CN113409599B - Urban public transport priority coordination control method based on information prediction - Google Patents

Urban public transport priority coordination control method based on information prediction Download PDF

Info

Publication number
CN113409599B
CN113409599B CN202110666086.1A CN202110666086A CN113409599B CN 113409599 B CN113409599 B CN 113409599B CN 202110666086 A CN202110666086 A CN 202110666086A CN 113409599 B CN113409599 B CN 113409599B
Authority
CN
China
Prior art keywords
intersection
phase
bus
lane
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110666086.1A
Other languages
Chinese (zh)
Other versions
CN113409599A (en
Inventor
江航
杨业涵
李俊升
李晨阳
张艺真
李慧云
荆林朋
张猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Urban And Rural Planning And Design Research Institute Co ltd
Original Assignee
Henan Urban And Rural Planning And Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Urban And Rural Planning And Design Research Institute Co ltd filed Critical Henan Urban And Rural Planning And Design Research Institute Co ltd
Priority to CN202110666086.1A priority Critical patent/CN113409599B/en
Publication of CN113409599A publication Critical patent/CN113409599A/en
Application granted granted Critical
Publication of CN113409599B publication Critical patent/CN113409599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/08Controlling traffic signals according to detected number or speed of vehicles
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/081Plural intersections under common control
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/081Plural intersections under common control
    • G08G1/083Controlling the allocation of time between phases of a cycle
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/087Override of traffic control, e.g. by signal transmitted by an emergency vehicle
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/40Engine management systems

Abstract

The invention discloses an urban public transport priority coordination control method based on information prediction, which ensures the time-space double priority of public transport vehicles passing through an intersection and can realize synchronous reduction of the per-capita delay and the per-vehicle delay of the intersection. The method comprises the following steps: step 10) designing a bus-only right channel based on a variable lane; step 20) acquiring basic data; step 30) predicting the traffic flow diversion coefficient of the intersection; simulating a road traffic flow driving process, and acquiring the time of the public transport vehicles and the social transport vehicles reaching the intersection based on the bus departure time; step 40) obtaining a per-person delay value of a second intersection under coordinated optimization control and green signal ratios of all phases of the intersection; calculating a per-person delay value of a first intersection arranged by original phase original lanes; comparing the second per-person delay value with the first intersection per-person delay value, and confirming output information; and step 50) realizing intersection traffic flow control according to the output information.

Description

Urban public transport priority coordination control method based on information prediction
Technical Field
The invention relates to an urban traffic control system, in particular to an urban public transport priority coordination control method based on information prediction.
Background
With the rapid development of economy in China, motorized travel becomes a common choice for people to pursue convenient and rapid life in the whole society. But with the attendant serious pollution of the environment. The foreign related traffic construction development experience shows that the pollution problem of urban motor vehicles can be effectively solved by preferentially developing public traffic. However, at present, the problems of slow running speed of buses in cities, serious bus crossing, low precision point rate of buses arriving at stop stations, long waiting time of passengers and the like need to be solved urgently, the difference of traffic flow of each road in each city is large, and how to establish a corresponding bus priority optimization mechanism according to different traffic environments on the basis of the existing optimization technology has important value and significance in the aspects of realizing the common application of bus priority, improving the dependence degree of residents on buses, reducing per capita delay and the like.
According to the finding of relevant documents, the prior research on the bus information prediction aspect about the bus priority is less, the past traffic flow data is mostly adopted for the prediction of the time of the bus arriving at the intersection for fitting prediction, the turning ratio of the traffic flow at the intersection is mostly determined and fixed according to the historical data characteristics, and certain deviation exists in the past data for fitting prediction according to the randomness and the time-varying characteristics of the traffic flow; in the aspect of bus space priority, a special lane and an entrance lane are adopted or an intermittent special lane and an entrance lane are arranged, and according to the running characteristics of traffic flow, although the lane can be set to be intermittent, the bus can be ensured to pass preferentially compared with the social vehicles, the delay of the social vehicles is reduced to a certain extent, but certain influence still exists on the delay of the phase social vehicles passing through the intersection; for the aspect of bus time priority, strategies such as red light early-off and green light time delay are mostly adopted, and less combined research is needed for realizing time priority based on certain space priority.
Disclosure of Invention
The technical problem is as follows: the invention provides an urban public transport priority coordination control method based on information prediction, which ensures the time-space double priority of the public transport vehicles passing through an intersection and can realize the synchronous reduction of the per-capita delay and the per-vehicle delay of the intersection.
The technical scheme is as follows: the purpose of the invention is realized by the following technical scheme:
a city bus priority coordination control method based on information prediction comprises the following steps:
step 10) designing a bus-only right channel based on a variable lane, wherein the design method comprises a variable lane setting method, a variable lane control phase vehicle running method, variable lane control geometric parameters and variable lane control signal parameters, and space priority of bus passing at an intersection is realized;
step 20) acquiring basic data, wherein the basic data comprises historical track data of vehicles on the road, traffic flow information entering the road, time of bus leaving a stop, the number or rate of passengers carried by the bus, the number or rate of the passengers carried by the bus, the phase duration of an intersection and geometric parameters of the road;
step 30) analyzing historical track data of the road vehicles according to the basic data obtained in the step 20), obtaining a lane change position for determining vehicle steering, and predicting a traffic flow diversion coefficient of the lane change; the method comprises the steps that an improved cellular transmission model is used for simulating a road traffic flow driving process, and the time of arrival of public buses and social vehicles at an intersection is obtained on the basis of the bus departure time;
step 40) carrying out coordinated control on signal optimization and the variable lanes according to the design of the variable lanes in the step 10) and the time of the public transport vehicles and the social vehicles to reach the intersection, which is obtained in the step 30), so as to obtain a per-person delay value of a second intersection and a green-to-noise ratio of each phase of the intersection, which are subjected to coordinated optimization control; calculating a first intersection per person delay value of the original phase original lane arrangement according to the time of the public transport vehicles and the social vehicles to reach the intersection obtained in the step 30); comparing the second per-person delay value with the first intersection per-person delay value, and confirming output information;
and step 50) realizing intersection traffic flow control according to the output information of the step 40).
Preferably, the step 10) specifically comprises: step 101) a method for setting a variable lane: the channelized intersection is a cross-shaped plane intersection, an entrance way in the entrance direction is provided with 1 left-turn lane, 1 variable lane and 1 straight lane, and the variable lane is set as the adjacent lane of the left-turn lane without considering the influence of the right-turn lane;
the variable lane includes three regions arranged from far to near according to the intersection: a bus waiting area, a lane changing area and a variable area;
the two sides of the bus waiting area are dotted line sections, the bus waiting area only allows buses to enter, buses with different phases can timely enter the bus waiting area, and other social vehicles cannot enter the bus waiting area;
dotted lines are arranged on two sides of the lane changing area, so that the lane changing of straight-going and left-turning vehicles is realized, and the two-lane driving is realized;
solid lines are arranged on two sides of the variable area, and the variable area is switched between straight running and left turning;
step 102) a variable lane control phase vehicle operation method:
east-west phase vehicle operation method: when the first phase is green light of east-west straight going, the vehicle is straight going, the variable lane is set as the straight going phase, when the east-west straight going bus arrives, the east-west straight going bus directly follows the traffic flow to pass through the intersection along the straight going lane, then the straight going bus can enter the variable area through lane changing to carry out double-entry lane driving, at the moment, the arriving left-turning bus arrives at the bus waiting area to queue for the pre-signal light to turn on the yellow light, namely, the early ending time of the pre-signal is waited; when the pre-signal lamp is yellow, the pre-signal early ending time is reached, the straight-going vehicle cannot run by means of the variable area, the pre-signal is turned on in advance when the left-turn phase is up, and the left-turn bus leaves the bus waiting area and enters the variable area to queue for the turning-left phase green lamp to turn on; when the left-turning vehicles arrive, the left-turning vehicles can directly follow the traffic flow to pass through the intersection along the left-turning lane, then the left-turning vehicles can also change the lane to run in the variable area of the double entry lanes, and at the moment, the arriving straight buses arrive in the bus waiting area, queue to wait for the pre-signal lamp to turn on the yellow lamp, namely the phase pre-signal lamp is ended in advance; when the signal lamp is changed into yellow lamp, the advanced ending time of the pre-signal is reached, the left-turning vehicle can not change the lane and can drive by means of the variable area, the pre-signal is turned on in advance when the straight-going bus is in the straight-going phase, and the straight-going bus enters the variable area through the bus waiting area to queue for the turning on of the straight-going phase green lamp;
the running method of the south-north phase vehicle is the same as that of the east-west phase vehicle;
step 103) variable lane control geometric parameters:
length l of bus waiting area 1 The maximum queuing distance required by the bus and the length l of the lane-changeable area are met 2 Should satisfyLane change distance of a car, variable zone length l 3 The length of the canalization section of the intersection entrance way is kept consistent;
step 104) variable lane control signal parameters:
Figure BDA0003117472800000031
g 2i =g i -g 1i formula (2)
In the formula: l 2i The switchable zone length for the ith inlet phase, in units of: m; l. the 3i Variable zone length for the ith inlet phase, unit: m; v. of b Is the average speed of the bus, unit: m/s; i is s To start up lost time, unit: s; g is a radical of formula i Represents the ith inlet phase green time in units of: s; g 1i Time for which the green light signal is turned on in advance, unit: s; g is a radical of formula 2i Pre-signal duration green time, unit: and s.
Preferably, in the step 30), predicting the intersection traffic flow splitting coefficient includes the following steps:
step 3011) analyzing and fitting the relationship between the lane change position of the vehicle and the length and density of the road: according to the historical track data of the road vehicle, fitting the relationship between the lane changing position and the length and density of the road, as shown in formula (3):
Figure BDA0003117472800000041
in the formula: x is a radical of a fluorine atom Lane changing device To determine the lane change position for vehicle steering, the unit: km; p is a radical of Road To determine the density of the road section where the lane change position where the vehicle is turning, the unit: veh/km; l Road Is the link length, in units: km;
step 3012) predicting the traffic flow diversion coefficient of the intersection: determining a corresponding lane change position x according to the density of each simulation step length when the road length is known according to the relationship between the lane change position and the road length and density; the controller receives and processes traffic flow information of a signal at a lane changing position x in a simulation step length by setting a vehicle sensor to transmit signals of a road position where the vehicle sensor is located and a lane occupied position in the running process, and calculates the traffic flow of each lane as a traffic flow diversion coefficient when the traffic flow runs to a crossing.
Preferably, in the step 30), acquiring the time when the public transport vehicle and the social transport vehicle arrive at the intersection includes:
step 3021) establishing an improved cellular transmission model of the road driving section:
according to the flow conservation theorem, the relationship between the internal density of the ordinary cells and the flow is shown in formula (4):
k a (t)=[min(v·p a-1 (t),q amax ,w(p jam -p a (t)))]formula (4)
In the formula: k is a radical of formula a (t) represents the integral traffic inflow of the cell a of the t simulation step length road section without the bus stop, and the unit is as follows: veh; v represents the free-flow vehicle speed of the overall flow, unit: km/h; p is a radical of formula a-1 (t) represents the overall traffic density of the t-th simulation step length road section cellular a-1, and the unit is: veh/km; q. q.s amax Represents the maximum flow rate of the road section cell a, unit: veh/h; w represents a backward propagation speed of a congestion wave generated when the traffic flow traveling density is greater than the optimum traveling density, and the unit is: km/h; p is a radical of jam Represents the maximum traffic density of the road section, unit: veh/km; p is a radical of formula a (t) represents the overall traffic density of the t-th simulation step length road section cellular a, and the unit is as follows: veh/km;
due to the consideration of the process of bus stop, the relation between the internal density and the flow of the unit cells containing the bus stop is shown as the formula (5):
Figure BDA0003117472800000042
in the formula: k' a (t) represents the integral traffic inflow of the cell a of the bus stop included in the t-th simulation step length road section, and the unit is as follows: veh; tl (t) represents the number of buses which do not leave the cell after stopping at the stop in the t simulation step length; delt represents the simulation step size, unit: h;
step 3022) acquiring the time when the vehicle reaches the intersection:
the predicted time tt of the bus from leaving the stop to the intersection is shown as formula (6):
Figure BDA0003117472800000051
in the formula: l 1 Express bus stop to the output end distance that contains the stop cell, the unit: km; p is a radical of formula 1 The unit of the cell density including the bus stop is as follows: veh/km; k is a radical of 1 ' represents the flow rate containing the cells of the bus stop, unit: veh/h; l ", a a The length and unit of other cells except the cells of the stop station are shown between the stop station and the intersection of the bus in the road: km; p is a radical of formula a The density and unit of other cells except the cells of the stop station are represented between the stop station and a crossing in the road: veh/km; k is a radical of formula a Express in the road from the bus stop to between the intersection, except that other each cellular flow, the unit that contain bus stop cell: veh/h; the mm is the number of divided cells between the bus stop and the intersection in the road;
the predicted time tt' of the social vehicle from the entering road to the intersection is shown as the formula (7):
Figure BDA0003117472800000052
in the formula: ls 1 Length of a cell of a stop included in a road, unit: km; ls aa "indicates the length of each cell in the road except the cell including the stop, unit: km; p is a radical of aa ' represents the density of each cell in the road except for the cells including the stop, unit: veh/km; k is a radical of aa ' represents the flow rate of each cell other than the cell including the stop in the road, unit: veh/h; mn is the number of road dividing cells;
step 3023) establishing an improved cellular transmission model of the intersection entrance road:
the relationship between the inlet channel cellular density and the flow is shown in formula (8):
Figure BDA0003117472800000053
in the formula: k is a radical of H (t) represents the traffic inflow of the t-th simulation step size unit cell H, unit: veh; p is a radical of formula H (t) represents the density of the t-th simulation step size cell H, unit: veh/km; p is a radical of E (t) represents the density of the t-th simulation step size unit cell E, unit: veh/km; p is a radical of formula G (t) represents the density of the t-th simulated step size cell G, unit: veh/km; epsilon E (t) a flow dividing coefficient of the cell H in the t simulation step length for the vehicle to flow to the cell E is shown; epsilon G (t) represents the shunting coefficient of the vehicle flowing to the cell G of the cell H in the t simulation step length;
the step 3012) obtains a step shunting coefficient of the lane change position, because the lane change position is distant from the intersection entrance lane, the step where the lane change position is located is different from the step where the vehicle travels to the intersection, the time for the vehicle to travel from the lane change position to the intersection is calculated according to the formula (9), the corresponding step where the vehicle travels to the intersection can be obtained by the sum of the time step of the lane change position and the travel time, and the intersection shunting coefficient of the step is updated:
Figure BDA0003117472800000061
in the formula: lus (Lus) aaa "represents the length of each cell between the road change position and the intersection, unit: km; p is a radical of formula aaa "indicates the density of each cell between the lane change position to the intersection in the road, unit: veh/km; k is a radical of aaa "represents the flow rate of each cell between the lane change position to the intersection in the road, unit: veh/h; and mnb is the number of cells between the road changing position and the intersection.
Preferably, in step 3021), tl (t) is obtained according to the following steps:
according to the time t when the bus automatically enters the bus stop 1 Stop stationLength l, distance from the docking station including distance l from the end of the docking station cell Powder And if the bus runs at the free flow speed v in the cellular, the bus runs out of the cellular time t without stopping at the bus stop 2 =t 1 +(l+l Powder )/v;
Time t of leaving the stop 3 The vehicle predicts the time t of leaving the unit cell by stopping at the bus stop 4 =t 3 +l Powder /v;
Comparing t corresponding to each bus 2 And t 4 If t is 2 And t 4 And if the current bus is in different step lengths, extracting the bus as the bus which does not leave the cell after the bus stops, and performing accumulative statistics to obtain the number of the buses which do not leave the cell after the bus stops in the t simulation step length.
Preferably, the step 40) comprises the steps of:
step 401) performing signal optimization control, specifically including establishing a target function with minimum delay per capita and setting constraint conditions;
establishing a target function with minimum delay per capita as follows: obtaining the intersection phase number m, the bus passenger carrying rate alpha and the social vehicle passenger carrying rate beta according to the step 20), and obtaining the bus flow arrival rate and the social vehicle arrival rate according to the step 30), wherein the per-person delay value at the second intersection is shown as the formula (10):
Figure BDA0003117472800000071
in the formula: and PI represents the per-capita delay value of a second intersection of the intersection in the intersection signal period, and the unit is: s; d is a radical of All people The method comprises the following steps of (1) representing that all participants riding vehicles at the intersection delay in a period, unit: s;
Figure BDA0003117472800000073
the vehicle delay of the social vehicle representing the ith import phase in the cycle is as follows: s;
Figure BDA0003117472800000074
the delay of the bus of the ith import phase in the period is represented by the following unit: s; alpha represents the average passenger carrying rate of the social vehicles in the period; beta represents the average passenger carrying rate of the buses in the period; q. q.s si Vehicle arrival rate of social vehicles representing the ith import phase in the cycle, in units of: veh/h; q. q of bi The vehicle arrival rate of the bus expressing the ith import phase in the cycle is as follows: veh/h;
setting the constraint queuing length:
according to N 0 +N S (t)-N C (t)=p jam Lz, obtaining an equivalent queuing length model formed by parking waiting at the intersection as shown in the formula (11):
Figure BDA0003117472800000072
in the formula: l is DL (t)' represents the equivalent queuing length for the vehicle to stop waiting at that phase of the intersection in units of: km, N 0 The number of vehicles traveling in the upstream and downstream sections at the initial time is expressed in units of: veh; n is a radical of hydrogen S (t) represents the cumulative number of vehicles passing through the upstream cross-section from the initial time to time t in units of: veh; n is a radical of C (t) represents the cumulative number of vehicles passing through the downstream cross-section from the initial time to time t, in units of: veh; lz represents the distance between the upstream and downstream sections in units: km; p is a radical of formula jam Represents the maximum traffic density of the road section, unit: veh/km;
calculating the queuing length of a plurality of cells divided according to an improved cell transmission model, calculating the equivalent queuing length in each cell according to a formula (11), wherein the equivalent queuing length of a phase intersection is the sum of the equivalent queuing lengths in the cells, and analogizing in the upstream direction;
in the queue length L DL (t)' the minimum value is 0, the maximum value is the sum of the distance from the intersection phase stop line to the upstream bus stop station and the length of the bus waiting area, and the minimum value and the maximum value are used as constraint conditions for optimization;
setting a constraint condition split ratio: the green light time corresponding to each phase needs to be constrained by taking the time required by the pedestrian to pass through the intersection as the minimum value and taking the signal cycle time as the maximum value;
step 402) controlling the variable lane, including the following steps 4021) to 4025):
step 4021) acquiring the arrival rates of the public buses and the social vehicles in a signal period according to the arrival time of the public buses and the social vehicles at the intersection obtained in the step 30);
step 4022) judging that the variable lane state is straight or left-turning at the moment according to the state of the vehicle driving from the intersection at the output end of the front entrance way;
step 4023) if the phase green light end of the intersection signal controller is changed into the red light in advance, judging that the arriving public transport vehicles are the same-phase public transport or different-phase public transport at the moment; if the phase is consistent with the lane direction of the front variable area, the bus drives to the lane with the corresponding phase for parking and waiting, after the green light of the different-phase pre-signal is turned on, the bus with the different phase drives away from the bus waiting area, and the bus can drive into the bus waiting area in a lane changing mode for parking and waiting for the arrival of the phase; if the phase position is different from the direction of the front lane, the bus arrives at a bus waiting area to stop for waiting for the arrival of the phase position; the process that the public transport vehicles arrive at the waiting area and drive away from the intersection and the social transport vehicles drive away from the intersection is carried out in the step 102);
step 4024) establishing a variable lane model: the relation between the delay of all vehicles and the green time of the phase position is based on the driving curve of the vehicle in the phase position at the intersection as follows:
the time relation between the second vehicle delay and the phase green light of the public transport vehicle is shown as the formula (12) and the formula (13):
if it is used
Figure BDA0003117472800000081
Then the
Figure BDA0003117472800000082
On the contrary, the first step is to take the reverse,
Figure BDA0003117472800000083
the social vehicle second vehicle average delay and phase green light time relation is shown as formula (14), formula (15), formula (16), formula (17) and formula (18):
if it is used
Figure BDA0003117472800000084
Figure BDA0003117472800000085
If it is not
Figure BDA0003117472800000091
Figure BDA0003117472800000092
If it is not
Figure BDA0003117472800000093
Figure BDA0003117472800000094
If it is used
Figure BDA0003117472800000095
Figure BDA0003117472800000096
On the contrary, the method can be used for carrying out the following steps,
Figure BDA0003117472800000097
in the formula: c is the intersection cycle duration, unit: s; g i Is the ith inlet phase green lamp in the cycleTime, unit: s; g 1i The method is characterized in that the turn-on time of a lane-changing green light of the ith inlet phase in the cycle is as follows: s; s is bi The departure rate of the bus in the ith entrance phase green light in the period is as follows: veh/h; q. q.s bi The unit of the arrival rate of the ith import phase bus in the cycle is as follows: veh/h;
Figure BDA0003117472800000098
and a second vehicle average delay value of the ith inlet phase public transport vehicle in the period is represented as the unit: s;
Figure BDA0003117472800000099
and a second vehicle mean delay value of the ith import phase social vehicle in the cycle, wherein the unit is as follows: s; q. q.s si The social vehicle arrival rate of the ith import phase in the cycle is as follows: veh/h; s is si The social vehicle leaving rate of the left-turn lane before lane change at the ith entrance phase green light in the cycle is as follows, unit: veh/h; s is si ' is the social vehicle leaving rate in the whole left-turning direction after lane change at the ith entrance phase green light in the period, and the unit is as follows: veh/h; h is bi The number of vehicles corresponding to the cycle starting end of the ith phase public transport vehicle arrival curve in the cycle is as follows: veh; h is a total of sbi The number of vehicles corresponding to the period starting end of the i-th import phase bus departure curve in the period is as follows: veh; h is si The number of vehicles corresponding to the starting end of the cycle when the social vehicles at the ith entry phase in the cycle reach the curve is as follows: veh; h is ssi The number of the social vehicles leaving the curve of the left-turn lane before the lane change at the ith entrance phase green light in the period, which corresponds to the starting end of the period, is as follows: veh; h is a total of sssi The number of the social vehicles in the whole left-turning direction leaving the curve corresponding to the starting end of the period after the lane change of the ith entrance phase green light in the period is as follows, the unit is: veh; h is a total of ssssi When the signal yellow is preset in the ith entrance phase in the period, the social vehicles of a left-turn lane leave the number of vehicles corresponding to the starting end of the period, the unit is as follows: veh;
step 4025) establishing a variable lane model according to the step 4024), and calculating a per-person delay value at a second intersection according to a formula (10);
step 403), calculating the per-person delay value of the first intersection of the original phase original lane distribution:
the average delay value of people at the second intersection is shown as formula (19):
Figure BDA0003117472800000101
in the formula: PI (proportional integral) Original source And (3) indicating the per-person delay value of the second intersection of the intersection in the intersection signal period, unit: s; d All the people And (3) indicating that all the participants riding the vehicle at the intersection delay in the period, unit: s;
Figure BDA0003117472800000102
the vehicle delay of the social vehicle representing the ith import phase in the cycle is as follows: s;
Figure BDA0003117472800000103
the delay of the bus of the ith import phase in the period is expressed as unit: s;
the time relation between the first vehicle average delay value and the phase green light is as shown in the formula (20) and the formula (21):
if it is not
Figure BDA0003117472800000104
Then
Figure BDA0003117472800000105
On the contrary, the method can be used for carrying out the following steps,
Figure BDA0003117472800000106
the relation between the first vehicle average delay value of the social vehicle and the phase green light time is as shown in the formula (22) and the formula (23):
if it is not
Figure BDA0003117472800000111
Figure BDA0003117472800000112
On the contrary, the first step is to take the reverse,
Figure BDA0003117472800000113
in the formula: c is the intersection cycle duration, unit: s; g' i The green time of the ith inlet phase in the lower cycle of the original lane at the original phase is as follows: s;
Figure BDA0003117472800000114
the unit of the delay of the vehicles of the ith import phase social vehicle in the lower period of the original phase original lane is as follows: s;
Figure BDA0003117472800000115
the unit of the delay of the bus of the ith import phase in the lower period of the original phase lane is shown as follows: s; q. q of bi The unit is the arrival rate of the ith import phase bus in the cycle: veh/h; s ″) bi The departure rate of the bus at the ith entrance phase green light in the lower period of the original phase original lane is as follows: veh/h; q. q of si The social vehicle arrival rate of the ith import phase in the cycle is as follows: veh/h; s si The social vehicle departure rate is the social vehicle departure rate at the ith entrance phase green light in the lower period of the original phase original lane, and the unit is as follows: veh/h; h is a total of bi The number of vehicles corresponding to the cycle starting end of the ith phase public transport vehicle arrival curve in the cycle is as follows: veh; h is sbi When the phase of the ith inlet phase of the green light in the lower period of the original phase original lane is' the number of the buses leaving the curve corresponding to the starting end of the period, unit: veh; h is si The number of vehicles corresponding to the starting end of the cycle when the social vehicles at the ith entry phase in the cycle reach the curve is as follows: veh; h' ssi When the i-th entrance phase of the lower period of the original lane is green, the social vehicle leaves the curveNumber of vehicles corresponding to the start of the cycle, unit: veh;
substituting the delay of all buses and the delay of all social vehicles distributed on the original phase original lane into a formula (19) to calculate the delay value of all people at the first intersection;
step 404), judging and outputting: if the per-person delay value of the second intersection is smaller than that of the first intersection, outputting the green signal ratio of each phase of the intersection under the variable lane scheme and the coordinated optimization control; if the per-person delay value at the second intersection is larger than that at the first intersection, the original phase is adopted, and the variable lane is only used as a bus-only approach to ensure that the bus space is prioritized and output.
Has the advantages that: compared with the prior art, the urban public transport priority coordination control method based on information prediction guarantees the time-space double priority of the public transport vehicles passing through the intersection, and can synchronously reduce the per-capita delay and the per-bus delay of the intersection. The invention extracts the relation between the lane changing position determining the flow direction of the vehicle and the length and the density of the road according to the running track of the vehicle on the road in the past, and can update the diversion coefficient, namely the steering ratio, of the corresponding predicted traffic flow with different simulation step lengths and densities in real time; the method comprises the steps that basic data such as the traffic volume of a vehicle entering a road and the time when a bus leaves a stop are obtained, and the time when the vehicle reaches an intersection and the distribution condition of the arrival rate are predicted in real time in the process that the bus enters and exits the stop; the number of passengers or the passenger carrying rate of the bus, the cycle duration of the intersection and other information are used as basic data of a control module, and coordination control is formed by combining signal optimization and a variable lane.
Drawings
FIG. 1 is a flow chart of an embodiment of the present invention;
FIG. 2 is a schematic diagram of variable lane channeling in an embodiment of the present invention; the yellow meshed shadow area after pre-signal is a bus waiting area, only buses are allowed to enter, the dotted line section of the bus waiting area realizes that buses in other phases timely enter the bus waiting area, and other social vehicles cannot enter the bus waiting area; the yellow reticular shadow area close to the intersection entrance lane is a variable area, and the attribute of the yellow reticular shadow area is switched between straight running and left turning; the dotted line part between the two areas is a straight-going and left-turning vehicle lane change realization dual-lane driving road section;
fig. 3 (a) to fig. 3 (d) are schematic diagrams illustrating a lane-changeable traffic rule according to an embodiment of the present invention;
FIG. 4 is a timing diagram of main and pre-signal timing of a variable lane according to an embodiment of the present invention;
FIG. 5 is a schematic diagram of an improved cell transmission model according to an embodiment of the present invention;
FIG. 6 is a flow chart illustrating a lane change principle of the variable lane according to an embodiment of the present invention;
fig. 7 (a) to 7 (g) are delay curves of the left-turning social vehicles and the buses in a certain phase period at the intersection according to the embodiment of the invention; FIG. 7 (a) shows a first condition of the time relationship between the second vehicle delay and the phase green light of the public transportation vehicle; FIG. 7 (b) is a second condition of the transit vehicle second vehicle delay versus phase green time; FIG. 7 (c) is a first case of social vehicle second vehicle delay versus phase green time; FIG. 7 (d) is a second case of social vehicle second vehicle average delay versus phase green time; FIG. 7 (e) is a third scenario of a social vehicle second vehicle delay versus phase green time; FIG. 7 (f) is a fourth scenario of a social vehicle second vehicle delay versus phase green time; FIG. 7 (g) is a fifth case of the social vehicle second vehicle delay versus phase green time;
FIGS. 8 (a) to 8 (d) are schematic diagrams illustrating vehicle delay curves according to the embodiment of the present invention; wherein FIG. 8 (a) is a first case of the time relationship between the first vehicle delay and the phase green light of a bus,
Figure BDA0003117472800000121
FIG. 8 (b) is a second case of a phase green time relationship with an average first vehicle delay for a bus; FIG. 8 (c) is a first case of social vehicle first vehicle delay versus phase green time,
Figure BDA0003117472800000131
FIG. 8 (d) is a second case of social vehicle first vehicle average delay versus phase green time;
FIG. 9 is a comparative delay chart for vehicles at each inlet phase at an intersection according to example 1 and comparative example 1 of the present invention;
FIG. 10 is a comparison graph of bus and social vehicle delays at each entrance phase of an intersection according to embodiment 1 and comparative example 1 of the present invention;
FIG. 11 is a comparative graph of the man-machine delay at the intersection of example 1 and comparative example 1 in the present invention;
FIG. 12 is a graph comparing the equivalent queue lengths for each entry phase at the junction of example 1 and comparative example 1 of the present invention.
Detailed Description
The technical solutions of the present invention are further described in detail below with reference to specific examples, but the scope of the present invention is not limited to the following.
As shown in fig. 1, a city bus priority coordination control method based on information prediction in the embodiment of the present invention includes:
s10) designing a bus-only right channel based on a variable lane, wherein the design comprises a setting method for designing the variable lane, a phase-variable vehicle control operation method, geometric parameters of variable lane control and signal parameters of the variable lane control, and space priority of bus passing at an intersection is realized.
S20) acquiring basic data, wherein the basic data comprises historical track data of vehicles on the road, traffic flow information of entering the road, stop leaving time of the public transport vehicles, the number or the rate of passengers carried by the social transport vehicles, intersection phase duration and road geometric parameters.
S30) analyzing historical track data of the road vehicles according to the basic data obtained in the S20), obtaining a lane change position for determining vehicle steering, and predicting a traffic flow diversion coefficient of the lane change; the improved cellular transmission model is used for simulating the driving process of road traffic flow, and the time of the public transport vehicles and the social transport vehicles reaching the intersection is obtained on the basis of the bus departure time.
S40) performing coordinated control on signal optimization and the variable lane according to the design of the variable lane in S10) and the time of arrival of the public transport vehicle and the social vehicle at the intersection obtained in S30), and obtaining a second intersection per-capita delay value and an intersection per-phase green-to-credit ratio under coordinated optimization control; calculating a first intersection per capita delay value of the original phase original lane arrangement according to the time of the bus and the social vehicle reaching the intersection obtained in the S30); and comparing the second per-person delay value with the first intersection per-person delay value, and confirming output information.
And S50) realizing intersection traffic flow control according to the output information of the S40).
The method can predict the traffic flow diversion coefficient of the intersection and the information of the vehicles arriving at the intersection in real time, realize two-stage control with time-space priority, increase the use efficiency of the variable lane and reduce the vehicle delay. The bus priority of the invention does not take the cost of excessive loss of the vehicle passing efficiency, and is applicable to different urban traffic environments in China.
Preferably, the step 10) specifically includes:
step 101) a method for setting a variable lane:
as shown in fig. 2, the channelized intersection is a cross-shaped plane intersection, the entrance lane in the entrance direction is provided with 1 left-turn lane, 1 variable lane and 1 straight lane, and the variable lane is set as the adjacent lane of the left-turn lane without considering the influence of the right-turn lane;
the variable lane includes three zones arranged from far to near according to the distance from the intersection: a bus waiting area, a lane changing area and a variable area;
the two sides of the bus waiting area are dotted line sections, the bus waiting area only allows buses to enter, the buses with different phases can timely enter the bus waiting area, and other social vehicles cannot enter the bus waiting area;
dotted lines are arranged on two sides of the lane changing area, so that the lane changing of straight-going and left-turning vehicles is realized, and the two-lane driving is realized;
the two sides of the variable area are solid lines, and the variable area is switched between straight running and left turning.
Step 102) a variable lane control phase vehicle operation method:
the east-west phase vehicle operation method is shown in fig. 3: as shown in fig. 3 (a), when the east-west straight green light is in the first phase, the vehicle is straight, the variable lane is set as the straight phase, when the east-west straight bus arrives, the vehicle directly follows the traffic flow to pass through the intersection along the straight lane, then the straight bus can enter the variable area through the lane change to carry out double-entry lane driving, and at the moment, the arriving left-turn bus arrives at the bus waiting area to queue for the pre-signal light to turn on the yellow light, namely, the coming pre-signal is waited for the early ending time; when the signal lamp is yellow as shown in fig. 3 (b), the advance ending time of the advance signal is reached, the straight-going vehicle can not drive by means of the variable area, the advance signal is turned on in advance when the left-turning phase is up, and the left-turning bus leaves the bus waiting area and enters the variable area to queue for waiting for the turn-left phase to turn on by the green lamp; as shown in fig. 3 (c), the second phase is that the vehicle turns green left, the variable lane is a left-turn lane, when the left-turn vehicle arrives, the left-turn vehicle directly follows the traffic flow to pass through the intersection along the left-turn lane, and then the left-turn vehicle can also change the lane variable area to carry out double-entry lane driving, and at this moment, the arriving direct bus arrives at the bus waiting area, queues up to wait for the pilot lamp to turn on the yellow lamp, namely, the phase pilot signal is ended in advance; as shown in fig. 3 (d), when the signal lamp to be predicted is changed into yellow, the advanced ending time of the prediction signal is reached, the left-turning bus can not change lanes and can run by virtue of the variable area, the prediction signal is turned on in advance in the phase of waiting for straight-going bus to pass through the bus waiting area, and the straight-going bus enters the variable area to queue for waiting for the turning on of the green lamp in the phase of waiting for straight-going bus.
The running method of the south-north phase vehicle is the same as that of the east-west phase vehicle.
Step 103) variable lane control geometric parameters:
length l of waiting area of bus 1 The maximum queuing distance required by buses and the length l of the lane-changeable area should be satisfied 2 The lane change distance of a car and the length l of a variable zone 3 The length of the canalization section of the intersection inlet passage is kept consistent.
Step 104) variable lane control signal parameters, as shown in fig. 4:
Figure BDA0003117472800000151
g 2i =g i -g 1i formula (2)
In the formula: l. the 2i Is a switchable zone of the ith inlet phaseLength, unit: m; l 3i Variable zone length for the ith inlet phase, unit: m; v. of b Is the average speed of the bus, unit: m/s; I.C. A s To start up lost time, unit: s; g i Represents the ith inlet phase green time in units of: s; g is a radical of formula 1i The unit of the time for which the green light signal is turned on in advance is as follows: s; g is a radical of formula 2i Pre-signal duration green time, unit: and s.
In fig. 4, the main signal is a phase signal of an intersection signal controller, and the advance signal is a signal for controlling the vehicles in the waiting area and the social vehicles to enter the variable area. g is the green time of the main signal phase; g is a radical of formula 1 The method comprises the steps that time is started in advance for pre-signal, vehicles in a waiting area can enter a variable area in advance, and the phase public transport vehicles can preferentially pass through an intersection when a main signal phase green light is started; g is a radical of formula 2 The pre-signal lasts for a green time.
And step 10), space priority of the bus passing through the intersection is guaranteed, the utilization efficiency of lanes can be improved in the limited road space, and lane sharing of left-turn and straight-going phases and lane sharing of the bus and social vehicles are realized.
Preferably, in the step 30), predicting the intersection traffic flow splitting coefficient includes the following steps:
step 3011) analyzing and fitting the relationship between the lane change position of the vehicle and the length and density of the road: according to the historical track data of the road vehicle, fitting the relationship between the lane changing position and the length and density of the road, as shown in formula (3):
Figure BDA0003117472800000152
in the formula: x is a radical of a fluorine atom Lane changing device To determine the lane change position for vehicle steering, the unit: km; p is a radical of formula Road To determine the density of the road section where the lane change position where the vehicle is turning, the unit: veh/km; l. the Road Is the link length, in units: km;
step 3012) predicting the traffic flow diversion coefficient of the intersection: determining a corresponding lane changing position x according to the relationship between the lane changing position and the length and density of the road and the density of each simulation step length when the length of the road is known; the controller receives and processes traffic flow information of a signal at a lane changing position x in a simulation step length by setting a vehicle sensor to transmit signals of a road position where the vehicle sensor is located and a lane occupied position in the running process, and calculates the traffic flow of each lane as a traffic flow diversion coefficient when the traffic flow runs to a crossing.
Step 3012) predict the traffic flow diversion coefficient of the intersection, can realize the real-time renewal of the diversion coefficient, no longer obtain the diversion coefficient value under a time quantum fixedly with the data characteristic of the past traffic flow, make the traffic flow parameter have errors in the operation simulation of the model; the corresponding shunt coefficient value can be matched according to the running characteristics of the vehicle under different time scenes by adopting real-time updating, and the running simulation error of the model can be properly reduced.
Preferably, in the step 30), acquiring the time when the public transport vehicle and the social transport vehicle arrive at the intersection includes:
step 3021) establishing an improved cellular transmission model of the road driving section:
the traffic volume of a vehicle entering a road is obtained, the road is divided into a plurality of cells, and the process of simulating the vehicle running on a road section is shown in fig. 5 according to the inflow and outflow relations (flow conservation theorem) among the cells. The inflow amount of the cell a is related to the outflow amount of the upstream cell, and is also related to the number of vehicles contained in the cell itself. The influx of the cell a-1 is k a-1 Length of l a-1 The flow rate to the cell a in the cell a-1 in the step length is k a Similarly, the flow rate of the cellular a is k a+1 . According to the flow conservation theorem, the relationship between the internal density of the ordinary cells and the flow is shown in the formula (4):
k a (t)=[min(v·p a-1 (t),q amax ,w(p jam -p a (t)))]formula (4)
In the formula: k is a radical of formula a (t) represents the integral traffic inflow of the cell a of the t simulation step length road section without containing the bus stop, and the unit is as follows: veh; v represents the free flow vehicle speed of the overall flow, unit: km/h; p is a radical of a-1 (t) represents the overall traffic density of the t-th simulation step length road section cellular a-1, and the unit is as follows: veh/km; q. q of amax Indicating roadMaximum flow rate of segment cell a, unit: veh/h; w represents a backward propagation speed of a congestion wave generated when the traffic flow running density is greater than the optimal running density, and the unit is as follows: km/h; p is a radical of formula jam Represents the maximum jam density of the road section, unit: veh/km; p is a radical of formula a (t) represents the overall traffic density of the t-th simulation step length road section cellular a, and the unit is as follows: veh/km;
the cellular flow calculation is carried out on the general road traffic flow to move forward at the speed of a free flow in the driving process, and the difference between the public transport vehicles and the social transport vehicles is that the passengers need to get in and get out of a bus stop station to carry out the operation of getting on and off the buses. Compared with the social vehicles, the public transport vehicles have certain delay and difference in the operation in the cells. Therefore, when the flow and the density in the cellular are calculated, the influence of the bus stop process on the flow of the cellular is not ignored, the bus stop-off time is obtained through the bus stop-off GPS, and the number of vehicles which do not flow out of the cellular in time due to the bus stop-off in the step length is extracted. Due to the consideration of the process of bus stop, the relation between the internal density and the flow of the cells containing the bus stop is shown as the formula (5):
Figure BDA0003117472800000171
in the formula: k' a (t) represents the integral traffic inflow of the cell a of the bus stop included in the t-th simulation step length road section, and the unit is as follows: veh; tl (t) represents the number of buses which do not leave the cell after stopping at the stop in the t simulation step length; delt represents the simulation step size, unit: h;
step 3021) adding the process of bus entering and exiting the stop into the model construction according to the bus departure time, so that the model construction is more practical in fitting.
Step 3022) acquiring the time when the vehicle reaches the intersection:
the predicted time tt of the bus from leaving the stop station to the intersection is shown as formula (6):
Figure BDA0003117472800000172
in the formula: l 1 Express bus stop to the output end distance that contains the stop cell, the unit: km; p is a radical of formula 1 The unit of the cell density including the bus stop is as follows: veh/km; k is a radical of 1 ' represents the flow rate containing the cells of the bus stop, unit: veh/h; l a The length and unit of other cells except the cells of the stop station are shown between the stop station and the intersection of the bus in the road: km; p is a radical of formula a The density and unit of other cells except the cells of the stop station are represented between the stop station and a crossing in the road: veh/km; k is a radical of formula a Express in the road from the bus stop to between the intersection, except that other each cellular flow, the unit that contain bus stop cell: veh/h; the mm is the number of divided cells between the bus stop and the intersection in the road;
the predicted time tt' of the social vehicle from the entering road to the intersection is shown as the formula (7):
Figure BDA0003117472800000173
in the formula: ls 1 Length of a cell of a stop included in a road, unit: km; ls aa "indicates the length of each cell in the road except the cell including the stop, unit: km; p is a radical of formula aa ' represents the density of each cell in the road except for the cells including the stop, unit: veh/km; k is a radical of aa ' represents the flow rate of each cell except for the cells including the stop in the road, unit: veh/h; mn is the number of road dividing cells.
And step 3022) predicting the time for the vehicle to reach the intersection, and predicting the time for the vehicle to reach the intersection according to the randomness of the running of the vehicle, so that the performance can be predicted dynamically in real time.
Step 3023) establishing an improved cellular transmission model of the intersection entrance road:
the relationship between inlet channel cell density and flow is shown in formula (8):
Figure BDA0003117472800000181
in the formula: k is a radical of H (t) represents the traffic inflow of the tth simulation step size unit cell H, unit: veh; p is a radical of H (t) represents the density of the t-th simulation step size cell H, unit: veh/km; p is a radical of formula E (t) represents the density of the t-th simulated step size cell E, unit: veh/km; p is a radical of G (t) represents the density of the t-th simulated step size cell G, unit: veh/km; epsilon E (t) a flow dividing coefficient of the cell H in the t simulation step length for the vehicle to flow to the cell E is shown; epsilon G (t) represents a splitting coefficient of the cell H vehicle to the cell G in the t-th simulation step.
The step 3012) obtains a step shunting coefficient of the lane change position, since the lane change position is away from the intersection entrance lane, the step length is different from the step length from the vehicle running to the intersection, the time from the lane change position to the intersection is calculated according to the formula (9), the corresponding step length from the vehicle running to the intersection can be obtained by the sum of the time step length of the lane change position and the running time, and the intersection shunting coefficient of the step length is updated.
Figure BDA0003117472800000182
In the formula: lus of Lus aaa "represents each cell length between the road change position to the intersection, unit: km; p is a radical of formula aaa "represents the density of each cell between the lane change position to the intersection in the road, unit: veh/km; k is a radical of formula aaa "represents the flow rate of each cell between the lane change position and the intersection in the road, unit: veh/h; and mnb is the number of cells between the road changing position and the intersection.
Preferably, in step 3021), tl (t) is obtained according to the following steps:
according to the time t when the bus automatically enters the bus stop 1 The length l of the docking station, the distance from the docking station including the distance l of the cell end of the docking station Powder If the bus runs in the cellular free flow velocity v, the bus does not stop at the bus stationTime t of leaving cellular 2 =t 1 +(l+l Powder )/v;
Time t of leaving the stop 3 The vehicle predicts the time t of leaving the unit cell by stopping at the bus station 4 =t 3 +l Powder /v;
Comparing t corresponding to each public transport vehicle 2 And t 4 If t is 2 And t 4 And if the current bus is in different step lengths, extracting the bus as the bus which does not leave the cellular after stopping at the stop, and performing cumulative statistics to obtain the number of the buses which do not leave the cellular after stopping at the stop in the t simulation step length. If t 2 And t 4 And if the distance is the same, the vehicle is not taken as a bus for staying the cellular, and extraction is not needed.
In said step 3022), p a Calculating the time step bp of the starting point of the predicted time for the vehicle, p of the cellular a a (bp) value. According to the formula (6), a is a name from the 2 nd cell to the mm cell. For the same reason p aa ' and p aaa "calculate and p a In the same principle, aa is the name from the 2 nd cell to the mn cell, and aaa is the name from the 1 st cell to the mn cell.
k a 、k aa ' and k aaa "is obtained according to the following steps:
if the vehicle arrives at the intersection within the period step length, according to the step length bk of the vehicle from the starting point of the calculated and predicted time to the time step length bn, k of the vehicle exiting the cell a Is k is a (bk) to k a (bn) the sum; wherein a is a name from the 2 nd cell to the mm cell.
If the vehicle does not reach the intersection within the step length of the period, namely the step length of bk + bj is k a (bk + bj) =0, then the predicted time is calculated as follows:
step 1) k a Is k is a (bk) to k a (bk + bj-1) and calculating the predicted time tk according to the formula (6) or the formula (7) 1
Step 2) calculating k a The time period tk between the time when (bk + bj) =0 and the turn-on time of the phase green light in the next cycle 2
Step 3) according to k a (bk + bj) =0 distance ls between the position of the cell where the vehicle is located and the leading exit cell a "' and p a The product of (bk + bj) is used to calculate the number cm of vehicles in front of the cell a Then k in the travel time prediction is calculated at this stage a According to the step length bk + bx of the time starting point of the phase green light turn-on time of the next period to the time step length bk + bc, k of the vehicle when the vehicle is driven out of the cell a Is k is a (bk + bx) to k a (bk + bc), and the predicted time tk is calculated from the formula (6) or the formula (7) 3
Step 4) if the cellular is not the connected cellular before the entrance in the step 3), predicting the time tk when the cellular vehicle drives out of the cellular and drives to the intersection in the step 3) according to the principle of the step 3) 4 (ii) a Otherwise, tk 4 =0;
Step 5) the predicted value of the time when the vehicle drives to the intersection is tk 1 +tk 2 +tk 3 +tk 4
k aa ’、k aaa "and k is calculated a The principle is the same, wherein aa is a name from a 2 nd unit cell to a mn unit cell, and aaa is a name from a 1 st unit cell to a mnb unit cell; k is a radical of formula aaa "the calculation time is calculated according to the formula (9).
Preferably, the step 40) includes the steps of:
step 401) performing signal optimization control, specifically including establishing a target function with minimum delay per capita and setting constraint conditions;
establishing a target function with minimum delay per capita: obtaining the intersection phase number m, the bus passenger carrying rate alpha and the social vehicle passenger carrying rate beta according to the step 20), and obtaining the bus flow arrival rate and the social vehicle arrival rate according to the step 30), wherein the per-person delay value at the second intersection is shown as the formula (10):
Figure BDA0003117472800000201
in the formula: and PI represents the per-capita delay value of a second intersection of the intersection in the intersection signal period, and the unit is: s; d All the people The method comprises the following steps of (1) representing that all participants riding vehicles at the intersection delay in a period, unit: s;
Figure BDA0003117472800000202
the vehicle delay of the social vehicle representing the ith import phase in the cycle is as follows: s;
Figure BDA0003117472800000203
the delay of the bus of the ith import phase in the period is expressed as unit: s; alpha represents the average passenger carrying rate of the social vehicles in the period; beta represents the average passenger carrying rate of the buses in the period; q. q of si Vehicle arrival rate of social vehicles representing the ith import phase in the cycle, in units of: veh/h; q. q of bi And the vehicle arrival rate of the buses of the ith import phase in the cycle is represented by the unit: veh/h;
setting the constraint condition queue length:
according to N 0 +N S (t)-N C (t)=p jam Lz, obtaining an equivalent queuing length model formed by parking waiting at the intersection as shown in the formula (11):
Figure BDA0003117472800000204
in the formula: l is a radical of an alcohol DL (t)' represents the equivalent queuing length for the vehicle to stop waiting at that phase of the intersection in units: km, N 0 The number of vehicles traveling in the upstream and downstream sections at the initial time is represented by: veh; n is a radical of hydrogen S (t) represents the cumulative number of vehicles passing through the upstream cross-section from the initial time to time t in units of: veh; n is a radical of C (t) represents the cumulative number of vehicles passing through the downstream cross-section from the initial time to time t, in units of: veh; lz represents the distance between the upstream and downstream sections in units: km; p is a radical of jam Represents the maximum jam density of the road section, unit: veh/km;
calculating the queuing length of a plurality of cells segmented according to an improved cell transmission model, calculating the equivalent queuing length in each cell according to a formula (11), wherein the equivalent queuing length of the phase intersection is the sum of the equivalent queuing lengths in the cells, and analogizing in the upstream direction;
in the queue length L DL (t)' the minimum value is 0, and the maximum value is the sum of the distance from the intersection phase stop line to the upstream bus stop and the length of the bus waiting area, and the sum is used as a constraint condition for optimization;
setting a constraint condition split ratio: the green light time corresponding to each phase needs to be constrained by taking the time required by the pedestrian to pass through the intersection as the minimum value and taking the signal cycle time as the maximum value;
step 402) controlling the variable lane, as shown in fig. 6, includes the following steps 4021) to 4025):
step 4021) acquiring the arrival rates of the public buses and the social vehicles in a signal period according to the arrival time of the public buses and the social vehicles at the intersection obtained in the step 30);
step 4022) judging that the lane-changeable state is straight or left-turning at the moment according to the state of the vehicle driving away from the intersection at the output end of the front entrance lane;
step 4023) if the phase green light tail end of the intersection signal controller is changed into the red light in advance, judging that the arriving buses are the same-phase buses or different-phase buses at the moment; if the phase is consistent with the lane direction of the front variable area, the bus drives to the lane with the corresponding phase for parking and waiting, after the green light of the different-phase pre-signal is turned on, the bus with the different phase drives away from the bus waiting area, and the bus can drive into the bus waiting area in a lane changing mode for parking and waiting for arrival of the phase; if the phase position is different from the direction of the front lane, the bus arrives at the bus waiting area to stop and wait for the phase position to arrive; the process that the public transport vehicles arrive at the waiting area and drive away from the intersection and the social transport vehicles drive away from the intersection is carried out in the step 102);
step 4024) establishing a variable lane model: as shown in fig. 7, based on the driving curve of the vehicle at one phase of the intersection, the relationship between the vehicle delay and the phase green time is as follows:
the relation between the second vehicle average delay and the phase green light time of the bus is shown as formula (12) and formula (13):
as shown in figure 7 (a) of the drawings,
Figure BDA0003117472800000211
then
Figure BDA0003117472800000212
On the contrary, as shown in FIG. 7 (b),
Figure BDA0003117472800000221
the social vehicle second vehicle average delay and phase green light time relation is shown as formula (14), formula (15), formula (16), formula (17) and formula (18):
as shown in figure 7 (c) of the drawings,
Figure BDA0003117472800000222
Figure BDA0003117472800000223
as shown in figure 7 (d) of the drawings,
Figure BDA0003117472800000224
Figure BDA0003117472800000225
as shown in figure 7 (e) of the drawings,
Figure BDA0003117472800000226
Figure BDA0003117472800000227
as shown in figure 7 (f) of the drawings,
Figure BDA0003117472800000228
Figure BDA0003117472800000229
on the contrary, as shown in FIG. 7 (g),
Figure BDA00031174728000002210
in the formula: c is the intersection cycle duration, unit: s; g i The unit is the green light time of the ith inlet phase in the period: s; g 1i The time for turning on the lane-changing green light of the ith inlet phase in advance in a cycle is as follows: s; s bi The departure rate of the bus in the ith entrance phase green light in the period is as follows: veh/h; q. q.s bi The unit of the arrival rate of the ith import phase bus in the cycle is as follows: veh/h;
Figure BDA0003117472800000231
and (3) a second vehicle average delay value of the ith import phase public transport in the period is represented as the unit: s;
Figure BDA0003117472800000232
and a second vehicle mean delay value of the ith import phase social vehicle in the cycle, wherein the unit is as follows: s; q. q.s si The social vehicle arrival rate of the ith import phase in the cycle is as follows: veh/h; s is si The social vehicle leaving rate of a left-turn lane before lane change at the ith entrance phase green light in a cycle is as follows: veh/h; s si ' is the social vehicle leaving rate in the whole left-turning direction after lane change at the ith entrance phase green light in the period, and the unit is as follows: veh/h; h is bi The number of vehicles corresponding to the starting end of the cycle of the ith phase bus arrival curve in the cycle is as follows: veh; h is a total of sbi The number of vehicles corresponding to the departure curve of the ith phase bus at the beginning end of the period in the period is as follows: veh; h is si The number of vehicles corresponding to the starting end of the cycle when the social vehicles at the ith entry phase in the cycle reach the curve is as follows: veh; h is a total of ssi For turning left lane before i-th entrance phase green time change in cycleThe number of the social vehicles leaving the curve at the beginning of the period, unit: veh; h is sssi The number of the vehicles corresponding to the starting end of the period when the social vehicles in the whole left-turning direction leave the curve after the ith entrance phase green light time lane change in the period is as follows: veh; h is ssssi When the signal yellow light is pre-signaled for the ith entrance phase in a cycle, the number of vehicles, the unit, corresponding to the starting end of the cycle, of a social vehicle leaving a left-turn lane from a curve is as follows: veh;
step 4025) establishing a variable lane model according to the step 4024), and calculating the per-person delay value of the second intersection according to a formula (10);
step 403), calculating the per-person delay value of the first intersection of the original phase original lane distribution:
the average delay value of people at the first intersection is shown as the formula (19):
Figure BDA0003117472800000233
in the formula: PI (polyimide) Original source And (3) indicating the per-capita delay value of a second intersection of the intersection in the intersection signal period, unit: s; d is a radical of All the people The method comprises the following steps of (1) representing that all participants riding vehicles at the intersection delay in a period, unit: s;
Figure BDA0003117472800000234
the vehicle delay of the social vehicle representing the ith import phase in the cycle is as follows: s;
Figure BDA0003117472800000235
the delay of the bus of the ith import phase in the period is expressed as unit: s;
the time relationship between the vehicle delay and the phase green light is shown in fig. 8. The time relation between the first vehicle average delay value and the phase green light is as shown in the formula (20) and the formula (21):
as shown in figure 8 (a) of the drawings,
Figure BDA0003117472800000241
then
Figure BDA0003117472800000242
On the contrary, as shown in FIG. 8 (b),
Figure BDA0003117472800000243
the relation between the first vehicle average delay value of the social vehicle and the phase green light time is as shown in the formula (22) and the formula (23):
as shown in figure 8 (c) of the drawings,
Figure BDA0003117472800000244
Figure BDA0003117472800000245
on the contrary, as shown in FIG. 8 (d),
Figure BDA0003117472800000246
in the formula: c is the intersection cycle duration, unit: s; g' i The unit of the green time of the ith inlet phase in the lower period of the original lane at the original phase is as follows: s;
Figure BDA0003117472800000247
the unit of vehicle delay of the i-th import phase social vehicle in the lower cycle of the original phase original lane is as follows: s;
Figure BDA0003117472800000248
the unit of the delay of the bus of the ith import phase in the lower period of the original phase lane is shown as follows: s; q. q.s bi The unit is the arrival rate of the ith import phase bus in the cycle: veh/h; s ″) bi The departure rate of the bus at the ith entrance phase green light in the lower period of the original phase original lane is as follows: veh/h; q. q.s si The social vehicle arrival rate of the ith import phase in the cycle is as follows: veh/h;s″ si The social vehicle departure rate is the social vehicle departure rate at the ith entrance phase green light in the lower period of the original phase original lane, and the unit is as follows: veh/h; h is bi The number of vehicles corresponding to the cycle starting end of the ith phase public transport vehicle arrival curve in the cycle is as follows: veh; h is sbi When the phase of the ith inlet phase of the green light in the lower period of the original phase original lane is' the number of the buses leaving the curve corresponding to the starting end of the period, unit: veh; h is si The number of vehicles corresponding to the starting end of the cycle when the social vehicles at the ith entry phase in the cycle reach the curve is as follows: veh; h' ssi The number of the social vehicles leaving the curve at the corresponding start end of the period when the ith entrance phase green light in the period under the original phase original lane is as follows: veh (v).
And substituting the delay of all buses and the delay of all social vehicles distributed on the original phase lane into a formula (19) to calculate the delay value of all people at the first intersection.
Step 404), judging and outputting: if the per-person delay value of the second intersection is smaller than that of the first intersection, outputting the green signal ratio of each phase of the intersection under the variable lane scheme and the coordinated optimization control; if the per-person delay value at the second intersection is larger than that at the first intersection, the original phase is adopted, and the variable lane is only used as a bus-only approach to ensure that the bus space is prioritized and output.
The innovation of the patent is that: step 10) variable lane setting. Compared with the existing space priority research, one lane in the direction of the entrance is established as a lane-changing model implementation object in the aspect of space through a lane-changing model, the space priority of the bus at the intersection is ensured by setting a pre-stop line as a support, but in order to reduce the increase of social vehicle delay caused by the priority of the bus space, after the bus at the phase passes through the intersection preferentially in the lane, other social vehicles at the phase are allowed to pass through the lane-changing model to the stop line and then exit the intersection from the variable area; the space priority right of the bus passing at the intersection and the social vehicle dual-lane leaving the intersection after the bus leaves the intersection are realized, and the influence of bus priority on the social vehicle is further reduced; the lane utilization efficiency is improved in a limited road space, and lane sharing of left-turn and straight-going phases and lane sharing of public buses and social vehicles are realized.
And step 3012) predicting the traffic flow splitting coefficient of the intersection. The relationship between the position of a steering lane change and the length and the density of a road is determined by fitting the vehicle on the road running track, the intersection diversion coefficient of each simulation step length, namely the steering ratio, can be predicted, and the dynamic update of the steering ratio is realized; the flow distribution coefficient value in a time period is not fixedly obtained by the characteristics of the conventional traffic flow data, so that the traffic flow parameters in the model operation simulation have errors; the corresponding shunt coefficient value can be matched according to the running characteristics of the vehicle under different time scenes by adopting real-time updating, and the running simulation error of the model can be properly reduced.
And in step 3022), predicting and obtaining the time when the vehicle reaches the intersection. The improved cellular transmission model is used for simulating the evolution effect of traffic flow, and the process that the bus enters and exits the stop station is considered, so that the information prediction that the bus arrives at the intersection is realized. Compared with the existing researched traffic flow prediction, the method does not use the past data as a basis for simulation, can quickly predict the time of the bus arriving at the intersection by acquiring real-time traffic data information of the entering road and bus departure time information, considers the process of the bus entering and exiting the stop, further enables the flow density relation of the cells to be fit with the reality, and provides a basis for signal optimization.
And step 40), establishing a coordination control model. And in the aspect of time, when the signal timing is optimized according to the bus arrival characteristics and the social vehicle arrival characteristics, a signal priority control model is established, and the time length of lane change pre-signals and green lights is synchronously coordinated. And the space and time dual-priority right of passage of the public transport vehicles at the intersection is realized by combining a variable lane model.
The control method of the invention is compared with the existing control method without optimization.
Comparative example 1: the existing control method without optimization, namely the fixed timing scheme adopted by the signal timing of the current traffic intersection, is adopted. According to the statistical operation conditions of the traffic flow of the vehicle at the peak and the peak, the common characteristics are obtained, the corresponding signal control model is established, and the corresponding green-to-noise ratios are obtained and are respectively used as the control basis of the phase traffic lights at the peak and peak time periods.
Example 1: the control method is adopted. The arrival rate and the departure rate of the vehicle are obtained by applying an improved cellular transmission model, the man-mean delay of a target function is taken as the input end of the genetic algorithm, the constraint condition queue length and the split ratio are taken as the input end of the genetic algorithm, and the output end of the genetic algorithm, namely the split ratio of each phase is obtained by matlab simulation.
The green signal ratios before and after optimization are substituted into indexes such as per-person delay, per-vehicle delay and the like for calculation, so that the conditions of vehicle per-vehicle delay, bus per-vehicle delay, social vehicle per-vehicle delay, intersection per-person delay and equivalent queuing length index change of the vehicles in comparative example 1 and example 1 at each entrance phase are obtained.
The vehicle delay condition for each inlet phase of the vehicle is shown in fig. 9. As can be seen from FIG. 9, the vehicle delay variation range of the method of the present invention is larger than that of the conventional method, and the overall vehicle delay of example 1 is reduced by 30.28% compared with that of comparative example 1. Wherein, the delay reduction amplitude of the sixth inlet phase is the largest and is reduced by 51.42%, and the delay reduction amplitude of the third inlet phase is the smallest and is reduced by 1.99%.
The bus delay and the social bus delay are shown in fig. 10. As can be seen from fig. 10, in example 1, compared with comparative example 1, the delay of the partial entrance direction of the buses, social vehicles and the like is increased, and the delay of the partial entrance direction is obviously reduced, because the green signal ratio of each phase direction is changed under the condition of fixed period of signal coordination control, and the optimization of the intersection index is achieved by taking mutual sacrifice of different phase directions as an objective. The buses in the eighth import phase are delayed by 56.46% and the buses in the fourth import phase are delayed by 67.58%. The delay of the whole buses in the embodiment 1 is reduced by 13.89% compared with that of the whole buses in the comparative example 1, and the delay of the whole buses in the embodiment 1 is reduced by 36.57% compared with that of the whole buses in the comparative example 1.
The human delay is shown in fig. 11. As can be seen from fig. 11: compared with the comparative example 1, the per-capita delay of the example 1 is obviously changed, the whole per-capita delay of the intersection is reduced by 14.45 percent, the man-average delay reduction effect is better under the condition that the vehicle-average delay reduction is obvious, and the advantages and the significance of the coordination model are verified.
The equivalent queuing length variation curve is shown in fig. 12. As can be seen from fig. 12, the second phase equivalent queuing length of example 1 is significantly increased by 112.47% compared with that of comparative example 1, but the increased queuing length is still within the constraint range, and the significant reason for the change is that the arrival rate of the bus in the phase is influenced by the arrival rate of the bus in the phase, and the arrival rate of the bus in the phase is smaller than that of the bus in other phases, so that the queuing length is suddenly increased by compressing the green duration of the bus in the signal optimization process, but the overall change does not exceed the constraint range.
Finally, it should be noted that: although the present invention has been described in detail with reference to the above embodiments, it should be understood by those skilled in the art that: modifications and equivalents may be made to the embodiments of the invention without departing from the spirit and scope of the invention, which is to be covered by the claims.

Claims (5)

1. A city bus priority coordination control method based on information prediction is characterized by comprising the following steps:
step 10) designing a bus-only right channel based on a variable lane, wherein the design method comprises a variable lane setting method, a variable lane control phase vehicle running method, variable lane control geometric parameters and variable lane control signal parameters, and space priority of bus passing at an intersection is realized;
step 20) acquiring basic data, wherein the basic data comprises historical track data of vehicles on the road, traffic flow information entering the road, time of bus leaving a stop, the number or rate of passengers carried by the bus, the number or rate of the passengers carried by the bus, the phase duration of an intersection and geometric parameters of the road;
step 30) analyzing historical track data of the road vehicles according to the basic data obtained in the step 20), obtaining a lane change position for determining vehicle steering, and predicting a traffic flow diversion coefficient of the lane change; the method comprises the steps that an improved cellular transmission model is used for simulating a road traffic flow driving process, and the time of arrival of public buses and social vehicles at an intersection is obtained on the basis of the bus departure time;
step 40) carrying out coordinated control on signal optimization and the variable lane according to the design of the variable lane in the step 10) and the time of arrival of the public transport vehicle and the social vehicle at the intersection obtained in the step 30), and obtaining a second intersection per-person delay value and an intersection per-phase green-to-noise ratio which are coordinated and optimized; calculating a first intersection per capita delay value of the original phase original lane arrangement according to the time of the public transport vehicles and the social vehicles to reach the intersection obtained in the step 30); comparing the per-person delay value of the second intersection with the per-person delay value of the first intersection, and confirming output information;
step 50) realizing intersection traffic flow control according to the output information of the step 40);
the step 10) specifically comprises:
step 101) a method for setting a variable lane:
the channelized intersection is a cross-shaped plane intersection, an entrance way in the entrance direction is provided with 1 left-turn lane, 1 variable lane and 1 straight lane, and the variable lane is set as an adjacent lane of the left-turn lane without considering the influence of the right-turn lane;
the variable lane includes three zones arranged from far to near according to the distance from the intersection: a bus waiting area, a lane changing area and a variable area;
the two sides of the bus waiting area are dotted line sections, the bus waiting area only allows buses to enter, buses with different phases can timely enter the bus waiting area, and other social vehicles cannot enter the bus waiting area;
dotted lines are arranged on two sides of the lane changing area, so that the straight-going and left-turning vehicles can change lanes to run on two lanes;
solid lines are arranged on two sides of the variable area, and the variable area is switched between straight running and left turning;
step 102) a variable lane control phase vehicle operation method:
east-west phase vehicle operation method: when the first phase is green light for east-west straight running, the vehicle runs straight, the variable lane is set as a straight-running phase, when the east-west straight-running bus arrives, the east-west straight-running bus directly follows the traffic flow to pass through the intersection along the straight-running lane, then the straight-running bus can enter the variable area through lane changing to run on double entry lanes, and at the moment, the arriving left-turning bus arrives at the bus waiting area to queue for the pre-signal light to turn on the yellow light, namely waiting for the pre-signal to finish the time in advance; when the signal lamp is yellow in advance, the advance ending time of the advance signal is reached, the straight-going vehicle can not drive by means of the variable area, the advance signal is turned on in advance when the left-turning phase is up, the left-turning bus drives out of the bus waiting area and enters the variable area to queue for the turning-left phase to turn on the green lamp; the left-turn vehicles can directly follow the traffic flow to pass through the intersection along the left-turn lane when arriving, then the left-turn vehicles can also change the lane variable area to carry out double-entry lane driving, and the arriving direct buses arrive at the bus waiting area at the moment and wait for the pre-signal lamp to turn on the yellow lamp, namely the phase pre-signal is finished in advance; when the pre-signal lamp is changed into a yellow lamp, the pre-signal early ending time is reached, a left-turning vehicle cannot change lanes and drive by virtue of a variable area, the pre-signal is turned on in advance when a straight-going phase is waited, and a straight-going bus enters the variable area through a bus waiting area to queue for a straight-going phase green lamp to turn on;
the running method of the vehicle in the south-north phase is the same as that of the vehicle in the east-west phase;
step 103) variable lane control geometric parameters:
length l of bus waiting area 1 The maximum queuing distance required by buses and the length l of the lane-changeable area should be satisfied 2 The lane change distance of a car and the length l of a variable zone 3 The length of the canalization section is consistent with that of the intersection entrance way;
step 104) variable lane control signal parameters:
Figure FDA0003728438470000021
g 2i =g i -g 1i formula (2)
In the formula: l 2i The switchable zone length for the ith inlet phase, in units of: m; l 3i Is the ith inletVariable zone length of the mouth phase, unit: m; v. of b Is the average speed of the bus, unit: m/s; i is s To start up lost time, unit: s; g is a radical of formula i Denotes the ith inlet phase green time, unit: s; g 1i The unit of the time for which the green light signal is turned on in advance is as follows: s; g 2i Pre-signal duration green time, unit: and s.
2. The urban bus priority coordination control method based on information prediction according to claim 1, wherein in the step 30), predicting the intersection traffic flow splitting coefficient comprises the following steps:
step 3011) analyzing and fitting the relationship between the lane change position of the vehicle and the length and density of the road: according to the historical track data of the road vehicle, fitting the relationship between the lane changing position and the length and density of the road, as shown in formula (3):
Figure FDA0003728438470000031
in the formula: x is a radical of a fluorine atom Lane changing device To determine the lane change position for vehicle steering, the unit: km; p is a radical of formula Road To determine the density of the road segment where the lane change position where the vehicle is turning, the unit: veh/km; l Road Is the link length, in units: km;
step 3012) predicting traffic flow diversion coefficients at the intersection: determining a corresponding lane changing position x according to the relationship between the lane changing position and the length and density of the road and the density of each simulation step length when the length of the road is known; the method comprises the steps that a vehicle sensor is arranged to transmit signals of the position of a road where the vehicle sensor is located and the position of a lane occupied in the running process of the vehicle sensor, a controller receives and processes traffic flow information of signals at a lane changing position x in a simulation step length, and the traffic flow diversion coefficient of traffic flow of each lane, which is the simulation step length, of the traffic flow running to a crossing is calculated.
3. The urban public transportation priority coordination control method based on information prediction according to claim 2, wherein in the step 30), acquiring the time when the public transportation vehicle and the social vehicle arrive at the intersection comprises:
step 3021) establishing an improved cellular transmission model of the road driving section:
according to the flow conservation theorem, the relationship between the internal density of the ordinary cells and the flow is shown in the formula (4):
k a (t)=[min(v·p a-1 (t),q amax ,w(p jam -p a (t)))]formula (4)
In the formula: k is a radical of a (t) represents the integral traffic inflow of the cell a of the t simulation step length road section without the bus stop, and the unit is as follows: veh; v represents the free-flow vehicle speed of the overall flow, unit: km/h; p is a radical of a-1 (t) represents the overall traffic density of the t-th simulation step length road section cellular a-1, and the unit is as follows: veh/km; q. q.s amax Represents the maximum flow rate of the road section cell a, unit: veh/h; w represents a backward propagation speed of a congestion wave generated when the traffic flow running density is greater than the optimal running density, and the unit is as follows: km/h; p is a radical of formula jam Represents the maximum traffic density of the road section, unit: veh/km; p is a radical of a (t) represents the overall traffic density of the t-th simulation step length road section cellular a, and the unit is as follows: veh/km;
due to the consideration of the process of bus stop, the relation between the internal density and the flow of the cells containing the bus stop is shown as the formula (5):
Figure FDA0003728438470000032
in the formula: k' a (t) represents the integral traffic inflow of the cell a of the bus stop included in the t-th simulation step length road section, and the unit is as follows: veh; tl (t) represents the number of buses which do not leave the cell after stopping at the stop in the t simulation step length; delt represents the simulation step size, unit: h;
step 3022) acquiring the time when the vehicle reaches the intersection:
the predicted time tt of the bus from leaving the stop to the intersection is shown as formula (6):
Figure FDA0003728438470000041
in the formula: l ″) 1 The distance, unit, from the bus stop to the output end containing the stop cells is represented as follows: km; p is a radical of formula 1 The unit of the cell density including the bus stop is as follows: veh/km; k is a radical of 1 ' represents the flow rate containing the cells of the bus stop, and the unit: veh/h; l ″) a The length and unit of other cells except the cells of the stop station are shown between the stop station and the intersection of the bus in the road: km; p is a radical of formula a The density and unit of other cells except the cells of the stop station are shown between the stop station and the intersection of the bus in the road: veh/km; k is a radical of a The method comprises the following steps of (1) representing that in a road, the flow and the unit of other cells including cells of a bus stop are measured from the bus stop to a crossing: veh/h; the mm is the number of divided cells between the bus stop and the intersection in the road;
the predicted time tt' of the social vehicle from the entering road to the intersection is shown as the formula (7):
Figure FDA0003728438470000042
in the formula: ls 1 Length of a stop cell included in a road, unit: km; ls aa "indicates the length of each cell in the road except the cell including the stop, unit: km; p is a radical of formula aa ' represents the density of each cell in the road except for the cells including the stop, unit: veh/km; k is a radical of aa ' represents the flow rate of each cell except for the cells including the stop in the road, unit: veh/h; mn is the number of road dividing cells;
step 3023) establishing an improved cellular transmission model of the intersection entrance road:
the relationship between inlet channel cell density and flow is shown in formula (8):
Figure FDA0003728438470000043
in the formula: k is a radical of formula H (t) represents the traffic inflow of the tth simulation step size unit cell H, unit: veh; p is a radical of formula H (t) represents the density of the t-th simulation step size unit cell H, unit: veh/km; p is a radical of E (t) represents the density of the t-th simulated step size cell E, unit: veh/km; p is a radical of formula G (t) represents the density of the t-th simulation step size unit cell G, unit: veh/km; epsilon E (t) a flow dividing coefficient of the cell H in the t simulation step length for the vehicle to flow to the cell E is shown; epsilon G (t) represents the shunting coefficient of the vehicle flowing to the cell G of the cell H in the t simulation step length;
the step 3012) obtains a step shunting coefficient of the lane change position, because the lane change position is distant from the intersection entrance lane, the step where the lane change position is distant from the intersection entrance lane, and the step where the lane change position is distant from the intersection entrance lane, the step where the lane change position is distant from the intersection entrance lane is different from the step where the vehicle travels to the intersection, the time that the vehicle travels from the lane change position to the intersection is calculated according to the formula (9), the corresponding step where the vehicle travels to the intersection can be obtained by the sum of the step of the lane change position time and the time that the vehicle travels from the lane change position to the intersection, and the intersection shunting coefficient of the step is updated:
Figure FDA0003728438470000051
in the formula: lus of Lus aaa "represents each cell length between the road change position to the intersection, unit: km; p is a radical of formula aaa "represents the density of each cell between the lane change position to the intersection in the road, unit: veh/km; k is a radical of aaa "represents the flow rate of each cell between the lane change position and the intersection in the road, unit: veh/h; and mnb is the number of cells between the road changing position and the intersection.
4. The city bus priority coordination control method based on information prediction as claimed in claim 3, wherein in step 3021), tl (t) is obtained according to the following steps:
according to the time t when the bus automatically enters the bus stop 1 The length l of the docking station, the distance from the docking station including the end of the cell of the docking stationDistance l Powder And if the bus runs at the free flow speed v in the cellular, the bus runs out of the cellular time t without stopping at the bus stop 2 =t 1 +(l+l Powder )/v;
Time t of departure from a stop 3 The vehicle predicts the time t of leaving the unit cell by stopping at the bus station 4 =t 3 +l Powder /v;
Comparing t corresponding to each bus 2 And t 4 If t is 2 And t 4 And if the current bus is in different step lengths, extracting the bus as the bus which does not leave the cellular after stopping at the stop, and performing cumulative statistics to obtain the number of the buses which do not leave the cellular after stopping at the stop in the t simulation step length.
5. The city bus priority coordination control method based on information prediction as claimed in claim 1, wherein said step 40) comprises the steps of:
step 401) performing signal optimization control, specifically including establishing a target function with minimum delay per capita and setting constraint conditions;
establishing a target function with minimum delay per capita: obtaining the intersection phase number m, the bus passenger carrying rate alpha and the social vehicle passenger carrying rate beta according to the step 20), and obtaining the bus flow arrival rate and the social vehicle arrival rate according to the step 30), wherein the per-person delay value at the second intersection is shown as the formula (10):
Figure FDA0003728438470000061
in the formula: and PI represents the per-capita delay value of a second intersection of the intersection in the intersection signal period, and the unit is: s; d is a radical of All the people And (3) indicating that all the participants riding the vehicle at the intersection delay in the period, unit: s;
Figure FDA0003728438470000062
the vehicle delay of the social vehicle representing the ith import phase in the cycle is as follows: s;
Figure FDA0003728438470000063
the delay of the bus of the ith import phase in the period is expressed as unit: s; alpha represents the average passenger carrying rate of the social vehicles in the period; beta represents the average passenger carrying rate of the buses in the period; q. q.s si Vehicle arrival rate of social vehicles representing the ith entry phase in the cycle, unit: veh/h; q. q.s bi And the vehicle arrival rate of the buses of the ith import phase in the cycle is represented by the unit: veh/h;
setting the constraint queuing length:
according to N 0 +N S (t)-N C (t)=p jam Lz, obtaining an equivalent queuing length model formed by parking and waiting at the intersection as shown in a formula (11):
Figure FDA0003728438470000064
in the formula: l is a radical of an alcohol DL (t)' represents the equivalent queuing length for the vehicle to stop waiting at that phase of the intersection in units: km, N 0 The number of vehicles traveling in the upstream and downstream sections at the initial time is expressed in units of: veh; n is a radical of hydrogen S (t) represents the cumulative number of vehicles passing through the upstream cross-section from the initial time to time t in units of: veh; n is a radical of C (t) represents the cumulative number of vehicles passing through the downstream cross-section from the initial time to time t, in units of: veh; lz represents the distance between the upstream and downstream sections in units: km; p is a radical of formula jam Represents the maximum jam density of the road section, unit: veh/km;
calculating the queuing length of a plurality of cells divided according to an improved cell transmission model, calculating the equivalent queuing length in each cell according to a formula (11), wherein the equivalent queuing length of a phase intersection is the sum of the equivalent queuing lengths in the cells, and analogizing in the upstream direction;
in the queue length L DL (t)' the minimum value is 0, and the maximum value is the sum of the distance from the intersection phase stop line to the upstream bus stop and the length of the bus waiting area, and the sum is used as a constraint condition for optimization;
setting a constraint condition split ratio: the green light time corresponding to each phase needs to be constrained by taking the time required by the pedestrian to pass through the intersection as the minimum value and taking the signal cycle time as the maximum value;
step 402) controlling the variable lane, including the following steps 4021) to 4025):
step 4021) acquiring the arrival rates of the public buses and the social vehicles in a signal period according to the arrival time of the public buses and the social vehicles at the intersection obtained in the step 30);
step 4022) judging that the variable lane state is straight or left-turning at the moment according to the state of the vehicle driving from the intersection at the output end of the front entrance way;
step 4023) if the phase of the front variable area controlled by the intersection signal controller is changed into a red light at the tail end of a green light and a pre-signal light, judging that the arriving buses are the same-phase buses or different-phase buses at the moment; if the phase is consistent with the lane direction of the front variable area, the bus drives to the lane with the corresponding phase for parking and waiting, after the green light of the different-phase pre-signal is turned on, the bus with the different phase drives away from the bus waiting area, and the bus can drive into the bus waiting area in a lane changing mode for parking and waiting for the arrival of the phase; if the phase position is different from the direction of the front lane, the bus arrives at the bus waiting area to stop and wait for the phase position to arrive; the public transport vehicles arrive at the waiting area and drive-off intersections, and the social transport vehicles drive off the intersections, as described in step 102);
step 4024) establishing a variable lane model: the relation between the delay of all vehicles and the green time of the phase position is based on the driving curve of the vehicle in the phase position at the intersection as follows:
the time relation between the second vehicle delay and the phase green light of the public transport vehicle is shown as the formula (12) and the formula (13):
if it is not
Figure FDA0003728438470000071
Then the
Figure FDA0003728438470000072
On the contrary, the first step is to take the reverse,
Figure FDA0003728438470000073
the social vehicle second vehicle average delay and phase green light time relation is shown as formula (14), formula (15), formula (16), formula (17) and formula (18):
if it is used
Figure FDA0003728438470000081
Figure FDA0003728438470000082
If it is used
Figure FDA0003728438470000083
Figure FDA0003728438470000084
If it is not
Figure FDA0003728438470000085
Figure FDA0003728438470000086
If it is used
Figure FDA0003728438470000087
Figure FDA0003728438470000088
On the contrary, the first step is to take the reverse,
Figure FDA0003728438470000089
in the formula: c is the intersection cycle duration, unit: s; g i The unit is the green light time of the ith inlet phase in the period: s; g is a radical of formula 1i The method is characterized in that the turn-on time of a lane-changing green light of the ith inlet phase in the cycle is as follows: s; s bi The departure rate of the bus in the ith entrance phase green light in the period is as follows: veh/h; q. q.s bi The unit is the arrival rate of the ith import phase bus in the cycle: veh/h;
Figure FDA00037284384700000810
and a second vehicle average delay value of the ith inlet phase public transport vehicle in the period is represented as the unit: s;
Figure FDA00037284384700000811
a second vehicle-to-vehicle delay value representing the i-th import phase social vehicle in the cycle, in units: s; q. q.s si The social vehicle arrival rate of the ith import phase in the cycle is as follows: veh/h; s si The social vehicle leaving rate of a left-turn lane before lane change at the ith entrance phase green light in a cycle is as follows: veh/h; s is si ' is the social vehicle leaving rate in the whole left-turning direction after lane change at the ith entrance phase green light in the period, and the unit is as follows: veh/h; h is bi The number of vehicles corresponding to the cycle starting end of the ith phase public transport vehicle arrival curve in the cycle is as follows: veh; h is sbi The number of vehicles corresponding to the departure curve of the ith phase bus at the beginning end of the period in the period is as follows: veh; h is a total of si The number of vehicles corresponding to the starting end of the cycle of the i-th import phase social vehicle arrival curve in the cycle is as follows: veh; h is a total of ssi The number of the social vehicles leaving the curve of the left-turn lane before the green light time change of the ith entrance phase in the cycle at the starting end of the cycle is as follows, the unit: veh; h is sssi After the ith entrance phase green light time-varying lane in the period, the social vehicles in the whole left turning direction leave the curve corresponding to the starting end of the periodNumber of vehicles (d), unit: veh; h is ssssi When the signal yellow is preset in the ith entrance phase in the period, the social vehicles of a left-turn lane leave the number of vehicles corresponding to the starting end of the period, the unit is as follows: veh;
step 4025) establishing a variable lane model according to the step 4024), and calculating a per-person delay value at a second intersection according to a formula (10);
step 403), calculating the per-person delay value of the first intersection of the original phase original lane distribution:
the average delay value of people at the first intersection is shown as the formula (19):
Figure FDA0003728438470000091
in the formula: PI (proportional integral) Original source And (3) indicating the per-capita delay value of the first intersection of the intersection in the intersection signal period, unit: s; d All the people And (3) indicating that all the participants riding the vehicle at the intersection delay in the period, unit: s;
Figure FDA0003728438470000092
the vehicle delay of the social vehicle representing the ith import phase in the cycle is as follows: s;
Figure FDA0003728438470000093
the delay of the bus of the ith import phase in the period is represented by the following unit: s;
the relation between the first bus average delay value and the phase green light time is as shown in the formula (20) and the formula (21):
if it is not
Figure FDA0003728438470000094
Then the
Figure FDA0003728438470000095
On the contrary, the method can be used for carrying out the following steps,
Figure FDA0003728438470000101
the relation between the first vehicle average delay value of the social vehicle and the phase green light time is as shown in the formula (22) and the formula (23):
if it is used
Figure FDA0003728438470000102
Figure FDA0003728438470000103
On the contrary, the first step is to take the reverse,
Figure FDA0003728438470000104
in the formula: c is the intersection cycle duration, unit: s; g' i The unit of the green time of the ith inlet phase in the lower period of the original lane at the original phase is as follows: s;
Figure FDA0003728438470000105
the unit of the delay of the vehicles of the ith import phase social vehicle in the lower period of the original phase original lane is as follows: s;
Figure FDA0003728438470000106
the unit of the delay of the bus of the ith import phase in the lower period of the original phase lane is shown as follows: s; q. q.s bi The unit is the arrival rate of the ith import phase bus in the cycle: veh/h; s ″) bi The departure rate of the bus at the ith entrance phase green light in the lower period of the original phase original lane is as follows: veh/h; q. q.s si The social vehicle arrival rate of the ith import phase in the cycle is as follows: veh/h; s ″) si The social vehicle departure rate is the social vehicle departure rate at the ith entrance phase green light in the lower period of the original phase original lane, and the unit is as follows: veh/h; h is bi Is period ofThe number of vehicles, unit, of the inner ith inlet phase bus arriving curve corresponding to the period starting end is as follows: veh; h is a total of sbi When the phase of the ith inlet phase of the green light in the lower period of the original phase original lane is' the number of the buses leaving the curve corresponding to the starting end of the period, unit: veh; h is si The number of vehicles corresponding to the starting end of the cycle when the social vehicles at the ith entry phase in the cycle reach the curve is as follows: veh; h' ssi The number of the social vehicles leaving the curve at the corresponding start end of the period when the ith entrance phase green light in the period under the original phase original lane is as follows: veh;
substituting the delay of all buses and the delay of all social vehicles distributed on the original phase original lane into a formula (19) to calculate the delay value of all people at the first intersection;
step 404) judging and outputting: if the per-person delay value of the second intersection is smaller than that of the first intersection, outputting the green signal ratio of each phase of the intersection under the variable lane scheme and the coordinated optimization control; if the per-person delay value at the second intersection is greater than the per-person delay value at the first intersection, the original phase is adopted, and the variable lane is only used as a bus special entrance lane to ensure that the bus space is prioritized and output.
CN202110666086.1A 2021-06-16 2021-06-16 Urban public transport priority coordination control method based on information prediction Active CN113409599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110666086.1A CN113409599B (en) 2021-06-16 2021-06-16 Urban public transport priority coordination control method based on information prediction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110666086.1A CN113409599B (en) 2021-06-16 2021-06-16 Urban public transport priority coordination control method based on information prediction

Publications (2)

Publication Number Publication Date
CN113409599A CN113409599A (en) 2021-09-17
CN113409599B true CN113409599B (en) 2022-10-25

Family

ID=77684345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110666086.1A Active CN113409599B (en) 2021-06-16 2021-06-16 Urban public transport priority coordination control method based on information prediction

Country Status (1)

Country Link
CN (1) CN113409599B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114724353B (en) * 2022-03-10 2023-06-09 深圳大学 Bus signal passive priority control method and device considering pedestrians
CN114973654B (en) * 2022-04-27 2023-10-13 深圳大学 Method and device for realizing coordination control of passive bus priority trunk road considering stop
CN115311868B (en) * 2022-07-20 2023-07-25 武汉理工大学 Main line coordination control method and device based on bus priority
CN115908838B (en) * 2022-12-12 2023-11-07 南京慧尔视智能科技有限公司 Vehicle presence detection method, device, equipment and medium based on radar fusion
CN116229724B (en) * 2023-05-06 2023-08-01 华东交通大学 Traffic signal control method and system considering average delay of passengers
CN116524743B (en) * 2023-06-25 2023-09-15 南京理工大学 Bus signal lamp priority release method and equipment based on simulation

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2304972A1 (en) * 1975-03-21 1976-10-15 Serel IMPROVEMENTS IN CROSSROADS SIGNALING SYSTEMS
CN102682612B (en) * 2012-05-18 2014-05-07 东南大学 Integration type signalized intersection bus priority system based on bus stop platform control
CN104298829B (en) * 2014-10-14 2017-04-12 浙江师范大学 Cellular automaton model based urban road network traffic flow simulation design method
JP6350262B2 (en) * 2014-12-17 2018-07-04 住友電気工業株式会社 Traffic signal control device, computer program, and traffic signal control method
CN105825677B (en) * 2016-05-31 2018-10-09 武汉大学 A kind of urban traffic blocking prediction technique based on improvement BML models
CN106781563B (en) * 2016-12-27 2019-03-22 河海大学 A kind of city expressway intersection public transport priority signal coordinating timing method
CN110021161B (en) * 2018-01-09 2021-12-21 株式会社日立制作所 Traffic flow direction prediction method and system
CN109345844B (en) * 2018-11-05 2021-02-19 哈尔滨工业大学 Intersection stop bus left lane changing pre-signal control method
CN110516846A (en) * 2019-07-26 2019-11-29 浙江工业大学 Intersection turning rate prediction technique based on LSTM neural network
CN112802326B (en) * 2019-11-13 2022-03-04 阿波罗智联(北京)科技有限公司 Traffic scheme control method and device
CN112365714B (en) * 2020-11-11 2022-05-10 武汉工程大学 Traffic signal control method for intersection of intelligent rail passing main branch road
CN112652179B (en) * 2020-12-17 2023-03-31 黑龙江省交通运输信息和规划研究中心(黑龙江省收费公路联网运营结算中心) Bus priority passing signal control method and system under cooperative vehicle and road environment
CN112652177B (en) * 2020-12-17 2022-02-11 北京建筑大学 Bus pre-signal priority control method and system based on space-time characteristics
CN112937604B (en) * 2021-03-03 2022-07-29 福瑞泰克智能系统有限公司 Lane changing processing method, device and equipment and vehicle

Also Published As

Publication number Publication date
CN113409599A (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN113409599B (en) Urban public transport priority coordination control method based on information prediction
CN109300306B (en) Intersection variable guide lane, signal lamp and vehicle track collaborative optimization method under cooperative vehicle and road environment
CN107016857B (en) Signal control intersection left-turn traffic combination design optimization method
CN107248297B (en) Intersection rasterized signal phase duration calculation method under cooperative vehicle and road environment
CN109949587B (en) Method for coordinating, controlling and optimizing signals of bus lanes at adjacent intersections
CN107016858B (en) Pre-signal control method for intersection multi-flow direction waiting area and dislocation type stop line
CN108986509B (en) Urban area path real-time planning method based on vehicle-road cooperation
CN109448403B (en) Bus signal priority necessity analysis method under trunk line coordination control
JP6183864B2 (en) Method and system for adapting vehicle traffic flow
Kamal et al. Intersection vehicle cooperative eco-driving in the context of partially connected vehicle environment
CN113487868B (en) Bus dynamic speed guidance-standing station control-signal priority cooperative control method
CN114999207B (en) Bus ecological approach guiding method in intelligent network connection environment
CN104183145B (en) The main line of communication three crossing control work zone two-way green wave coordination control method
CN115035704B (en) Pedestrian signal advance phase setting method for signal control intersection
Xu et al. Traffic signal coordination control for arterials with dedicated CAV lanes
CN113506442B (en) Urban road network traffic signal lamp control method based on expected income estimation
Li et al. A cooperative traffic control for the vehicles in the intersection based on the genetic algorithm
CN112017439A (en) Control method for pedestrian crossing ferry vehicle at automatic driving intersection
CN113947889A (en) Pedestrian crossing control method for automatic driving intersection
CN112258861A (en) Method for setting crossing pedestrian crossing ferry vehicle running channel in automatic driving environment
CN115565390A (en) Intelligent internet automobile multi-lane queue traffic control method and system and computer readable storage medium
CN112687115B (en) Method for controlling crossing of road between running path and road section of automatic pedestrian-driven connection vehicle
CN105741585A (en) Fuel-economizing-oriented vehicle track smoothing control method based on Internet-of-vehicles
CN112489457B (en) Intersection vehicle passing guiding method in automatic driving environment
JP2012068721A (en) Vehicle group operation management device and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant