CN113450054A - Intelligent control system of circuit board plug-in components - Google Patents

Intelligent control system of circuit board plug-in components Download PDF

Info

Publication number
CN113450054A
CN113450054A CN202110766954.3A CN202110766954A CN113450054A CN 113450054 A CN113450054 A CN 113450054A CN 202110766954 A CN202110766954 A CN 202110766954A CN 113450054 A CN113450054 A CN 113450054A
Authority
CN
China
Prior art keywords
module
plug
storage
component
components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110766954.3A
Other languages
Chinese (zh)
Inventor
成小虎
张瑞芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Haizhou Electronic Technology Co ltd
Original Assignee
Nantong Haizhou Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Haizhou Electronic Technology Co ltd filed Critical Nantong Haizhou Electronic Technology Co ltd
Priority to CN202110766954.3A priority Critical patent/CN113450054A/en
Publication of CN113450054A publication Critical patent/CN113450054A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Abstract

The invention discloses an intelligent control system of a circuit board plug-in component, which belongs to the field of intelligent spare part management and is used for realizing the optimized storage of the plug-in component and the reasonable allocation of money resources, and comprises a getting module, an acquisition module, an integration module, an accounting module, an evaluation module and a storage module; the acquisition module is used for acquiring the inventory quantity of each plug-in assembly stored in the storage module; marking the obtained inventory quantities respectively as SXg; the receiving module is used for receiving the plugging component by an operator; the integration module is connected with the getting module, the acquisition module and the storage module; the evaluation module is used for evaluating the plug-in assembly and judging the plug-in assembly to be a consumable or a non-consumable; and the accounting module is used for optimally storing the storage quantity of the plug-in components and realizing reasonable allocation of money resources.

Description

Intelligent control system of circuit board plug-in components
Technical Field
The invention belongs to the field of intelligent spare part management, and particularly relates to an intelligent control system of a circuit board plug-in assembly.
Background
The circuit board plug-in component is a special plug-in component applied to a circuit board, and the circuit can be accessed through the plug-in component and a circuit printed on the circuit board.
In the management process of current plug connector, often once only purchase a large amount of plug connector components, along with the use and the replacement of plug connector, do not carry out reasonable prediction to the quantity of the plug connector of stock and the quantity that later stage needs, lead to the disappearance to lead to circuit board follow-up work to be difficult to develop when the plug connector component of urgent need.
Therefore, an intelligent control system of the circuit board plug-in assembly is provided.
Disclosure of Invention
The invention provides an intelligent control system of a circuit board plug-in component, which is used for realizing the optimized storage of the plug-in component and the reasonable allocation of money resources and comprises a receiving module, an acquisition module, an integration module, an accounting module, an evaluation module and a storage module; the acquisition module is used for acquiring the inventory quantity of each plug-in assembly stored in the storage module; marking the obtained inventory quantities respectively as SXg; the receiving module is used for receiving the plugging component by an operator; the integration module is connected with the getting module, the acquisition module and the storage module; the evaluation module is used for evaluating the plug-in assembly and judging the plug-in assembly to be a consumable or a non-consumable; and the accounting module is used for optimally storing the storage quantity of the plug-in components and realizing reasonable allocation of money resources.
The purpose of the invention can be realized by the following technical scheme:
an intelligent control system of a circuit board plug-in component comprises a picking module, an acquisition module, an integration module, an accounting module, an evaluation module and a storage module;
the acquisition module is used for acquiring the inventory quantity of each plug-in assembly stored in the storage module; marking the obtained inventory quantities respectively as SXg;
the picking module is used for picking the plugging components by operating workers;
the integration module is connected with the getting module, the acquisition module and the storage module;
the evaluation module is used for evaluating the plug-in assembly and judging the plug-in assembly to be a consumable or a non-consumable;
and the accounting module is used for optimally storing the storage quantity of the plug-in components and realizing reasonable allocation of money resources.
The classification module is used for classifying the circuit board plug-in components, the classification standard is the models and the specifications of the plug-in components, and the classification module sends the classified plug-in components to the storage module according to the models and the specifications.
Furthermore, the acquisition module is connected with the storage module, and correspondingly indicates the number of the plug-in components stored in the storage module.
The system further comprises a registration module, before the operation worker receives the plug-in component, the operation worker registers in the registration module, a user name and a password are generated during registration, when the operation worker receives the plug-in component through the receiving module, the user name of the operation worker is shown to receive the plug-in component, when the operation worker receives the plug-in component, the receiving module is connected with the storage module, the receiving module performs identity receiving registration, and the storage module is connected with the storage module to perform normal receiving of the plug-in component.
Further, the evaluation module performs evaluation calculation, which includes the following steps:
the acquisition module acquires the inventory number SXg of the plug-in components stored in the storage module, the evaluation module sets an evaluation period T, the acquisition module is connected with the acquisition module and the integration module to acquire the acquisition number of the plug-in components within the period T, and the acquisition number of the plug-in components is sent to the evaluation module;
when the evaluation module receives the picking number of the plug-in components sent by the acquisition module, marking the picking number as LXg;
the evaluation module calculates the unit time consumption coefficient HXg according to the formula
Figure BDA0003151142700000031
Wherein α is a consumption factor;
the evaluation module sets a consumable coefficient threshold value, and when HXg is greater than or equal to the consumable coefficient threshold value, the plug-in component is marked as a consumable;
when HXg is less than the consumable coefficient threshold, marking the plug assembly as a non-consumable;
the assessment module sends the consumable and non-consumable to the memory module, labeling the corresponding plug-in components.
Further, the process of the accounting module for optimizing storage comprises the following steps:
the accounting module is connected with external finance, unit prices of all plug-in components stored in the storage module are obtained, and the unit prices of the plug-in components are marked as QXg;
the accounting module sets an amount threshold value, and calculates ZJE the amount of the storage plug-in assembly by using a calculation formula, wherein the calculation formula is as follows:
Figure BDA0003151142700000032
wherein beta is a correction coefficient;
when stored plug assembly amount ZJE is greater than or equal to the amount threshold, it indicates that the amount is mishandled; the accounting module adjusts the number of the storage plug-in components of the storage module;
the accounting module acquires the picking number LXg and the stock number SXg of the plug-in components within the period time T, and compares the LXg with SXg;
when the LXg is more than or equal to SXg, the plug-in module is insufficient to store, and the plug-in module needs to be supplemented, wherein the supplement quantity is LXg-SXg;
when LXg < SXg, it means that the plug-in component is stored sufficiently, the plug-in component is not replenished, and when the plug-in component consumes LXg amount, the plug-in component is replenished and LXg is marked as the lowest storage inventory of the plug-in component.
Further, when LXg is 0, it indicates that the plug-in module is a non-consumable, the storage amount in the storage module is consumed to 1 piece and then replenished, and the storage amount of the storage module must not exceed two pieces.
Further, when the plug-in module is stored sufficiently and the plug-in module is a consumable product, the inventory is adjusted to be 1-2 times of the minimum storage inventory.
Further, when store plug assembly amount ZJE is less than the amount threshold, it indicates that the amount is stored properly.
Compared with the prior art, the invention has the beneficial effects that:
1. the acquisition module acquires the inventory number SXg of the plug-in components stored in the storage module, the evaluation module sets an evaluation period T, the acquisition module is connected with the acquisition module and the integration module to acquire the acquisition number of the plug-in components within the period T, and the acquisition number of the plug-in components is sent to the evaluation module; when the evaluation module receives the picking number of the plug-in components sent by the acquisition module, marking the picking number as LXg; the evaluation module calculates the unit time consumption coefficient HXg according to the formula
Figure BDA0003151142700000041
The evaluation module sets a consumable coefficient threshold value, and when HXg is greater than or equal to the consumable coefficient threshold value, the plug-in component is marked as a consumable; when HXg is less than the consumable coefficient threshold, marking the plug assembly as a non-consumable; the assessment module sends the consumable and non-consumable to the memory module, labeling the corresponding plug-in components. The evaluation module is based on the majority of plug assemblies when it is configured to evaluate the period time T. The importance degree of different plug-in components is reflected by different labels, and the importance degree is used as an index when accounting is carried out.
2. The accounting module is connected with external finance, unit prices of all plug-in components stored in the storage module are obtained, and the unit prices of the plug-in components are marked as QXg; the accounting module sets an amount threshold value, and calculates ZJE the amount of the storage plug-in assembly by using a calculation formula, wherein the calculation formula is as follows:
Figure BDA0003151142700000042
Figure BDA0003151142700000043
when stored plug assembly amount ZJE is greater than or equal to the amount threshold, it indicates that the amount is mishandled; the accounting module adjusts the number of the storage plug-in components of the storage module; the accounting module acquires the picking number LXg and the stock number SXg of the plug-in components within the period time T, and compares the LXg with SXg; when LXg is larger than or equal to SXg, the plug-in module is insufficient in storage, plug-in module supplement is needed, and the supplement quantity isIs LXg-SXg; when LXg<SXg, the plug-in module is stored sufficiently, the plug-in module is not replenished, and when the plug-in module consumes LXg amount, the stock is replenished, and LXg is marked as the lowest storage stock of the plug-in module; when the LXg is 0, the plug-in component is represented as a non-consumable product, the storage quantity in the storage module is consumed to be 1, and then the storage quantity is supplemented, and the storage quantity of the storage module is not more than two; when the plug-in components are stored sufficiently and are easily consumable products, the inventory can be adjusted to be 1-2 times of the minimum storage inventory. And finally, the storage quantity of the plug-in components is optimized and stored, and reasonable allocation of money resources is realized.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a structural diagram of an intelligent control system of a circuit board plug assembly according to the present invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, an intelligent control system of a circuit board plug-in component comprises a classification module, a picking module, an acquisition module, an integration module, an accounting module, a registration module, an evaluation module and a storage module;
the classification module is used for classifying the circuit board plug-in components, the classification standard is the types and specifications of the plug-in components, the classified plug-in components are marked by the classification module and marked as Xg according to the types and specifications, wherein X represents the type numbers of the plug-in components, and g represents the specification numbers of the plug-in components; wherein X is a positive integer, and X ═ 1,2 … … n; g is also a positive integer, and g is 1,2 … … m;
the classification module sends the classified plug-in components to the storage module according to the models and the specifications;
the acquisition module is used for acquiring the inventory quantity of each plug-in assembly stored in the storage module; marking the obtained inventory quantities respectively as SXg; the acquisition module is connected with the storage module and correspondingly indicates the number of the plug-in components stored in the storage module;
the system comprises a receiving module, a registration module and a receiving module, wherein the receiving module is used for receiving a plug-in assembly by an operator, the operator needs to register in the registration module before receiving the plug-in assembly, a user name and a password are generated during registration, and the user name of the operator needs to be shown for receiving when receiving through the receiving module;
when an operator receives the plug-in assembly, the receiving module is connected with the storage module, the receiving module is used for identity receiving registration, and the storage module is combined for normal receiving of the plug-in assembly;
the integration module is connected with the getting module, the acquisition module and the storage module and comprises a visualization unit, and the integration module acquires the number and types of the plug-in components stored in the storage module in real time and displays the plug-in components in real time through the visualization unit of the integration module;
the acquisition module is further used for acquiring the picking number of the plug-in components in a period and sending the picking number of the plug-in components to the evaluation module for evaluation and calculation, and specifically, the evaluation module performs the evaluation and calculation process and comprises the following steps:
the method comprises the following steps: the acquisition module acquires the inventory number SXg of the plug-in components stored in the storage module, the evaluation module sets an evaluation period T, the acquisition module is connected with the acquisition module and the integration module to acquire the acquisition number of the plug-in components within the period T, and the acquisition number of the plug-in components is sent to the evaluation module;
step two: when the evaluation module receives the picking number of the plug-in components sent by the acquisition module, marking the picking number as LXg;
step three: the evaluation module calculates the unit time consumption coefficient HXg according to the formula
Figure BDA0003151142700000061
Wherein α is a consumption factor;
step four: the evaluation module sets a consumable coefficient threshold value, and when HXg is greater than or equal to the consumable coefficient threshold value, the plug-in component is marked as a consumable;
when HXg is less than the consumable coefficient threshold, marking the plug assembly as a non-consumable;
step five: the assessment module sends the consumable and non-consumable to the memory module, labeling the corresponding plug-in components.
It should be noted that the evaluation module is based on most plug assemblies when the evaluation period time T is set.
The accounting module is configured to perform optimized storage on the storage quantity of the plug-in components, and specifically, the process of performing optimized storage by the accounting module includes the following steps:
step S1: the accounting module is connected with external finance, unit prices of all plug-in components stored in the storage module are obtained, and the unit prices of the plug-in components are marked as QXg;
step S2: the accounting module sets an amount threshold value, and calculates ZJE the amount of the storage plug-in assembly by using a calculation formula, wherein the calculation formula is as follows:
Figure BDA0003151142700000071
wherein beta is a correction coefficient;
step S3: when stored plug assembly amount ZJE is greater than or equal to the amount threshold, it indicates that the amount is mishandled; the accounting module adjusts the number of the storage plug-in components of the storage module; executing the next operation;
when the stored plug assembly amount ZJE is less than the amount threshold, the amount is stored reasonably;
step S4: the accounting module acquires the picking number LXg and the stock number SXg of the plug-in components within the period time T, and compares the LXg with SXg;
step S5: when the LXg is more than or equal to SXg, the plug-in module is insufficient to store, and the plug-in module needs to be supplemented, wherein the supplement quantity is LXg-SXg;
when LXg < SXg, the plug-in module is stored sufficiently, the plug-in module is not replenished, and when the plug-in module consumes LXg, the plug-in module is replenished and the LXg is marked as the lowest storage inventory of the plug-in module;
when the LXg is 0, the plug-in component is represented as a non-consumable product, the storage quantity in the storage module is consumed to be 1, and then the storage quantity is supplemented, and the storage quantity of the storage module is not more than two;
it should be noted that, when the plug-in module is stored sufficiently and the plug-in module is a consumable product, the inventory can be adjusted to 1-2 times of the minimum storage inventory.
The above formulas are all calculated by removing dimensions and taking numerical values thereof, the formula is a formula which is obtained by acquiring a large amount of data and performing software simulation to obtain the closest real situation, and the preset parameters and the preset threshold value in the formula are set by the technical personnel in the field according to the actual situation or obtained by simulating a large amount of data.
The working principle of the invention is as follows:
in the embodiments provided by the present invention, it should be understood that the disclosed apparatus, device and method can be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the modules is only one logical functional division, and there may be other divisions when the actual implementation is performed; the modules described as separate parts may or may not be physically separate, and parts displayed as modules may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the method of the embodiment.
It will also be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof.
The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference signs in the claims shall not be construed as limiting the claim concerned.
Furthermore, it is obvious that the word "comprising" does not exclude other elements or steps, and the singular does not exclude the plural. A plurality of units or means recited in the system claims may also be implemented by one unit or means in software or hardware. The terms second, etc. are used to denote names, but not any particular order.
Finally, it should be noted that the above examples are only intended to illustrate the technical process of the present invention and not to limit the same, and although the present invention has been described in detail with reference to the preferred embodiments, it will be understood by those skilled in the art that modifications or equivalent substitutions may be made to the technical process of the present invention without departing from the spirit and scope of the technical process of the present invention.

Claims (9)

1. An intelligent control system of a circuit board plug-in component is characterized by comprising a picking module, an acquisition module, an integration module, an accounting module, an evaluation module and a storage module;
the acquisition module is used for acquiring the inventory quantity of each plug-in assembly stored in the storage module; marking the obtained inventory quantities respectively as SXg;
the picking module is used for picking the plugging components by operating workers;
the integration module is connected with the getting module, the acquisition module and the storage module;
the evaluation module is used for evaluating the plug-in assembly and judging the plug-in assembly to be a consumable or a non-consumable;
and the accounting module is used for optimally storing the storage quantity of the plug-in components and realizing reasonable allocation of money resources.
2. The intelligent control system of a circuit board plug-in component according to claim 1, further comprising a classification module, wherein the classification module is used for classifying the circuit board plug-in component, the classification standard is the type and specification of the plug-in component, and the classification module sends the classified plug-in component to the storage module according to the type and specification.
3. The intelligent control system of circuit board plug assemblies according to claim 1, wherein the acquisition module is connected with the storage module and correspondingly indicates the number of plug assemblies stored in the storage module.
4. The intelligent control system of the circuit board plug-in component is characterized in that the system further comprises a registration module, before the plug-in component is taken by an operator, the operator registers in the registration module, a user name and a password are generated during registration, when the plug-in component is taken by the taking module, the user name of the operator is shown for taking, when the plug-in component is taken by the operator, the taking module is connected with the storage module, the taking module performs identity taking registration, and the storage module is connected for normal taking of the plug-in component.
5. The intelligent control system of a circuit board plug-in assembly according to claim 1, wherein the evaluation module performs evaluation calculation process including the following steps:
the acquisition module acquires the inventory number SXg of the plug-in components stored in the storage module, the evaluation module sets an evaluation period T, the acquisition module is connected with the acquisition module and the integration module to acquire the acquisition number of the plug-in components within the period T, and the acquisition number of the plug-in components is sent to the evaluation module;
when the evaluation module receives the picking number of the plug-in components sent by the acquisition module, marking the picking number as LXg;
the evaluation module calculates the unit time consumption coefficient HXg according to the formula
Figure FDA0003151142690000021
Wherein α is a consumption factor;
the evaluation module sets a consumable coefficient threshold value, and when HXg is greater than or equal to the consumable coefficient threshold value, the plug-in component is marked as a consumable;
when HXg is less than the consumable coefficient threshold, marking the plug assembly as a non-consumable;
the assessment module sends the consumable and non-consumable to the memory module, labeling the corresponding plug-in components.
6. The intelligent control system of a circuit board plug-in assembly according to claim 1, wherein the process of performing optimized storage by the accounting module comprises the following steps:
the accounting module is connected with external finance, unit prices of all plug-in components stored in the storage module are obtained, and the unit prices of the plug-in components are marked as QXg;
the accounting module sets an amount threshold value, and calculates ZJE the amount of the storage plug-in assembly by using a calculation formula, wherein the calculation formula is as follows:
Figure FDA0003151142690000022
wherein beta is a correction coefficient;
when stored plug assembly amount ZJE is greater than or equal to the amount threshold, it indicates that the amount is mishandled; the accounting module adjusts the number of the storage plug-in components of the storage module;
the accounting module acquires the picking number LXg and the stock number SXg of the plug-in components within the period time T, and compares the LXg with SXg;
when the LXg is more than or equal to SXg, the plug-in module is insufficient to store, and the plug-in module needs to be supplemented, wherein the supplement quantity is LXg-SXg;
when LXg < SXg, it means that the plug-in component is stored sufficiently, the plug-in component is not replenished, and when the plug-in component consumes LXg amount, the plug-in component is replenished and LXg is marked as the lowest storage inventory of the plug-in component.
7. The system of claim 6, wherein when LXg is 0, it indicates that the connector is a non-consumable product, the storage amount in the storage module is 1 and then is supplemented, and the storage amount in the storage module should not exceed two.
8. The intelligent control system of circuit board plug assembly of claim 6, wherein when the plug assembly is fully stored and the plug assembly is consumable, the inventory is adjusted to 1-2 times the minimum storage inventory.
9. The intelligent control system of a circuit board plug assembly of claim 6, wherein when the stored plug assembly amount ZJE is less than the amount threshold, it indicates that the amount is stored properly.
CN202110766954.3A 2021-07-07 2021-07-07 Intelligent control system of circuit board plug-in components Pending CN113450054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110766954.3A CN113450054A (en) 2021-07-07 2021-07-07 Intelligent control system of circuit board plug-in components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110766954.3A CN113450054A (en) 2021-07-07 2021-07-07 Intelligent control system of circuit board plug-in components

Publications (1)

Publication Number Publication Date
CN113450054A true CN113450054A (en) 2021-09-28

Family

ID=77815311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110766954.3A Pending CN113450054A (en) 2021-07-07 2021-07-07 Intelligent control system of circuit board plug-in components

Country Status (1)

Country Link
CN (1) CN113450054A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000029925A2 (en) * 1998-11-18 2000-05-25 Bintel Systems, Inc. Inventory control and communication system
US20040225579A1 (en) * 2003-05-07 2004-11-11 Peery Galen O. Method for scheduling and inventory management for a process
JP2005208382A (en) * 2004-01-23 2005-08-04 Canon Inc Management device for image forming apparatus
JP2006318254A (en) * 2005-05-13 2006-11-24 Rishi Ro Automatic inventory management system
CN101908166A (en) * 2009-06-05 2010-12-08 松下电器产业株式会社 Component management unit
US20160062347A1 (en) * 2014-09-02 2016-03-03 International Business Machines Corporation Method and system for hierarchical data-driven inventory and warehouse management for manufacturing environments
CN206209852U (en) * 2016-12-02 2017-05-31 四川亚润科技有限公司 A kind of control system for Power Material field management
CN110223192A (en) * 2019-06-17 2019-09-10 Oppo(重庆)智能科技有限公司 Material loss statistical method and device, electronic equipment, storage medium
CN112580989A (en) * 2020-12-23 2021-03-30 南京绿投科技有限公司 Cloud platform data management system and management method based on industrial big data
CN112749936A (en) * 2020-12-31 2021-05-04 小网科技(杭州)有限公司 Purchase-sales-inventory management system based on product serial number full-flow tracking
CN113065778A (en) * 2021-04-07 2021-07-02 苏州索芙特威尔软件科技有限公司 Production management method and system
CN113065776A (en) * 2021-04-07 2021-07-02 苏州索芙特威尔软件科技有限公司 Raw material management method and system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000029925A2 (en) * 1998-11-18 2000-05-25 Bintel Systems, Inc. Inventory control and communication system
US20040225579A1 (en) * 2003-05-07 2004-11-11 Peery Galen O. Method for scheduling and inventory management for a process
JP2005208382A (en) * 2004-01-23 2005-08-04 Canon Inc Management device for image forming apparatus
JP2006318254A (en) * 2005-05-13 2006-11-24 Rishi Ro Automatic inventory management system
CN101908166A (en) * 2009-06-05 2010-12-08 松下电器产业株式会社 Component management unit
US20160062347A1 (en) * 2014-09-02 2016-03-03 International Business Machines Corporation Method and system for hierarchical data-driven inventory and warehouse management for manufacturing environments
CN206209852U (en) * 2016-12-02 2017-05-31 四川亚润科技有限公司 A kind of control system for Power Material field management
CN110223192A (en) * 2019-06-17 2019-09-10 Oppo(重庆)智能科技有限公司 Material loss statistical method and device, electronic equipment, storage medium
CN112580989A (en) * 2020-12-23 2021-03-30 南京绿投科技有限公司 Cloud platform data management system and management method based on industrial big data
CN112749936A (en) * 2020-12-31 2021-05-04 小网科技(杭州)有限公司 Purchase-sales-inventory management system based on product serial number full-flow tracking
CN113065778A (en) * 2021-04-07 2021-07-02 苏州索芙特威尔软件科技有限公司 Production management method and system
CN113065776A (en) * 2021-04-07 2021-07-02 苏州索芙特威尔软件科技有限公司 Raw material management method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘凤益: "Y印制电路板公司供应商管理创新研究", 《中国优秀硕士学位论文全文数据库》 *

Similar Documents

Publication Publication Date Title
CN107168854B (en) Internet advertisement abnormal click detection method, device, equipment and readable storage medium
CN106570778B (en) A kind of method that data integration based on big data is calculated with line loss analyzing
CN106846176B (en) Electricity charge accounting system
CN108073146B (en) Automated process control hardware engineering planning using architecturally represented requirements
CN113591900A (en) Identification method and device for high-demand response potential user and terminal equipment
CN113688923A (en) Intelligent order abnormity detection method and device, electronic equipment and storage medium
CN115469590B (en) Low-power consumption control method, device and equipment for intelligent electric meter interface and storage medium
CN111897856A (en) Supervision message generation method and device, electronic equipment and readable storage medium
CN115049232A (en) Method and system for judging station area abnormity
CN109783385A (en) A kind of product test method and apparatus
CN107908731B (en) PSD-BPA-based Guangxi power grid area load data batch modification method
CN113450054A (en) Intelligent control system of circuit board plug-in components
CN110659747B (en) Vehicle maintenance method and system based on process implementation and cost control
CN114819652B (en) Intelligent fixed asset management method and system based on block chain
CN108109002B (en) Data processing method and device
CN112269826B (en) Visual processing system and method based on big data
CN114461630A (en) Intelligent attribution analysis method, device, equipment and storage medium
CN113486646A (en) Product report issuing method and device, electronic equipment and readable storage medium
CN108363789B (en) Short-term missing repairing method and device for electricity consumption meter data of industrial and commercial users
CN113313211A (en) Text classification method and device, electronic equipment and storage medium
CN110220639A (en) Pressure gauge meter register method, device and terminal device in substation
CN112700328B (en) Automatic index analysis method, device, equipment and storage medium
CN114997123B (en) Method and device for checking enterprise, electronic equipment and storage medium
CN113051450B (en) Device model automatic classification method and device, storage medium and equipment
CN108153725A (en) A kind of office work management method that operation is carried out by node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination