CN113457327A - A scrubbing tower for gaseous dust fall - Google Patents

A scrubbing tower for gaseous dust fall Download PDF

Info

Publication number
CN113457327A
CN113457327A CN202110885749.9A CN202110885749A CN113457327A CN 113457327 A CN113457327 A CN 113457327A CN 202110885749 A CN202110885749 A CN 202110885749A CN 113457327 A CN113457327 A CN 113457327A
Authority
CN
China
Prior art keywords
water
tower
pipe
gas
tower body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110885749.9A
Other languages
Chinese (zh)
Other versions
CN113457327B (en
Inventor
蓝雷剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Huanbi Environmental Protection Engineering Equipment Co ltd
Original Assignee
Guizhou Honglin Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Honglin Machinery Technology Co ltd filed Critical Guizhou Honglin Machinery Technology Co ltd
Priority to CN202110885749.9A priority Critical patent/CN113457327B/en
Publication of CN113457327A publication Critical patent/CN113457327A/en
Application granted granted Critical
Publication of CN113457327B publication Critical patent/CN113457327B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning

Abstract

The invention relates to the field of gas treatment, in particular to a washing tower for gas dust fall, which comprises a tower body, wherein a water storage tank is arranged on one side of the tower body, a water supply part is arranged on one side of the water storage tank, which is far away from the tower body, an air inlet part is arranged on one side of the tower body, which is far away from a water storage tank 4, the top of the tower body is connected with an air pipeline, and an air water making component is connected to one side of the air pipeline, which is far away from the tower body. Can realize resources are saved, increase life, improve the function of dust fall rate.

Description

A scrubbing tower for gaseous dust fall
Technical Field
The invention relates to the field of gas treatment, in particular to a washing tower for gas dust fall.
Background
In the industrial processing process, a lot of workshops have a phenomenon of a large amount of dust emission in the processing process, which has great influence on the continuous production and environmental conditions of the workshops and seriously influences the normal production and the physical health of staff. The existing washing tower generally adopts spraying dust fall, and directly leads waste gas into the washing tower, so that the dust fall efficiency is lower, the interior of the washing tower is difficult to clean, and the service life of the washing tower is greatly influenced.
Disclosure of Invention
The invention aims to solve the problems in the prior art and provides a washing tower for gas dust settling, which has long service life, high dust settling efficiency and good effect.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides a scrubbing tower for gaseous dust fall, includes the tower body, tower body one side is provided with the storage water tank, one side that the tower body was kept away from to the storage water tank is provided with the water supply part, one side that the storage water tank was kept away from to the tower body is provided with the part of admitting air, and the tower body top of telling is connected with gas transmission pipeline, gas transmission pipeline keeps away from tower body one side and is connected with the air and make water component.
Preferably, the tower body includes the tower shell, the one end that the tower shell is close to gas transmission pipeline is provided with the roller bearing, the part that the roller bearing is located the tower shell is provided with roller group, roller group is including interior roller group and outer roller group, interior roller group and outer roller group are respectively including the roller that a plurality of becomes circumference array distribution, be provided with first conveyer belt on the outer roller group, be provided with the second conveyer belt on the interior roller group, have the filtration pore on first conveyer belt and the second conveyer belt, placed the filler between first conveyer belt and the second conveyer belt, the symmetry is provided with two returning face plates between first conveyer belt and the second conveyer belt.
Preferably, the tower body includes that the symmetry sets up the diversion board of the one end of keeping away from the gas transmission pipeline at the tower shell, the tower body bottom is provided with the shaft, the part that the shaft is located the tower shell is provided with water wheels, the part that the shaft is located the tower shell outside is provided with first belt pulley, be provided with first bearing between shaft and the tower shell, the part that the roller is located the tower shell outside is provided with the second belt pulley, be provided with the second bearing between roller and the tower shell, be provided with first belt on first belt pulley and the second belt pulley.
Preferably, the tower body comprises two turbine shafts symmetrically arranged at the bottom of the tower shell, a turbine is arranged on each turbine shaft, two transmission shafts are symmetrically arranged above the turbine shafts of the tower shell, and sponge belts are arranged on the transmission shafts and the turbine shafts.
Preferably, the water supply part is including setting up the fender in the storage water tank, the storage water tank is kept away from tower body one side and is provided with the inlet tube, the inlet tube other end is connected with the suction pump, be provided with the outlet pipe on the suction pump, be provided with first branch pipeline and second branch pipeline on the outlet pipe, the part that first branch pipeline is located the tower shell sets up a plurality of nozzle, be connected with the rotation water pipe on the second branch pipeline, the symmetry is provided with a plurality of nozzle on the rotation water pipe.
Preferably, the part of admitting air is including setting up the intake pipe of keeping away from storage water tank one end in the tower shell outside, it has the through-hole of cam type to open in the intake pipe, be provided with the third bearing between intake pipe and the tower shell, be provided with the third belt pulley in the intake pipe, be provided with the air inlet of cam type on the tower shell, the tower shell is located the intake pipe top and is provided with the backup pad, be provided with the motor in the backup pad, the motor is connected and is rotated the water pipe, be provided with the fourth bearing on rotation water pipe and the tower shell, be provided with the fourth belt pulley on the rotation water pipe, be provided with the second belt between third belt pulley and the fourth belt pulley.
Preferably, the air water making component comprises a compressor connected with the gas transmission pipeline, the compressor is connected with an air outlet pipe, the other end of the air outlet pipe is connected with a condensation box, a condensation pipe is arranged in the condensation box, a water feeding pipe is arranged at the bottom of the condensation box, and the water feeding pipe is communicated with the condensation box and the water storage tank.
Has the advantages that:
the invention provides a washing tower for gas dust fall through improvement, which has the following improvement and advantages compared with the prior art:
1. realize the cyclic utilization of water through setting up the water supply part to set up the air and make the water part, make the washing tower better using water wisely in the use, avoid the waste of water resource.
2. Through setting up the conveyer belt, make the continuous removal of packing, make dust removal effect better to be provided with the returning face plate, make the packing can overturn, increased the life who packs.
3. Through setting up the sponge area, can wash the work position of packing layer to set up and rotate the water pipe and wash the sponge area, increased the life of scrubbing tower.
4. Through setting up water wheels and turbine, utilize the flow of water as the power supply, reduced the consumption of resource.
5. Through the intake pipe and the air inlet that set up the cam type, the velocity of flow when making gas get into the scrubbing tower is different, makes gaseous more even distribution in the scrubbing tower, efficiency when having increased the dust fall.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is an internal cross-sectional view of the present invention;
FIG. 3 is a perspective view of the part A in FIG. 2;
FIG. 4 is a view from B-B in FIG. 2;
fig. 5 is a side view of the tower body.
In the figure: the tower body 1, the gas transmission pipeline 2, the air water making component 3, the water storage tank 4, the water supply part 5, the air inlet part 6, the tower shell 101, the second conveyor belt 102, the first conveyor belt 103, the roller group 104, the outer roller group 1041, the inner roller group 1042, the turnover plate 105, the water guide plate 106, the water wheel 107, the wheel shaft 108, the first bearing 109, the first belt pulley 110, the first belt 111, the roller 112, the second belt pulley 113, the second bearing 114, the turbine shaft 115, the turbine 116, the sponge belt 117, the transmission shaft 118, the water transmission pipe 301, the compressor 302, the air outlet pipe 303, the condenser tank 304, the condenser pipe 305, the mud guard 501, the water inlet pipe 502, the water pump 503, the first branch pipe 504, the second branch pipe 505, the nozzle 506, the rotating water pipe 507, the water outlet pipe 508, the air inlet pipe 601, the third belt pulley 602, the third bearing 603, the support plate 604, the motor 605, the fourth belt pulley 606, the fourth bearing 607, the second belt 608, An air inlet 609.
Detailed Description
The following are specific embodiments of the present invention and are further described with reference to the drawings, but the present invention is not limited to these embodiments.
In the description of the present invention, it should be noted that the terms "inside", "below", and the like refer to orientations or positional relationships based on the orientations or positional relationships shown in the drawings or orientations or positional relationships that the products of the present invention conventionally place when used, and are used only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
Combine figure 1, a scrubbing tower for gaseous dust fall, including tower body 1, tower body 1 one side is provided with storage water tank 4, and one side that storage water tank 4 kept away from tower body 1 is provided with water supply unit 5, and one side that storage water tank 4 was kept away from to tower body 1 is provided with air intake component 6, and the tower body 1 top of telling is connected with gas transmission pipeline 2, and gas transmission pipeline 2 keeps away from tower body 1 one side and is connected with air and makes water component 3.
With reference to fig. 2-3, the tower body 1 includes a tower shell 101, a roller 112 is disposed at one end of the tower shell 101 close to the gas transmission pipeline 2, a roller set 104 is disposed at a portion of the roller 112 located in the tower shell 101, the roller set 104 includes an inner roller set 1042 and an outer roller set 1041, each of the inner roller set 1042 and the outer roller set 1041 includes a plurality of rollers distributed in a circumferential array, a first conveyor belt 103 is disposed on the outer roller set 1041, a second conveyor belt 102 is disposed on the inner roller set 1042, filter holes are formed in the first conveyor belt 103 and the second conveyor belt 102, a filler is disposed between the first conveyor belt 103 and the second conveyor belt 102, and two turnover plates 105 are symmetrically disposed between the first conveyor belt 103 and the second conveyor belt 102.
With reference to fig. 2-5, the tower body 1 includes water guide plates 106 symmetrically disposed at one end of the tower shell 101 away from the gas transmission pipeline 2, a wheel shaft 108 is disposed at the bottom of the tower body 1, a water wheel 107 is disposed at a portion of the wheel shaft 108 located inside the tower shell 101, a first belt pulley 110 is disposed at a portion of the wheel shaft 108 located outside the tower shell 101, a first bearing 109 is disposed between the wheel shaft 108 and the tower shell 101, a second belt pulley 113 is disposed at a portion of the roller 112 located outside the tower shell 101, a second bearing 114 is disposed between the roller 112 and the tower shell 101, and a first belt 111 is disposed on the first belt pulley 110 and the second belt pulley 113.
With reference to fig. 2-4, the tower body 1 includes two turbine shafts 115 symmetrically disposed at the bottom of the tower shell 101, a turbine 116 is disposed on each turbine shaft 115, two transmission shafts 118 are symmetrically disposed on the tower shell 101 above the turbine shafts 115, and sponge bands 117 are disposed on the transmission shafts 118 and the turbine shafts 115.
Referring to fig. 2, the water supply part 5 includes a mudguard 501 disposed in the water storage tank 4, a water inlet pipe 502 is disposed on one side of the water storage tank 4 away from the tower body 1, a water pump 503 is connected to the other end of the water inlet pipe 502, a water outlet pipe 508 is disposed on the water pump 503, a first branch pipe 504 and a second branch pipe 505 are disposed on the water outlet pipe 508, a plurality of nozzles 506 are disposed on a portion of the first branch pipe 504 located in the tower shell 101, a rotating water pipe 507 is connected to the second branch pipe 505, and a plurality of nozzles 506 are symmetrically disposed on the rotating water pipe 507.
With reference to fig. 2 to 5, the air inlet part 6 includes an air inlet pipe 601 disposed at an end of the outer side of the tower casing 101 far from the water storage tank 4, a cam-shaped through hole is opened on the air inlet pipe 601, a third bearing 603 is disposed between the air inlet pipe 601 and the tower casing 101, a third belt pulley 602 is disposed on the air inlet pipe 601, a cam-shaped air inlet 609 is disposed on the tower casing 101, a support plate 604 is disposed above the air inlet pipe 601 of the tower casing 101, a motor 605 is disposed on the support plate 604, the motor 605 is connected with a rotating water pipe 507, a fourth bearing 607 is disposed on the rotating water pipe 507 and the tower casing 101, a fourth belt pulley 606 is disposed on the rotating water pipe 507, and a second belt 608 is disposed between the third belt pulley 602 and the fourth belt pulley 606.
With reference to fig. 2, the air generating water member 3 includes a compressor 302 connected to the air pipe 2, the compressor 302 is connected to an air outlet pipe 303, the other end of the air outlet pipe 303 is connected to a condensation box 304, a condensation pipe 305 is disposed in the condensation box 304, an air pipe 301 is disposed at the bottom of the condensation box 304, and the air pipe 301 is communicated with the condensation box 304 and the water storage tank 4.
The working principle is as follows: initially, the motor 605 and the suction pump 503 are not operated, and the turbine 116 and the water wheel 107 are in a stationary state.
During operation, motor 605 begins to rotate, it rotates to drive rotation water pipe 507 and fourth belt pulley 606, it is further, fourth belt pulley 606 drives the rotation of third belt pulley 602 through second belt 608, it is further, third belt pulley 602 drives intake pipe 601 and rotates, dirty gas gets into rethread air inlet 609 entering scrubbing tower from intake pipe 601 in, the rotation of intake pipe 601 makes the size of entrance constantly change, the speed that gas got into in the tower is different, make gaseous evenly distributed in the scrubbing tower.
Further, the water pump 503 starts to operate to pump out the water in the water storage tank 4, the water in the first branch pipe 504 is sprayed out through the nozzle 506 through the first branch pipe 504 and the second branch pipe 505, and the water in the second branch pipe 505 flows into the rotary water pipe 507 and is sprayed out through the nozzle 506. When the dust-containing gas enters the washing tower, preliminary dust fall is carried out through the water mist sprayed out of the rotating water pipe 507, and secondary dust fall is carried out through the water mist sprayed out of the first branch pipeline 504 and the packing layer.
Furthermore, water sprayed from the nozzle 507 flows into the bottom of the tower and is introduced onto the water wheel 107 through the water guide plate 106 to drive the water wheel 107 to rotate, the first belt pulley 110 and the first belt 111 drive the second belt pulley 113 to rotate, the second belt pulley 113 drives the roller 112 to rotate, further, the roller group 104 on the roller 112 rotates to drive the conveyor belt on the roller to move, so that the filler in the conveyor belt continuously moves between the conveyor belts, and the filler is turned over and layered up and down when passing through the turning plate 105, so that the utilization rate of the filler in dust fall is increased.
Further, the rotation of turbine 116 has been driven in the flow of water, and the rotation of turbine makes sponge area 117 constantly remove to wipe off the dust that is in on the conveyer belt, rotates the water smoke that water pipe 507 spun and also constantly washs the sponge area, makes the dust fall into the washing tower bottom, and further, the rotation of turbine 116 makes the mud that is in the bottom of the tower portion raise and flow into storage water tank 4 and carry out filtration processing.
Further, the dusted gas enters the compressor 302 through the gas transmission pipeline 2, the air is compressed by the compressor 302 to heat the gas, the gas is condensed by the condenser pipe 305 in the condenser box 304 to make water, and the water flows back to the water storage tank 4 through the water transmission pipe 301 to be recycled.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (7)

1. The utility model provides a scrubbing tower for gaseous dust fall, includes tower body (1), its characterized in that, tower body (1) one side is provided with storage water tank (4), one side that tower body (1) was kept away from in storage water tank (4) is provided with water supply unit (5), one side that storage water tank (4) were kept away from in tower body (1) is provided with air inlet unit (6), and tower body (1) top of telling is connected with gas transmission pipeline (2), gas transmission pipeline (2) are kept away from tower body (1) one side and are connected with air and make water component (3).
2. A washing tower for gas dust settling according to claim 1, wherein the tower body (1) comprises a tower shell (101), a roller (112) is arranged at one end of the tower shell (101) close to the gas transmission pipeline (2), a roller group (104) is arranged at the part of the roller (112) in the tower shell (101), the roller group (104) comprises an inner roller group (1042) and an outer roller group (1041), the inner roller group (1042) and the outer roller group (1041) each comprise a plurality of rollers distributed in a circumferential array, a first conveyor belt (103) is arranged on the outer roller group (1041), a second conveyor belt (102) is arranged on the inner roller group (1042), filter holes are formed in the first conveyor belt (103) and the second conveyor belt (102), and a filler is arranged between the first conveyor belt (103) and the second conveyor belt (102), two turnover plates (105) are symmetrically arranged between the first conveyor belt (103) and the second conveyor belt (102).
3. A scrubber tower for gas dust reduction according to claim 2, the tower body (1) comprises water guide plates (106) which are symmetrically arranged at one end of the tower shell (101) far away from the gas transmission pipeline (2), the bottom of the tower body (1) is provided with a wheel shaft (108), the part of the wheel shaft (108) positioned in the tower shell (101) is provided with a water wheel (107), the part of the wheel shaft (108) outside the tower shell (101) is provided with a first belt pulley (110), a first bearing (109) is arranged between the wheel shaft (108) and the tower shell (101), the part of the roller (112) positioned outside the tower shell (101) is provided with a second belt pulley (113), a second bearing (114) is arranged between the rolling shaft (112) and the tower shell (101), a first belt (111) is arranged on the first belt pulley (110) and the second belt pulley (113).
4. A washing tower for gas dust settling according to claim 3, wherein the tower body (1) comprises two turbine shafts (115) symmetrically arranged at the bottom of a tower shell (101), a turbine (116) is arranged on each turbine shaft (115), two transmission shafts (118) are symmetrically arranged on the tower shell (101) above the turbine shafts (115), and sponge belts (117) are arranged on the transmission shafts (118) and the turbine shafts (115).
5. The washing tower for gas dust fall according to claim 4, wherein the water supply part (5) comprises a mud guard (501) arranged in the water storage tank (4), a water inlet pipe (502) is arranged on one side, away from the tower body (1), of the water storage tank (4), a water suction pump (503) is connected to the other end of the water inlet pipe (502), a water outlet pipe (508) is arranged on the water suction pump (503), a first branch pipeline (504) and a second branch pipeline (505) are arranged on the water outlet pipe (508), a plurality of nozzles (506) are arranged on the part, located in the tower shell (101), of the first branch pipeline (504), a rotating water pipe (507) is connected to the second branch pipeline (505), and a plurality of nozzles (506) are symmetrically arranged on the rotating water pipe (507).
6. The washing tower for dust settling of gas as claimed in claim 5, wherein the gas inlet component (6) comprises a gas inlet pipe (601) arranged at one end of the outer side of the tower shell (101) far away from the water storage tank (4), the gas inlet pipe (601) is provided with a cam-shaped through hole, a third bearing (603) is arranged between the gas inlet pipe (601) and the tower shell (101), the gas inlet pipe (601) is provided with a third belt pulley (602), the tower shell (101) is provided with a cam-shaped gas inlet (609), the tower shell (101) is provided with a support plate (604) above the gas inlet pipe (601), the support plate (604) is provided with a motor (605), the motor (605) is connected with a rotating water pipe (507), the rotating water pipe (507) and the tower shell (101) are provided with a fourth bearing (607), the rotating water pipe (507) is provided with a fourth belt pulley (606), a second belt (608) is arranged between the third belt pulley (602) and the fourth belt pulley (606).
7. The washing tower for gas dust fall according to claim 1, wherein the air water making component (3) comprises a compressor (302) connected with a gas transmission pipeline (2), the compressor (302) is connected with an air outlet pipe (303), the other end of the air outlet pipe (303) is connected with a condensation tank (304), a condensation pipe (305) is arranged in the condensation tank (304), a water transmission pipe (301) is arranged at the bottom of the condensation tank (304), and the water transmission pipe (301) is communicated with the condensation tank (304) and a water storage tank (4).
CN202110885749.9A 2021-08-03 2021-08-03 A scrubbing tower for gaseous dust fall Active CN113457327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110885749.9A CN113457327B (en) 2021-08-03 2021-08-03 A scrubbing tower for gaseous dust fall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110885749.9A CN113457327B (en) 2021-08-03 2021-08-03 A scrubbing tower for gaseous dust fall

Publications (2)

Publication Number Publication Date
CN113457327A true CN113457327A (en) 2021-10-01
CN113457327B CN113457327B (en) 2022-10-18

Family

ID=77883901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110885749.9A Active CN113457327B (en) 2021-08-03 2021-08-03 A scrubbing tower for gaseous dust fall

Country Status (1)

Country Link
CN (1) CN113457327B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2082583A (en) * 1982-11-01 1984-05-10 Shell Internationale Research Maatschappij B.V. Process and apparatus for cleaning solids laden gas
CN201701844U (en) * 2010-02-24 2011-01-12 山东三方化工集团有限公司 Chemical fertilizer dust circulating washer
CN103071371A (en) * 2011-10-26 2013-05-01 密西西比国际水务有限公司 Treating method and apparatus for active coke regenerated mixed steam
CN103894045A (en) * 2014-04-18 2014-07-02 德合南京智能技术有限公司 High-humidity gas drying and separating device and method
CN205435339U (en) * 2016-03-08 2016-08-10 广东米高化工有限公司 Multilayer level dust fall waste gas scrubbing tower
CN205733865U (en) * 2016-07-11 2016-11-30 江阴市泓林机械锻造有限公司 Rotate processing platform
CN107029523A (en) * 2017-06-14 2017-08-11 湘潭大学 Foam scrubber
CN107051093A (en) * 2017-06-14 2017-08-18 四川弘毅智慧知识产权运营有限公司 A kind of environment-friendly type dust treatment equipment
KR101798427B1 (en) * 2017-06-30 2017-11-16 주식회사 세종이엔지 Rapid mixing and equal division mixing chemical solution cleaning and deodorizing device
KR101923502B1 (en) * 2018-01-25 2019-02-27 한관우 Method For Purifying Waste Gas Ann Purification System Using The Method
CN109395558A (en) * 2018-10-23 2019-03-01 临安恒绿环境科技有限公司 A kind of liquid spray scrubber
CN111167696A (en) * 2020-01-07 2020-05-19 单烨石 Can reduce energy loss's drum screening sand machine for building
CN210964407U (en) * 2019-09-29 2020-07-10 杭州天石工程设备有限公司 Washing tower
CN212141935U (en) * 2020-04-26 2020-12-15 盐城中航自动化装备有限公司 Novel spray tower with good dust and paint mist removing effect

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2082583A (en) * 1982-11-01 1984-05-10 Shell Internationale Research Maatschappij B.V. Process and apparatus for cleaning solids laden gas
CN201701844U (en) * 2010-02-24 2011-01-12 山东三方化工集团有限公司 Chemical fertilizer dust circulating washer
CN103071371A (en) * 2011-10-26 2013-05-01 密西西比国际水务有限公司 Treating method and apparatus for active coke regenerated mixed steam
CN103894045A (en) * 2014-04-18 2014-07-02 德合南京智能技术有限公司 High-humidity gas drying and separating device and method
CN205435339U (en) * 2016-03-08 2016-08-10 广东米高化工有限公司 Multilayer level dust fall waste gas scrubbing tower
CN205733865U (en) * 2016-07-11 2016-11-30 江阴市泓林机械锻造有限公司 Rotate processing platform
CN107029523A (en) * 2017-06-14 2017-08-11 湘潭大学 Foam scrubber
CN107051093A (en) * 2017-06-14 2017-08-18 四川弘毅智慧知识产权运营有限公司 A kind of environment-friendly type dust treatment equipment
KR101798427B1 (en) * 2017-06-30 2017-11-16 주식회사 세종이엔지 Rapid mixing and equal division mixing chemical solution cleaning and deodorizing device
KR101923502B1 (en) * 2018-01-25 2019-02-27 한관우 Method For Purifying Waste Gas Ann Purification System Using The Method
CN109395558A (en) * 2018-10-23 2019-03-01 临安恒绿环境科技有限公司 A kind of liquid spray scrubber
CN210964407U (en) * 2019-09-29 2020-07-10 杭州天石工程设备有限公司 Washing tower
CN111167696A (en) * 2020-01-07 2020-05-19 单烨石 Can reduce energy loss's drum screening sand machine for building
CN212141935U (en) * 2020-04-26 2020-12-15 盐城中航自动化装备有限公司 Novel spray tower with good dust and paint mist removing effect

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘旭涛等: "2000m~3高炉煤气高效复合湿式洗涤塔", 《河北冶金》 *
刘旭涛等: "2000m~3高炉煤气高效复合湿式洗涤塔", 《河北冶金》, no. 03, 25 June 2006 (2006-06-25), pages 52 - 61 *
左爱武: "螺旋传动机构自锁失效分析", 《武钢技术》 *
左爱武: "螺旋传动机构自锁失效分析", 《武钢技术》, no. 04, 26 August 2009 (2009-08-26), pages 33 - 37 *
张天放等: "潜流式喷淋装置洗涤塔", 《有色设备》 *
张天放等: "潜流式喷淋装置洗涤塔", 《有色设备》, no. 04, 30 August 1999 (1999-08-30), pages 18 - 23 *

Also Published As

Publication number Publication date
CN113457327B (en) 2022-10-18

Similar Documents

Publication Publication Date Title
CN108080320A (en) A kind of automobile component high-efficiency washing device
CN113457327B (en) A scrubbing tower for gaseous dust fall
CN212999077U (en) Washing tower with high acid mist purification efficiency
CN210021611U (en) Waste gas treatment device in injection molding process
CN208694688U (en) A kind of energy-saving desulfuration spray tower
CN112629094A (en) Cooling device for automobile parts
CN216967335U (en) Reservoir bottom burring device
CN214715658U (en) Desulfurization device with spraying structure for helium refining production
CN215962843U (en) Activated carbon adsorption box of waste gas treatment equipment
CN211794460U (en) Mask machine with medicine sprays function
CN208949533U (en) A kind of environmental protection printing and dyeing shaping equipment
CN211536998U (en) A water film deduster for betaine crystallization pollutant
CN211635779U (en) Humidifying tower for producing cement
CN106040507A (en) Energy-saving and environment-friendly rotary automatic coating machine
CN108704883B (en) Storage battery automatic cleaning and blow-drying device based on scroll support bars
CN212942053U (en) Spray purification device of washing tower
CN211562319U (en) Waste gas absorption tower for industrial environmental protection
CN212881584U (en) Novel high-efficient dry process desulfurizer device
CN211098305U (en) Organic waste gas treatment equipment
CN218034149U (en) Rotary drying and cooling integrated machine
CN213433812U (en) Desulphurization unit for industrial waste gas treatment
CN220633565U (en) Desulfurization, denitrification and dust removal device
CN218873172U (en) Material jar punching machine
CN215373136U (en) Cooling device in automobile fastener machining process
CN112178434B (en) Environment-friendly energy-saving titration lubricating device system of carbon black dryer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220922

Address after: 474550 north section of Chuangye Avenue, Xixia County, Nanyang City, Henan Province

Applicant after: HENAN HUANBI ENVIRONMENTAL PROTECTION ENGINEERING EQUIPMENT CO.,LTD.

Address before: 561100 No. 3 combustion branch, xiayun Town, Pingba District, Anshun City, Guizhou Province

Applicant before: Guizhou Honglin Machinery Technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant