CN113498072B - Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements) - Google Patents

Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements) Download PDF

Info

Publication number
CN113498072B
CN113498072B CN202010193035.7A CN202010193035A CN113498072B CN 113498072 B CN113498072 B CN 113498072B CN 202010193035 A CN202010193035 A CN 202010193035A CN 113498072 B CN113498072 B CN 113498072B
Authority
CN
China
Prior art keywords
cell
pdcch
determining
downlink
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010193035.7A
Other languages
Chinese (zh)
Other versions
CN113498072A (en
Inventor
周欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ziguang Zhanrui Communication Technology Co Ltd
Original Assignee
Beijing Ziguang Zhanrui Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ziguang Zhanrui Communication Technology Co Ltd filed Critical Beijing Ziguang Zhanrui Communication Technology Co Ltd
Priority to CN202010193035.7A priority Critical patent/CN113498072B/en
Publication of CN113498072A publication Critical patent/CN113498072A/en
Application granted granted Critical
Publication of CN113498072B publication Critical patent/CN113498072B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the application discloses a method, a device and equipment for determining monitoring numbers of PDCCH candidates and non-overlapping CCEs, wherein the method comprises the following steps: determining the PDCCH capacity proportion of a monitoring and scheduling main cell, and determining the cell type of a serving cell; and determining a first limit number of monitoring PDCCH candidates and a second limit number of non-overlapped CCEs per time slot under the condition of supporting cross-carrier scheduling of the main cell according to the PDCCH capacity ratio and/or the cell type of the serving cell. By adopting the embodiment of the application, the complexity of monitoring the PDCCH can be reduced under the condition that the primary cell allows the cross-carrier scheduling of the secondary cell.

Description

Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements)
Technical Field
The present application relates to the field of computer technologies, and in particular, to a method, an apparatus, and a device for determining monitoring numbers of PDCCH candidates and non-overlapping CCEs.
Background
For the same-cell scheduling and cross-carrier scheduling, the protocol specifies the maximum number of candidate Physical Downlink Control Channel (PDCCHD) candidates and the maximum number of non-overlapping Control Channel 1 elements (CCEs) that need to be monitored in each timeslot.
However, in the existing conclusion, one cell can be scheduled only by the cell or only by cross-cell scheduling, and the situations of both the cell scheduling and the cross-cell scheduling cannot occur. Especially, under the condition that the primary cell is allowed to be cross-carrier scheduled by the secondary cell, the PDCCH candidate limit and the non-overlapping CCE limit which need to be monitored in each time slot cannot be determined, and the cross-cell scheduling of the primary cell needs to monitor the PDCCH candidate limit and the non-overlapping CCE limit, which results in higher complexity of monitoring the PDCCH.
Disclosure of Invention
The embodiment of the application provides a method, a device and equipment for determining monitoring numbers of PDCCH candidates and non-overlapping CCEs, and can reduce the complexity of PDCCH monitoring under the condition that a primary cell is subjected to cross-carrier scheduling by a secondary cell.
In a first aspect, an embodiment of the present application provides a method for determining monitored numbers of PDCCH candidates and non-overlapping CCEs, where the method includes:
determining the PDCCH capacity proportion of a monitoring and scheduling main cell, and determining the cell type of a serving cell;
determining a first limit number of monitoring PDCCH candidates in each time slot and a second limit number of non-overlapping CCEs under the condition of supporting cross-carrier scheduling of a main cell according to the PDCCH capacity proportion and/or the cell type of the serving cell, wherein the cell type comprises
Figure SMS_1
Downstream cells and>
Figure SMS_2
and (4) a downlink cell.
In a second aspect, an embodiment of the present application provides an apparatus for determining monitored numbers of PDCCH candidates and non-overlapping CCEs, including:
a first determining unit, configured to determine a PDCCH capacity ratio of a monitoring scheduling primary cell, and determine a cell type of a serving cell;
a second determining unit, configured to determine, according to the PDCCH capacity ratio and/or the cell type of the serving cell, a first limit number for monitoring PDCCH candidates and a second limit number for non-overlapping CCEs per slot when supporting cross-carrier scheduling of a primary cell, where the cell type includes
Figure SMS_3
Downstream cells and>
Figure SMS_4
and (4) a downlink cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_5
when the serving cell is
Figure SMS_6
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_7
The second limit number is->
Figure SMS_8
Wherein γ represents
Figure SMS_9
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_10
In order to report the capability of the PDCCH,
Figure SMS_11
and &>
Figure SMS_12
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_13
when the serving cell is
Figure SMS_14
When a downlink cell supports cross-carrier scheduling of a main cell, determining that the first limit number is greater than or equal to>
Figure SMS_15
The second limit number is->
Figure SMS_16
Wherein γ represents
Figure SMS_17
Blind detection capability of PDCCH in downlink cell>
Figure SMS_18
In order to report the capability of the PDCCH,
Figure SMS_19
and &>
Figure SMS_20
Are respectively one service cellAnd monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition of supporting cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_21
when the serving cell is
Figure SMS_22
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_23
The second limit number is->
Figure SMS_24
Wherein γ represents
Figure SMS_25
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_26
In order to report the capability of the PDCCH,
Figure SMS_27
and &>
Figure SMS_28
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_29
when the serving cell is
Figure SMS_30
When a downlink cell supports cross-carrier scheduling of a main cell, determining that the first limit number is greater than or equal to>
Figure SMS_31
The second limit number is->
Figure SMS_32
Wherein γ represents
Figure SMS_33
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_34
In order to report the capability of the PDCCH,
Figure SMS_35
and &>
Figure SMS_36
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_37
when the serving cell is
Figure SMS_38
When the downlink cell does not support cross-carrier scheduling of the main cell, determining the first limit number as
Figure SMS_39
The second limit number is->
Figure SMS_40
Wherein:
Figure SMS_41
Figure SMS_42
wherein γ represents
Figure SMS_44
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_47
In order to report the capability of the PDCCH,
Figure SMS_49
and &>
Figure SMS_45
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu for one service cell under the condition that the cross-carrier scheduling main cell is not supported, wherein delta is the PDCCH capacity proportion and is the->
Figure SMS_46
Is selected as belonging to>
Figure SMS_48
Number of secondary cells of a downlink cell, ->
Figure SMS_50
Is selected as belonging to>
Figure SMS_43
The number of secondary cells of the downlink cell, j, is equal to μ.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_51
when the serving cell is
Figure SMS_52
When the downlink cell supports cross-carrier scheduling of the main cell, the first limit number is determined as
Figure SMS_53
The second limiting number is>
Figure SMS_54
Wherein:
Figure SMS_55
Figure SMS_56
wherein γ represents
Figure SMS_59
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_61
In order to report the capability of the PDCCH,
Figure SMS_63
and &>
Figure SMS_58
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu for one service cell under the condition that the cross-carrier scheduling main cell is not supported, wherein delta is the PDCCH capacity proportion and is the->
Figure SMS_60
Is/belong to>
Figure SMS_62
Number of secondary cells of a downlink cell, ->
Figure SMS_64
Is selected as belonging to>
Figure SMS_57
The number of secondary cells of the downlink cell, j, is equal to μ.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_65
when the serving cell is
Figure SMS_66
When the downlink cell does not support cross-carrier scheduling of the main cell, determining the first limit number as
Figure SMS_67
The second limit number is->
Figure SMS_68
Figure SMS_69
Figure SMS_70
Wherein γ represents
Figure SMS_72
Blind detection capability of PDCCH in downlink cell>
Figure SMS_74
In order to report the capability of the PDCCH,
Figure SMS_76
and &>
Figure SMS_73
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu for one service cell under the condition that the cross-carrier scheduling main cell is not supported, wherein delta is the PDCCH capacity of the monitoring scheduling main cellRatio,. Sup.>
Figure SMS_75
Is selected as belonging to>
Figure SMS_77
Number of secondary cells of a downlink cell, ->
Figure SMS_78
Is selected as belonging to>
Figure SMS_71
The number of secondary cells of the downlink cell, j, is equal to μ.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_79
when the serving cell is
Figure SMS_80
When the downlink cell supports cross-carrier scheduling of the main cell, the first limit number is determined as
Figure SMS_81
The second limiting number is>
Figure SMS_82
Figure SMS_83
Figure SMS_84
Wherein γ represents
Figure SMS_87
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_88
In order to report the capability of the PDCCH,
Figure SMS_90
and &>
Figure SMS_86
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and>
Figure SMS_89
is selected as belonging to>
Figure SMS_91
Number of secondary cells of a downlink cell, ->
Figure SMS_92
Is selected as belonging to>
Figure SMS_85
The number of secondary cells of the downlink cell, j, is equal to μ.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_93
when the serving cell is
Figure SMS_94
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_95
The second limit number is->
Figure SMS_96
Figure SMS_97
Reporting the capacity of the PDCCH;
wherein, gamma tableDisplay device
Figure SMS_98
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_99
In order to report the capability of the PDCCH,
Figure SMS_100
and &>
Figure SMS_101
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_102
when the serving cell is the above->
Figure SMS_103
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_104
The second limit number is->
Figure SMS_105
Wherein γ represents
Figure SMS_106
Blind detection capability of PDCCH in downlink cell>
Figure SMS_107
In order to report the capability of the PDCCH,
Figure SMS_108
and &>
Figure SMS_109
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell. />
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_110
when the serving cell is
Figure SMS_111
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_112
The second limiting number is>
Figure SMS_113
Wherein γ represents
Figure SMS_114
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_115
In order to report the capability of the PDCCH,
Figure SMS_116
and &>
Figure SMS_117
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_118
when the serving cell is
Figure SMS_119
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_120
The second limiting number is>
Figure SMS_121
Wherein γ represents
Figure SMS_122
Blind detection capability of PDCCH in downlink cell>
Figure SMS_123
In order to report the capability of the PDCCH,
Figure SMS_124
and &>
Figure SMS_125
The maximum number of monitoring PDCCH candidates and non-overlapped CCEs in each time slot mu is respectively the maximum number of monitoring PDCCH candidates and non-overlapped CCEs in one service cell under the condition that the cross-carrier scheduling main cell is not supported, and delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_126
when the serving cell is
Figure SMS_127
When the downlink cell does not support cross-carrier scheduling of the main cell, determining the first limit number as
Figure SMS_128
The second limit number is->
Figure SMS_129
Wherein,
Figure SMS_130
Figure SMS_131
wherein γ represents
Figure SMS_132
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_133
In order to report the capability of the PDCCH,
Figure SMS_134
and &>
Figure SMS_135
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_136
when the serving cell is
Figure SMS_137
When the downlink cell supports cross-carrier scheduling of the main cell, the first limit number is determined as
Figure SMS_138
The second limit number is->
Figure SMS_139
Wherein it is present>
Figure SMS_140
Figure SMS_141
Wherein γ represents
Figure SMS_142
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_143
In order to report the capability of the PDCCH,
Figure SMS_144
and &>
Figure SMS_145
The maximum number of monitoring PDCCH candidates and non-overlapped CCEs in each time slot mu is respectively determined by a serving cell under the condition that a cross-carrier scheduling main cell is not supported, delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_146
when the serving cell is
Figure SMS_147
When the downlink cell does not support cross-carrier scheduling of the main cell, determining the first limit number as
Figure SMS_148
The second limit number is->
Figure SMS_149
Wherein,
Figure SMS_150
Figure SMS_151
wherein γ represents
Figure SMS_152
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_153
In order to report the capability of the PDCCH,
Figure SMS_154
and &>
Figure SMS_155
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
With reference to the second aspect, in a possible implementation manner, the second determining unit is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_156
when the serving cell is
Figure SMS_157
When the downlink cell supports cross-carrier scheduling of the main cell, the first limit number is determined as
Figure SMS_158
The second limiting number is>
Figure SMS_159
Wherein,
Figure SMS_160
Figure SMS_161
wherein γ represents
Figure SMS_162
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_163
In order to report the capability of the PDCCH,
Figure SMS_164
and &>
Figure SMS_165
The maximum number of monitoring PDCCH candidates and non-overlapped CCEs in each time slot mu is respectively determined by a serving cell under the condition that a cross-carrier scheduling main cell is not supported, delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu. />
In a third aspect, an embodiment of the present application provides an apparatus, which includes a processor and a memory, where the processor and the memory are connected to each other. The memory is configured to store a computer program that supports the terminal device to execute the method provided by the first aspect and/or any one of the possible implementation manners of the first aspect, where the computer program includes program instructions, and the processor is configured to call the program instructions to execute the method provided by the first aspect and/or any one of the possible implementation manners of the first aspect.
In a fourth aspect, the present application provides a computer-readable storage medium, which stores a computer program, where the computer program is executed by a processor to implement the method provided by the first aspect and/or any one of the possible implementation manners of the first aspect.
In the embodiment of the application, the cell type of the serving cell is determined by determining the PDCCH capacity ratio of the monitoring and scheduling primary cell, and the maximum number limit of the maximum monitoring downlink control channel candidates and the maximum number limit of the non-overlapping CCEs in each time slot can be determined under the condition that the primary cell can be scheduled by the secondary cell in a cross-carrier manner, so as to reduce the complexity of monitoring the PDCCH.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a flowchart illustrating a method for determining monitored numbers of PDCCH candidates and non-overlapping CCEs according to an embodiment of the present application;
fig. 2 is a schematic structural diagram of an apparatus for determining monitored numbers of PDCCH candidates and non-overlapping CCEs according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of an apparatus provided in an embodiment of the present application.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The method for determining the monitoring number of the PDCCH candidates and the non-overlapping CCEs (for convenience of description, the method provided by the embodiment of the present application may be referred to as the method for determining the monitoring number of the non-overlapping CCEs) may be applied to a method for limiting the maximum number of the PDCCH candidates that is monitored by the UE in each time slot and a method for limiting the number of the non-overlapping CCEs, when the primary cell may be cross-carrier scheduled by the secondary cell, so as to reduce the complexity of the UE monitoring the PDCCH.
The user device may be any type of device that provides voice and/or data connectivity to a user, such as a handheld device having wireless connection capability or a processing device connected to a wireless modem. For example, mobile phones (or so-called "cellular" phones), computers with mobile terminals, portable, pocket, hand-held, computer-included or vehicle-mounted mobile devices, smart wearable devices, and the like may be included. For example, devices such as Personal Communication Service (PCS) phones, cordless phones, session Initiation Protocol (SIP) phones, wireless Local Loop (WLL) stations, personal Digital Assistants (PDAs), smartbands, smartwatches, and the like. Also included are constrained devices, such as devices that consume less power, or devices that have limited storage capabilities, or devices that have limited computing capabilities, etc. Examples of information sensing devices include bar codes, radio Frequency Identification (RFID), sensors, global Positioning Systems (GPS), laser scanners, and so forth.
Referring to fig. 1, fig. 1 is a flowchart illustrating a method for determining monitored numbers of PDCCH candidates and non-overlapping CCEs according to an embodiment of the present application. The method shown in fig. 1 may include the following steps S101 to S102.
S101, determining the PDCCH capacity proportion of the monitoring and scheduling main cell, and determining the cell type of the service cell.
In some possible embodiments, the PDCCH carries scheduling, resource allocation information of a specific user equipment, such as common scheduling assignment of downlink resource allocation, uplink grant, uplink power control command, signaling message (e.g., system message, paging message, etc.). The capacity ratio δ of the PDCCH monitoring and scheduling the primary cell is determined by high-level configuration or reported by the capability of the ue, and the value may be 1 or 2, and may be specifically determined according to an actual application scenario, which is not limited herein.
Wherein, in the case of supporting cross-carrier scheduling of the primary cell, the user equipment is configured with
Figure SMS_166
Downlink cell and
Figure SMS_167
and (4) a downlink cell. Wherein +>
Figure SMS_168
The downstream cell has a Single-Transmission Reception Point (Single-trp) downstream cell which is greater or less than a predetermined threshold value>
Figure SMS_169
The downlink cell is a downlink cell having multiple transmission reception points (Multi-TRPs).
S102, according to the PDCCH capacity proportion and/or the cell type of the service cell, determining a first limit number of PDCCH candidates monitored in each time slot and a second limit number of non-overlapped CCEs under the condition of supporting cross-carrier scheduling of the main cell.
In some possible embodiments, the user equipment is configured with
Figure SMS_170
Downstream cell and->
Figure SMS_171
In the case of a downlink cell, assuming that the subcarrier spacing of the serving cell is μ, if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell and ≥ is given>
Figure SMS_172
At this time, the maximum value of the number of PDCCH candidates monitored by the serving cell per time slot μ (hereinafter referred to as a first limit number for convenience of description) and the maximum value of the number of non-overlapping CCEs (hereinafter referred to as a second limit number for convenience of description) may be determined according to the following situations.
Wherein mu can take the values of 0, 1, 2 and 3. When mu is 0, the subcarrier interval is 15KHz; when mu is 1, the subcarrier interval is 30KHz; when mu is 2, the subcarrier interval is 60KHz; when mu is 3, the subcarrier spacing is 120KHz.
Specifically, when the serving cell is
Figure SMS_173
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_174
The second limiting number is->
Figure SMS_175
I.e. the user equipment does not require more than ≧ per slot μ on the serving cell activation downlink BWP (Bandwidth part)>
Figure SMS_176
PDDCH candidate, or more than >>
Figure SMS_177
Non-overlapping CCEs. Wherein the serving cell is a primary cell.
Wherein,
Figure SMS_178
for the capability of reporting PDCCH, be->
Figure SMS_179
And &>
Figure SMS_180
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
Figure SMS_181
And &>
Figure SMS_182
See table 1 for specific values of (a).
TABLE 1
Figure SMS_183
Wherein γ represents
Figure SMS_184
And the blind detection capability of the PDCCH of the downlink cell. For example if the subscriber device supports a ^ h->
Figure SMS_185
Serving a cell and no coresetpoilndex is configured for the user equipment or only one coresetpoilndex for all CORESETs (control resource sets) in the cell.
Figure SMS_186
The serving cell configures the user equipment with a CORESET poilndex value of 0 and a CORESET value of 1. At this time, the ue reports the R value (which may be a fixed value) to provide higher PDCCH blind detection capability. Wherein γ is 1 or R.
Specifically, when the serving cell is
Figure SMS_187
Determining a first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure SMS_188
The second limiting number is->
Figure SMS_189
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_190
PDDCH candidate, or more than >>
Figure SMS_191
Non-overlapping CCEs. Wherein the serving cell is a secondary cell.
Specifically, when the serving cell is
Figure SMS_192
Determining a first limit number in conjunction with a ^ when a downlink cell does not support cross-carrier scheduling in a primary cell>
Figure SMS_193
A second limiting number of { [ means ] }>
Figure SMS_194
I.e. the user equipment does not require a per-time activation on downlink BWP on the serving cellGap mu exceeds->
Figure SMS_195
PDDCH candidate, or more than >>
Figure SMS_196
Non-overlapping CCEs. Wherein the serving cell is a primary cell.
Specifically, when the serving cell is
Figure SMS_197
Determining a first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure SMS_198
The second limiting number is->
Figure SMS_199
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_200
PDDCH candidate, or more than>
Figure SMS_201
Non-overlapping CCEs. Wherein the serving cell is a secondary cell.
In some possible embodiments, the user equipment is configured with
Figure SMS_202
Downstream cell and->
Figure SMS_203
In the case of a downlink cell, assuming that the subcarrier spacing of the serving cell is μ, if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell and ≥ is given>
Figure SMS_204
The first limit number of the number of PDCCH candidates monitored by the serving cell per slot μ and the second limit number of the number of non-overlapping CCEs at this time may be determined as follows.
Specifically, when the serving cell is
Figure SMS_205
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_206
A second limiting number of { [ means ] }>
Figure SMS_207
I.e. the user equipment does not require more than ÷ in/slot μ on the serving cell activation downlink BWP>
Figure SMS_208
PDDCH candidate, or more than >>
Figure SMS_209
Non-overlapping CCEs. Wherein the serving cell is a primary cell. Wherein: />
Figure SMS_210
Figure SMS_211
Wherein,
Figure SMS_213
is selected as belonging to>
Figure SMS_216
Number of secondary cells in a downlink cell, in conjunction with a number of secondary cells in a downlink cell>
Figure SMS_217
Is selected as belonging to>
Figure SMS_214
Number of secondary cells of a downlink cell, ->
Figure SMS_215
Is selected as belonging to>
Figure SMS_218
Number of secondary cells of a downlink cell, ->
Figure SMS_219
Is selected as belonging to>
Figure SMS_212
The number of secondary cells of the downlink cell, j, is equal to μ.
Specifically, when the serving cell is
Figure SMS_220
Determining a first limit number in conjunction with a ^ when a downlink cell supports cross-carrier scheduling in a primary cell>
Figure SMS_221
The second limiting number is->
Figure SMS_222
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_223
PDDCH candidate, or more than >>
Figure SMS_224
Non-overlapping CCEs. Wherein the serving cell is a secondary cell. Wherein:
Figure SMS_225
Figure SMS_226
wherein,
Figure SMS_227
is selected as belonging to>
Figure SMS_228
Number of secondary cells in a downlink cell, in conjunction with a number of secondary cells in a downlink cell>
Figure SMS_229
Is selected as belonging to>
Figure SMS_230
The number of secondary cells of the downlink cell, j, is equal to μ.
Specifically, when the serving cell is
Figure SMS_231
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_232
The second limiting number is->
Figure SMS_233
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_234
PDDCH candidate, or more than >>
Figure SMS_235
Non-overlapping CCEs. Wherein the serving cell is a primary cell. Wherein:
Figure SMS_236
Figure SMS_237
wherein, the PDCCH in the control resource set belonging to the same control resource set index in each time slot is not more than
Figure SMS_238
PDCCH candidates, or not more than >>
Figure SMS_239
Non-overlapping CCEs.
Specifically, when the serving cell is
Figure SMS_240
Determining a first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure SMS_241
The second limiting number is->
Figure SMS_242
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_243
PDDCH candidate, or more than >>
Figure SMS_244
Non-overlapping CCEs. Wherein the serving cell is a secondary cell. Wherein:
Figure SMS_245
Figure SMS_246
wherein, the PDCCH in the control resource set belonging to the same control resource set index in each time slot is not more than
Figure SMS_247
PDCCH candidates, or not more than >>
Figure SMS_248
Non-overlapping CCEs.
In some possible embodiments, the user equipment is configured with
Figure SMS_249
Downstream cell and->
Figure SMS_250
In case of a downlink cell, falseLet the subcarrier spacing of the serving cell be μ, if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell and ^ is greater than or equal to ^ u>
Figure SMS_251
The first limit number of the number of PDCCH candidates monitored by the serving cell per slot μ and the second limit number of the number of non-overlapping CCEs at this time may be determined as follows.
Specifically, when the serving cell is
Figure SMS_252
Determining a first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure SMS_253
The second limiting number is->
Figure SMS_254
Figure SMS_255
Is the capability of reporting PDCCH. I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_256
PDDCH candidate, or more than >>
Figure SMS_257
Non-overlapping CCEs. Wherein the serving cell is a secondary cell.
Specifically, when the serving cell is
Figure SMS_258
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_259
The second limiting number is->
Figure SMS_260
I.e. the user equipment does not require a per-time activation on downlink BWP on the serving cellSlit μ greater than +>
Figure SMS_261
PDDCH candidate, or more than>
Figure SMS_262
Non-overlapping CCEs. Wherein the serving cell is a primary cell.
Specifically, when the serving cell is
Figure SMS_263
Determining a first limit number in conjunction with a ^ when a downlink cell supports cross-carrier scheduling in a primary cell>
Figure SMS_264
A second limiting number of { [ means ] }>
Figure SMS_265
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_266
PDDCH candidate, or more than >>
Figure SMS_267
Non-overlapping CCEs. Wherein the serving cell is a secondary cell.
Wherein, PDCCH in the control resource set belonging to the same control resource set index in each time slot is not more than
Figure SMS_268
PDCCH candidates, or not more than->
Figure SMS_269
Non-overlapping CCEs.
Specifically, when the serving cell is
Figure SMS_270
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_271
The second limiting number is->
Figure SMS_272
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_273
PDDCH candidate, or more than >>
Figure SMS_274
Non-overlapping CCEs. Wherein the serving cell is a primary cell.
Wherein, the PDCCH in the control resource set belonging to the same control resource set index in each time slot is not more than
Figure SMS_275
PDCCH candidates, or not more than->
Figure SMS_276
Non-overlapping CCEs.
In some possible embodiments, the user equipment is configured with
Figure SMS_277
Downstream cell and->
Figure SMS_278
In the case of downlink cells, assuming the subcarrier spacing of the serving cell is μ, if the increased PDCCH size in the higher layer signaling belongs to the primary cell and ÷ binds to the primary cell>
Figure SMS_279
The first limit number of the number of PDCCH candidates monitored by the serving cell per slot μ and the second limit number of the number of non-overlapping CCEs at this time may be determined as follows.
Specifically, when the serving cell is
Figure SMS_280
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_281
The second limiting number is->
Figure SMS_282
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_283
PDDCH candidate, or more than>
Figure SMS_284
Non-overlapping CCEs.
Wherein:
Figure SMS_285
Figure SMS_286
specifically, when the serving cell is
Figure SMS_287
Determining a first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure SMS_288
The second limiting number is->
Figure SMS_289
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_290
PDDCH candidate, or more than>
Figure SMS_291
Non-overlapping CCEs.
Wherein,
Figure SMS_292
Figure SMS_293
specifically, when the serving cell is
Figure SMS_294
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_295
The second limiting number is->
Figure SMS_296
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_297
PDDCH candidate, or more than >>
Figure SMS_298
Non-overlapping CCEs. />
Wherein:
Figure SMS_299
Figure SMS_300
wherein, the PDCCH in the control resource set belonging to the same control resource set index in each time slot is not more than
Figure SMS_301
PDCCH candidates, or not more than >>
Figure SMS_302
Non-overlapping CCEs.
Specifically, when the serving cell is
Figure SMS_303
Determining a first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure SMS_304
The second limiting number is->
Figure SMS_305
I.e. the user equipment does not require more than ≥ per slot μ on serving cell activation downlink BWP>
Figure SMS_306
PDDCH candidate, or more than>
Figure SMS_307
Non-overlapping CCEs. Wherein:
Figure SMS_308
Figure SMS_309
wherein, the PDCCH in the control resource set belonging to the same control resource set index in each time slot is not more than
Figure SMS_310
PDCCH candidates, or not more than->
Figure SMS_311
Non-overlapping CCEs.
In the embodiment of the application, the cell type of the serving cell is determined by determining the PDCCH capacity ratio of the monitoring and scheduling primary cell, and the maximum number limit of the maximum monitoring downlink control channel candidates and the maximum number limit of the non-overlapping CCEs in each time slot can be determined under the condition that the primary cell can be scheduled by the secondary cell in a cross-carrier manner, so as to reduce the complexity of monitoring the PDCCH.
Referring to fig. 2, fig. 2 is a schematic structural diagram of an apparatus for determining monitored numbers of PDCCH candidates and non-overlapping CCEs according to an embodiment of the present application. The device 1 provided by the embodiment of the application comprises:
a first determining unit 11, configured to determine a PDCCH capacity ratio of a monitoring scheduling primary cell, and determine a cell type of a serving cell;
a second determining unit 12, configured to determine, according to the PDCCH capacity ratio and/or the cell type of the serving cell, a first limit number for monitoring PDCCH candidates and a second limit number for non-overlapping CCEs per slot of the serving cell when supporting cross-carrier scheduling of a primary cell, where the cell type includes
Figure SMS_312
Downstream cell and->
Figure SMS_313
And (4) a downlink cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_314
when the serving cell is->
Figure SMS_315
When the downlink cell does not support cross-carrier scheduling of the main cell, determining the first limit number as ^ greater than or equal to>
Figure SMS_316
The second limit number is
Figure SMS_317
Wherein γ represents
Figure SMS_318
Blind detection capability of PDCCH in downlink cell>
Figure SMS_319
In order to report the capability of the PDCCH,
Figure SMS_320
and &>
Figure SMS_321
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_322
when the serving cell is->
Figure SMS_323
When a downlink cell supports cross-carrier scheduling of a main cell, determining that the first limit number is greater than or equal to>
Figure SMS_324
The second limit number is
Figure SMS_325
Wherein γ represents
Figure SMS_326
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_327
In order to report the capability of the PDCCH,
Figure SMS_328
and &>
Figure SMS_329
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_330
when the serving cell is->
Figure SMS_331
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_332
The second limit number is
Figure SMS_333
Wherein γ represents
Figure SMS_334
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_335
In order to report the capability of the PDCCH,
Figure SMS_336
and &>
Figure SMS_337
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_338
when the serving cell is->
Figure SMS_339
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_340
The second limit number is
Figure SMS_341
Wherein γ represents
Figure SMS_342
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_343
In order to report the capability of the PDCCH,
Figure SMS_344
and &>
Figure SMS_345
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_346
when the serving cell is &>
Figure SMS_347
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_348
The second limit number is->
Figure SMS_349
Wherein:
Figure SMS_350
Figure SMS_351
wherein γ represents
Figure SMS_353
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_355
In order to report the capability of the PDCCH,
Figure SMS_358
and &>
Figure SMS_354
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity proportion of the monitoring scheduling main cell;
Figure SMS_356
Is selected as belonging to>
Figure SMS_357
Number of secondary cells of a downlink cell, ->
Figure SMS_359
Is selected as belonging to>
Figure SMS_352
The number of secondary cells of the downlink cell, j, is equal to μ.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_360
when the serving cell is->
Figure SMS_361
When a downlink cell supports cross-carrier scheduling of a main cell, determining that the first limit number is greater than or equal to>
Figure SMS_362
The second limit number is->
Figure SMS_363
Wherein:
Figure SMS_364
Figure SMS_365
wherein γ represents
Figure SMS_368
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_369
In order to report the capability of the PDCCH,
Figure SMS_371
and &>
Figure SMS_367
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity proportion of the monitoring scheduling main cell;
Figure SMS_370
Is selected as belonging to>
Figure SMS_372
Number of secondary cells in a downlink cell, in conjunction with a number of secondary cells in a downlink cell>
Figure SMS_373
Is selected as belonging to>
Figure SMS_366
The number of secondary cells of the downlink cell, j, is equal to μ.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_374
when the serving cell is->
Figure SMS_375
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_376
The second limit number is->
Figure SMS_377
Figure SMS_378
Figure SMS_379
Wherein γ represents
Figure SMS_382
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_384
In order to report the capability of the PDCCH,
Figure SMS_386
and &>
Figure SMS_381
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity proportion of the monitoring scheduling main cell;
Figure SMS_383
Is selected as belonging to>
Figure SMS_385
Number of secondary cells in a downlink cell, in conjunction with a number of secondary cells in a downlink cell>
Figure SMS_387
Is selected as belonging to>
Figure SMS_380
The number of secondary cells of the downlink cell, j, is equal to μ.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the secondary cell, and
Figure SMS_388
when the serving cell is->
Figure SMS_389
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_390
The second limit number is->
Figure SMS_391
Figure SMS_392
Figure SMS_393
Wherein γ represents
Figure SMS_396
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_399
In order to report the capability of the PDCCH,
Figure SMS_400
and &>
Figure SMS_395
Respectively one service cell does not support cross-carrier modulationMonitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition of measuring the main cell, wherein delta is the PDCCH capacity ratio of the monitoring and scheduling main cell, and is greater than or equal to>
Figure SMS_397
Is selected as belonging to>
Figure SMS_398
Number of secondary cells of a downlink cell, ->
Figure SMS_401
Is/belong to>
Figure SMS_394
The number of secondary cells of the downlink cell, j, is equal to μ.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_402
when the serving cell is->
Figure SMS_403
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_404
The second limit number is
Figure SMS_405
Figure SMS_406
Reporting the capacity of the PDCCH;
wherein γ represents
Figure SMS_407
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_408
In order to report the capability of the PDCCH,
Figure SMS_409
and &>
Figure SMS_410
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_411
when the serving cell is the above->
Figure SMS_412
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_413
The second limiting number is>
Figure SMS_414
Wherein γ represents
Figure SMS_415
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_416
In order to report the capability of the PDCCH,
Figure SMS_417
and &>
Figure SMS_418
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the high layer isThe increased PDCCH capacity of the signaling is attributed to the primary cell, and
Figure SMS_419
when the serving cell is->
Figure SMS_420
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_421
The second limit number is
Figure SMS_422
Wherein γ represents
Figure SMS_423
Blind detection capability of PDCCH in downlink cell>
Figure SMS_424
In order to report the capability of the PDCCH,
Figure SMS_425
and &>
Figure SMS_426
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support cross-carrier scheduling of the main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_427
when the serving cell is &>
Figure SMS_428
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_429
The second limiting number is>
Figure SMS_430
Wherein γ represents
Figure SMS_431
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_432
In order to report the capability of the PDCCH,
Figure SMS_433
and &>
Figure SMS_434
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_435
when the serving cell is->
Figure SMS_436
When the downlink cell does not support cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_437
The second limit number is->
Figure SMS_438
Wherein,
Figure SMS_439
Figure SMS_440
wherein γ represents
Figure SMS_441
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_442
In order to report the capability of the PDCCH,
Figure SMS_443
and &>
Figure SMS_444
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_445
when the serving cell is->
Figure SMS_446
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_447
The second limit number is->
Figure SMS_448
Wherein +>
Figure SMS_449
Figure SMS_450
Wherein γ represents
Figure SMS_451
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_452
In order to report the capability of the PDCCH,
Figure SMS_453
and &>
Figure SMS_454
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_455
when the serving cell is->
Figure SMS_456
When the downlink cell does not support cross-carrier scheduling of the main cell, determining the first limit number as ^ greater than or equal to>
Figure SMS_457
The second limit number is->
Figure SMS_458
Wherein,
Figure SMS_459
Figure SMS_460
wherein γ represents
Figure SMS_461
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_462
In order to report the capability of the PDCCH,
Figure SMS_463
and &>
Figure SMS_464
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
In some possible embodiments, the second determining unit 12 is configured to: if the increased PDCCH capacity of the higher layer signaling belongs to the primary cell, and
Figure SMS_465
when the serving cell is->
Figure SMS_466
When the downlink cell supports cross-carrier scheduling of the main cell, determining that the first limit number is greater than or equal to>
Figure SMS_467
The second limit number is->
Figure SMS_468
Wherein,
Figure SMS_469
Figure SMS_470
wherein γ represents
Figure SMS_471
Blind detection capability of PDCCH of downlink cell, and->
Figure SMS_472
In order to report the capability of the PDCCH,
Figure SMS_473
and &>
Figure SMS_474
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell, and j is equal to mu.
In specific implementation, the apparatus 1 may execute, through each built-in functional module thereof, the implementation manner provided in each step in fig. 1, which may be specifically referred to as the implementation manner provided in each step, and is not described herein again.
In the embodiment of the application, the cell type of the serving cell is determined by determining the PDCCH capacity ratio of the monitoring and scheduling primary cell, and the maximum number limit of the maximum monitoring downlink control channel candidates and the maximum number limit of the non-overlapping CCEs in each time slot can be determined under the condition that the primary cell can be scheduled by the secondary cell in a cross-carrier manner, so as to reduce the complexity of monitoring the PDCCH.
Referring to fig. 3, fig. 3 is a schematic structural diagram of an apparatus provided in an embodiment of the present application. As shown in fig. 3, the apparatus 1000 in the present embodiment may include: the processor 1001, the network interface 1004, and the memory 1005, and the apparatus 1000 may further include: a user interface 1003, and at least one communication bus 1002. The communication bus 1002 is used to implement connection communication among these components. The user interface 1003 may include a Display (Display) and a Keyboard (Keyboard), and the optional user interface 1003 may further include a standard wired interface and a standard wireless interface. The network interface 1004 may optionally include a standard wired interface, a wireless interface (e.g., WI-FI interface). The memory 1005 may be a high-speed RAM memory or a non-volatile memory (non-volatile memory), such as at least one disk memory. The memory 1005 may optionally be at least one memory device located remotely from the processor 1001. As shown in fig. 3, a memory 1005, which is a kind of computer-readable storage medium, may include therein an operating system, a network communication module, a user interface module, and a device control application program.
In the device 1000 shown in fig. 3, the network interface 1004 may provide network communication functions; the user interface 1003 is an interface for providing a user with input; the processor 1001 may be configured to call the device control application stored in the memory 1005 to implement the implementation manners provided in the foregoing steps in fig. 1, which may specifically refer to the implementation manners provided in the foregoing steps, and details of which are not described herein again.
It should be understood that in some possible embodiments, the processor 1001 may be a Central Processing Unit (CPU), and the processor may be other general purpose processors, digital Signal Processors (DSPs), application Specific Integrated Circuits (ASICs), field-programmable gate arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, and the like. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like. The memory may include both read-only memory and random access memory, and provides instructions and data to the processor. The portion of memory may also include non-volatile random access memory. For example, the memory may also store device type information.
An embodiment of the present application further provides a computer-readable storage medium, where a computer program is stored in the computer-readable storage medium, and is executed by a processor to implement the method provided in each step in fig. 1, which may specifically refer to the implementation manner provided in each step, and is not described herein again.
The computer readable storage medium may be an internal storage unit of the task processing device provided in any of the foregoing embodiments, for example, a hard disk or a memory of an electronic device. The computer readable storage medium may also be an external storage device of the electronic device, such as a plug-in hard disk, a Smart Memory Card (SMC), a Secure Digital (SD) card, a flash memory card (flash card), and the like, provided on the electronic device. The computer readable storage medium may further include a magnetic disk, an optical disk, a read-only memory (ROM), a Random Access Memory (RAM), and the like. Further, the computer readable storage medium may also include both an internal storage unit and an external storage device of the electronic device. The computer readable storage medium is used for storing the computer program and other programs and data required by the electronic device. The computer readable storage medium may also be used to temporarily store data that has been output or is to be output.
The terms "first", "second", and the like in the claims and in the description and drawings of the present application are used for distinguishing between different objects and not for describing a particular order. Furthermore, the terms "include" and "have," as well as any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those steps or elements listed, but may alternatively include other steps or elements not listed, or inherent to such process, method, article, or apparatus. Reference herein to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the application. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments. The term "and/or" as used in this specification and the appended claims refers to any and all possible combinations of one or more of the associated listed items and includes such combinations.
Those of ordinary skill in the art will appreciate that the elements and algorithm steps of the examples described in connection with the embodiments disclosed herein may be embodied in electronic hardware, computer software, or combinations of both, and that the components and steps of the examples have been described in a functional general in the foregoing description for the purpose of illustrating clearly the interchangeability of hardware and software. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present application.
The above disclosure is only for the purpose of illustrating the preferred embodiments of the present application and is not to be construed as limiting the scope of the present application, so that the present application is not limited thereto, and all equivalent variations and modifications can be made to the present application.

Claims (5)

1. A method for determining monitored number of PDCCH candidates and non-overlapping CCEs, the method comprising:
determining the PDCCH capacity proportion of a monitoring and scheduling main cell, and determining the cell type of a serving cell, wherein the PDCCH capacity proportion of the monitoring and scheduling main cell is determined by high-level configuration;
determining a first limit number of monitoring PDCCH candidates and a second limit number of non-overlapping CCEs per time slot under the condition of supporting cross-carrier scheduling of a main cell according to the cell type of the serving cell or according to the PDCCH capacity ratio and the cell type of the serving cell, wherein the cell type comprises
Figure FDA0004074892030000011
And (4) a downlink cell.
2. The method of claim 1, wherein the increased PDCCH capacity if higher layer signaling belongs to a secondary cell, and wherein
Figure FDA0004074892030000012
When the serving cell is->
Figure FDA0004074892030000013
Determining the first limit number as ^ greater than or equal to when the downlink cell supports cross-carrier scheduling of the main cell>
Figure FDA0004074892030000014
The second limiting number is->
Figure FDA0004074892030000015
Wherein,
Figure FDA0004074892030000016
the downlink cell is a downlink cell with a single transmitting and receiving node, and is based on the value of the received signal>
Figure FDA0004074892030000017
The downlink cell is provided with a multi-transmission receiving node, and gamma represents ^ greater than or equal to>
Figure FDA0004074892030000018
Blind detection capability of PDCCH of downlink cell, and->
Figure FDA0004074892030000019
For the capability of reporting PDCCH, be->
Figure FDA00040748920300000110
And &>
Figure FDA00040748920300000111
Respectively monitoring the maximum number of PDCCH candidates and non-overlapped CCEs in each time slot mu under the condition that one serving cell does not support the cross-carrier scheduling of the main cell, wherein delta is the PDCCH capacity ratio of the monitoring scheduling main cell.
3. An apparatus for determining monitored numbers of PDCCH candidates and non-overlapping CCEs, the apparatus comprising:
the first determining unit is used for determining the PDCCH capacity proportion of the monitoring and scheduling main cell and determining the cell type of the serving cell, wherein the PDCCH capacity proportion of the monitoring and scheduling main cell is determined by high-level configuration;
a second determination unit for determining whether the first determination unit is a power-on determination unit,a first limit number for monitoring PDCCH candidates and a second limit number for non-overlapping CCEs per time slot under the condition of supporting cross-carrier scheduling of the main cell are determined according to the cell type of the serving cell or according to the PDCCH capacity ratio and the cell type of the serving cell, wherein the cell type comprises
Figure FDA00040748920300000112
And (4) a downlink cell.
4. The equipment for determining the monitoring number of the PDCCH candidates and the non-overlapped CCEs comprises a processor and a memory, wherein the processor and the memory are connected with each other;
the memory for storing a computer program comprising program instructions, the processor being configured to invoke the program instructions to perform the method of claim 1 or 2.
5. A computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer program which is executed by a processor to implement the method of claim 1 or 2.
CN202010193035.7A 2020-03-18 2020-03-18 Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements) Active CN113498072B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010193035.7A CN113498072B (en) 2020-03-18 2020-03-18 Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010193035.7A CN113498072B (en) 2020-03-18 2020-03-18 Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements)

Publications (2)

Publication Number Publication Date
CN113498072A CN113498072A (en) 2021-10-12
CN113498072B true CN113498072B (en) 2023-03-31

Family

ID=77993292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010193035.7A Active CN113498072B (en) 2020-03-18 2020-03-18 Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements)

Country Status (1)

Country Link
CN (1) CN113498072B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116760517A (en) * 2022-03-04 2023-09-15 北京紫光展锐通信技术有限公司 Physical downlink control channel monitoring method and device, terminal equipment and network equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110351002A (en) * 2018-04-03 2019-10-18 北京展讯高科通信技术有限公司 The priority determination of candidate PDCCH and monitor method, device, storage medium, base station, terminal

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110324127B (en) * 2018-03-30 2022-01-25 维沃移动通信有限公司 PDCCH monitoring candidate allocation method and network side equipment
CN110740512B (en) * 2018-07-19 2023-03-24 北京紫光展锐通信技术有限公司 Method, terminal and medium for determining monitoring number of candidate PDCCH and CCE
CN110830216B (en) * 2018-08-10 2021-03-30 华为技术有限公司 Method and device for determining number of monitoring PDCCH candidates under carrier aggregation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110351002A (en) * 2018-04-03 2019-10-18 北京展讯高科通信技术有限公司 The priority determination of candidate PDCCH and monitor method, device, storage medium, base station, terminal

Also Published As

Publication number Publication date
CN113498072A (en) 2021-10-12

Similar Documents

Publication Publication Date Title
EP3813420B1 (en) Method for monitoring pdcch, and terminal and network device
CN106941724B (en) Data processing method and device
EP3945689A1 (en) Method and apparatus for enhancing srs flexibility, coverage, and capacity in a communication system
KR20210056945A (en) Channel access mechanisms in wireless communication
US20120196610A1 (en) Supporting multiple subscriber identities in a portable device using a single transceiver
CN110831181B (en) Information detection method, communication device, and computer-readable storage medium
CN110139390A (en) Resource scheduling indication method, terminal and the network equipment
CN110098905B (en) Information indication method, terminal equipment, network equipment and system
CN111615197B (en) Resource adjustment method and equipment
CN113498072B (en) Method, device and equipment for determining monitoring number of PDCCH candidates and non-overlapping CCEs (control channel elements)
WO2012022369A1 (en) Empty buffer status reporting from an user equipment in uplink transmissions
CN108886460B (en) Indication method, device, terminal, base station and storage medium of control signaling
CN110475369B (en) Service scheduling method, terminal and network equipment
CN108811156B (en) Information transmission method and device
CN107295648B (en) Uplink transmission method, UE, base station and system
WO2021046798A1 (en) Method and apparatus for transmitting ue capability information, and storage medium
CN110337794A (en) Detection method, device, equipment and the storage medium of control signaling
US8611274B2 (en) Method for scheduling transmissions in communication systems
CN113973270B (en) Message sending and receiving methods, devices and communication equipment
CN111836389B (en) Uplink resource scheduling method, terminal and network side equipment
KR20220140782A (en) How to multiplex services with different priority levels
CN115208529A (en) Signal transmission method, terminal and network side equipment
CN112438058A (en) System message updating method, device and storage medium
CN113518377B (en) CSI report conflict processing method, device, equipment and storage medium
CN113556816B (en) Method and device for indicating uplink channel resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant