CN113489138A - Power utilization scheduling system and method suitable for multiple scenes - Google Patents
Power utilization scheduling system and method suitable for multiple scenes Download PDFInfo
- Publication number
- CN113489138A CN113489138A CN202110408858.1A CN202110408858A CN113489138A CN 113489138 A CN113489138 A CN 113489138A CN 202110408858 A CN202110408858 A CN 202110408858A CN 113489138 A CN113489138 A CN 113489138A
- Authority
- CN
- China
- Prior art keywords
- layer
- equipment
- master station
- operation instruction
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000005265 energy consumption Methods 0.000 claims abstract description 29
- 230000003993 interaction Effects 0.000 claims abstract description 12
- 230000004044 response Effects 0.000 claims description 15
- 238000010248 power generation Methods 0.000 claims description 13
- 239000013307 optical fiber Substances 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 9
- 238000004220 aggregation Methods 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 230000002776 aggregation Effects 0.000 claims description 5
- 238000005070 sampling Methods 0.000 claims description 4
- 230000004931 aggregating effect Effects 0.000 claims description 3
- QVFWZNCVPCJQOP-UHFFFAOYSA-N chloralodol Chemical compound CC(O)(C)CC(C)OC(O)C(Cl)(Cl)Cl QVFWZNCVPCJQOP-UHFFFAOYSA-N 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 3
- 238000004146 energy storage Methods 0.000 claims description 3
- 238000004128 high performance liquid chromatography Methods 0.000 claims description 3
- 239000000835 fiber Substances 0.000 claims 1
- 230000008901 benefit Effects 0.000 abstract description 5
- 238000004590 computer program Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 10
- 230000006870 function Effects 0.000 description 8
- 238000003860 storage Methods 0.000 description 6
- 230000001276 controlling effect Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000012544 monitoring process Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 230000000295 complement effect Effects 0.000 description 2
- 238000011217 control strategy Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00002—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
- H02J13/00017—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus using optical fiber
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00022—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
- H02J13/00026—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission involving a local wireless network, e.g. Wi-Fi, ZigBee or Bluetooth
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/126—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Public Health (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a power utilization scheduling system and method suitable for multiple scenes, which comprises the following steps: the device layer, the network layer and the master station layer; the equipment layer is used for controlling the user side equipment by utilizing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquiring and sending energy utilization data of a user; the network layer is used for realizing data interaction between the equipment layer and the master station layer; and the master station layer is used for analyzing the received energy consumption data according to multi-scene load regulation to generate an operation instruction and sending the operation instruction to the equipment layer. According to the energy consumption data of the user side and the load regulation and control of multiple scenes, the received energy consumption data are analyzed to generate the operation instruction, so that the reunion redistribution of idle energy is realized, the energy consumption cost of the user is obviously reduced while the maximum energy benefit is exerted, and the energy-saving willingness of the user is stimulated.
Description
Technical Field
The invention relates to the field of power utilization scheduling, in particular to a power utilization scheduling system and method suitable for multiple scenes.
Background
With the continuous deepening of electric power marketization, based on the thinking mode of the energy internet, the structural reform of the energy field is promoted, and the electric power marketization is deepened more and more urgently. At present, energy management of domestic electric power customers such as industrial enterprises, parks and the like is mostly not standard, most of the electric power customers do not have standard grading measurement, and the energy consumption condition is not transparent. Scientific management and monitoring can not be realized, and customers can not finely analyze and evaluate the energy consumption condition and can not be reformed and optimized. Some electric power customers build energy management systems, but generally operate independently, and the systems are mutually independent, lack of modes and strategies for realizing linkage, cannot really realize load storage of a longitudinal source network and transverse multi-energy complementary coordination optimization, lack of interaction with a power grid, and do not perform interconnection and intercommunication with a large power grid system.
Aiming at the construction of an energy management system of a power customer, the demand of the power customer needs to be differentially analyzed according to different scenes, a proper functional architecture is selected, and the system is popularized and applied through a proper mode. The energy management system of the power customer is built according to scenes by combining the differences of the power customer in various aspects such as an energy utilization structure, a user-level energy management system control level, power grid interaction capacity and the like.
Disclosure of Invention
In order to solve the above-mentioned deficiencies in the prior art, the present invention provides a power dispatching system suitable for multiple scenes, comprising: the device layer, the network layer and the master station layer;
the equipment layer is used for controlling the user side equipment by utilizing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquiring and sending energy utilization data of a user;
the network layer is used for realizing data interaction between the equipment layer and the master station layer;
and the master station layer is used for analyzing the received energy consumption data according to multi-scene load regulation to generate an operation instruction and sending the operation instruction to the equipment layer.
Preferably, the device layer comprises an edge internet of things gateway and a user side device;
the edge Internet of things gateway is used for sensing the situation of a power grid and controlling the running state of the intelligent equipment at the user side by using a preset control instruction corresponding to the situation of the power grid; the energy consumption data of the user are collected and sent to the master station layer, and meanwhile, the operation instruction sent by the master station layer is received;
and the user side equipment is used for providing the energy data for the edge Internet of things gateway, and receiving and executing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer.
Preferably, the edge internet of things gateway includes: the system comprises a main control module and an expansion module;
the main control module comprises 2 paths of 10/100Mbps Ethernet, 2 paths of RS-485, 1 path of Bluetooth BLE5.0 and 1 path of USB2.0 HOST;
the expansion module comprises an I/O module, an HPLC module, an RS-485 module, an RS-232 module, an Ethernet module, an optical fiber module, a 2G/3G/4G/5G module, a LoRa module, a ZigBee module and an alternating current sampling module.
Preferably, the edge internet-of-things gateway can adopt an NEG-9210 virtual power plant controller, an NEG-9220 intelligent gateway, an NEG-9230 energy source controller, an NEG-9240 block chain metering terminal or an NEG-9250 local co-control device.
Preferably, the general communication protocol adopted by the edge internet of things gateway includes: IEC60870-5-101, IEC60870-5-104, Q/GDW 1376.1-2013, DLT698.45, MQTT, Modbus and DLT645 protocols.
Preferably, the edge internet of things gateway communicates with the master station layer through a 2G/3G/4G/5G/Ethernet or an optical fiber;
the edge Internet of things gateway and the user side equipment communicate through micropower wireless, power line carrier, Ethernet, optical fiber or RS-485.
Preferably, the user side device includes: user special equipment and intelligent terminal equipment;
the user-specific equipment comprises a wind power generation system, a photovoltaic power generation system, an energy storage system, an electric automobile charging pile, an industrial control system and a building air conditioner control system; the intelligent terminal equipment comprises an intelligent socket, an electric meter, a water meter, a gas meter and a heat meter.
Preferably, the edge internet of things gateway is specifically configured to:
and when the frequency of the power grid is lower than the set frequency value, generating a control instruction for load shedding control or cutting off a preset control instruction for load according to a preset fixed value.
Preferably, the master station layer is specifically configured to:
when the power grid fails to generate power shortage, calling an operation instruction of each fault processing stage from a preset strategy according to the adjustable load in the energy consumption data;
when a demand response demand exists, aggregating the distributed power generation resources and the load resources in the energy consumption data, and calling a preset operation instruction for responding the demand response according to an aggregation result.
Based on the same inventive concept, the invention also provides a method based on the power utilization scheduling system applicable to multiple scenes, which comprises the following steps:
the equipment layer controls the user side equipment by using a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquires and transmits energy utilization data of a user;
the network layer realizes data interaction between the equipment layer and the master station layer;
and the master station layer analyzes the received energy consumption data according to the multi-scene load regulation to generate an operation instruction and sends the operation instruction to the equipment layer.
Compared with the prior art, the invention has the beneficial effects that:
according to the technical scheme provided by the invention, the equipment layer is used for controlling the user side equipment by utilizing the preset control instruction corresponding to the power grid situation and the operation instruction issued by the master station layer, and simultaneously acquiring and transmitting the energy utilization data of the user; the network layer is used for realizing data interaction between the equipment layer and the master station layer; and the master station layer is used for analyzing the received energy consumption data according to multi-scene load regulation to generate an operation instruction and sending the operation instruction to the equipment layer. According to the energy consumption data of the user side and the load regulation and control of multiple scenes, the received energy consumption data are analyzed to generate the operation instruction, so that the reunion redistribution of idle energy is realized, the energy consumption cost of the user is obviously reduced while the maximum energy benefit is exerted, and the energy-saving willingness of the user is stimulated.
Drawings
Fig. 1 is a schematic diagram of a power utilization scheduling system suitable for multiple scenarios in this embodiment;
fig. 2 is a schematic diagram of an electric scheduling system according to an embodiment of the present invention.
Detailed Description
For a better understanding of the present invention, reference is made to the following description taken in conjunction with the accompanying drawings and examples.
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the power utilization scheduling system suitable for multiple scenarios provided in this embodiment includes: the device layer, the network layer and the master station layer;
the equipment layer is used for controlling the user side equipment by utilizing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquiring and sending energy utilization data of a user;
the network layer is used for realizing data interaction between the equipment layer and the master station layer;
and the master station layer is used for analyzing the received energy consumption data according to multi-scene load regulation to generate an operation instruction and sending the operation instruction to the equipment layer.
In this embodiment, the master station layer is configured to obtain operation data of the device in real time, perform application analysis on the device data, and perform remote control on the device through a network channel according to a load regulation and control requirement;
the network layer is mainly a data interaction channel between the equipment layer and the main station platform and is realized based on 2G/3G/4G/5G, Ethernet or optical fiber;
in the equipment layer, the equipment side realizes the collection and monitoring of energy consumption data of the user side by deploying different types of edge internet-of-things gateways and intelligent terminal equipment such as intelligent sockets, electric meters, water meters, gas meters and heat meters, and realizes the dynamic control of the running state of the equipment of the user side by applying different regulation and control strategies according to different application scene requirements.
In a specific embodiment, different types of edge internet of things gateways can be selected according to different field application requirements.
Wherein, the edge thing allies oneself with the gateway and includes: the system comprises an NEG-9210 virtual power plant controller, an NEG-9220 intelligent gateway, an NEG-9230 energy source controller, an NEG-9240 block chain metering terminal and an NEG-9250 local co-control device.
The edge Internet of things gateway comprises a main control module and an expansion module, and different expansion modules can be selected and matched according to the field application condition.
In a specific embodiment, the main control module comprises resources such as 2 paths of 10/100Mbps Ethernet, 2 paths of RS-485, 1 path of Bluetooth BLE5.0, 1 path of USB2.0 HOST and the like;
the expansion module includes: the device comprises an I/O module, an HPLC module, an RS-485 module, an RS-232 module, an Ethernet module, an optical fiber module, a 2G/3G/4G/5G module, a LoRa module, a ZigBee module, an alternating current sampling module and the like.
The edge internet of things gateway in this embodiment supports multiple general communication protocols, including: IEC60870-5-101, IEC60870-5-104, Q/GDW 1376.1-2013, DLT698.45, MQTT, Modbus, DLT645 and the like.
In one embodiment, the device layer comprises an edge internet of things gateway and a user side device;
the edge Internet of things gateway is used for sensing the situation of a power grid and controlling the running state of the intelligent equipment at the user side by using a preset control instruction corresponding to the situation of the power grid; the energy consumption data of the user are collected and sent to the master station layer, and meanwhile, the operation instruction sent by the master station layer is received;
and the user side equipment is used for providing the energy data for the edge Internet of things gateway, and receiving and executing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer.
The edge internet of things gateway is specifically configured to:
and when the frequency of the power grid is lower than the set frequency value, generating a control instruction for load shedding control or cutting off a preset control instruction for load according to a preset fixed value.
The master station layer in this embodiment is specifically configured to:
when the power grid fails to generate power shortage, calling an operation instruction of each fault processing stage from a preset strategy according to the adjustable load in the energy consumption data;
when a demand response demand exists, aggregating distributed power generation resources and load resources in the energy consumption data, and calling a preset operation instruction for responding the demand response according to an aggregation result;
the power utilization scheduling system in one embodiment comprises the following functions:
(1) in-place frequency autonomous control
The user load self-adaptively senses the change mode of the power grid situation, and the active switching regulation and control mode in an emergency state is realized. The method mainly aims at the emergency fault of the extra-high voltage power grid, such as sudden simultaneous locking of a plurality of direct currents, the high-power shortage condition is rapidly generated, the fault is obvious, at the moment, the edge Internet of things gateway adopts an advanced frequency measurement method, the frequency is measured with high precision, the low-frequency load reduction control function can be started, and load reduction control is carried out according to the frequency measured in real time on site and the preset load reduction fixed value so as to assist in power grid frequency recovery.
In the process, the master station issues the frequency value and the load shedding fixed value to the edge Internet of things gateway in a preset mode, and when the edge Internet of things gateway detects that a low-frequency event (namely an emergency fault occurs in an ultra-high voltage power grid) occurs, the low-frequency load shedding control function is started immediately.
(2) Flexible regulation and control
The power utilization scheduling system receives the regulation and control instruction of the main station under the scene, the power shortage is small under the condition of most general faults, comprehensive allocation of various means can be carried out according to the whole network scheduling resources, the edge internet of things gateway can receive different operation instructions from the main station of the system at each stage of accident handling, and the user can be orderly regulated and controlled to regulate and control the load so as to assist the power grid to schedule and operate. In the mode, the edge Internet of things gateway has the functions of load monitoring, load forecasting, control interaction and the like, and realizes remote flexible load regulation and control.
The edge internet of things gateway calculates an adjustable load by combining load monitoring data, load prediction data and a user participation regulation and control intention and sends the adjustable load to the master station, and when the power grid fails to generate power shortage, the master station calls operation instructions of each fault processing stage from a preset strategy according to the adjustable load and sends the operation instructions to the edge internet of things gateway to realize flexible load regulation and control.
(3) Demand response
The demand response purpose of the power utilization scheduling system in the embodiment is to ensure the safety of a power grid and the power utilization quality of users by scheduling distributed power generation resources and load resources when the frequency of the power grid fluctuates or is at the peak valley of the power utilization;
the method comprises the steps that the edge internet-of-things gateway uploads collected user energy consumption data and willingness of a user to participate in demand response under different stimuli to a master station, the master station classifies and aggregates distributed power generation resources and load resources in the energy consumption data, and an operation instruction for responding the demand response is formulated according to a classification and aggregation result, willingness of the user to participate in demand response under different stimuli and current electric quantity needing to participate in the response;
in the actual scheduling process, when a demand response demand exists, the distributed power generation resources and the load resources in the energy consumption data uploaded by the edge internet of things gateway are aggregated, and a preset operation instruction is called according to the aggregation result or the operation instruction is formulated in real time.
The incentive policy of demand response is used for transferring the user to actively participate in response, so that the pressure of the power grid during power utilization peak is solved, and the power quality of the user is guaranteed. The method has the advantages that intermittent and random influences of renewable energy power generation and loads on an external system are eliminated, the loads participate in power grid auxiliary service, and corresponding control strategies are formulated according to resource differences and complementary characteristics, so that the consumption capacity of a power grid is improved, the flexibility and the regulation and control capacity of the power grid are improved, and stable operation of various loads is realized.
(4) Block chaining techniques
The power utilization scheduling system in the implementation can provide a transparent and open transaction environment for application services by adopting a block chain technology, and improves the safety, transparency and credibility of the whole process data of the power market transaction by establishing a block chain network, compiling an intelligent contract and a block chain metering terminal.
The power management mechanism deploys intelligent contracts and links the business at the main station layer so as to realize power transaction contract, and the block chain metering terminal is used for performing link distributed storage on the business data so as to realize safe, transparent and traceable transaction data.
In the operation process of the multi-scene power utilization scheduling system, advanced acquisition control, edge calculation, block chain and other technologies are applied, idle energy of users is classified, aggregated, coordinated and optimized, re-aggregation and redistribution of the idle energy are realized through power market trading and blending deficiencies, the energy cost of the users is obviously reduced while the maximum benefit of the energy is exerted, and the energy-saving willingness of the users is stimulated.
The power utilization scheduling system suitable for multiple scenes adopts the advanced Internet of things technology to promote the updating and upgrading of related equipment, and drives the rapid development of upstream and downstream industrial chains.
Based on the above scheme, the present embodiment further explains the present invention as shown in fig. 2, and a technical problem to be solved by the present invention is to provide a power utilization scheduling system suitable for multiple scenarios for the current technical situation, including a system master station layer, an edge internet of things gateway, user-specific devices, and some intelligent terminal devices such as smart sockets, electric meters, water meters, gas meters, and heat meters, which are installed according to the field energy utilization type. The edge internet of things gateway can select an NEG-9210 virtual power plant controller, an NEG-9220 intelligent gateway, an NEG-9230 energy source controller, an NEG-9240 block chain metering terminal or an NEG-9250 local cooperative control device according to an application scene. The user special equipment comprises a wind power generation system, a photovoltaic power generation system, an energy storage system, an electric automobile charging pile, an industrial control system, a building air conditioner control system and other related equipment. The intelligent terminal equipment comprises an intelligent socket, an electric meter, a water meter, a gas meter and a heat meter.
The edge Internet of things gateway and the system main station platform communicate through a 2G/3G/4G/5G/Ethernet or an optical fiber. The edge Internet of things gateway is connected with special equipment of a user or equipment such as an electric meter, a water meter, a gas meter, a heat meter and the like through micro-power wireless, power line carrier, Ethernet, optical fiber or RS-485.
The edge Internet of things gateway and the system main station communicate by adopting general communication protocols such as IEC60870-5-101, IEC60870-5-104, DLT698.45, MQTT and the like.
The edge Internet of things gateway and the user special equipment and the intelligent meter adopt general communication protocols such as DLT698.45, IEC60870-5-101, IEC60870-5-104, Modbus, Q/GDW 1376.1-2013 and the like for communication.
The type edge Internet of things gateway integrates high-speed sampling, signal processing, remote control, remote signaling and data acquisition, and the control system and the data acquisition system are physically isolated, so that the load shedding is flexibly selected on the basis of ensuring the data safety, and the diversity, the rapidity and the accuracy of the grid shedding load are improved.
Based on the same inventive concept, the embodiment further provides a power utilization scheduling method applicable to multiple scenes, which comprises the following steps:
the equipment layer controls the user side equipment by using a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquires and transmits energy utilization data of a user;
the network layer realizes data interaction between the equipment layer and the master station layer;
and the master station layer analyzes the received energy consumption data according to the multi-scene load regulation to generate an operation instruction and sends the operation instruction to the equipment layer.
It will be understood by those skilled in the art that all or part of the flow of the method according to the above-described embodiment may be implemented by a computer program, which may be stored in a computer-readable storage medium and used to implement the steps of the above-described embodiments of the method when the computer program is executed by a processor. Wherein the computer program comprises computer program code, which may be in the form of source code, object code, an executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying said computer program code, media, usb disk, removable hard disk, magnetic diskette, optical disk, computer memory, read-only memory, random access memory, electrical carrier wave signals, telecommunication signals, software distribution media, etc. It should be noted that the computer readable medium may contain content that is subject to appropriate increase or decrease as required by legislation and patent practice in jurisdictions, for example, in some jurisdictions, computer readable media does not include electrical carrier signals and telecommunications signals as is required by legislation and patent practice.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting the same, and although the present invention is described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: modifications and equivalents may be made to the embodiments of the invention without departing from the spirit and scope of the invention, which is to be covered by the claims.
Claims (10)
1. A power utilization scheduling system suitable for multiple scenes is characterized by comprising: the device layer, the network layer and the master station layer;
the equipment layer is used for controlling the user side equipment by utilizing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquiring and sending energy utilization data of a user;
the network layer is used for realizing data interaction between the equipment layer and the master station layer;
and the master station layer is used for analyzing the received energy consumption data according to multi-scene load regulation to generate an operation instruction and sending the operation instruction to the equipment layer.
2. The system of claim 1, wherein the device layer comprises an edge internet of things gateway and a user-side device;
the edge Internet of things gateway is used for sensing the situation of a power grid and controlling the running state of the intelligent equipment at the user side by using a preset control instruction corresponding to the situation of the power grid; the energy consumption data of the user are collected and sent to the master station layer, and meanwhile, the operation instruction sent by the master station layer is received;
and the user side equipment is used for providing the energy data for the edge Internet of things gateway, and receiving and executing a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer.
3. The system of claim 2, wherein the edge internet of things gateway comprises: the system comprises a main control module and an expansion module;
the main control module comprises 2 paths of 10/100Mbps Ethernet, 2 paths of RS-485, 1 path of Bluetooth BLE5.0 and 1 path of USB2.0 HOST;
the expansion module comprises an I/O module, an HPLC module, an RS-485 module, an RS-232 module, an Ethernet module, an optical fiber module, a 2G/3G/4G/5G module, a LoRa module, a ZigBee module and an alternating current sampling module.
4. The system of claim 2, wherein the edge gateway may employ a NEG-9210 virtual power plant controller, a NEG-9220 intelligent gateway, a NEG-9230 energy controller, a NEG-9240 block chain metering terminal, or a NEG-9250 co-located control device.
5. The system of claim 2, wherein the edge internet of things gateway employs a common communication protocol comprising: IEC60870-5-101, IEC60870-5-104, Q/GDW 1376.1-2013, DLT698.45, MQTT, Modbus and DLT645 protocols.
6. The system of claim 2, wherein the edge internet of things gateway communicates with the master layer via 2G/3G/4G/5G/ethernet or fiber;
the edge Internet of things gateway and the user side equipment communicate through micropower wireless, power line carrier, Ethernet, optical fiber or RS-485.
7. The system of claim 2, wherein the user-side device comprises: user special equipment and intelligent terminal equipment;
the user-specific equipment comprises a wind power generation system, a photovoltaic power generation system, an energy storage system, an electric automobile charging pile, an industrial control system and a building air conditioner control system; the intelligent terminal equipment comprises an intelligent socket, an electric meter, a water meter, a gas meter and a heat meter.
8. The system of claim 2, wherein the edge internet of things gateway is specifically configured to:
and when the frequency of the power grid is lower than the set frequency value, generating a control instruction for load shedding control or cutting off a preset control instruction for load according to a preset fixed value.
9. The system of claim 1, wherein the master layer is specifically configured to:
when the power grid fails to generate power shortage, calling an operation instruction of each fault processing stage from a preset strategy according to the adjustable load in the energy consumption data;
when a demand response demand exists, aggregating the distributed power generation resources and the load resources in the energy consumption data, and calling a preset operation instruction for responding the demand response according to an aggregation result.
10. The method for the multi-scenario power utilization scheduling system according to any one of claims 1 to 9, comprising:
the equipment layer controls the user side equipment by using a preset control instruction corresponding to the power grid situation and an operation instruction issued by the master station layer, and simultaneously acquires and transmits energy utilization data of a user;
the network layer realizes data interaction between the equipment layer and the master station layer;
and the master station layer analyzes the received energy consumption data according to the multi-scene load regulation to generate an operation instruction and sends the operation instruction to the equipment layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110408858.1A CN113489138A (en) | 2021-04-16 | 2021-04-16 | Power utilization scheduling system and method suitable for multiple scenes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110408858.1A CN113489138A (en) | 2021-04-16 | 2021-04-16 | Power utilization scheduling system and method suitable for multiple scenes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113489138A true CN113489138A (en) | 2021-10-08 |
Family
ID=77932737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110408858.1A Pending CN113489138A (en) | 2021-04-16 | 2021-04-16 | Power utilization scheduling system and method suitable for multiple scenes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113489138A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113991875A (en) * | 2021-12-27 | 2022-01-28 | 江苏驷源电力有限公司 | Low-voltage distribution network terminal equipment and message interaction method thereof |
CN115065702A (en) * | 2022-06-17 | 2022-09-16 | 国电南瑞科技股份有限公司 | New energy data access system and method suitable for new generation scheduling master station |
WO2023168911A1 (en) * | 2022-03-11 | 2023-09-14 | 广西电网有限责任公司 | Low-voltage user demand response interaction apparatus and operation method therefor |
CN117318071A (en) * | 2023-11-30 | 2023-12-29 | 中国电力科学研究院有限公司 | Power load regulation and control system and method based on high-speed wireless transmission network |
-
2021
- 2021-04-16 CN CN202110408858.1A patent/CN113489138A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113991875A (en) * | 2021-12-27 | 2022-01-28 | 江苏驷源电力有限公司 | Low-voltage distribution network terminal equipment and message interaction method thereof |
WO2023168911A1 (en) * | 2022-03-11 | 2023-09-14 | 广西电网有限责任公司 | Low-voltage user demand response interaction apparatus and operation method therefor |
CN115065702A (en) * | 2022-06-17 | 2022-09-16 | 国电南瑞科技股份有限公司 | New energy data access system and method suitable for new generation scheduling master station |
CN115065702B (en) * | 2022-06-17 | 2024-03-26 | 国电南瑞科技股份有限公司 | New energy data access system and method suitable for new generation scheduling master station |
CN117318071A (en) * | 2023-11-30 | 2023-12-29 | 中国电力科学研究院有限公司 | Power load regulation and control system and method based on high-speed wireless transmission network |
CN117318071B (en) * | 2023-11-30 | 2024-03-15 | 中国电力科学研究院有限公司 | Power load regulation and control system and method based on high-speed wireless transmission network |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113489138A (en) | Power utilization scheduling system and method suitable for multiple scenes | |
CN107086668B (en) | Distributed energy storage networking operation platform and electric energy optimization allocation method | |
Bhattarai et al. | Optimizing electric vehicle coordination over a heterogeneous mesh network in a scaled-down smart grid testbed | |
Dicorato et al. | An integrated DC microgrid solution for electric vehicle fleet management | |
CN102591278B (en) | Microgrid control system having power generation and load forecast functions and microgrid control method | |
RU2613350C2 (en) | Method and device for telecommunication network electric power consumption space-time control depending on power supply system conditions | |
CN111654067A (en) | Novel control method and device for power distribution system scheduling in transmission and distribution coordination | |
CN104753068B (en) | Two-way interaction load scheduling system | |
CN115833402B (en) | Artificial intelligent network command management and issuing system based on power dispatching | |
CN107463732A (en) | A kind of multiterminal alternating current-direct current active distribution network scheduling controlling analogue system and method | |
CN108919758A (en) | A kind of Regional Energy management system | |
Ci et al. | Building a cloud-based energy storage system through digital transformation of distributed backup battery in mobile base stations | |
Zhou et al. | Spatial–temporal energy management of base stations in cellular networks | |
CN114825617A (en) | Cloud-edge service interaction method based on power Internet of things | |
Pan et al. | Edge-cloud computing application, architecture, and challenges in ubiquitous power Internet of Things demand response | |
CN116404655A (en) | Distribution network load flexible regulation and control method and system | |
CN116094032A (en) | High-permeability photovoltaic access power distribution network Yun Bianduan cooperative energy self-balancing method | |
CN111463781B (en) | Elastically-guided power distribution network recovery method and system considering electric buses | |
CN103378604A (en) | Smart micro-grid | |
CN101231523B (en) | Control system and method for sensibility charge | |
Wu et al. | Collaborative planning of cyber physical distribution system considering the flexibility of data centers | |
CN111342446B (en) | Three-dimensional household intelligent energy ubiquitous dispatching control method and system | |
CN114726086A (en) | Integrated management system for power monitoring and diagnosis of transformer area | |
CN113904378A (en) | Virtual power plant resource regulation and control method, system and resource regulation and control terminal | |
CN111224430A (en) | Balanced power supply system and method based on distributed energy Internet of things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |