CN113429000A - Green building roof waste water preliminary treatment equipment - Google Patents

Green building roof waste water preliminary treatment equipment Download PDF

Info

Publication number
CN113429000A
CN113429000A CN202110575212.2A CN202110575212A CN113429000A CN 113429000 A CN113429000 A CN 113429000A CN 202110575212 A CN202110575212 A CN 202110575212A CN 113429000 A CN113429000 A CN 113429000A
Authority
CN
China
Prior art keywords
pipe
connecting pipe
piece
assembled
waste water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110575212.2A
Other languages
Chinese (zh)
Other versions
CN113429000B (en
Inventor
任程云
杜志军
滕万振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan First Construction Group Co Ltd
Original Assignee
Jinan First Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan First Construction Group Co Ltd filed Critical Jinan First Construction Group Co Ltd
Priority to CN202110575212.2A priority Critical patent/CN113429000B/en
Publication of CN113429000A publication Critical patent/CN113429000A/en
Application granted granted Critical
Publication of CN113429000B publication Critical patent/CN113429000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices
    • B01D36/04Combinations of filters with settling tanks
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F2001/007Processes including a sedimentation step
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/001Runoff or storm water

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The invention discloses a green building roof wastewater primary treatment device, which comprises a recovery tank for rainwater recovery, wherein the recovery tank comprises a tank body, a filter layer is assembled on the inner surface of the tank body, a water filtering layer is laid on the upper surface of the filter layer, an eighth connecting pipe is assembled at the left end of the recovery tank, a wastewater separator is assembled at the left end of the eighth connecting pipe, and a cleaning device is assembled at the bottom end of the wastewater separator The source waste is a big problem.

Description

Green building roof waste water preliminary treatment equipment
Technical Field
The invention relates to the field of green buildings, in particular to primary treatment equipment for roof wastewater of a green building.
Background
In the whole life cycle, resources are saved, the environment is protected, pollution is reduced, healthy, applicable and efficient use space is provided for people, high-quality buildings which are harmonious and symbiotic with the nature are realized to the maximum extent, resources generated outside the buildings are calculated in the resource range utilized by the green buildings in the process of designing the buildings by the green buildings, so that rainwater is also an important ring for resource recovery of the green buildings, the energy waste caused by pressurizing and filtering or continuously pumping and separating the rainwater wastewater by a large amount of electric drive pump bodies of the existing rainwater collection system is large, and in view of the above problems, the primary treatment equipment for the wastewater at the top of the green buildings is provided.
Disclosure of Invention
The invention aims to provide primary treatment equipment for building roof wastewater of a green building, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: the green building roof wastewater primary treatment equipment comprises a recovery tank for recovering rainwater, wherein the recovery tank comprises a tank body, the inner surface of the tank body is assembled with a filter layer, a water filtering layer is laid on the upper surface of the filter layer, the left end of the recovery tank is assembled with an eighth connecting pipe, the left end of the eighth connecting pipe is assembled with a wastewater separator, the bottom end of the wastewater separator is assembled with a cleaning device, the left end of the cleaning device is assembled with a water inlet pipe, the top end of the water inlet pipe is assembled with a filter screen, the outer surfaces of the water inlet pipe, the wastewater separator and the cleaning device are assembled with a second fixer, the filter screen comprises an inflation pipe, the lower surface of the inflation pipe is integrally formed with a pocket net, the top end of the inflation pipe is integrally formed with an inflation pipe, the wastewater separator comprises a drain pipe, and the bottom end of the drain pipe is integrally formed, the bottom of fourth connecting pipe is equipped with the fifth connecting pipe, the bottom assembly of fifth connecting pipe is on cleaning device's top, inlet tube, waste water separator and cleaning device's junction is equipped with the connector respectively, the drain pipe assembly is on waste water separator's top, and waste water is discharged from the drain pipe through supreme settlement under the pipeline of inlet tube and cleaning device.
Preferably, the water inlet pipe comprises a first connecting pipe, a second connecting pipe and a third connecting pipe, the first connecting pipe is assembled in a drainage system at the top end of the roof, the bottom end of the third connecting pipe is assembled at the top end of the cleaning device, and clamping pipes are integrally formed at the outer side ends of the first connecting pipe, the second connecting pipe and the third connecting pipe.
Preferably, the connector includes the sealed tube, the surface integrated into one piece of sealed tube has first joint piece, the side surface integrated into one piece of sealed tube has first removal claw, the side surface integrated into one piece of first removal claw has the reinforcement piece.
Preferably, the top end and the bottom end of the sealing tube are respectively and integrally formed with a sealing ring.
Preferably, the cleaning device comprises a sewage pipe, a sixth connecting pipe is integrally formed at the top end of the sewage pipe, a motor is assembled at the left end of the sewage pipe, a first fixer is assembled on the outer surface of the motor, a transmission screw is assembled on the inner surface of the sewage pipe, and a section of the motor is assembled at the left end of the transmission screw.
Preferably, the right-hand member of sewage pipe and right side top are equipped with the closed tube, the closed tube includes the seventh connecting pipe, the right-hand member of seventh connecting pipe is equipped with the sealer, the outside end integrated into one piece of sealer has the second to remove the claw, the surface integrated into one piece of sealer has the second joint piece.
Preferably, a locking pipe is integrally formed at the outer side end of the seventh connecting pipe, a slot is formed in the inner surface of the locking pipe, a clamping groove is formed in the side surface of the slot, the clamping groove is sleeved on the outer surface of the second clamping block, and the structural size of the clamping pipe is the same as that of the locking pipe.
Preferably, the second fixer comprises a fixing frame, a screw hole is formed in the front surface of the fixing frame, fixing legs are integrally formed at the outer side end of the fixing frame, the screw hole is formed in the front surface of the fixing frame, a screw rod is screwed on the inner surface of the screw hole, a fixing shaft is integrally formed at the front end of the screw rod, two sets of clamping jaws are hinged to the front end of the fixing shaft, and bolts are assembled at the front ends of the clamping jaws.
Compared with the prior art, the invention has the beneficial effects that: the invention provides a post-rain wastewater primary treatment device utilizing automatic sedimentation and separation, when the device is used, wastewater flows downwards into a sewage pipe through primary filtration of a filter screen from the top end of a water inlet pipe, rainwater can gradually fill the interior of a fifth connecting pipe by utilizing the principle of a liquid communicating vessel, the wastewater stays in the fifth connecting pipe through transmission of a plurality of sections of pipelines, the effect of multiple sedimentation is further realized by utilizing gravity, silt is isolated in the sewage pipe, and the settled and separated purified water enters a recovery tank from a drain pipe to be further refined and filtered, so that the problem of great energy waste caused by that a large amount of electric power is required to drive a pump body to pressurize and filter the post-rain wastewater or the post-rain wastewater is continuously pumped and separated by the conventional rainwater collection system is effectively solved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a cutaway schematic view of the recovery tank of the present invention;
FIG. 3 is a schematic diagram of a wastewater separator according to the present invention;
FIG. 4 is a schematic view of the retainer assembly of the present invention;
FIG. 5 is a schematic view of a cutaway assembly of the cleaning apparatus of the present invention;
FIG. 6 is a schematic view of a cut-away assembly of the water inlet pipe and the connector of the present invention;
FIG. 7 is a schematic view of the closure tube assembly of the present invention.
In the figure: 1. a recycling tank, 11, a tank body, 12, a water inlet hole, 13, a filter layer, 4, an eighth connecting pipe, 2, a water inlet pipe, 21, a first connecting pipe, 22, a second connecting pipe, 23, a third connecting pipe, 24, a clamping pipe, 3, a connector, 31, a sealing pipe, 32, a first clamping block, 33, a first moving claw, 34, a reinforcing sheet, 4, a waste water separator, 41, a drain pipe, 42, a fourth connecting pipe, 43, a fifth connecting pipe, 5, a cleaning device, 51, a waste water pipe, 52, a sixth connecting pipe, 53, a motor, 54, a first fixer, 55, a transmission screw, 6, a second fixer, 61, a fixing frame, 62, a screw hole, 63, a fixing pin, 64, a screw rod, 65, a fixing shaft, 66, a clamping jaw, 67, a bolt, 7, a filter screen, 71, an inflation pipe, 72, an inflation ring, 73, a pocket net, 8, a closed connecting pipe, 81, a seventh connecting pipe, 82 and a locking pipe, 83. the sealing device comprises a slot 84, a clamping slot 85, a sealer 86, a second moving claw 87 and a second clamping block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a green building roof waste water primary treatment device comprises a recovery tank 1 for recovering rainwater, the recovery tank 1 comprises a tank body 11, a filter layer 13 is assembled on the inner surface of the tank body 11, a water filtering layer is laid on the upper surface of the filter layer 13, an eighth connecting pipe 14 is assembled at the left end of the recovery tank 1, a waste water separator 4 is assembled at the left end of the eighth connecting pipe 14, a cleaning device 5 is assembled at the bottom end of the waste water separator 4, a water inlet pipe 2 is assembled at the left end of the cleaning device 4, a filter screen 7 is assembled at the top end of the water inlet pipe 2, a second fixer 6 is assembled on the outer surfaces of the water inlet pipe 2, the waste water separator 4 and the cleaning device 5, the filter screen 7 comprises an inflation pipe 71, a pocket net 73 is integrally formed on the lower surface of the inflation pipe 71, an inflation pipe 71 is integrally formed at the top end of the inflation pipe 71, the waste water separator 4 comprises a drain pipe 41, a fourth connecting pipe 42 is integrally formed at the bottom end of the drain pipe 41, the bottom end of the fourth connecting pipe 42 is provided with a fifth connecting pipe 43, the bottom end of the fifth connecting pipe 43 is provided at the top end of the cleaning device 5, the joints of the water inlet pipe 2, the wastewater separator 4 and the cleaning device 5 are provided with the connectors 3 respectively, the drain pipe 41 is provided at the top end of the wastewater separator 4, wastewater passes through the pipes of the water inlet pipe 2 and the cleaning device 5 from bottom to top and is discharged from the drain pipe 41 after sedimentation, in the wastewater separator 4, the height of the fifth connecting pipe 43 is determined according to the average annual rainfall of the installation site, and after multiplying the area of the roof by the annual rainfall, the daily average rainfall is obtained by dividing the number of days, and the average of the single rainfall is obtained according to the rainfall law, so that the passing rate of the rainfall inside the diameter of the pipe can be filled with 3 times of the integral capacity of the fifth connecting pipe 43 in a certain time, thereby obtaining the length of the fifth connecting pipe 43 according to, so that the rainwater can have enough time to settle when separated after each rainfall;
the invention provides a post-rain wastewater primary treatment device utilizing automatic sedimentation separation, when in use, wastewater flows downwards into the interior of a sewage pipe 51 through primary filtration of a filter screen 7 from the top end of a water inlet pipe 2, rainwater can gradually fill the interior of a fifth connecting pipe 43 through the principle of a liquid communicating vessel, the wastewater stays in the interior of the fifth connecting pipe 43 through transmission of a plurality of sections of pipelines, further, the effect of multiple sedimentation is realized through gravity, silt is isolated in the interior of the sewage pipe 51, and the settled and separated purified water enters a recovery tank 1 from a drain pipe 41 for further refined filtration, thereby effectively solving the problem that the existing rainwater collection system needs a large amount of electric drive pump bodies to pressurize and filter the post-rain wastewater or continuously pump the post-rain wastewater for separation, thereby causing great energy waste.
Specifically, the water inlet pipe 2 includes a first connecting pipe 21, a second connecting pipe 22 and a third connecting pipe 23, the first connecting pipe 21 is assembled in the drainage system at the top end of the roof, the bottom end of the third connecting pipe 23 is assembled at the top end of the cleaning device 5, the outer ends of the first connecting pipe 21, the second connecting pipe 22 and the third connecting pipe 23 are all integrally formed with a clamping pipe 24, generally, the first connecting pipe 21 is a front connecting section of the drainage system, the second connecting pipe 22 is a connecting middle section of a pipeline, and the specific length of the water inlet pipe needs to be determined according to the height of the building body, and the length of the third connecting pipe 23 needs to be determined according to the length of the tail end of the drainage pipeline, so as to supplement the remaining length.
Specifically, the connector 3 includes a sealing tube 31, a first clamping block 32 is integrally formed on the outer surface of the sealing tube 31, a first moving claw 33 is integrally formed on the side surface of the sealing tube 31, a reinforcing plate 34 is integrally formed on the side surface of the first moving claw 33, and the connector 3 can be used for connection and sealing of all pipeline joints in the present invention.
Particularly, the top and the bottom of sealed tube 31 are integrated into one piece respectively and have the sealing washer, and the sealing washer is the rubber circle to its thickness is slightly greater than the thickness of draw-in groove 84, consequently after the joint is accomplished, when the sealing washer is extruded and can provide stable sealed effect, can also provide stable friction extrusion stable effect, and then avoid connector 3 to drop.
Specifically, the cleaning device 5 comprises a sewage pipe 51, a sixth connecting pipe 52 is integrally formed at the top end of the sewage pipe 51, a motor 53 is assembled at the left end of the sewage pipe 51, a first fixer 54 is assembled on the outer surface of the motor 53, a transmission screw 55 is assembled on the inner surface of the sewage pipe 51, the motor 53 is assembled at the left end of the transmission screw 55 in sections, after the cleaning device is used for a period of time, the sealer 85 for closing the sewage pipe 8 is taken down, and the motor 53 is started to discharge mud inside the sewage pipe 51, so that the cleaning effect is ensured.
Specifically speaking, sewage pipe 51's right-hand member and right side top are equipped with closed pipe 8, closed pipe 8 includes seventh connecting pipe 81, the right-hand member of seventh connecting pipe 81 is equipped with sealer 85, sealer 85's outside end integrated into one piece has second removal claw 86, sealer 85's surface integrated into one piece has second joint piece 87 sealer 85 one-way installation promptly and can sealed connector 3, its structure is the same, and joint piece structure size is the same, consequently can reach general effect.
Specifically, the locking pipe 82 is integrally formed at the outer end of the seventh connecting pipe 81, the inner surface of the locking pipe 82 is provided with a slot 83, the side surface of the slot 83 is provided with a slot 84, the slot 84 is sleeved on the outer surface of the second clamping block 87, and the structural size of the clamping pipe 24 is the same as that of the locking pipe 82.
Specifically, the second fixer 6 includes a fixing frame 61, a screw hole 62 is formed in a front surface of the fixing frame 61, a fixing pin 63 is integrally formed at an outer side end of the fixing frame 61, the screw hole 62 is formed in the front surface of the fixing frame 61, a screw rod 64 is screwed to an inner surface of the screw hole 62, a fixing shaft 65 is integrally formed at a front end of the screw rod 64, two sets of clamping jaws 66 are hinged to a front end of the fixing shaft 65, and a bolt 67 is assembled at a front end of the clamping jaw 66.
Specifically, the structure of the first holder 54 is the same as that of the second holder 6.
Particularly, the right end of the cleaning device 5 is provided with a plurality of redundant joints which can be connected with the fifth connecting pipe 43, so that the waste water separators 4 with different specifications can be conveniently connected for use
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a green building roof waste water preliminary treatment equipment, is including recovery jar (1) that is used for the rainwater to retrieve, its characterized in that: retrieve jar (1) including jar body (11), the internal surface of jar body (11) is equipped with filter layer (13), the water filtration layer has been laid to the upper surface of filter layer (13), the left end of retrieving jar (1) is equipped with eighth connecting pipe (14), the left end of eighth connecting pipe (14) is equipped with waste water separator (4), waste water separator (4)'s bottom is equipped with cleaning device (5), cleaning device (4)'s left end is equipped with inlet tube (2), the top of inlet tube (2) is equipped with filter screen (7), the surface of inlet tube (2), waste water separator (4) and cleaning device (5) is equipped with second fixer (6), filter screen (7) are including gas tube (71), the lower surface integrated into one piece of gas tube (71) has pocket net (73), the top integrated into one piece of gas tube (71) has gas tube (71), waste water separator (4) includes drain pipe (41), the bottom integrated into one piece of drain pipe (41) has fourth connecting pipe (42), the bottom of fourth connecting pipe (42) is equipped with fifth connecting pipe (43), the bottom assembly of fifth connecting pipe (43) is on the top of cleaning device (5), the junction of inlet tube (2), waste water separator (4) and cleaning device (5) is equipped with connector (3) respectively, drain pipe (41) assemble on the top of waste water separator (4), and waste water is discharged from drain pipe (41) through supreme settlement from the lower process of the pipeline of inlet tube (2) and cleaning device (5).
2. The green building roof wastewater primary treatment equipment as claimed in claim 1, wherein: the water inlet pipe (2) comprises a first connecting pipe (21), a second connecting pipe (22) and a third connecting pipe (23), the first connecting pipe (21) is assembled in a drainage system at the top end of a roof, the bottom end of the third connecting pipe (23) is assembled at the top end of the cleaning device (5), and clamping pipes (24) are integrally formed at the outer side ends of the first connecting pipe (21), the second connecting pipe (22) and the third connecting pipe (23).
3. The green building roof wastewater primary treatment equipment as claimed in claim 1, wherein: the connector (3) includes sealed tube (31), the surface integrated into one piece of sealed tube (31) has first joint piece (32), the side surface integrated into one piece of sealed tube (31) has first removal claw (33), the side surface integrated into one piece of first removal claw (33) has reinforcement piece (34).
4. The green building roof wastewater primary treatment equipment as claimed in claim 3, wherein: and the top end and the bottom end of the sealing pipe (31) are respectively integrally formed with a sealing ring.
5. The green building roof wastewater primary treatment equipment as claimed in claim 2, wherein: the cleaning device (5) comprises a sewage pipe (51), a sixth connecting pipe (52) is integrally formed at the top end of the sewage pipe (51), a motor (53) is assembled at the left end of the sewage pipe (51), a first fixer (54) is assembled on the outer surface of the motor (53), a transmission screw (55) is assembled on the inner surface of the sewage pipe (51), and a section of the motor (53) is assembled at the left end of the transmission screw (55).
6. The green building roof wastewater primary treatment equipment as claimed in claim 5, wherein: the right-hand member and the right side top of sewage pipe (51) are equipped with closed pipe (8), closed pipe (8) are including seventh connecting pipe (81), the right-hand member of seventh connecting pipe (81) is equipped with sealer (85), the outside end integrated into one piece of sealer (85) has second movable claw (86), the surface integrated into one piece of sealer (85) has second joint piece (87).
7. The green building roof wastewater primary treatment equipment as claimed in claim 6, wherein: the locking pipe (82) is integrally formed at the outer side end of the seventh connecting pipe (81), a slot (83) is formed in the inner surface of the locking pipe (82), a clamping groove (84) is formed in the side surface of the slot (83), the clamping groove (84) is sleeved on the outer surface of the second clamping block (87), and the clamping pipe (24) is identical to the locking pipe (82) in structure size.
8. The green building roof wastewater primary treatment equipment as claimed in claim 1, wherein: second fixer (6) are including mount (61), screw (62) have been seted up to the front surface of mount (61), the outside end integrated into one piece of mount (61) has fixed foot (63), screw (62) have been seted up to the front surface of mount (61), the internal surface spiro union of screw (62) has screw rod (64), the front end integrated into one piece of screw rod (64) has fixed axle (65), the front end of fixed axle (65) articulates there are two sets of clamping jaws (66), the front end of clamping jaw (66) is equipped with bolt (67).
CN202110575212.2A 2021-05-26 2021-05-26 Green building roof waste water preliminary treatment equipment Active CN113429000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110575212.2A CN113429000B (en) 2021-05-26 2021-05-26 Green building roof waste water preliminary treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110575212.2A CN113429000B (en) 2021-05-26 2021-05-26 Green building roof waste water preliminary treatment equipment

Publications (2)

Publication Number Publication Date
CN113429000A true CN113429000A (en) 2021-09-24
CN113429000B CN113429000B (en) 2022-05-27

Family

ID=77802852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110575212.2A Active CN113429000B (en) 2021-05-26 2021-05-26 Green building roof waste water preliminary treatment equipment

Country Status (1)

Country Link
CN (1) CN113429000B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115305990A (en) * 2022-09-15 2022-11-08 李洪伟 Green building rainwater recovery method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090200216A1 (en) * 2005-04-27 2009-08-13 Iain Aleander Stewart Robinson Storm drain filter
ES2403128A1 (en) * 2012-11-07 2013-05-14 María CANDIL PÉREZ System for using water from rainfall for creating permanent or seasonal water sources or watering points
CN203213273U (en) * 2013-04-28 2013-09-25 中国水利水电科学研究院 Rainwater abandoning and treating device
CN210636507U (en) * 2019-08-01 2020-05-29 盐城市西方科技有限公司 Novel building rainwater is collected device
CN212001375U (en) * 2019-09-17 2020-11-24 张建英 Rainwater collection device is used in gardens

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090200216A1 (en) * 2005-04-27 2009-08-13 Iain Aleander Stewart Robinson Storm drain filter
ES2403128A1 (en) * 2012-11-07 2013-05-14 María CANDIL PÉREZ System for using water from rainfall for creating permanent or seasonal water sources or watering points
CN203213273U (en) * 2013-04-28 2013-09-25 中国水利水电科学研究院 Rainwater abandoning and treating device
CN210636507U (en) * 2019-08-01 2020-05-29 盐城市西方科技有限公司 Novel building rainwater is collected device
CN212001375U (en) * 2019-09-17 2020-11-24 张建英 Rainwater collection device is used in gardens

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115305990A (en) * 2022-09-15 2022-11-08 李洪伟 Green building rainwater recovery method

Also Published As

Publication number Publication date
CN113429000B (en) 2022-05-27

Similar Documents

Publication Publication Date Title
CN104746638B (en) Powerful sludge slag-liquid separation car
CN206198855U (en) A kind of sewage disposal device
CN113429000B (en) Green building roof waste water preliminary treatment equipment
CN215798783U (en) Green building roof effluent treatment plant
CN211946759U (en) Oil sludge treatment device
CN112316499A (en) Sewage treatment pond based on environmental protection
CN215630343U (en) Vertical frequency conversion water supply equipment
CN215026807U (en) Categorised sedimentation tank of carwash groove
CN210583891U (en) Solid-liquid separation device for sewage treatment
CN211935706U (en) Rainwater wastewater collecting and recycling device
CN204874098U (en) Elementary processing apparatus of sewage secondary
CN211025368U (en) Heavy metal wastewater treatment device
CN211774344U (en) Multistage building rainwater recovery processing device
CN211395918U (en) Sewage filtering device for sump pit of pumped storage station
CN217350973U (en) Emergency sewage treatment system for high-speed service area
CN210393827U (en) Reclaimed water reuse water treatment equipment
CN106836669B (en) Roof rainwater collecting, pressure-bearing filtering and discharging modular assembly system
CN113047410A (en) Prefabricated pump station of sewage filth autosegregation
CN211546048U (en) Solid-liquid settling separation purification device for sewage treatment
CN206189554U (en) Underground space rainwater mass flow composite set
CN111072246A (en) Sludge reduction treatment process for urban sewage treatment plant
CN220555874U (en) Low-energy-consumption rainwater grading recycling system
CN214784578U (en) Urban rainwater regulation and storage system
CN2626980Y (en) Device for processing oily sewage
CN205892802U (en) Oil and water separation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant