110808003 A CN202110808003 A CN 202110808003A CN 113532104 A CN113532104 A CN 113532104A
Authority
CN
China
Prior art keywords
hanging
piece
table top
hanging piece
preheater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110808003.8A
Other languages
Chinese (zh)
Inventor
王大亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shuangfa Machinery Co ltd
Original Assignee
Jiangsu Shuangfa Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shuangfa Machinery Co ltd filed Critical Jiangsu Shuangfa Machinery Co ltd
Priority to CN202110808003.8A priority Critical patent/CN113532104A/en
Publication of CN113532104A publication Critical patent/CN113532104A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B7/00Rotary-drum furnaces, i.e. horizontal or slightly inclined
    • F27B7/20Details, accessories, or equipment peculiar to rotary-drum furnaces
    • F27B7/2016Arrangements of preheating devices for the charge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Supply (AREA)

Abstract

The invention discloses a preheater inner cylinder hanging piece and a preheater inner cylinder, and belongs to the technical field of preheater devices. The hanging piece comprises an upper hanging piece, a connecting piece and a lower hanging piece, wherein the upper hanging piece and the lower hanging piece are connected through the connecting piece; the bottom of the upper hanging piece is provided with an upper hanging part, and the top of the lower hanging piece is provided with a lower hanging part; the upper hanging part is provided with a first splicing fixing piece, and the lower hanging part is provided with a second splicing fixing piece; and a height difference is arranged between the hanging piece table surfaces, a first sealing surface is formed between the first lower table surface and the second lower table surface, and gaps are respectively arranged between the first lower table surface and the first upper table surface and between the second upper table surface and the second lower table surface. Through the setting of concatenation mounting, improve the concatenation intensity before the lacing film, in addition because set up the clearance between the upper and lower mesa, when the lacing film installation of being convenient for, sealed face is favorable to guaranteeing the leakproofness of inner tube.

Description

Preheater inner tube lacing film, lacing film and preheater inner tube
Technical Field
The invention relates to the technical field of preheater devices, in particular to a preheater inner cylinder hanging piece, a hanging piece and a preheater inner cylinder.
Background
In the cement production industry, the inner cylinder of the preheater is important equipment for ensuring normal production of cement, in the rotary kiln preheater for producing cement, the preheater needs to provide multistage concurrent heat exchange for material powder and hot air at the tail of a kiln so that the material powder finally enters the rotary kiln to be calcined, the inner cylinder can provide enough dispersion time for the material powder, the working condition environment of the inner cylinder is very severe in the process, the internal temperature of the inner cylinder can reach 1000 ℃, and the inner cylinder needs to bear scouring of high-speed wind dust and corrosion of acid-base oxides, and faces high-speed scouring of high temperature, alkali steam, sulfur steam and powder.
The current inner tube of the preheater is mostly in the form of hanging pieces, the inner tube of the hanging piece type preheater has the advantages of convenient transportation and assembly, the current inner tube of the hanging piece type preheater mainly comprises heat-resistant steel hanging pieces and ceramic hanging pieces, but the current inner tube of the hanging piece type preheater also has more problems: the heat-resistant steel hanging piece is formed by assembling and splicing castings, has low sealing effect and poor corrosion resistance, and causes high energy consumption and short service cycle, and the replacement cycle of the C5 inner cylinder is 12 months or 18 months generally; although the ceramic inner cylinder hanging piece has better wear resistance, high temperature resistance and corrosion resistance, the biggest defect is that the hanging piece is made of pure ceramic materials and is spliced, and the impact resistance is poor, so that a damaged piece must be repaired within a certain period of use; in conclusion, the conventional hanging plate type preheater has short service life, and the inner cylinder needs to be replaced after the preheater is used for a period of time, so that the equipment cost of a cement plant is increased, and the shutdown and production stoppage caused by the replacement process also cause great loss.
But can discover in the in-service use, if leave too big so that the installation of lacing film with the gap between the lacing film when installing, can lead to the leakproofness of inner tube to receive great harm, but the gap is left too little and can lead to unable setting up concatenation additional strengthening and then lead to the reduction of lacing film concatenation intensity.
Disclosure of Invention
The invention aims to provide a hanging piece of an inner cylinder of a preheater, the hanging piece and the inner cylinder of the preheater, aiming at the technical problem that the splicing strength of the hanging piece of the inner cylinder of the hanging piece type preheater and the sealing property of the inner cylinder are difficult to combine in the prior art.
In order to achieve the purpose, the technical scheme provided by the invention is as follows:
the hanging piece for the inner cylinder of the preheater comprises an upper hanging piece, a connecting piece and a lower hanging piece, wherein the upper hanging piece and the lower hanging piece are connected through the connecting piece; the bottom of the upper hanging piece is provided with an upper hanging part, and the top of the lower hanging piece is provided with a lower hanging part;
the upper hanging part is provided with a first splicing fixing piece, and the lower hanging part is provided with a second splicing fixing piece;
a first upper table top and a second upper table top are arranged at the bottom end of the hanging piece, a height difference exists between the first upper table top and the second upper table top, and a second sealing surface is formed between the first upper table top and the second upper table top; the top end of the hanging piece is provided with a first lower table top and a second lower table top, a height difference exists between the first lower table top and the second lower table top, a first sealing surface is formed between the first lower table top and the second lower table top, and gaps are formed between the first lower table top and the first upper table top and between the second upper table top and the second lower table top. Through the setting of concatenation mounting, improve the concatenation intensity before the lacing film, in addition because set up the clearance between the upper and lower mesa, when the lacing film installation of being convenient for, sealed face is favorable to guaranteeing the leakproofness of inner tube.
Preferably, on one side of the hanging piece, the upper hanging part, the connecting piece and the lower hanging part form a concave part, in the concave part, the vertical distance between the upper hanging part and the lower hanging part is L, and the L is gradually reduced along the direction far away from the connecting piece.
Preferably, the first splicing fixing piece is a bump, and the first splicing contact surface is one side surface of the bump; the second splicing fixing piece is a groove, and the second splicing contact surface is a groove surface of the groove; the lug is matched with the groove;
or
The first splicing fixing piece is a groove, and the first splicing contact surface is a groove surface of the groove; the second splicing fixing piece is a convex block, and the second splicing fixing piece is one side surface of the convex block; the groove is matched with the lug.
Preferably, the projection is in a pillar shape, and the cross-sectional area of the projection gradually decreases in a direction away from the surface of the hanging piece, and/or the groove gradually enlarges in an inward-outward direction.
Preferably, the first splicing contact surface of the first splicing fixing piece and the second splicing contact surface of the second splicing fixing piece incline towards one side far away from the connecting piece.
Preferably, the first splicing end face of the first splicing fixing piece and the second splicing end face of the second splicing fixing piece incline towards one side far away from the connecting piece.
Preferably, the angle of inclination is β, said 0 ° < β < 60 °.
Preferably, the inclination angle is α, the 0 ° < α < 60 °.
Preferably, the first upper mesa corresponds to the first lower mesa; the second upper table surface corresponds to the second lower table surface.
Preferably, the first upper table top, the second upper table top, the first lower table top and the second lower table top are all arranged horizontally.
Preferably, the first sealing surface is arranged vertically to the second sealing surface.
The invention discloses a preheater inner cylinder, which comprises a plurality of hanging pieces, wherein the hanging pieces are the hanging pieces according to any one of claims 1-11, and the plurality of hanging pieces are spliced to form the preheater inner cylinder.
Drawings
FIG. 1 is a schematic view of a vertical splicing structure of a hanging piece of the present invention;
FIG. 2 is a side view of a hanging piece of the present invention;
FIG. 3 is a perspective view of a hanger according to the present invention;
FIG. 4 is a schematic perspective view of another aspect of a hanger of the present invention;
FIG. 5 is a cross-sectional view and a partially enlarged view of a hanging piece of the present invention;
FIG. 6 is a cross-sectional view of a hanging piece of the present invention;
FIG. 7 is a schematic view of a hanging piece structure of the present invention;
FIG. 8 is a cross-sectional view of the internal ribs of a hanger according to the present invention;
FIG. 9 is a schematic view of a hanger assembly according to the present invention;
FIG. 10 is a schematic view of the inner barrel of the present invention;
the structure of the inner cylinder is schematically shown;
the reference numerals in the schematic drawings illustrate:
100. hanging a piece; 101. hanging the film; 102. hanging the slices; 103. a top end fixing part of the inner cylinder; 110. hanging a connecting piece; 111. an upper hanging part; 112. a first splice fixture; 113. a first splice contact surface; 114. a first splice end face; 120. a connecting member; 130. a lower hanging part; 131. a lower hanging part; 132. a second splice fixture; 133. a second splice contact surface; 134. a second splice end face;
200. a reinforcement; 210. an upper reinforcement; 211. an upper hooking reinforcement part; 212. an upper reinforcement penetration portion; 220. connecting a reinforcing member; 222. connecting the reinforcing pipe penetrating part; 230. a lower reinforcement; 231. a lower hitch reinforcement portion; 232. a lower reinforcement pipe penetration portion;
301. an expansion part; 311. an upper fixing member; 312. a connecting part fixing member; 313. a lower fixing member;
400. molding materials;
510. a first sealing surface; 511. a first lower table top; 512. second lower table surface
520. A second sealing surface; 521. a first upper table; 522. a second upper table;
531. a first positioning member; 532. a second positioning member.
Detailed Description
For a further understanding of the invention, reference should be made to the following detailed description taken in conjunction with the accompanying drawings and examples.
The structure, proportion, size and the like shown in the drawings are only used for matching with the content disclosed in the specification, so that the person skilled in the art can understand and read the description, and the description is not used for limiting the limit condition of the implementation of the invention, so the method has no technical essence, and any structural modification, proportion relation change or size adjustment still falls within the scope of the technical content disclosed by the invention without affecting the effect and the achievable purpose of the invention. Meanwhile, the terms such as "upper", "lower", "left", "right" and "middle" used in the present specification are for clarity of description only, and are not used to limit the implementable scope, and the relative relationship changes or adjustments may be considered to be within the implementable scope of the present invention without substantial technical changes; in addition, the embodiments of the present invention are not independent of each other, but may be combined.
Example 1
The hanging piece for the inner cylinder of the preheater comprises an upper hanging piece 110, a connecting piece 120 and a lower hanging piece 130, wherein the upper hanging piece 110 is connected with the lower hanging piece 130 through the connecting piece 120; the bottom of the upper hanging piece 110 is provided with an upper hanging part 111, and the top of the lower hanging piece 130 is provided with a lower hanging part 131;
the upper hanging part 111 is provided with a first splicing fixing part 112, and the lower hanging part 130 is provided with a second splicing fixing part 132;
a first upper table surface 521 and a second upper table surface 522 are arranged at the bottom end of the hanging piece, a height difference exists between the first upper table surface 521 and the second upper table surface 522, and a second sealing surface 520 is formed between the first upper table surface 521 and the second upper table surface 522; the top end of the hanging piece is provided with a first lower table surface 511 and a second lower table surface 512, the first lower table surface 511 and the second lower table surface 512 have a height difference, a first sealing surface 510 is formed between the first lower table surface 511 and the second lower table surface 512, and gaps are respectively arranged between the first lower table surface 511 and the first upper table surface 521 and between the second upper table surface 522 and the second lower table surface 512. Through the setting of concatenation mounting, improve the concatenation intensity before the lacing film, in addition because set up the clearance between the upper and lower mesa, when the lacing film installation of being convenient for, sealed face is favorable to guaranteeing the leakproofness of inner tube.
The hanging piece of the embodiment comprises an upper hanging piece 110, a connecting piece 120 and a lower hanging piece 130, wherein the upper hanging piece 110 is connected with the lower hanging piece 130 through the connecting piece 120; the bottom of the upper hanging piece 110 is provided with an upper hanging part 111, the top of the lower hanging piece 130 is provided with a lower hanging part 131, one side of the hanging piece is provided with a concave part formed by the upper hanging part 111, the connecting piece 120 and the lower hanging part 131, the vertical distance between the upper hanging part 111 and the lower hanging part 131 in the concave part is L, and the L is gradually reduced along the direction far away from the connecting piece 120; due to the arrangement of the flaring in the concave portion, the lower hanging portion 131 is enabled to be less prone to falling off from the upper hanging portion 111, and therefore splicing strength is improved.
It should be noted that the upper hanging part 111 and the lower hanging part 131 are both inclined surfaces facing the connecting member 120, an included angle between the inclined surfaces and a horizontal plane is γ, and the range of γ is: 0 ° < γ ≦ 75 °, γ ≦ 15 ° in this example.
The upper and lower hanging piece splicing structure of the preheater inner cylinder hanging piece of the embodiment comprises a first upper table surface 521 and a second upper table surface 522 which are arranged on the hanging piece above, wherein a height difference exists between the first upper table surface 521 and the second upper table surface 522, and a second sealing surface 520 is formed between the first upper table surface 521 and the second upper table surface 522; the first lower table surface 511 and the second lower table surface 512 are arranged on the hanging piece below, the height difference exists between the first lower table surface 511 and the second lower table surface 512, and a first sealing surface 510 is formed between the first lower table surface 511 and the second lower table surface 512; the first sealing surface 510 and the second sealing surface 520 are matched, so that the splicing position of the hanging pieces is sealed; through the matching of the first sealing surface 510 and the second sealing surface 520 formed above, the resistance of the air flow directly entering the inner cylinder through the gap between the hanging pieces is greatly improved, and therefore, the sealing performance of the inner cylinder is effectively improved.
It should be noted that the first upper table 521 corresponds to the first lower table 511; the second upper mesa 522 corresponds to the second lower mesa 512. And the first upper table surface 521, the second upper table surface 522, the first lower table surface 511 and the second lower table surface 512 are all horizontally arranged. Additionally, the first sealing surface 510 is disposed vertically with respect to the second sealing surface 520.
The positioning piece comprises a first positioning piece 531 arranged on the hanging piece below and a second positioning piece 532 arranged on the hanging piece above, the first positioning piece 531 and the second positioning piece 532 are arranged in a matched mode, and the hanging piece above and the hanging piece below are positioned through the matching of the first positioning piece 531 and the second positioning piece 532.
It should be noted that the first positioning element 531 is a groove, the second positioning element 532 is a protrusion, and the protrusion is matched with the groove; or the first positioning member 531 is a protrusion, and the second positioning member 532 is a groove, and the groove is matched with the protrusion.
The hanging piece comprises an upper hanging piece splicing structure and a lower hanging piece splicing structure, wherein the upper hanging piece splicing structure and the lower hanging piece splicing structure are the upper hanging piece splicing structure and the lower hanging piece splicing structure, a first upper table-board 521 and a second upper table-board 522 are arranged at the bottom end of the hanging piece, a height difference exists between the first upper table-board 521 and the second upper table-board 522, and a second sealing surface 520 is formed between the first upper table-board 521 and the second upper table-board 522; and/or the top end of the hanging piece is provided with a first lower table surface 511 and a second lower table surface 512, the first lower table surface 511 and the second lower table surface 512 have a height difference, and a first sealing surface 510 is formed between the first lower table surface 511 and the second lower table surface 512.
In addition, the top end of the hanging piece is provided with a first positioning piece 531, and/or the bottom end of the hanging piece is provided with a second positioning piece 532. The first positioning element 531 is a groove, the second positioning element 532 is a projection, and the projection is matched with the groove; or the first positioning member 531 is a protrusion, and the second positioning member 532 is a groove, and the groove is matched with the protrusion.
The hanging piece splicing structure of the embodiment includes a first splicing fixing member 112 and a second splicing fixing member 132, where the first splicing fixing member 112 and the second splicing fixing member 132 may be respectively disposed on two hanging pieces; first concatenation mounting 112 and second concatenation mounting 132 can mutually support, be provided with first concatenation contact surface 113 on the first concatenation mounting 112, be provided with second concatenation contact surface 133 on the second concatenation mounting 132, first concatenation contact surface 113 makes first concatenation mounting 112 and second concatenation mounting 132 position relatively fixed through mutual contact with second concatenation contact surface 133. Through the cooperation of first concatenation mounting 112 and second concatenation mounting 132 for the lacing film after articulating is difficult to follow the landing of articulating, effectively improves the concatenation intensity of lacing film.
The first splicing fixing piece 112 is a convex block, and the first splicing contact surface 113 is one side surface of the convex block; the second splicing fixing piece 132 is a groove, and the second splicing contact surface 133 is a groove surface of the groove; the lug is matched with the groove; or the first splicing fixing piece 112 is a groove, and the first splicing contact surface 113 is a groove surface of the groove; the second splicing fixing piece 132 is a convex block, and the second splicing fixing piece 132 is one side surface of the convex block; the groove is matched with the lug. It should be noted that the lug is in a pillar shape, and along the direction far away from the surface of the hanging piece, the cross-sectional area of the lug is gradually reduced, and/or the groove is gradually enlarged along the direction from inside to outside, which is beneficial to improving the convenience of the hanging process.
The hanging piece of the embodiment comprises an upper hanging piece 110, a connecting piece 120 and a lower hanging piece 130, wherein the upper hanging piece 110 is connected with the lower hanging piece 130 through the connecting piece 120; the bottom of the upper hanging piece 110 is provided with an upper hanging part 111, and the top of the lower hanging piece 130 is provided with a lower hanging part 131; the hanging piece also comprises a splicing structure, and the splicing structure is the splicing structure; the upper hanging part 111 is provided with a first splicing fixing part 112, and/or the lower hanging part 130 is provided with a second splicing fixing part 132.
In addition, the width of the upper hanging piece 110 is D1, the width of the connecting piece 120 is D2, the width of the lower hanging piece 130 is D3, and D1, D2 and D3 satisfy the following relations: d1 > D2, and D3 > D2; the upper hooking parts 111 are formed at both sides of the position where the upper hooking part 110 is coupled to the coupling part 120, and the lower hooking parts 131 are formed at both sides of the position where the lower hooking part 130 is coupled to the coupling part 120.
A hanging piece of the embodiment, as shown in fig. 7 and 8, comprises a reinforcing member 200 and a molding material 400, wherein the reinforcing member 200 is arranged inside the molding material 400; the hanging piece comprises an upper hanging piece 110, a connecting piece 120 and a lower hanging piece 130, wherein the upper hanging piece 110 is connected with the lower hanging piece 130 through the connecting piece 120; the width of the upper hanging piece 110 is D1, the width of the connecting piece 120 is D2, the width of the lower hanging piece 130 is D3, and D1, D2 and D3 satisfy the following relations: d1 > D2, and D3 > D2; upper hanging parts 111 are formed at both sides of the position where the upper hanging member 110 is connected to the connecting member 120, and lower hanging parts 131 are formed at both sides of the position where the lower hanging member 130 is connected to the connecting member 120; through using the reinforcement to the internal cylinder lacing film of preheater can improve the bulk strength of the internal cylinder lacing film of preheater to adopt foretell lacing film shape, the last lacing film portion of hanging down can be comparatively stable articulate the lower lacing film portion of hanging in last lacing film both sides, and this kind of concatenation mode is favorable to improving the holistic concatenation intensity of the internal cylinder of preheater, and improves the holistic sealing performance of the internal cylinder of preheater.
In addition, the upper hanging portion 111, the connector 120, and the lower hanging portion 131 form one recess on one side of the hanging piece. The length of the upper hanging piece 110 is H1, the length of the lower hanging piece 130 is H2, the length of the concave part is H3, and H1, H2 and H3 satisfy the following relations: h1+ H2 is not more than H3, and the arrangement is favorable for improving the convenience of hanging the hanging piece in the splicing process. In the same hanger, when H2 is the distance from the lower hanging portion 131 to the first upper table surface 521, H1 is the distance from the upper hanging portion 111 to the first lower table surface 511; when H2 is the distance from the lower hook 131 to the second upper table 522, H1 is the distance from the upper hook 111 to the second lower table 512.
The reinforcement 200 includes an upper reinforcement 210, a connection reinforcement 220, and a lower reinforcement 230; the upper reinforcing member 210 is correspondingly disposed inside the molding material 400 at the upper hanging portion 111, the connecting reinforcing member 220 is correspondingly disposed inside the molding material 400 at the connecting member 120, and the lower reinforcing member 230 is correspondingly disposed inside the molding material 400 at the lower hanging portion 131. The upper reinforcement 210 and the lower reinforcement 230 are connected by a connection reinforcement 220. The upper reinforcement member 210 is transversely disposed in the upper hooking portion 111, and/or the lower reinforcement member 230 is transversely disposed in the lower hooking portion 131. The upper reinforcing member 210 is provided with an upper reinforcing through part 212, and/or the connecting reinforcing through part 222 is provided on the connecting reinforcing member 220, and/or the lower reinforcing through part 232 is provided on the lower reinforcing member 230, and the molding materials 400 at both sides of the reinforcing member 200 are connected through the upper reinforcing through part 212 and/or the connecting reinforcing through part 222 and/or the lower reinforcing through part 232. The upper reinforcement 210 is provided with an upper fixing member 311, and/or the connection reinforcement 220 is provided with a connection portion fixing member 312, and/or the lower reinforcement 230 is provided with a lower fixing member 313.
The inner cylinder of the preheater in the embodiment comprises a plurality of hanging pieces 100, the hanging piece 100 is the hanging piece 100 in the embodiment, and the plurality of hanging pieces 100 are spliced to form the inner cylinder of the preheater.
The hanging pieces comprise upper hanging pieces 110 and lower hanging pieces 130, any two hanging pieces 100 which are adjacent up and down are respectively an upper hanging piece 101 and a lower hanging piece 102, the upper hanging pieces 110 of the lower hanging pieces 102 are matched with the lower hanging pieces 130 of the upper hanging pieces 101, and the lower hanging pieces 102 are hung on the upper hanging pieces 101 through the matching of the upper hanging pieces 110 and the lower hanging pieces 130. Fig. 4 shows a partial schematic splicing view of an inner cylinder of a preheater according to this embodiment, which is shown in fig. 7; the hanging piece 100 is formed by splicing a plurality of hanging pieces 100, the hanging pieces 100 can be produced in a factory and then transported to a construction site for splicing, and the production, transportation and construction processes are convenient.
The hanging piece in the embodiment is used for a preheater inner cylinder formed by splicing a plurality of hanging pieces, the hanging piece 100 comprises a reinforcing piece 200 and a molding material 400, and the reinforcing piece 200 is arranged in the molding material 400; it should be noted that the molding material 400 includes a material that can be dried or fired to become a solid from a generally fluid or flexible castable material, such as a conventional refractory castable material, or a ceramic, and all of them are flowable or flexible before molding and can be fixed and molded after drying or firing.
In addition, the reinforcing member 200 in this embodiment can reinforce the internal structure of the molding material 400 in the molding material 400, in the specific production process of the hanging piece of this embodiment, the reinforcing member 200 can be placed in a mold for producing the hanging piece, then the molding material 400 in the flowing state or the flexible state is placed in the mold to be in the shape of the mold, and then the molding material is cured, for example, weathered and dried, and fired, etc., the molding material 400 in this embodiment is a casting material, and after the casting material is poured into the mold, the casting material is placed in a heating device for firing and molding, and finally the hanging piece in this embodiment is formed.
The hanging piece 100 comprises an upper hanging piece 110 and a connecting piece 120, wherein the connecting piece 120 is connected with the upper hanging piece 110, and the connecting piece 120 is arranged below the upper hanging piece 110; the lower part of the upper hanging piece 110 is provided with an upper hanging part 111; it should be noted that the upper hanging piece 110 is used to integrally hang the hanging piece 100 on the adjacent hanging piece 100 above or hang at the inner cylinder top end fixing part 103, and a part for hanging the inner cylinder of the preheater is reserved in the inner cylinder of the preheater indicated by the inner cylinder top end fixing part 103, which is a fixing ring in this embodiment as shown in fig. 7.
The hanging piece 100 of the embodiment further comprises a lower hanging piece 130, the lower hanging piece 130 is connected to the bottom end of the connecting piece 120, and a lower hanging part 131 is arranged at the upper part of the lower hanging piece 130; in this embodiment, the hanging piece 100 is provided with upper hanging parts 111 on both sides of the upper hanging part 110, and the hanging piece 100 is provided with lower hanging parts 131 on both sides of the lower hanging part 130. As shown in fig. 6, the hanging pieces 100 include an upper hanging piece 110 and a lower hanging piece 130, any two hanging pieces 100 adjacent up and down are respectively an upper hanging piece 101 and a lower hanging piece 102, the upper hanging piece 110 of the lower hanging piece 102 is arranged in a matching manner with the lower hanging piece 130 of the upper hanging piece 101, the lower hanging piece 102 is hung on the upper hanging piece 101 through the matching of the upper hanging piece 110 and the lower hanging piece 130, and the inner cylinder of the preheater shown in fig. 8 is finally formed by splicing in the same manner.
Through the splicing mode, the periphery of each hanging piece except the hanging piece 100 at the topmost end and the bottommost end is mutually fixed by 4 hanging pieces 100, so that the fixing mode of each hanging piece is very stable, and the hanging piece has very good sealing performance.
The reinforcing member of the embodiment is used for the preheater inner cylinder hanging piece 100, and comprises an upper reinforcing member 210 and a connecting reinforcing member 220, wherein the lower part of the upper reinforcing member 210 is an upper hanging reinforcing part 211, and the top end of the connecting reinforcing member 220 is connected with the upper reinforcing part 210. Through set up reinforcement 200 in shaping material 400 for the whole higher intensity that has of lacing film 100, it is not fragile under the suspension state, has prolonged life. The reinforcing member may be made of metal, or any other material having high rigidity, such as metal ceramic.
The upper reinforcing member 210 of the reinforcing member is correspondingly arranged inside the molding compound 400 at the upper hanging part 110, and the connecting reinforcing member 220 of the reinforcing member is correspondingly arranged inside the molding compound 400 at the connecting part 120. Go up reinforcement 210 and can consolidate last hanger 110 department shaping material 400, connect reinforcement 220 and can consolidate connecting piece 120 department shaping material 400, more importantly, go up reinforcement 210 and be connected reinforcement 220 and link to each other, it can strengthen the joint strength between hanger 110 department shaping material 400 and connecting piece 120 department shaping material 400, and go up reinforcement 210 and articulate the reinforcement 211 and can carry out effectual reinforcement to the shaping material 400 of last hookup portion 111, make lacing film 100 have excellent suspension strength, and then make the whole excellent suspension strength that has of preheater inner tube, the life of extension preheater inner tube.
In this embodiment, still include lower reinforcement 230, the upper portion of lower reinforcement 230 is provided with hangs reinforcement 231 down, the bottom of connecting reinforcement 220 is continuous with lower reinforcement 230, and lower reinforcement 230 can carry out effectual reinforcement to the molding compound 400 of hanging portion 131 department down, is favorable to further improving the hanging intensity of lacing film 100. The connection strength between the lower reinforcement 230 and the upper reinforcement 210 can be further improved by the connection reinforcement 220, so that the connection strength between the connection piece 120 of the hanging piece 100 and the upper hanging piece 110 and the lower hanging piece 130 is improved, and the connection piece 120 is effectively prevented from being broken under the action of gravity. The connection reinforcement member 220 has an elongated shape, and/or a plate shape and/or a bar shape, and in this embodiment, an elongated shape is used.
In addition, be provided with the portion of running through on the reinforcement 200, the shaping material 400 of reinforcement 200 both sides passes through the portion of running through links to each other, through the setting of portion of running through for shaping material 400 joint in portion of running through department effectively improves the intensive effect of reinforcement 200 to shaping material 400. Specifically, in this embodiment, as shown in fig. 2, the upper reinforcing member 210 is provided with an upper reinforcing penetration portion 212, the connection reinforcing member 220 is provided with a connection reinforcing penetration portion 222, and the lower reinforcing member 230 is provided with a lower reinforcing penetration portion 232.
Moreover, a fixing member may be disposed on the reinforcing member 200, the fixing member protrudes from the surface of the reinforcing member 200, and the arrangement of the fixing member may further improve the direct bonding performance between the molding material 400 and the reinforcing member 200, thereby effectively preventing the molding material 400 from falling off. Specifically, in this embodiment, the upper reinforcing member 210 is provided with an upper fixing member 311, the connection reinforcing member 220 is provided with a connection portion fixing member 312, and the lower reinforcing member 230 is provided with a lower fixing member 313.
An expansion part 301 is arranged between the reinforcing piece 200 and the molding material 400, and the expansion part 301 allows the reinforcing piece 200 not to extrude the molding material 400 after being expanded. In the hanger sheet production process, a metal product is a form that the reinforcing member 200 can adopt, but the metal product is easy to generate a thermal expansion effect, is easy to expand when being fired, and is also easy to expand when other castable is fired, and through the arrangement of the expansion part 301, such as a gap, the castable is prevented from generating internal damage due to internal stress when being expanded, so that the quality of the hanger sheet 100 is ensured. It should be noted, however, that the voids are only one embodiment and other means of avoiding expansion damage that would have the same effect are within the scope of this disclosure.
It should be noted that the present invention refers to the field of cement processing in the background art, but the scope of the present invention is not limited to the inner cylinder of the cement preheater, and other preheater inner cylinders capable of referring to the field should be within the protection scope of the present invention.
In addition, the hanging piece in fig. 8 is also provided with a first splicing fixing member 112 and a second splicing fixing member 132, and the cross section is not cut to the plane containing the first splicing fixing member 112 and the second splicing fixing member 132.
The invention has been described in detail hereinabove with reference to specific exemplary embodiments thereof. It will, however, be understood that various modifications and changes may be made without departing from the scope of the invention as defined in the appended claims. The detailed description and drawings are to be regarded as illustrative rather than restrictive, and any such modifications and variations are intended to be included within the scope of the present invention as described herein. Furthermore, the background is intended to be illustrative of the state of the art as developed and the meaning of the present technology and is not intended to limit the scope of the invention or the application and field of application of the invention.
More specifically, although exemplary embodiments of the invention have been described herein, the invention is not limited to these embodiments, but includes any and all embodiments modified, omitted, combined, e.g., between various embodiments, adapted and/or substituted, as would be recognized by those skilled in the art from the foregoing detailed description. The limitations in the claims are to be interpreted broadly based the language employed in the claims and not limited to examples described in the foregoing detailed description or during the prosecution of the application, which examples are to be construed as non-exclusive. Any steps recited in any method or process claims may be executed in any order and are not limited to the order presented in the claims. The scope of the invention should, therefore, be determined only by the appended claims and their legal equivalents, rather than by the descriptions and examples given above.

Claims (12)

1. The hanging piece for the inner cylinder of the preheater is characterized by comprising an upper hanging connecting piece (110), a connecting piece (120) and a lower hanging connecting piece (130), wherein the upper hanging connecting piece (110) is connected with the lower hanging connecting piece (130) through the connecting piece (120); an upper hanging part (111) is arranged at the bottom of the upper hanging piece (110), and a lower hanging part (131) is arranged at the top of the lower hanging piece (130);
the upper hanging part (111) is provided with a first splicing fixing piece (112), and the lower hanging piece (130) is provided with a second splicing fixing piece (132);
a first upper table top (521) and a second upper table top (522) are arranged at the bottom end of the hanging piece, a height difference exists between the first upper table top (521) and the second upper table top (522), and a second sealing surface (520) is formed between the first upper table top (521) and the second upper table top (522); the top end of the hanging piece is provided with a first lower table top (511) and a second lower table top (512), the first lower table top (511) and the second lower table top (512) have a height difference, a first sealing surface (510) is formed between the first lower table top (511) and the second lower table top (512), and gaps are arranged between the first lower table top (511) and the first upper table top (521) and between the second upper table top (522) and the second lower table top (512).
2. A preheater inner cylinder hanger according to claim 1, wherein at one side of the hanger, the upper hanger portion (111), the connecting member (120) and the lower hanger portion (131) form a recess in which the vertical distance between the upper hanger portion (111) and the lower hanger portion (131) is L, and the L gradually decreases in a direction away from the connecting member (120).
3. A preheater inner tube hanger as claimed in claim 1 wherein the first splice holder (112) is a projection and the first splice contact surface (113) is a side surface of the projection; the second splicing fixing piece (132) is a groove, and the second splicing contact surface (133) is a groove surface of the groove; the lug is matched with the groove;
or
The first splicing fixing piece (112) is a groove, and the first splicing contact surface (113) is a groove surface of the groove; the second splicing fixing piece (132) is a convex block, and the second splicing fixing piece (132) is one side surface of the convex block; the groove is matched with the lug.
4. A preheater inner tube hanger as claimed in claim 3 wherein the projections are frusto-conical and the cross-sectional area of the projections decreases progressively in a direction away from the surface of the hanger and/or the grooves increases progressively in an inward to outward direction.
5. A preheater inner tube hanger as claimed in claim 1 wherein the first splice contact surface (113) of the first splice holder (112) and the second splice contact surface (133) of the second splice holder (132) are inclined towards the side remote from the connector (120).
6. A preheater inner tube hanger as claimed in claim 1 wherein the first splice end face (114) of the first splice holder (112) and the second splice end face (134) of the second splice holder (132) are inclined towards the side remote from the connector (120).
7. A preheater inner tube hanger as set forth in claim 5 wherein said angle of inclination is β, said 0 ° < β < 60 °.
8. A preheater inner tube hanger as set forth in claim 6 wherein said angle of inclination is α, said angle of inclination being 0 ° < α < 60 °.
9. A preheater inner tube hanger as claimed in claim 1 wherein the first upper deck surface (521) corresponds to the first lower deck surface (511); the second upper mesa (522) corresponds to the second lower mesa (512).
10. A preheater inner tube hanger as claimed in claim 1 wherein the first upper table surface (521), the second upper table surface (522), the first lower table surface (511) and the second lower table surface (512) are all horizontally disposed.
11. A preheater inner tube hanger as claimed in claim 1 wherein the first seal face (510) and the second seal face (520) are arranged vertically.
12. A preheater inner cylinder, characterized in that, includes a plurality of lacing films (100), lacing film (100) is a lacing film (100) of any one of claims 1-11, and a plurality of lacing films (100) splice to form the preheater inner cylinder.
CN202110808003.8A 2021-07-16 2021-07-16 Preheater inner tube lacing film, lacing film and preheater inner tube Pending CN113532104A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110808003.8A CN113532104A (en) 2021-07-16 2021-07-16 Preheater inner tube lacing film, lacing film and preheater inner tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110808003.8A CN113532104A (en) 2021-07-16 2021-07-16 Preheater inner tube lacing film, lacing film and preheater inner tube

Publications (1)

Publication Number Publication Date
CN113532104A true CN113532104A (en) 2021-10-22

Family

ID=78099892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110808003.8A Pending CN113532104A (en) 2021-07-16 2021-07-16 Preheater inner tube lacing film, lacing film and preheater inner tube

Country Status (1)

Country Link
CN (1) CN113532104A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1971189A (en) * 2006-12-08 2007-05-30 中天仕名科技集团有限公司 Inner tube composed of ceramic hanging slices
CN200944006Y (en) * 2006-03-30 2007-09-05 中天仕名科技集团有限公司 Chinese character
CN101298960A (en) * 2008-06-06 2008-11-05 贾剑光 Ceramic suspending board for internal barrel of preheater cyclone barrel and connection method thereof
CN201181155Y (en) * 2008-04-01 2009-01-14 贾剑光 Ceramic internal barrel of preheater whirlwind barrel
CN201534821U (en) * 2009-02-26 2010-07-28 贾剑光 Inner cylinder of preheater cyclone
CN201945192U (en) * 2010-12-20 2011-08-24 中国建材装备有限公司 Plate-hung type inner cylinder of pre-heater
CN202158782U (en) * 2011-07-19 2012-03-07 中材装备集团有限公司 Cyclone inner barrel of preheater at tail end of kiln
CN204112363U (en) * 2014-10-24 2015-01-21 昆明市东川区泥石流防治研究所 Barricade, blocking dam, river levee, the drainage groove of a kind of brick body and formation thereof
CN205223022U (en) * 2015-11-12 2016-05-11 南宁易速德机械设备有限公司 Preheater internal cylinder for kiln of production cement
CN207622523U (en) * 2017-11-19 2018-07-17 东台市圣德尔耐热材料有限公司 Impervious carbon brick with splicing construction
RU194480U1 (en) * 2019-05-27 2019-12-11 федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВО "НИУ "МЭИ") DEVICE FOR PRELIMINARY HEATING OF BASALT CHARGE

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200944006Y (en) * 2006-03-30 2007-09-05 中天仕名科技集团有限公司 Chinese character
CN1971189A (en) * 2006-12-08 2007-05-30 中天仕名科技集团有限公司 Inner tube composed of ceramic hanging slices
CN201181155Y (en) * 2008-04-01 2009-01-14 贾剑光 Ceramic internal barrel of preheater whirlwind barrel
CN101298960A (en) * 2008-06-06 2008-11-05 贾剑光 Ceramic suspending board for internal barrel of preheater cyclone barrel and connection method thereof
CN201534821U (en) * 2009-02-26 2010-07-28 贾剑光 Inner cylinder of preheater cyclone
CN201945192U (en) * 2010-12-20 2011-08-24 中国建材装备有限公司 Plate-hung type inner cylinder of pre-heater
CN202158782U (en) * 2011-07-19 2012-03-07 中材装备集团有限公司 Cyclone inner barrel of preheater at tail end of kiln
CN204112363U (en) * 2014-10-24 2015-01-21 昆明市东川区泥石流防治研究所 Barricade, blocking dam, river levee, the drainage groove of a kind of brick body and formation thereof
CN205223022U (en) * 2015-11-12 2016-05-11 南宁易速德机械设备有限公司 Preheater internal cylinder for kiln of production cement
CN207622523U (en) * 2017-11-19 2018-07-17 东台市圣德尔耐热材料有限公司 Impervious carbon brick with splicing construction
RU194480U1 (en) * 2019-05-27 2019-12-11 федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВО "НИУ "МЭИ") DEVICE FOR PRELIMINARY HEATING OF BASALT CHARGE

Similar Documents

Publication Publication Date Title
CN215176988U (en) Upper and lower lacing film mosaic structure, lacing film and pre-heater inner tube
CN113532104A (en) Preheater inner tube lacing film, lacing film and preheater inner tube
CN215598112U (en) Hanging piece splicing structure, hanging piece and inner barrel of preheater
CN101709676A (en) Lengthened piston for optical engine
CN215113987U (en) Splicing reinforced hanging piece and inner barrel of preheater
CN201251367Y (en) High-temperature and abrasion resistant inner tube of preheater in cement drying production line
CN215113986U (en) Reinforcement piece, hanging piece and inner cylinder of preheater
CN215063779U (en) Hanging piece and preheater inner barrel
CN103424000B (en) A kind of ceramic inner barrel of preheater
CN113686161A (en) Method for sintering and curing inner barrel hanging piece of castable preheater and inner barrel hanging piece
CN202657510U (en) Hanging shaking integrated coal hopper
CN208253003U (en) A kind of steel modeling wear-resistant composite tubes
CN105333745A (en) Preheater inner barrel for cement production kiln
CN205537135U (en) Conventional three -section stove dysmorphism furnace roof
CN201407910Y (en) Novel kiln tail chute with long service life
CN113800797B (en) Special ceramic hanging piece for inner cylinder of preheater and preparation method thereof
CN217877144U (en) High-strength ceramic inner cylinder of cyclone preheater
CN219907389U (en) Side wall structure and melting pit
CN110940194A (en) Gas resistance adjusting system and method for rotary lime kiln preheater
CN106995705B (en) Coke oven ascending pipe base
CN219264925U (en) Sealing structure for tertiary air duct smoke chamber
CN105546986B (en) A kind of special-shaped furnace roof of conventional three sections of stoves
CN219368409U (en) Inner barrel hanging piece for preheater
CN205228179U (en) Inner tube of preheater
CN104596299A (en) Inner tube hanging sheet replacement construction method for preheater cyclone of cement clinker production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination